Thruway Only Projects

Future Projects

  • MP 278.90: Tarbell Road Maintenance Building (M3341) - Reconfigure/Refurbish
  • MP 141.9: Albany Maintenance Facility - Replace Metal Building
  • MP 324 WB: Junius Ponds Service Area - Rehabilitate/Replace Wastewater Treatment Plant
  • MP NE5.76: North Avenue Bridge over I-95 (New England Thruway) (Phase 3): Replacement
  • Replacement of the Manchester Interchange (Exit 43) and Chapin-Palmyra Bridges, Pavement Resurfacing between the Bridges (East of Manchester, Exit 43) and Replacement of the Sulphur Brook Culverts at MP 335.20
  • Syracuse Division: On-Demand Repair Contract - 2021-2022
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $2,000,000.00
  • Buffalo Division: On-Demand Repair Contract - 2020-2021
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $2,000,000.00
  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2020
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2020
    • Location: S. GRAND IS. SB (OLD) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $800,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2020
    • Location: S. GRAND IS. NB (NEW) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $800,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2020
    • Location: NORTH GRAND ISLAND SB (NEW) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $800,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2020
    • Location: NORTH GRAND ISLAND NB (OLD) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $800,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • MP 81.72: Thruway Bridge over Wallkill River - Rehabilitation
  • East of Westfield (MP 483.0) to Pennsylvania State Line (MP 496.0) Eastbound: Pavement Resurfacing
  • Little Falls (Exit 29A, MP 210.3) to Herkimer (Exit 30, MP 220.0): Pavement Resurfacing
  • West of Pembroke (MP 404.7) to Depew (Exit 49, MP 416.9): Pavement Resurfacing and Replacement of I-190 (Niagara Section) Highway Lighting from ExIt 7 to Exit 14
  • Construct Sandblast Booth in Buffalo Division
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $750,000.00
  • MP 252.71: Verona Maintenance - Construct Municipal Sewer / Water Connections
  • Buffalo Division: Variable Message Sign and CCTV Replacements at Various Locations
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $4,000,000.00
  • Construct Sandblast Booth in New York Division
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $750,000.00
  • MP 607.0: Larchmont Maintenance Section - Building Additions and Renovations
  • MP 906.58: Porter Avenue Bridge over Thruway - Replacement (part of NYSDOT's Peace Bridge Gateway project)
  • New York Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: AIRMONT ROAD (EB) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,800,000.00
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • New York Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: GARDEN STATE PARKWAY CONN. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,800,000.00
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • New York Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: HACKENSACK RIVER Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,800,000.00
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • New York Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: LINCOLN PARK PED. OVERPAS Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,800,000.00
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • New York Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: NJ STATE L.-CONGERS RT.303 Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,800,000.00
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • New York Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: SMITH CLOVE ROAD Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,800,000.00
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • New York Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: SUFFERN INTERCHANGE RAMP C Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,800,000.00
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • New York Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: TAYLOR ROAD Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,800,000.00
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • MP 475.25 and MP 475.26: I-90 Bridges over CSX & Norfolk Southern RR - Rehabilitations
    • Location: NYCRR , PENN RR & NPRR (WB) Bridge
    • Estimated Letting Year: 2021
    • Approved Construction Amount: $10,000,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 475.25 and MP 475.26: I-90 Bridges over CSX & Norfolk Southern RR - Rehabilitations
    • Location: NYCRR, PENN RR & NPRR (EB) Bridge
    • Estimated Letting Year: 2021
    • Approved Construction Amount: $10,000,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Design-Build Contract to Replace 7 Buffalo Division Bridges - MP 411.60 Ransom Rd, MP 420.34 Int. 50 NB Ramp to I-290, MP 420.36 SB Ramp over Wherle Dr. I-290, MP 900.37 Rossler St., MP 901.06 Weiss St., MP 915.46 Beaver Island State Parkway over I-190, and MP 917.27 Whitehaven Rd over I-190
  • MP 12.85: Improvements to I-87 Interchange 9 Ramp Intersection with Route 9 and Construct Route 9/I-87 Pedestrian Bridge
  • Berkshire Thruway, West of Exit B-1 (MP BS5.7) to East of Canaan Toll Barrier (MP BS19.9): Pavement Resurfacing and Safety Upgrades
  • East of Fulton (MP 289.3) to west of Weedsport (MP 304.5): Concrete Pavement Restoration
  • Statewide: Pavement Safety Striping - 2021
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $1,700,000.00
  • Albany and Syracuse Divisions: Pavement Safety Striping - 2018
  • Statewide: Pavement Safety Striping - 2019
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,700,000.00
  • MP BS14.25: Berkshire Thruway, west of Taconic Parkway - Rock Removal and Highway Resurfacing
    • Location: B - MP: 812.7 to 815.7
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $9,000,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP BS14.25: Berkshire Thruway, west of Taconic Parkway - Rock Removal and Highway Resurfacing
  • Nyack and Harriman Maintenance Sections - Construction of Vehicle Wash Bays and Equipment Storage
  • MP 607.7: Larchmont Maintenance - Replace Existing Metal Building
  • MP 91.4: Kingston Maintenance Section - Replace Salt Shed
  • MP's 310 EB and 337 EB: Port Byron and Clifton Springs Service Areas - Rehabilitate/Replace Wastewater Treatment Plants and Replace Waterline
    • Location: Clifton Springs Service Area
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,200,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP's 310 EB and 337 EB: Port Byron and Clifton Springs Service Areas - Rehabilitate/Replace Wastewater Treatment Plants and Replace Waterline
    • Location: Port Byron Service Area
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,200,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 210.62: Thruway Westbound Bridge over Little Falls Interchange Ramp (Exit 29A) - Rehabilitation
    • Location: LITTLE FALLS INTER. (EB) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $3,000,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 210.62: Thruway Westbound Bridge over Little Falls Interchange Ramp (Exit 29A) - Rehabilitation
    • Location: LITTLE FALLS INTER. (WB) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $3,000,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP BS15.09: Taconic Parkway (Exit B2) Ramp Bridge over Berkshire Thruway - Replacement
  • MP 485.59, MP 485.60 and MP 485.86: Chautauqua Creek (Eastbound & Westbound) and Hawley Street Bridges - Rehabilitations
    • Location: CHAUTAUQUA CREEK (EB) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 485.59, MP 485.60 and MP 485.86: Chautauqua Creek (Eastbound & Westbound) and Hawley Street Bridges - Rehabilitations
    • Location: CHAUTAUQUA CREEK (WB) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 485.59, MP 485.60 and MP 485.86: Chautauqua Creek (Eastbound & Westbound) and Hawley Street Bridges - Rehabilitations
    • Location: HAWLEY STREET Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2021
  • I-95 (New England Thruway), Highway Replacement from Port Chester (MP NE14.1) to Connecticut State Line (MP NE15.0), Replacement of the CWE Ramp (EB) over I-95 and Grace Street over I-95 Bridges and Rehabilitation of Four I-95 Bridges
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $3,000,000.00
  • West of Utica (MP 233.5) to Verona (Exit 33, MP 252.2): Pavement Resurfacing and Drainage Improvements at Mindenville (MP 205.05 WB)
  • MP 33.20: Sloatsburg Pedestrian Overpass - Roof Replacement
  • Construct Sandblast Booth in Albany Division
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $750,000.00
  • MP 103.0: Malden Service Area: Pitched Roof Replacement
  • MP N0.70 SB: Construction of New Salt Shed at Niagara Interchange
  • Renovation of Two Syracuse Division Section Maintenance Buildings
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,750,000.00
  • MP's 210 WB and 266 WB: Iroquois and Chittenango Service Areas - Rehabilitate/Replace Wastewater Treatment Plants
    • Location: Chittenango Service Area
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,200,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP's 210 WB and 266 WB: Iroquois and Chittenango Service Areas - Rehabilitate/Replace Wastewater Treatment Plants
    • Location: Iroquois Service Area
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,200,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Replacement of Two New York Division Mainline Bridges over the RR at MP 306.72 and MP 326.74
  • South Grand Island Bridge Maintenance Cleaning for Steel Preservation - 2018
    • Location: S. GRAND IS. NB (NEW) Bridge
    • Estimated Letting Year: 2017
    • Approved Construction Amount: $400,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • South Grand Island Bridge Maintenance Cleaning for Steel Preservation - 2018
    • Location: S. GRAND IS. SB (OLD) Bridge
    • Estimated Letting Year: 2017
    • Approved Construction Amount: $400,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Albany Division: On-Demand Repair Contract - 2020-2021
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $2,000,000.00
  • MP 454.47: Thruway over Cattaraugus Creek Bridge - Rehabilitation
  • I-287/Route 17S (Exit 15, MP 29.4) to north of Suffern (MP 38.7): Pavement Resurfacing
  • North of Sloatsburg (MP 38.7) to South of Harriman (MP 43.5): Pavement Resurfacing
  • New York Division: Pavement Safety Striping - 2018
    • Estimated Letting Year: 2017
    • Approved Construction Amount: $850,000.00
  • New Facilities for All Electronic Toll Collection at Harriman Toll Barrier (Exit 16, MP 45.2)
  • Replacement of ITS Equipment Statewide
    • Estimated Letting Year: 2021
    • Approved Construction Amount: $.00
  • Rockland Shared Use Path at Interchange 10 for New NY Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $15,000,000.00
  • MP 423.19: Walden Avenue Maintenance Facility - Replace Metal Buildings and Construct Vehicle Wash Bay
  • Syracuse Division: Upgrade Waste Water Treatment Plants Division-Wide
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $2,000,000.00
  • Statewide: Replacement of Maintenance Facility Roofs
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $1,000,000.00
  • MP 128.08: Thruway Bridge over Hannacroix Creek - Rehabilitation
  • Rehabilitation of Five I-95 (New England Thruway) Bridges
    • Location: BAYCHESTER AVE. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,500,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Rehabilitation of Five I-95 (New England Thruway) Bridges
    • Location: PED. OVERPASS 222ND ST. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,500,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Rehabilitation of Five I-95 (New England Thruway) Bridges
    • Location: PED. OVERPASS DYRE AVE. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,500,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2018
  • Albany Division: Bridge Steel Repairs/Pin and Hanger Work for Major Truss Bridges
  • MP 327.54: Thruway Bridge over Canandiagua Outlet - Replacement
  • Rehabilitation of 15 Albany Division Bridges
    • Location: AMSTERDAM-MINAVILLE RT. 30 Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: BEAVER DAM RD. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: CANOE HILL ROAD Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: CATSKILL CREEK Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: COUNTY RD. 27 Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: COUNTY ROAD #18 EB Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: MAIN ST RT 30A Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: MUITZES KILL (EB) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: NYCRR (WEST SHORE) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: PLAST RD. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: RONDOUT CREEK Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: SERVICE AREA RAMPS Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: WESTERLO ST. RT. 143 Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: WESTERN AVE. RT. 20 Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Rehabilitation of 15 Albany Division Bridges
    • Location: WOODWARD ROAD (WB) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $3,500,000.00
    • View this project location on the map (Note: This is 1 of 15 locations for this project)
  • Statewide: Bridge Preservation for Various Bridges - 2020
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $10,000,000.00
  • MP 801.08: Castleton Bridge - Rehabilitation
  • Statewide: Bridge Preservation for Various Bridges Statewide - 2021
    • Estimated Letting Year: 2021
    • Approved Construction Amount: $10,000,000.00
  • East of Fultonville (MP 180.0) to east of Little Falls (MP 197.9): Pavement Resurfacing
  • South of Nyack (MP 16.2) to south of Spring Valley Toll Barrier: Pavement Resurfacing
  • I-95, New England Thruway: Pavement Rehabilitation/Replacement- 2019
  • Major Deegan Expressway (MP 0.00) to Cross Westchester Expressway (Exit 8, MP 11.3): Pavement Resurfacing
  • Construction of the Permanent All Electronic Toll Collection Facility at the New NY Bridge
  • MP 304.2: Weedsport Maintenance - Construct Municipal Sewer / Water Connections
  • MP 33: Ramapo and Sloatsburg Service Areas - Demolition of Aging Wastewater Facility and Construct Connection to Municipal System
    • Location: Ramapo Service Area
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,450,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 33: Ramapo and Sloatsburg Service Areas - Demolition of Aging Wastewater Facility and Construct Connection to Municipal System
    • Location: Sloatsburg Service Area
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,450,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 427.95: Route 400 Ramp Bridge over Harlem Road - Replacement (part of a NYSDOT Project)
  • New York Division: Paint 4 Bridges with Poor Paint Condition Ratings
    • Location: ERIE RR & 9W NB RAMP Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $5,000,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • New York Division: Paint 4 Bridges with Poor Paint Condition Ratings
    • Location: FOURTH STREET Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $5,000,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • New York Division: Paint 4 Bridges with Poor Paint Condition Ratings
    • Location: FRANKLIN ST. EXTENSION Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $5,000,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • New York Division: Paint 4 Bridges with Poor Paint Condition Ratings
    • Location: SPRING VALLEY-SUFFERN RT.59 Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $5,000,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2019
    • Location: S. GRAND IS. NB (NEW) Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $800,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2019
    • Location: S. GRAND IS. SB (OLD) Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $800,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: BABCOCK ST. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: BRIGHAM ROAD (CR 98B) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: CHAUTAUQUA CREEK (EB) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: CHAUTAUQUA CREEK (WB) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: DEPEW INTERCHANGE Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: EVANS CENTER - EDEN RD. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: FRONTIER FUEL OIL SIDING Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: GENESEE ST. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: GEORGE URBAN BLVD. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: KENSINGTON EXPRY.-RT. 33 Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: LAKE AVE. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: LONG ROAD Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: MAIN ST. EXT. & NYCRR Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: MAIN ST. EXT. & NYCRR Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: NYCRR (NIAG. ST. RAMPS SB) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: O'BRIEN ROAD Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: PEABODY ST. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: PITTSFORD-MENDON RT. 64 Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: RAMP "B" SKYWAY TO TWY SB Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: SOUTH ROBERTS ROAD (CR 136) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: TWY NB OFF TO SCAJ EB Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: VAN VOORHIS RD. Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: W. HENRIETTA-ROCH. RT. 15 Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • Buffalo Division Substructure and Joint Repairs on Various Bridges - 2018
    • Location: WEHRLE DRIVE Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $5,500,000.00
    • View this project location on the map (Note: This is 1 of 24 locations for this project)
  • New York Division: On-Demand Repair Contract - 2021-2022
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $2,000,000.00
  • Statewide: Various Culvert Rehabilitations/Replacements - 2020
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $3,500,000.00
  • Statewide: Pavement Safety Striping - 2022
    • Estimated Letting Year: 2021
    • Approved Construction Amount: $1,700,000.00
  • East of Amsterdam (MP 170.0) to east of Fultonville (MP 180.0): Pavement Resurfacing
  • Weedsport (Exit 40, MP 304.5) to east of Waterloo (MP 313.8): Pavement Resurfacing
  • Statewide: Pavement Safety Striping - 2020
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,700,000.00
  • Replacement of ITS Equipment in Albany Division
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $2,500,000.00
  • Construct Sandblast Booth in Syracuse Division
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $750,000.00
  • MP 45.2 and MP 607.7: Replacement of Deteriorated Roofs at the Harriman and Larchmont Maintenance Sections
  • MP 45.2 and MP 607.7: Replacement of Deteriorated Roofs at the Harriman and Larchmont Maintenance Sections
  • Harriman Maintenance Section and Toll Building (Exit 16, MP 45.2): Connect to Municipal Water, Sewer and Gas
  • Harriman Maintenance Section and Toll Building (Exit 16, MP 45.2): Connect to Municipal Water, Sewer and Gas
  • MP 278.90: Tarbell Complex Main Building - Roof Replacement
  • MP 366 EB, 376 WB and 397 EB: Scottsville, Ontario and Pembroke Service Areas - Replace Flat Roofs
    • Location: Ontario Service Area
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 366 EB, 376 WB and 397 EB: Scottsville, Ontario and Pembroke Service Areas - Replace Flat Roofs
    • Location: Pembroke Service Area
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 366 EB, 376 WB and 397 EB: Scottsville, Ontario and Pembroke Service Areas - Replace Flat Roofs
    • Location: Scottsville Service Area
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 112.57: Leeds-Old Kings Highway Bridge over Thruway - Replacement
  • Replace 3 Bridges in Syracuse Division in the Exits 39/40 area (from MP 292.06 to MP 310.98)
  • North and South Grand Island Bridges: Retrofit / Repair Roller Bearings, Pins and Hangers and North Grand Island Bridges - Steel Repairs and South Grand Island Bridges - Replace Sidewalks
    • Location: NORTH GRAND ISLAND NB (OLD) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $20,000,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • North and South Grand Island Bridges: Retrofit / Repair Roller Bearings, Pins and Hangers and North Grand Island Bridges - Steel Repairs and South Grand Island Bridges - Replace Sidewalks
    • Location: NORTH GRAND ISLAND SB (NEW) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $20,000,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • North and South Grand Island Bridges: Retrofit / Repair Roller Bearings, Pins and Hangers and North Grand Island Bridges - Steel Repairs and South Grand Island Bridges - Replace Sidewalks
    • Location: S. GRAND IS. NB (NEW) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $20,000,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • North and South Grand Island Bridges: Retrofit / Repair Roller Bearings, Pins and Hangers and North Grand Island Bridges - Steel Repairs and South Grand Island Bridges - Replace Sidewalks
    • Location: S. GRAND IS. SB (OLD) Bridge
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $20,000,000.00
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • MP N20.35 and MP N21.12: North Grand Island Southbound and Northbound Bridges - Painting
    • Location: NORTH GRAND ISLAND NB (OLD) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $37,500,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP N20.35 and MP N21.12: North Grand Island Southbound and Northbound Bridges - Painting
    • Location: NORTH GRAND ISLAND SB (NEW) Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $37,500,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • I-95 New England Thruway Viaduct, Railroad Span, (MP 605.09), Chatsworth Ave over I-95, (MP 607.64) Rehabilitaions and Larchmont Station Plaza Substructure Repairs, (MP 607.72)
  • MP 434.48 EB and 434.49 WB: Thruway Bridges over Erie RR - Rehabilitations
    • Location: ERIE RR (EB) Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 434.48 EB and 434.49 WB: Thruway Bridges over Erie RR - Rehabilitations
    • Location: ERIE RR (WB) Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 434.85: South Park Ave. (Route 62) Bridge over Thruway - Replacement
  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2019
  • Design-Build Contract to Replace 8 Syracuse Division Bridges from MP 219.91 to MP 262.01
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2021
    • Location: S. GRAND IS. NB (NEW) Bridge
    • Estimated Letting Year: 2021
    • Approved Construction Amount: $.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2021
    • Location: S. GRAND IS. SB (OLD) Bridge
    • Estimated Letting Year: 2021
    • Approved Construction Amount: $.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • New York Division: On-Demand Repair Contract - 2018-2019
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,000,000.00
  • Pavement Replacement from Electronics Parkway (Exit 37, MP 284.1) to I-690 (Exit 39, MP 289.3), Replacement of the Electronics Parkway Interchange (Exit 37) Ramp Bridge, Repalcement of the Thuway Bridge over CSX Railroad (Geddes), and Rehabilitation of Two Bridges
  • East of Amsterdam (MP 170.0) to east of Little Falls (MP 197.9): Safety Upgrades
  • I-95, New England Thruway: Pavement Rehabilitation/Replacement - 2021
  • East of Silver Creek (MP 451.5) to Silver Creek (Exit 58, MP 455.2): Pavement Rehabilitation
  • Buffalo and Syracuse Divisions: Pavement Safety Striping - 2018
    • Location: ML - MP: 350.6 to 496
    • Estimated Letting Year: 2017
    • Approved Construction Amount: $900,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Buffalo and Syracuse Divisions: Pavement Safety Striping - 2018
    • Location: N - MP: 900 to 921.21
    • Estimated Letting Year: 2017
    • Approved Construction Amount: $900,000.00
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Statewide: Weigh-in-Motion Equipment Installations
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $4,000,000.00
  • Replacement of ITS Equipment in New York Division
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $6,000,000.00
  • MP 278.9: Syracuse Maintenance Facility - Replace Metal Building
  • MP 210.0: Iroquois Service Area - Roof Replacement
  • Statewide: Rehabilitation of Maintenance Facilities
    • Estimated Letting Year: 2021
    • Approved Construction Amount: $2,000,000.00
  • Statewide: Bridge Painting at Various Locations
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $12,000,000.00
  • Albany Division: Bridge Scour Repairs at Various Locations
    • Location: AURIES CREEK Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 6 locations for this project)
  • Albany Division: Bridge Scour Repairs at Various Locations
    • Location: CHUCTANUNDA CREEK Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 6 locations for this project)
  • Albany Division: Bridge Scour Repairs at Various Locations
    • Location: RESERVOIR CREEK & RD. Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 6 locations for this project)
  • Albany Division: Bridge Scour Repairs at Various Locations
    • Location: RONDOUT CREEK Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 6 locations for this project)
  • Albany Division: Bridge Scour Repairs at Various Locations
    • Location: TERWILLEGER CREEK Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 6 locations for this project)
  • Albany Division: Bridge Scour Repairs at Various Locations
    • Location: VAN WIE CREEK Bridge
    • Estimated Letting Year: 2019
    • Approved Construction Amount: $1,000,000.00
    • View this project location on the map (Note: This is 1 of 6 locations for this project)
  • MP 362.44: West Henrietta Interchange Bridge over Thruway - Replacement
  • MP 436.70: Thruway Bridge over Camp Road (Exit 57) - Removal
  • Syracuse Division: On-Demand Repair Contract - 2019-2020
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $2,000,000.00
  • South of Coxsackie (MP 121.2) to south of Albany (MP 141.9): Pavement Resurfacing, including New Baltimore Service Area (MP 127.0)
  • South of Coxsackie (MP 121.2) to south of Albany (MP 141.9): Pavement Resurfacing, including New Baltimore Service Area (MP 127.0)
  • Replacement of ITS Equipment in Syracuse Division
    • Estimated Letting Year: 2020
    • Approved Construction Amount: $2,500,000.00
  • Tappen Zee High School - Green Infrastructure Project for New NY Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,600,000.00
  • Oyster Bed Restoration for New NY Bridge
    • Estimated Letting Year: 2018
    • Approved Construction Amount: $1,300,000.00

Go to Top | Bottom

Under Construction Projects

  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: WILLIAM ST. Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: WALDEN AVE. (INTER.) Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: W. SHORE RR & SCAJAQUADA CR Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: SHADAGEE RD & 18 MILE CR WB Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: SHADAGEE RD & 18 MILE CR EB Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: RAMP "E" OVER WILLOW RD. Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: N.Y.C.R.R. Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: N.Y.C.R.R. (MAIN) Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: ML - MP: 350.77
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: ERIE L.V. & DL. & W. RR'S Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: ELLICOTT CREEK Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
    • Location: BROADWAY Bridge
    • Letting Date: 06/08/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $7,048,769.00
    • Contract Number: TAB 16-29B/D214493
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map (Note: This is 1 of 12 locations for this project)
  • MP 191.32: Thruway Bridge over Flat Creek - Replacement
    • Location: FLAT CREEK Bridge
    • Letting Date: 10/04/2017
    • Estimated Completion Year: 2019
    • Low Bid Amount: $7,791,645.00
    • Contract Number: TAA 17-33B/D214582
    • Contractor: Bette & Cring, LLC.
    • View this project location on the map
  • MP 63.16: Union Avenue Bridge over Thruway - Rehabilitation and MP 67.86: Route 32 Bridge over Thruway - Replacement
    • Location: UNION AVENUE Bridge
    • Letting Date: 05/03/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,804,804.80
    • Contract Number: TANY 17-27B/D214572
    • Contractor: Harrison & Burrowes Bridge Construction, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 63.16: Union Avenue Bridge over Thruway - Rehabilitation and MP 67.86: Route 32 Bridge over Thruway - Replacement
    • Location: PLATTEKILL-MODENA RT. 32 Bridge
    • Letting Date: 05/03/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,804,804.80
    • Contract Number: TANY 17-27B/D214572
    • Contractor: Harrison & Burrowes Bridge Construction, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • North of Garden State Parkway Connector (MP 24.1) to south of I-287/Route 17S (Exit 15, MP 29.4) and Garden State Parkway Connector (MP GS0.00 to MP GS2.40): Safety Upgrades
    • Location: ML - MP: 26.87
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $19,189,120.29
    • Contract Number: TANY 17-18R/D214564
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • North of Garden State Parkway Connector (MP 24.1) to south of I-287/Route 17S (Exit 15, MP 29.4) and Garden State Parkway Connector (MP GS0.00 to MP GS2.40): Safety Upgrades
    • Location: ML - MP: 24.1 to 29.4
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $19,189,120.29
    • Contract Number: TANY 17-18R/D214564
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • North of Garden State Parkway Connector (MP 24.1) to south of I-287/Route 17S (Exit 15, MP 29.4) and Garden State Parkway Connector (MP GS0.00 to MP GS2.40): Safety Upgrades
    • Location: ML - MP: 23.77
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $19,189,120.29
    • Contract Number: TANY 17-18R/D214564
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • North of Garden State Parkway Connector (MP 24.1) to south of I-287/Route 17S (Exit 15, MP 29.4) and Garden State Parkway Connector (MP GS0.00 to MP GS2.40): Safety Upgrades
    • Location: ML - MP: 22.11
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $19,189,120.29
    • Contract Number: TANY 17-18R/D214564
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • North of Garden State Parkway Connector (MP 24.1) to south of I-287/Route 17S (Exit 15, MP 29.4) and Garden State Parkway Connector (MP GS0.00 to MP GS2.40): Safety Upgrades
    • Location: ML - MP: 18.06
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $19,189,120.29
    • Contract Number: TANY 17-18R/D214564
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • New York Division: On-Demand Repair Contract - 2017-2018
    • Letting Date: 12/14/2016
    • Estimated Completion Year: 2019
    • Low Bid Amount: $2,054,000.00
    • Contract Number: TANY 16-36BR/D214513
    • Contractor: HVB Construction, Inc.
  • Victor (Exit 45, MP 351.0) to I-390 (Exit 46, MP 362.5) and LeRoy/I-490 (MP 378.27, Exit 47) to west of Pembroke (MP 404.7): Pavement Resurfacing
    • Location: ML - MP: 378.2 to 404.7
    • Letting Date: 02/22/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $9,896,026.00
    • Contract Number: TAB 17-6/D214530
    • Contractor: Cold Spring Construction Company
    • View this project location on the map
  • MP's 227 WB, 280 EB, 292 WB and 310 EB: Replacement of Deteriorated Flat Roofs at the Schuyler, DeWitt, Warners and Port Byron Service Areas
    • Location: Warners Service Area
    • Letting Date: 03/04/2015
    • Estimated Completion Year: 2015
    • Low Bid Amount: $1,066,540.00
    • Contract Number: TAS 15-6A/D214372
    • Contractor: Henderson-Johnson Co., Inc.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • MP's 227 WB, 280 EB, 292 WB and 310 EB: Replacement of Deteriorated Flat Roofs at the Schuyler, DeWitt, Warners and Port Byron Service Areas
    • Location: Schuyler Service Area
    • Letting Date: 03/04/2015
    • Estimated Completion Year: 2015
    • Low Bid Amount: $1,066,540.00
    • Contract Number: TAS 15-6A/D214372
    • Contractor: Henderson-Johnson Co., Inc.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • MP's 227 WB, 280 EB, 292 WB and 310 EB: Replacement of Deteriorated Flat Roofs at the Schuyler, DeWitt, Warners and Port Byron Service Areas
    • Location: Port Byron Service Area
    • Letting Date: 03/04/2015
    • Estimated Completion Year: 2015
    • Low Bid Amount: $1,066,540.00
    • Contract Number: TAS 15-6A/D214372
    • Contractor: Henderson-Johnson Co., Inc.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • MP's 227 WB, 280 EB, 292 WB and 310 EB: Replacement of Deteriorated Flat Roofs at the Schuyler, DeWitt, Warners and Port Byron Service Areas
    • Location: Dewitt Service Area
    • Letting Date: 03/04/2015
    • Estimated Completion Year: 2015
    • Low Bid Amount: $1,066,540.00
    • Contract Number: TAS 15-6A/D214372
    • Contractor: Henderson-Johnson Co., Inc.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • MP 23.09: Thruway over Pascack Road; MP 23.62: Scotland Hill Road over Thruway; and MP 25.10: Thruway over Saddle River Road Bridges: Rehab
    • Location: SCOTLAND HILL ROAD Bridge
    • Letting Date: 05/25/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $11,122,588.50
    • Contract Number: TANY 16-18BR/D214454
    • Contractor: Joseph M Sanzari, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 23.09: Thruway over Pascack Road; MP 23.62: Scotland Hill Road over Thruway; and MP 25.10: Thruway over Saddle River Road Bridges: Rehab
    • Location: SADDLE RIVER RD. RT. 306 Bridge
    • Letting Date: 05/25/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $11,122,588.50
    • Contract Number: TANY 16-18BR/D214454
    • Contractor: Joseph M Sanzari, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 23.09: Thruway over Pascack Road; MP 23.62: Scotland Hill Road over Thruway; and MP 25.10: Thruway over Saddle River Road Bridges: Rehab
    • Location: PASCACK ROAD Bridge
    • Letting Date: 05/25/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $11,122,588.50
    • Contract Number: TANY 16-18BR/D214454
    • Contractor: Joseph M Sanzari, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 376 WB: Ontario Service Area - Replace Pitched Roof
    • Location: Ontario Service Area
    • Letting Date: 02/01/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $258,752.00
    • Contract Number: TAB 17-17A/D214563
    • Contractor: Summit Enterprises Contracting Corporation
    • View this project location on the map
  • MP 407.27: South Newstead Road Bridge over Thruway - Replacement
    • Location: SO. NEWSTEAD RD. Bridge
    • Letting Date: 01/21/2015
    • Estimated Completion Year: 2015
    • Low Bid Amount: $4,868,000.79
    • Contract Number: TAB 14-28B/D214312
    • Contractor: Sealand Contractors Corporation
    • View this project location on the map
  • Syracuse Division: Bridge Culvert Repairs at Various Locations
    • Location: LEY CREEK Bridge
    • Letting Date: 02/10/2016
    • Estimated Completion Year: 2016
    • Low Bid Amount: $1,329,986.00
    • Contract Number: TAS 16-1B/D214432
    • Contractor: CP Ward, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • Syracuse Division: Bridge Culvert Repairs at Various Locations
    • Location: ML - MP: 334.01
    • Letting Date: 02/10/2016
    • Estimated Completion Year: 2016
    • Low Bid Amount: $1,329,986.00
    • Contract Number: TAS 16-1B/D214432
    • Contractor: CP Ward, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • Syracuse Division: Bridge Culvert Repairs at Various Locations
    • Location: ML - MP: 341.53
    • Letting Date: 02/10/2016
    • Estimated Completion Year: 2016
    • Low Bid Amount: $1,329,986.00
    • Contract Number: TAS 16-1B/D214432
    • Contractor: CP Ward, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • Albany Division: Various Culvert Rehabilitations/Replacements - 2016
    • Location: ML - MP: 78 to 185
    • Letting Date: 12/28/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $2,595,628.88
    • Contract Number: TAA 16-19/D214437
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map
  • East Syracuse (MP 279.3) to Syracuse - Electronics Parkway (MP 284.1): Pavement Resurfacing and MP 284.1 to MP 289.3 - Interim Pavement Repairs
    • Location: ML - MP: 279.3 to 284.1
    • Letting Date: 04/05/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $9,933,358.85
    • Contract Number: TAS 17-8/D214544
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • East Syracuse (MP 279.3) to Syracuse - Electronics Parkway (MP 284.1): Pavement Resurfacing and MP 284.1 to MP 289.3 - Interim Pavement Repairs
    • Location: ML - MP: 284.1 to 289.3
    • Letting Date: 04/05/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $9,933,358.85
    • Contract Number: TAS 17-8/D214544
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP's 455.5, 485.0 and N13.35: Silver Creek, Westfield and Niagara Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: ML - MP: 455.5
    • Letting Date: 02/15/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,297,000.00
    • Contract Number: TAB 17-14A/D214559
    • Contractor: Nichter Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP's 455.5, 485.0 and N13.35: Silver Creek, Westfield and Niagara Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: ML - MP: 485
    • Letting Date: 02/15/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,297,000.00
    • Contract Number: TAB 17-14A/D214559
    • Contractor: Nichter Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP's 455.5, 485.0 and N13.35: Silver Creek, Westfield and Niagara Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: N - MP: 913.35
    • Letting Date: 02/15/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,297,000.00
    • Contract Number: TAB 17-14A/D214559
    • Contractor: Nichter Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 219.7: Herkimer Maintenance Section: Equipment Storage Building Wash Bay
    • Location: ML - MP: 219.7
    • Letting Date: 01/18/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $451,000.00
    • Contract Number: TAS 17-16A/D214561
    • Contractor: Beebe Construction Services
    • View this project location on the map
  • Syracuse Division: On-Demand Repair Contract - 2017-2018
    • Letting Date: 11/23/2016
    • Estimated Completion Year: 2019
    • Low Bid Amount: $1,998,000.00
    • Contract Number: TAS 16-47B/D214547
  • Canastota (Exit 34, MP 262.0) to west of Syracuse (MP 279.3): Pavement Resurfacing
    • Location: ML - MP: 268 to 279.3
    • Letting Date: 11/09/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $9,484,350.44
    • Contract Number: TAS 16-31/D214448
    • Contractor: Dolomite Products Co., Inc. DBA A.L. Blades
    • View this project location on the map
  • East of Williamsville Toll Barrier (MP 419.4) to west of Buffalo-Williams Street (Exit 52A, MP 425.9) and Lackawanna Toll Barrier (MP 430.4) to west of Hamburg (MP 438.6): Pavement Resurfacing
    • Location: ML - MP: 430.4 to 438.6
    • Letting Date: 12/21/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $4,982,518.50
    • Contract Number: TAB 16-44/D214531
    • Contractor: D&H Excavating, Inc.
    • View this project location on the map
  • North of Catskill (MP 115.6 to MP 116.0 SB and MP 115.3 to MP 116.0 NB): Rock Removal
    • Location: ML - MP: 115.3 to 116
    • Letting Date: 11/23/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $4,095,771.25
    • Contract Number: TAA 16-41/D214558
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • North of Catskill (MP 115.6 to MP 116.0 SB and MP 115.3 to MP 116.0 NB): Rock Removal
    • Location: ML - MP: 115.6 to 116
    • Letting Date: 11/23/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $4,095,771.25
    • Contract Number: TAA 16-41/D214558
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Replacement of the Newburgh Interchange (Exit 17) and Drainage Improvements at MP 60.95
    • Location: NEWBURGH INTERCHANGE Bridge
    • Letting Date: 09/27/2017
    • Estimated Completion Year: 2019
    • Low Bid Amount: $11,165,222.73
    • Contract Number: TANY 17-32B/D214579
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map
  • MP 920.35: North Grand Island Bridge Northbound - Bridge Deck Overlay
    • Location: NORTH GRAND ISLAND NB (OLD) Bridge
    • Letting Date: 10/05/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $8,481,412.50
    • Contract Number: TAN 16-32B/D214503
    • Contractor: Oakgrove Construction Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 920.35: North Grand Island Bridge Northbound - Bridge Deck Overlay
    • Location: NORTH GRAND ISLAND SB (NEW) Bridge
    • Letting Date: 10/05/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $8,481,412.50
    • Contract Number: TAN 16-32B/D214503
    • Contractor: Oakgrove Construction Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 920.35: North Grand Island Bridge Northbound - Bridge Deck Overlay
    • Location: RAMP NO. GRAND ISLAND Bridge
    • Letting Date: 10/05/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $8,481,412.50
    • Contract Number: TAN 16-32B/D214503
    • Contractor: Oakgrove Construction Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Buffalo Division: On-Demand Repair Contract - 2017-2019
    • Letting Date: 09/20/2017
    • Estimated Completion Year: 2019
    • Low Bid Amount: $2,952,600.00
    • Contract Number: TAB 17-40B/D214593
    • Contractor: Union Concrete and Construction Corporation
  • South of Kingston (MP 86.8) to south of Saugerties (MP 93.8): Pavement Resurfacing
    • Location: ML - MP: 86.8 to 93.8
    • Letting Date: 03/29/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $12,092,049.40
    • Contract Number: TAA 17-19/D214565
    • Contractor: Callanan Industries, Inc.
    • View this project location on the map
  • Canandaigua (Exit 44, MP 347.1) to Rochester (Exit 45, MP 351.4): Concrete Pavement Restoration
    • Location: ML - MP: 347.1 to 351.4
    • Letting Date: 02/15/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $17,608,000.61
    • Contract Number: TAS 17-5/D214546
    • Contractor: Sealand Contractors Corporation
    • View this project location on the map
  • MP 420.9 to 421.5: Buffalo Airport Route 33 EB (Exit 51): Lengthen Eastbound Merge Lane
    • Location: ML - MP: 420.9 to 421.5
    • Letting Date: 06/29/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,718,030.00
    • Contract Number: TAB 16-17/D214471
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map
  • Dunkirk (MP 467.0, Exit 59) to east of Westfield (MP 483.0): Pavement Resurfacing
    • Location: ML - MP: 467 to 483
    • Letting Date: 01/18/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $4,042,907.45
    • Contract Number: TAB 17-10/D214552
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map
  • MP 165.11: Reconstruct Retaining Wall west of Exit 26
    • Location: ML - MP: 165.11
    • Letting Date: 08/30/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $2,527,450.00
    • Contract Number: TAA 17-11B/D214557
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map
  • West Seneca (Exit 54, MP 427.7) to US Route 219 (Exit 55, MP 429.55): Pavement Resurfacing, US Route 219 (Exit 55, MP 429.55) to Lackawanna Toll Barrier (MP 430.4): Pavement Replacement, Rehabilitation of Thruway Bridges over Smokes Creek, Seneca Street, Cazenovia Creek and Potters Corners Road, Replacement of Thruway Bridge over Norfolks Southern RR and Resurface Lackawanna Toll Barrier
    • Location: N.Y.C.R.R. & PENN. R.R. Bridge
    • Letting Date: 09/06/2017
    • Estimated Completion Year: 2019
    • Low Bid Amount: $66,474,997.50
    • Contract Number: TAB 17-4/D214545
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map
  • MP 253.52: Thruway Bridge over CSX Railroad and Stony Creek - Rehabilitation
    • Location: NYCRR Bridge
    • Letting Date: 01/25/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $1,656,410.00
    • Contract Number: TAS 17-12B/D214499
    • Contractor: ABHE & SVOBODA, Inc.
    • View this project location on the map
  • Buffalo Division: On-Demand Repair Contract - 2017-2018
    • Letting Date: 12/14/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $1,957,300.00
    • Contract Number: TAB 16-42BR/D214525
    • Contractor: C.P. Ward, Inc.
  • East of Rome (MP 240.9) to Verona (Exit 33, MP 252.2): Safety Upgrades
    • Location: ML - MP: 240.9 to 252.2
    • Letting Date: 10/04/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $3,245,982.75
    • Contract Number: TAS 17-36/D214586
    • Contractor: Hanson Aggregates New York, Inc.
    • View this project location on the map
  • South of Nyack (MP 16.00) to North of Garden State Parkway Connector (MP 24.00): Pavement Rehabilitation and Resurfacing
    • Location: ML - MP: 16 to 24
    • Letting Date: 05/21/2014
    • Estimated Completion Year: 2016
    • Low Bid Amount: $16,170,507.38
    • Contract Number: TANY 14-27/D214324
    • Contractor: Tilcon New York, Inc.
    • View this project location on the map
  • I-90, east of Depew to Williamsville Toll Barrier and I-190, I-90 to South Ogden Street (Exit N1) and Angola Travel Plaza - Pavement Resurfacing, and Replacement of Median Light Poles from I-90 to Route 5/Skyway (Exit 7)
    • Location: ML - MP: 416.9 to 419.58
    • Letting Date: 04/12/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $10,076,722.70
    • Contract Number: TAB 17-21/D214567
    • Contractor: Concrete Applied Technologies Corporation DBA CATCO
    • View this project location on the map
  • MP 304.2 and 340.2: Weedsport and Manchester Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: ML - MP: 304.2
    • Letting Date: 01/25/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $832,668.00
    • Contract Number: TAS 17-15A/D214560
    • Contractor: Crane Hogan Structural Systems, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 304.2 and 340.2: Weedsport and Manchester Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: ML - MP: 340.2
    • Letting Date: 01/25/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $832,668.00
    • Contract Number: TAS 17-15A/D214560
    • Contractor: Crane Hogan Structural Systems, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: BARGE CANAL Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: BARGE CANAL,MOHW. RIVER(WB) Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: CANANDAIGUA OUTLET (EB) Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: CANANDAIGUA OUTLET (WB) Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: CIDER ST. CO. RT. 23 Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: CO. RD. 188 Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: GENEVA-LYONS INTERCHANGE Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: LELAND AVENUE Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: ONEIDA-VERONA RT 365 Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: ONONDAGA PARKWAY Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: PERU RD. Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: RANDALL ROAD Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: STERLING CREEK (WB) Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: TOWN LINE ROAD Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: VERNON-VERONA STAT.RD RT 31 Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: VERONA INTERCHANGE Bridge
    • Letting Date: 08/02/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $4,567,890.12
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Fabrication of Structural Steel for Route 32 Bridge over Thruway (MP 67.86)
    • Location: PLATTEKILL-MODENA RT. 32 Bridge
    • Letting Date: 01/25/2017
    • Estimated Completion Year: 2017
    • Low Bid Amount: $507,140.00
    • Contract Number: TA 17-26B/D214570
    • Contractor: High Steel Structures, Inc.
    • View this project location on the map
  • Gay's Point Channel Restoration for New NY Bridge
    • Letting Date: 04/19/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $997,258.50
    • Contract Number: TAA 17-3/D214519
    • Contractor: C.D. Perry, LLC
  • MP 356.69 EB and MP 356.70 WB: Thruway Bridges over Pittsford Mendon Center Road - Rehabilitations
    • Location: PITTSFORD-MENDON CTR.RD(EB) Bridge
    • Letting Date: 11/30/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $3,746,000.15
    • Contract Number: TAB 16-33B/D214504
    • Contractor: Sealand Contractors Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 356.69 EB and MP 356.70 WB: Thruway Bridges over Pittsford Mendon Center Road - Rehabilitations
    • Location: PITTSFORD-MENDON CTR.RD(WB) Bridge
    • Letting Date: 11/30/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $3,746,000.15
    • Contract Number: TAB 16-33B/D214504
    • Contractor: Sealand Contractors Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2016
    • Location: NE - MP: 600.17 to 614.11
    • Letting Date: 01/27/2016
    • Estimated Completion Year: 2016
    • Low Bid Amount: $508,873.00
    • Contract Number: TANE 16-4B/D214430
    • Contractor: ACME Powerwashing, Inc.
    • View this project location on the map
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: CHITTENANGO CREEK (EB) Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: HERKIMER INTERCHANGE Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: INDIAN CSTL.RD NOWADAGA(EB) Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: INDIAN CSTL.RD NOWADAGA(WB) Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: LIMESTONE CREEK (EB) Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: MEMPHIS RD. CO. RD. 64 Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: ONONDAGA LAKE OUTLET Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: OWASCO OUTLET Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: STERLING CREEK (EB) Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: STERLING CREEK (WB) Bridge
    • Letting Date: 05/04/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,981,657.25
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Replacement of Joints on Various New York Division Bridges and Rehabilitation of the Midland Ave and Route 304 Bridges over Thruway
    • Location: BRONX-PELHAM PARKWAY Bridge
    • Letting Date: 04/27/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,681,000.00
    • Contract Number: TANY 16-14B/D214467
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Replacement of Joints on Various New York Division Bridges and Rehabilitation of the Midland Ave and Route 304 Bridges over Thruway
    • Location: CHATS. AVE OVER NY,NH, HRR Bridge
    • Letting Date: 04/27/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,681,000.00
    • Contract Number: TANY 16-14B/D214467
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Replacement of Joints on Various New York Division Bridges and Rehabilitation of the Midland Ave and Route 304 Bridges over Thruway
    • Location: LARCHMONT STATION PLAZA Bridge
    • Letting Date: 04/27/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,681,000.00
    • Contract Number: TANY 16-14B/D214467
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Replacement of Joints on Various New York Division Bridges and Rehabilitation of the Midland Ave and Route 304 Bridges over Thruway
    • Location: NEW PALTZ INTERCHANGE Bridge
    • Letting Date: 04/27/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,681,000.00
    • Contract Number: TANY 16-14B/D214467
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Replacement of Joints on Various New York Division Bridges and Rehabilitation of the Midland Ave and Route 304 Bridges over Thruway
    • Location: PARK ROAD Bridge
    • Letting Date: 04/27/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,681,000.00
    • Contract Number: TANY 16-14B/D214467
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Replacement of Joints on Various New York Division Bridges and Rehabilitation of the Midland Ave and Route 304 Bridges over Thruway
    • Location: SUFFERN INTERCHANGE RAMP D Bridge
    • Letting Date: 04/27/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,681,000.00
    • Contract Number: TANY 16-14B/D214467
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Replacement of Joints on Various New York Division Bridges and Rehabilitation of the Midland Ave and Route 304 Bridges over Thruway
    • Location: TAYLOR ROAD Bridge
    • Letting Date: 04/27/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,681,000.00
    • Contract Number: TANY 16-14B/D214467
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Replacement of Joints on Various New York Division Bridges and Rehabilitation of the Midland Ave and Route 304 Bridges over Thruway
    • Location: WALDEN-NEWBURGH RT. 52 Bridge
    • Letting Date: 04/27/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $6,681,000.00
    • Contract Number: TANY 16-14B/D214467
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • South of Saugerties (MP 100.8) to north of Saugerties (MP 109.3): Safety Upgrades
    • Location: ML - MP: 100.8 to 109.3
    • Letting Date: 11/02/2016
    • Estimated Completion Year: 2017
    • Low Bid Amount: $1,863,683.79
    • Contract Number: TAA 16-27R/D214482
    • Contractor: Carver Construction Inc.
    • View this project location on the map
  • MP 282.93: Interchange 36 Bridge Replacement and Ramp Realignment
    • Location: SYRACUSE INTER. I-81 Bridge
    • Letting Date: 12/17/2014
    • Estimated Completion Year: 2016
    • Low Bid Amount: $11,169,593.13
    • Contract Number: TAS 14-18B/D214310
    • Contractor: Cold Spring Construction Co.
    • View this project location on the map
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: CAYUGA ROAD Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: CENTRAL AVE. (EB) Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: CENTRAL AVE. (WB) Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: CRITTENDEN ROAD Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: ELLICOTT CREEK Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: RUSH-HENRIETTA RD. RT. 15A Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: STATE ST. RD. Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: TRANSIT ROAD RT. 78 Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: W. BLOOMFIELD RD. Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Buffalo Division: Paint 10 Bridges with Poor Paint Condition Ratings
    • Location: WEHRLE DRIVE Bridge
    • Letting Date: 04/08/2015
    • Estimated Completion Year: 2016
    • Low Bid Amount: $5,375,312.00
    • Contract Number: TAB 15-15BP/D214382
    • Contractor: Erie Painting & Maintenance, Inc.
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Replacement of the Thruway Bridges over Vine Street (MP 284.80) and CSX Railroad (Salina) (MP 284.74)
    • Location: VINE STREET Bridge
    • Letting Date: 11/23/2016
    • Estimated Completion Year: 2018
    • Low Bid Amount: $15,223,573.46
    • Contract Number: TAS 16-23B/D214479
    • Contractor: Tioga Construction Company, Inc.
    • View this project location on the map
  • Albany Division: On-Demand Repair Contract - 2017-2019
    • Letting Date: 03/08/2017
    • Estimated Completion Year: 2019
    • Low Bid Amount: $1,949,148.00
    • Contract Number: TAA 17-31B/D214578
    • Contractor: Harrison & Burrowes Bridge Constructors Inc.
  • Geneva (Exit 42, MP 327.5) to Canandaigua (Exit 44, MP 347.1) Pavement Resurfacing
    • Location: ML - MP: 327.5 to 337.5
    • Letting Date: 02/22/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $26,272,250.00
    • Contract Number: TAS 17-7/D214543
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Geneva (Exit 42, MP 327.5) to Canandaigua (Exit 44, MP 347.1) Pavement Resurfacing
    • Location: ML - MP: 335.16
    • Letting Date: 02/22/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $26,272,250.00
    • Contract Number: TAS 17-7/D214543
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Geneva (Exit 42, MP 327.5) to Canandaigua (Exit 44, MP 347.1) Pavement Resurfacing
    • Location: ML - MP: 335.21
    • Letting Date: 02/22/2017
    • Estimated Completion Year: 2018
    • Low Bid Amount: $26,272,250.00
    • Contract Number: TAS 17-7/D214543
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)

Go to Top | Bottom

Completed Projects

  • MP NE7.22: Construct a Replacement Salt Shed at Larchmont Maintenance Section on I-95 (New England Thruway)
    • Location: NE - MP: 607.7
    • Letting Date: 09/30/2015
    • Completion Date: 01/27/2016
    • Construction Amount: $785,970.77
    • Contract Number: TANE 15-41A/D214450
    • Contractor: Park Lane Construction and Development Corporation
    • View this project location on the map
  • MP 420.33, MP 420.34 and MP 420.36 Three Bridges at I-90/I-290 Interchange - Rehabilitations and MP 420.35 Wherle Drive over Thruway - Substructure and Fascia Repairs
    • Location: SB RAMP O/ WEHRLE (I-290) Bridge
    • Letting Date: 09/02/2015
    • Completion Date: 06/22/2017
    • Construction Amount: $4,810,684.36
    • Contract Number: TAB 15-20B/D214392
    • Contractor: Union Concrete and Construction Corp.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 420.33, MP 420.34 and MP 420.36 Three Bridges at I-90/I-290 Interchange - Rehabilitations and MP 420.35 Wherle Drive over Thruway - Substructure and Fascia Repairs
    • Location: N.B. RAMP TO I-290 Bridge
    • Letting Date: 09/02/2015
    • Completion Date: 06/22/2017
    • Construction Amount: $4,810,684.36
    • Contract Number: TAB 15-20B/D214392
    • Contractor: Union Concrete and Construction Corp.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP 420.33, MP 420.34 and MP 420.36 Three Bridges at I-90/I-290 Interchange - Rehabilitations and MP 420.35 Wherle Drive over Thruway - Substructure and Fascia Repairs
    • Location: E.B. RAMP FROM I-290 Bridge
    • Letting Date: 09/02/2015
    • Completion Date: 06/22/2017
    • Construction Amount: $4,810,684.36
    • Contract Number: TAB 15-20B/D214392
    • Contractor: Union Concrete and Construction Corp.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • MP NE9.55: Old White Plains Road Bridge over I-95 (New England Thruway) - Rehabilitation
    • Location: OLD WHITE PLAINS ROAD Bridge
    • Letting Date: 10/01/2014
    • Completion Date: 02/19/2016
    • Construction Amount: $806,747.90
    • Contract Number: TANE 14-38B/D214345
    • Contractor: ELQ Industries, Inc.
    • View this project location on the map
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: WESTMLAND-LOWELL CO RD 52 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: TOWN LINE RD. Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: SAND HILL ROAD Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: ROUTE 31 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: PORT GIBSON RD. Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: PERU RD. Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: NORTH MANLIUS RD Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: NORTH MAIN ST. Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: MORGAN ROAD Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: JORDAN-BALDWINSVILLE RT 31 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: HORATIO STREET (RAMP) Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: GENEVA-LYONS RT 14 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: FALL BROOK (WB) Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: FALL BROOK (EB) Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: COURT STREET Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: CLYDE WATERLOO INTERCHANGE Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: CIDER ST. CO. RT. 23 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: CANASTOTA INTERCHANGE Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: CANADAIGUA INTER. RT 332 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2016
    • Location: S. GRAND IS. SB (OLD) Bridge
    • Letting Date: 02/10/2016
    • Completion Date: 06/10/2016
    • Construction Amount: $152,743.00
    • Contract Number: TAN 16-7B/D214447
    • Contractor: Union Concrete and Construction
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • South Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2016
    • Location: S. GRAND IS. NB (NEW) Bridge
    • Letting Date: 02/10/2016
    • Completion Date: 06/10/2016
    • Construction Amount: $152,743.00
    • Contract Number: TAN 16-7B/D214447
    • Contractor: Union Concrete and Construction
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • 4 Bridge Rehabilitations - MP 458.5 and MP 458.81 - Thruway Bridges over Silver Creek and MP 459.9 and MP 459.91 Thruway Bridges over Walnut Creek
    • Location: SILVER CREEK (WB) Bridge
    • Letting Date: 10/16/2013
    • Completion Date: 12/11/2015
    • Construction Amount: $14,722,571.67
    • Contract Number: TAB 13-41B/D214237
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • 4 Bridge Rehabilitations - MP 458.5 and MP 458.81 - Thruway Bridges over Silver Creek and MP 459.9 and MP 459.91 Thruway Bridges over Walnut Creek
    • Location: SILVER CREEK (EB) Bridge
    • Letting Date: 10/16/2013
    • Completion Date: 12/11/2015
    • Construction Amount: $14,722,571.67
    • Contract Number: TAB 13-41B/D214237
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 426.18: I-90/I-190 Interchange 53 Ramp Bridge - Steel Repairs
    • Location: NIA. SECT.CON. I-190 TOP L. Bridge
    • Letting Date: 10/12/2016
    • Completion Date: 11/29/2016
    • Construction Amount: $1,474,070.87
    • Contract Number: TAB 16-45B/D214537
    • Contractor: Union Concrete and Construction Corp.
    • View this project location on the map
  • MP 369.85: Union Street Bridge over Thruway - Replacement
    • Location: UNION STREET Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 11/17/2016
    • Construction Amount: $3,348,511.98
    • Contract Number: TAB 15-31B/D214418
    • Contractor: Ramsey Constructors, Inc.
    • View this project location on the map
  • MP 419.69: Williamsville Toll Barrier - Operational Improvements
    • Location: Williamsville Toll Plaza
    • Letting Date: 10/29/2014
    • Completion Date: 09/15/2016
    • Construction Amount: $7,522,284.21
    • Contract Number: TAB 14-43/D214355
    • Contractor: Cold Spring Construction Company
    • View this project location on the map
  • I-95 (New England Thruway), Pelham Parkway (MP NE0.0, Exit 8B) to Port Chester (MP NE14.1, Exit 22): Concrete Pavement Restoration, including New Rochelle Toll Plaza Pavement Repairs and Kings Highway, Cross County Connection and Cedar Street Bridge Rehabilitations
    • Location: NE - MP: 606.8 to 614.1
    • Letting Date: 05/28/2014
    • Completion Date: 04/28/2017
    • Construction Amount: $63,707,859.90
    • Contract Number: TANE 14-1/D214256
    • Contractor: Yonkers Contracting Co., Inc.
    • View this project location on the map
  • Woodbury Toll Barrier (MP 46.0) to north of Newburgh (Exit 17, MP 60.22 (SB) / MP 60.50 (NB) ): Pavement Resurfacing
    • Location: ML - MP: 46 to 60.5
    • Letting Date: 12/17/2014
    • Completion Date: 12/04/2015
    • Construction Amount: $12,771,381.38
    • Contract Number: TANY 14-55/D214351
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Woodbury Toll Barrier (MP 46.0) to north of Newburgh (Exit 17, MP 60.22 (SB) / MP 60.50 (NB) ): Pavement Resurfacing
    • Location: ML - MP: 46 to 60.22
    • Letting Date: 12/17/2014
    • Completion Date: 12/04/2015
    • Construction Amount: $12,771,381.38
    • Contract Number: TANY 14-55/D214351
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • North of Garden State Parkway Connector (MP 24.1) to Sloatsburg/Suffern/Route 17 (Exit 15A, MP 31.45): Pavement Resurfacing
    • Location: ML - MP: 24.1 to 31.45
    • Letting Date: 03/11/2015
    • Completion Date: 12/18/2015
    • Construction Amount: $8,050,957.79
    • Contract Number: TANY 15-8/D214377
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map
  • Amsterdam: Mohawk Valley Gateway Overlook - New Construction, Montgomery County (funded with 2005 Transportation Bond Act funds)
    • Location: Bridge - Pedestrian (Amsterdam)
    • Letting Date: 11/06/2013
    • Completion Date: 08/27/2016
    • Construction Amount: $13,877,583.34
    • Contract Number: TAA 13-33C/D214226
    • Contractor: Kubricky Construction Corporation
  • Lockport: Rehabilitation of Historic Locks E-69 and E-70 at Flight of Five, Niagara County
    • Location: Old Lock 70
    • Letting Date: 07/10/2013
    • Completion Date: 10/15/2015
    • Construction Amount: $1,770,764.35
    • Contract Number: TAB 13-26C/D214201
    • Contractor: Hohl Industrial Services, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Lockport: Rehabilitation of Historic Locks E-69 and E-70 at Flight of Five, Niagara County
    • Location: Old Lock 69
    • Letting Date: 07/10/2013
    • Completion Date: 10/15/2015
    • Construction Amount: $1,770,764.35
    • Contract Number: TAB 13-26C/D214201
    • Contractor: Hohl Industrial Services, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 46.42: Estrada Road Bridge over Thruway - Rehabilitation
    • Location: WEST POINT-CENTRAL VALLEY Bridge
    • Letting Date: 03/23/2016
    • Completion Date: 08/31/2017
    • Construction Amount: $2,559,000.00
    • Contract Number: TANY 16-16B/D214470
    • Contractor: HVB Construction, Inc.
    • View this project location on the map
  • Reconstruct Buildings at the Old Erie Canal Port Byron Lock Rest Area
    • Location: ML - MP: 308
    • Letting Date: 09/17/2014
    • Completion Date: 06/01/2016
    • Construction Amount: $3,180,743.65
    • Contract Number: TAS 14-33A/D214335
    • Contractor: Bouley Associates, Inc.
    • View this project location on the map
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: RUBY ROAD Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: RT. 23A Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: ROUTE 144 Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: OLD CHATHAM-MALDEN BR. TNPK Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: KINDERHOOK CREEK (WB) Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: KINDERHOOK CREEK (EB) Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: COXSACKIE-RAVENA RT 9W Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: CLAPPER ROAD Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: CATSKILL-CO. CAIRO Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: BRAINARD RD CO RD 33 Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: ASBURY RD. Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: ALB. INT SO BLVD RT 9W (WB) Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • Albany Division: Paint Thirteen Bridges with Poor Paint Condition Ratings
    • Location: ALB. INT SO BLVD RT 9W (EB) Bridge
    • Letting Date: 02/17/2016
    • Completion Date: 10/25/2016
    • Construction Amount: $6,609,401.09
    • Contract Number: TAA 16-2BP/D214442
    • Contractor: PS Bruckel, Inc.
    • View this project location on the map (Note: This is 1 of 13 locations for this project)
  • I-95 (New England Thruway) Bridges: Maintenance Cleaning for Steel Preservation - 2017
    • Location: NE - MP: 600 to 614.93
    • Letting Date: 04/26/2017
    • Completion Date: 08/24/2017
    • Construction Amount: $477,048.00
    • Contract Number: TANE 17-1B/D214514
    • Contractor: ACME Powerwashing Inc.
    • View this project location on the map
  • MP 292 WB: Warners Service Area - Rehabilitate Wastewater Treatment Plant
    • Location: Warners Service Area
    • Letting Date: 04/20/2016
    • Completion Date: 06/16/2017
    • Construction Amount: $1,021,450.00
    • Contract Number: TAS 16-6A/D214366
    • Contractor: MA Bongiovanni, Inc.
    • View this project location on the map
  • MP 91.88: Sawkill Road (County Road 31) Bridge over Thruway - Replacement
    • Location: SAWKILL RD. CO. RD. #42 Bridge
    • Letting Date: 12/16/2015
    • Completion Date: 11/18/2016
    • Construction Amount: $3,792,224.56
    • Contract Number: TAA 15-34B/D214390
    • Contractor: Bette & Cring, LLC
    • View this project location on the map
  • Route 295 Bridge over Berkshire Thruway (MP BS16.26) and Berkshire Spur Bridges over Kinderhook Creek (MP BS11.34 and BS11.35) - Rehabilitations
    • Location: ROUTE 295 Bridge
    • Letting Date: 03/16/2016
    • Completion Date: 07/26/2017
    • Construction Amount: $2,033,713.00
    • Contract Number: TABS 16-15B/D214400
    • Contractor: The Middlesex Corporation
    • View this project location on the map
  • MP 921.12: North Grand Island Bridge Southbound - Deck Replacement
    • Location: NORTH GRAND ISLAND NB (OLD) Bridge
    • Letting Date: 07/03/2013
    • Completion Date: 12/15/2015
    • Construction Amount: $51,143,311.43
    • Contract Number: TAN 13-10B/D214198
    • Contractor: Cianbro Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 921.12: North Grand Island Bridge Southbound - Deck Replacement
    • Location: NORTH GRAND ISLAND SB (NEW) Bridge
    • Letting Date: 07/03/2013
    • Completion Date: 12/15/2015
    • Construction Amount: $51,143,311.43
    • Contract Number: TAN 13-10B/D214198
    • Contractor: Cianbro Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Replace Four Sign Structures at MP 1.55, MP 1.88, MP 600.58 and MP 600.95
    • Location: ML - MP: 1.55
    • Letting Date: 08/27/2014
    • Completion Date: 02/02/2016
    • Construction Amount: $1,538,511.83
    • Contract Number: TANY 14-29B/D214331
    • Contractor: Beaver Concrete Construction Co.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • Replace Four Sign Structures at MP 1.55, MP 1.88, MP 600.58 and MP 600.95
    • Location: ML - MP: 1.88
    • Letting Date: 08/27/2014
    • Completion Date: 02/02/2016
    • Construction Amount: $1,538,511.83
    • Contract Number: TANY 14-29B/D214331
    • Contractor: Beaver Concrete Construction Co.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • Replace Four Sign Structures at MP 1.55, MP 1.88, MP 600.58 and MP 600.95
    • Location: NE - MP: 600.58
    • Letting Date: 08/27/2014
    • Completion Date: 02/02/2016
    • Construction Amount: $1,538,511.83
    • Contract Number: TANY 14-29B/D214331
    • Contractor: Beaver Concrete Construction Co.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • Replace Four Sign Structures at MP 1.55, MP 1.88, MP 600.58 and MP 600.95
    • Location: NE - MP: 600.95
    • Letting Date: 08/27/2014
    • Completion Date: 02/02/2016
    • Construction Amount: $1,538,511.83
    • Contract Number: TANY 14-29B/D214331
    • Contractor: Beaver Concrete Construction Co.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • New York Division: Substructure Repairs to 7 Bridges
    • Location: CHESTER-VAILS GATE RT.94 Bridge
    • Letting Date: 08/12/2015
    • Completion Date: 05/19/2017
    • Construction Amount: $4,122,687.00
    • Contract Number: TANY 15-21B/D214398
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • New York Division: Substructure Repairs to 7 Bridges
    • Location: GARDEN STATE PARKWAY CONN. Bridge
    • Letting Date: 08/12/2015
    • Completion Date: 05/19/2017
    • Construction Amount: $4,122,687.00
    • Contract Number: TANY 15-21B/D214398
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • New York Division: Substructure Repairs to 7 Bridges
    • Location: MAIN ST. RT. 59 Bridge
    • Letting Date: 08/12/2015
    • Completion Date: 05/19/2017
    • Construction Amount: $4,122,687.00
    • Contract Number: TANY 15-21B/D214398
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • New York Division: Substructure Repairs to 7 Bridges
    • Location: MAMARONECK AVE. Bridge
    • Letting Date: 08/12/2015
    • Completion Date: 05/19/2017
    • Construction Amount: $4,122,687.00
    • Contract Number: TANY 15-21B/D214398
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • New York Division: Substructure Repairs to 7 Bridges
    • Location: PARK ROAD Bridge
    • Letting Date: 08/12/2015
    • Completion Date: 05/19/2017
    • Construction Amount: $4,122,687.00
    • Contract Number: TANY 15-21B/D214398
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • New York Division: Substructure Repairs to 7 Bridges
    • Location: TAXTER ROAD Bridge
    • Letting Date: 08/12/2015
    • Completion Date: 05/19/2017
    • Construction Amount: $4,122,687.00
    • Contract Number: TANY 15-21B/D214398
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • New York Division: Substructure Repairs to 7 Bridges
    • Location: WALDEN-NEWBURGH RT. 52 Bridge
    • Letting Date: 08/12/2015
    • Completion Date: 05/19/2017
    • Construction Amount: $4,122,687.00
    • Contract Number: TANY 15-21B/D214398
    • Contractor: E. Daskal Corporation
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • East of Rotterdam (MP 161.0) to east of Amsterdam (MP 170.0): Pavement Resurfacing including the Pattersonville Service Area and Interchange 25A
    • Location: ML - MP: 161.1 to 163.3
    • Letting Date: 04/13/2016
    • Completion Date: 12/16/2016
    • Construction Amount: $7,222,581.68
    • Contract Number: TAA 16-9/D214457
    • Contractor: Callanan Industries, Inc.
    • View this project location on the map
  • South of Saugerties (MP 100.8) to north of Saugerties (MP 109.3): Pavement Resurfacing with Resurfacing of Malden Service Area
    • Location: ML - MP: 100.8 to 109.3
    • Letting Date: 08/12/2015
    • Completion Date: 10/14/2016
    • Construction Amount: $8,061,463.82
    • Contract Number: TAA 15-29/D214415
    • Contractor: Callanan Industries, Inc.
    • View this project location on the map
  • South of New Paltz (MP 74.5) to south of Kingston (MP 86.8): Pavement Resurfacing
    • Location: CO. RD. #73 Bridge
    • Letting Date: 06/24/2015
    • Completion Date: 10/14/2016
    • Construction Amount: $10,180,518.17
    • Contract Number: TAA 15-14/D214381
    • Contractor: Callanan Industries, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • South of New Paltz (MP 74.5) to south of Kingston (MP 86.8): Pavement Resurfacing
    • Location: ML - MP: 74.5 to 86.8
    • Letting Date: 06/24/2015
    • Completion Date: 10/14/2016
    • Construction Amount: $10,180,518.17
    • Contract Number: TAA 15-14/D214381
    • Contractor: Callanan Industries, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • South of New Paltz (MP 74.5) to south of Kingston (MP 86.8): Pavement Resurfacing
    • Location: RONDOUT CREEK Bridge
    • Letting Date: 06/24/2015
    • Completion Date: 10/14/2016
    • Construction Amount: $10,180,518.17
    • Contract Number: TAA 15-14/D214381
    • Contractor: Callanan Industries, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Herkimer (Exit 30, MP 220.0) to west of Utica (MP 233.5): Pavement Resurfacing
    • Location: ML - MP: 220 to 233.5
    • Letting Date: 04/27/2016
    • Completion Date: 12/02/2016
    • Construction Amount: $9,086,310.83
    • Contract Number: TAS 16-11/D214458
    • Contractor: Hanson Aggregates New York, Inc.
    • View this project location on the map
  • MP 397 EB: Pembroke Service Area - Replace Pitched Roof
    • Location: Pembroke Service Area
    • Letting Date: 04/13/2016
    • Completion Date: 11/03/2016
    • Construction Amount: $315,296.80
    • Contract Number: TAB 16-12AR/D214465
    • Contractor: Harvey Strassner Contracting, LLC
    • View this project location on the map
  • MP 53.10: Pleasant Hill Road Bridge over Thruway - Rehabilitation
    • Location: PLEASANT HILL ROAD Bridge
    • Letting Date: 04/02/2014
    • Completion Date: 06/23/2015
    • Construction Amount: $1,786,124.44
    • Contract Number: TANY 14-6B/D214289
    • Contractor: HVB Construction, Inc.
    • View this project location on the map
  • Syracuse Division: On-Demand Repair Contract - 2014-2016
    • Location: ML - MP: 197.9 to 350.6
    • Letting Date: 11/13/2013
    • Completion Date: 10/18/2016
    • Construction Amount: $834,487.80
    • Contract Number: TAS 13-56B/D214262
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map
  • Berkshire Thruway, Canaan Toll Barrier (MP BS17.9) to Massachusetts State Line (MP BS24.3): Pavement Resurfacing
    • Location: B - MP: 817.9 to 824.3
    • Letting Date: 04/06/2016
    • Completion Date: 12/02/2016
    • Construction Amount: $6,624,799.67
    • Contract Number: TABS 16-20/D214468
    • Contractor: Callanan Industries, Inc.
    • View this project location on the map
  • Buffalo and Syracuse Divisions: Pavement Safety Striping - 2016
    • Letting Date: 12/02/2015
    • Completion Date: 06/28/2016
    • Construction Amount: $611,164.27
    • Contract Number: TAB 15-42/D214453
    • Contractor: Straight Line Industries, Inc.
  • I-190, Tonawanda Toll Barrier (MP N14.90) to Niagara Toll Barrier (MP N20.22): Pavement Resurfacing with Resurfacing of Interchanges
    • Location: N - MP: 914.9 to 920.22
    • Letting Date: 04/06/2016
    • Completion Date: 11/17/2016
    • Construction Amount: $5,794,272.48
    • Contract Number: TAN 16-24/D214481
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map
  • MP 227 WB and MP 244 EB: Schuyler and Oneida Service Areas - Rehabilitate/Replace Wastewater Treatment Plants
    • Location: Oneida Service Area
    • Letting Date: 08/12/2015
    • Completion Date: 10/27/2016
    • Construction Amount: $1,523,860.98
    • Contract Number: TAS 15-39A/D214443
    • Contractor: Henderson Bros. Contracting, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 227 WB and MP 244 EB: Schuyler and Oneida Service Areas - Rehabilitate/Replace Wastewater Treatment Plants
    • Location: Schuyler Service Area
    • Letting Date: 08/12/2015
    • Completion Date: 10/27/2016
    • Construction Amount: $1,523,860.98
    • Contract Number: TAS 15-39A/D214443
    • Contractor: Henderson Bros. Contracting, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 345.01 and MP 345.98: Farmington Road and Pumpkin Hook Road Bridges over Thruway - Rehabilitation
    • Location: FARMINGTON RD. Bridge
    • Letting Date: 11/30/2016
    • Completion Date: 06/01/2017
    • Construction Amount: $481,094.40
    • Contract Number: TAS 16-43B/D214526
    • Contractor: Bothar Construction, LLC.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 345.01 and MP 345.98: Farmington Road and Pumpkin Hook Road Bridges over Thruway - Rehabilitation
    • Location: PUMPKIN HOOK RD. Bridge
    • Letting Date: 11/30/2016
    • Completion Date: 06/01/2017
    • Construction Amount: $481,094.40
    • Contract Number: TAS 16-43B/D214526
    • Contractor: Bothar Construction, LLC.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 420.70: Cleveland Drive Bridge over Thruway - Replacement
    • Location: CLEVELAND DRIVE Bridge
    • Letting Date: 10/22/2014
    • Completion Date: 12/11/2015
    • Construction Amount: $10,517,334.74
    • Contract Number: TAB 14-23B/D214320
    • Contractor: Cold Spring Construction Company
    • View this project location on the map
  • Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges
    • Location: CLINTONDALE ROAD Bridge
    • Letting Date: 05/28/2014
    • Completion Date: 10/13/2015
    • Construction Amount: $1,626,840.14
    • Contract Number: TANY 14-30B/D214332
    • Contractor: Piasecki Steel Construction Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges
    • Location: COCHECTON TPK. RT. 17K Bridge
    • Letting Date: 05/28/2014
    • Completion Date: 10/13/2015
    • Construction Amount: $1,626,840.14
    • Contract Number: TANY 14-30B/D214332
    • Contractor: Piasecki Steel Construction Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges
    • Location: FREETOWN ROAD Bridge
    • Letting Date: 05/28/2014
    • Completion Date: 10/13/2015
    • Construction Amount: $1,626,840.14
    • Contract Number: TANY 14-30B/D214332
    • Contractor: Piasecki Steel Construction Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges
    • Location: HEMION ROAD Bridge
    • Letting Date: 05/28/2014
    • Completion Date: 10/13/2015
    • Construction Amount: $1,626,840.14
    • Contract Number: TANY 14-30B/D214332
    • Contractor: Piasecki Steel Construction Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges
    • Location: NEWBURGH INTERCHANGE Bridge
    • Letting Date: 05/28/2014
    • Completion Date: 10/13/2015
    • Construction Amount: $1,626,840.14
    • Contract Number: TANY 14-30B/D214332
    • Contractor: Piasecki Steel Construction Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges
    • Location: NEWBURGH-CAMBELL HALL RT207 Bridge
    • Letting Date: 05/28/2014
    • Completion Date: 10/13/2015
    • Construction Amount: $1,626,840.14
    • Contract Number: TANY 14-30B/D214332
    • Contractor: Piasecki Steel Construction Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges
    • Location: PLATTEKILL-MODENA RT. 32 Bridge
    • Letting Date: 05/28/2014
    • Completion Date: 10/13/2015
    • Construction Amount: $1,626,840.14
    • Contract Number: TANY 14-30B/D214332
    • Contractor: Piasecki Steel Construction Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges
    • Location: TUCKAHOE ROAD Bridge
    • Letting Date: 05/28/2014
    • Completion Date: 10/13/2015
    • Construction Amount: $1,626,840.14
    • Contract Number: TANY 14-30B/D214332
    • Contractor: Piasecki Steel Construction Corporation
    • View this project location on the map (Note: This is 1 of 8 locations for this project)
  • Rehabilitation of the Niagara Viaduct Deck and Louisiana Street Bridge
    • Location: NIAGARA VIADUCT Bridge
    • Letting Date: 01/11/2017
    • Completion Date: 09/28/2017
    • Construction Amount: $2,583,121.50
    • Contract Number: TAN 16-38B/D214518
    • Contractor: Union Concrete and Construction Corporation
    • View this project location on the map
  • New York Division: On-Demand Infrastructure Repair Contract - 2014-2016
    • Letting Date: 07/23/2014
    • Completion Date: 02/17/2017
    • Construction Amount: $1,974,700.00
    • Contract Number: TANY 14-40B/D214349
    • Contractor: HVB Construction, Inc.
  • Buffalo Division: On-Demand Repair Contract - 2015-2016
    • Location: NIA. SECT.CON. I-190 TOP L. Bridge
    • Letting Date: 10/15/2014
    • Completion Date: 01/31/2017
    • Construction Amount: $1,986,600.00
    • Contract Number: TAB 14-44B/D214357
    • Contractor: C.P. Ward, Inc.
    • View this project location on the map
  • MP BS1.08: Castleton Bridge Truss Spans - Painting and Repair of Deteriorated Steel Members
    • Location: CASTLETON-ON-HUDSON Bridge
    • Letting Date: 12/23/2014
    • Completion Date: 12/19/2016
    • Construction Amount: $15,344,376.93
    • Contract Number: TABS 14-37B/D214344
    • Contractor: Atlas Painting and Sheeting Corporation
    • View this project location on the map
  • Albany Division: On-Demand Repair Contract - 2017-2018
    • Letting Date: 11/23/2016
    • Completion Date: 06/23/2017
    • Construction Amount: $1,938,800.00
    • Contract Number: TAA 16-48B/D214550
    • Contractor: D.A. Collins Construction Co. Inc.
  • Northway (Exit 24, MP 148.2) to west of Schenectady (Exit 25, MP 154.4): Pavement Rehabilitation
    • Location: ML - MP: 148.2 to 154.4
    • Letting Date: 04/06/2016
    • Completion Date: 07/28/2017
    • Construction Amount: $17,774,750.00
    • Contract Number: TAA 16-8/D214456
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map
  • I-287/Route 17S (Exit 15) to North of Suffern (Exit 15A): Pavement Resurfacing, Exits 15/15A Ramp Concrete Pavement Restoration and 2 Bridge Rehabilitations at MP 31.78 and MP 31.79
    • Location: ML - MP: 29.4 to 38.7
    • Letting Date: 12/04/2013
    • Completion Date: 11/24/2015
    • Construction Amount: $26,259,260.95
    • Contract Number: TANY 13-51/D214240
    • Contractor: Ecco III Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • I-287/Route 17S (Exit 15) to North of Suffern (Exit 15A): Pavement Resurfacing, Exits 15/15A Ramp Concrete Pavement Restoration and 2 Bridge Rehabilitations at MP 31.78 and MP 31.79
    • Location: SEVEN LAKES DR.RT. 210 (NB) Bridge
    • Letting Date: 12/04/2013
    • Completion Date: 11/24/2015
    • Construction Amount: $26,259,260.95
    • Contract Number: TANY 13-51/D214240
    • Contractor: Ecco III Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • I-287/Route 17S (Exit 15) to North of Suffern (Exit 15A): Pavement Resurfacing, Exits 15/15A Ramp Concrete Pavement Restoration and 2 Bridge Rehabilitations at MP 31.78 and MP 31.79
    • Location: SUFF INTER RAMP B RAMAPO RIVER Bridge
    • Letting Date: 12/04/2013
    • Completion Date: 11/24/2015
    • Construction Amount: $26,259,260.95
    • Contract Number: TANY 13-51/D214240
    • Contractor: Ecco III Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • I-287/Route 17S (Exit 15) to North of Suffern (Exit 15A): Pavement Resurfacing, Exits 15/15A Ramp Concrete Pavement Restoration and 2 Bridge Rehabilitations at MP 31.78 and MP 31.79
    • Location: SUFFERN INTERCHANGE (RAMP B) Bridge
    • Letting Date: 12/04/2013
    • Completion Date: 11/24/2015
    • Construction Amount: $26,259,260.95
    • Contract Number: TANY 13-51/D214240
    • Contractor: Ecco III Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • I-287/Route 17S (Exit 15) to North of Suffern (Exit 15A): Pavement Resurfacing, Exits 15/15A Ramp Concrete Pavement Restoration and 2 Bridge Rehabilitations at MP 31.78 and MP 31.79
    • Location: SUFFERN INTERCHANGE RAMP C Bridge
    • Letting Date: 12/04/2013
    • Completion Date: 11/24/2015
    • Construction Amount: $26,259,260.95
    • Contract Number: TANY 13-51/D214240
    • Contractor: Ecco III Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • I-287/Route 17S (Exit 15) to North of Suffern (Exit 15A): Pavement Resurfacing, Exits 15/15A Ramp Concrete Pavement Restoration and 2 Bridge Rehabilitations at MP 31.78 and MP 31.79
    • Location: SUFFERN INTERCHANGE RAMP D Bridge
    • Letting Date: 12/04/2013
    • Completion Date: 11/24/2015
    • Construction Amount: $26,259,260.95
    • Contract Number: TANY 13-51/D214240
    • Contractor: Ecco III Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • I-287/Route 17S (Exit 15) to North of Suffern (Exit 15A): Pavement Resurfacing, Exits 15/15A Ramp Concrete Pavement Restoration and 2 Bridge Rehabilitations at MP 31.78 and MP 31.79
    • Location: SUFFREN-MT. IVY RT. 202 Bridge
    • Letting Date: 12/04/2013
    • Completion Date: 11/24/2015
    • Construction Amount: $26,259,260.95
    • Contract Number: TANY 13-51/D214240
    • Contractor: Ecco III Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Ardsley Service Area - Pavement Rehabilitation, Construct 14 Truck and 2 Tandem Parking Spaces and Replace Aging Water Supply Main and Demolition of Obsolete Fire Water Supply System
    • Location: Ardsley Service Area
    • Letting Date: 04/13/2016
    • Completion Date: 06/30/2017
    • Construction Amount: $3,171,000.00
    • Contract Number: TANY 16-10/D214258
    • Contractor: Ben Ciccone, Inc.
    • View this project location on the map
  • Albany and Syracuse Divisions: Pavement Safety Striping - 2017
    • Letting Date: 12/21/2016
    • Completion Date: 08/10/2017
    • Construction Amount: $430,916.00
    • Contract Number: TA 16-49/D214554
    • Contractor: Straight Line Industries, Inc.
  • Westfield (Exit 60, MP 485.0) to Pennsylvania State Line (MP 496.0) Westbound: Pavement Resurfacing
    • Location: ML - MP: 485 to 496
    • Letting Date: 02/24/2016
    • Completion Date: 09/29/2016
    • Construction Amount: $6,532,511.98
    • Contract Number: TAB 16-21/D214416
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map
  • East of Silver Creek (MP 455.2) to Dunkirk (Exit 59, MP 467.0): Pavement Resurfacing and Interchange 58 Resurfacing
    • Location: BEAVER CREEK Bridge
    • Letting Date: 07/29/2015
    • Completion Date: 11/18/2016
    • Construction Amount: $10,123,503.15
    • Contract Number: TAB 15-23/D214409
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • East of Silver Creek (MP 455.2) to Dunkirk (Exit 59, MP 467.0): Pavement Resurfacing and Interchange 58 Resurfacing
    • Location: DIKE ROAD (BUFFALO RD.) Bridge
    • Letting Date: 07/29/2015
    • Completion Date: 11/18/2016
    • Construction Amount: $10,123,503.15
    • Contract Number: TAB 15-23/D214409
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • East of Silver Creek (MP 455.2) to Dunkirk (Exit 59, MP 467.0): Pavement Resurfacing and Interchange 58 Resurfacing
    • Location: ML - MP: 455.2 to 467
    • Letting Date: 07/29/2015
    • Completion Date: 11/18/2016
    • Construction Amount: $10,123,503.15
    • Contract Number: TAB 15-23/D214409
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • East of Silver Creek (MP 455.2) to Dunkirk (Exit 59, MP 467.0): Pavement Resurfacing and Interchange 58 Resurfacing
    • Location: NEW ROAD Bridge
    • Letting Date: 07/29/2015
    • Completion Date: 11/18/2016
    • Construction Amount: $10,123,503.15
    • Contract Number: TAB 15-23/D214409
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • East of Silver Creek (MP 455.2) to Dunkirk (Exit 59, MP 467.0): Pavement Resurfacing and Interchange 58 Resurfacing
    • Location: RAMP OVER RTS. 5 & 20 Bridge
    • Letting Date: 07/29/2015
    • Completion Date: 11/18/2016
    • Construction Amount: $10,123,503.15
    • Contract Number: TAB 15-23/D214409
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • East of Silver Creek (MP 455.2) to Dunkirk (Exit 59, MP 467.0): Pavement Resurfacing and Interchange 58 Resurfacing
    • Location: SCOTT CREEK Bridge
    • Letting Date: 07/29/2015
    • Completion Date: 11/18/2016
    • Construction Amount: $10,123,503.15
    • Contract Number: TAB 15-23/D214409
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • East of Silver Creek (MP 455.2) to Dunkirk (Exit 59, MP 467.0): Pavement Resurfacing and Interchange 58 Resurfacing
    • Location: SILVER CREEK INTER. Bridge
    • Letting Date: 07/29/2015
    • Completion Date: 11/18/2016
    • Construction Amount: $10,123,503.15
    • Contract Number: TAB 15-23/D214409
    • Contractor: Cold Spring Construction Company
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Construct Facilities at the Old Erie Canal Port Byron Rest Area
    • Location: ML - MP: 308
    • Letting Date: 03/04/2015
    • Completion Date: 01/31/2017
    • Construction Amount: $3,231,674.00
    • Contract Number: TAS 15-16A/D214384
    • Contractor: Bette & Cring, LLC.
    • View this project location on the map
  • MP 453.46: Mile Strip Road and MP 454.31: Four Mile Level Road Bridges over Thruway - Replacements
    • Location: MILE STRIP ROAD Bridge
    • Letting Date: 08/06/2014
    • Completion Date: 04/28/2016
    • Construction Amount: $13,269,379.57
    • Contract Number: TAB 14-21B/D214317
    • Contractor: Oakgrove Construction, Inc.
    • View this project location on the map
  • Buffalo Division: Paint 7 Bridges with Poor Paint Condition Ratings
    • Location: BUFFALO CRK. RR PENN RR Bridge
    • Letting Date: 03/02/2016
    • Completion Date: 01/13/2017
    • Construction Amount: $3,225,998.00
    • Contract Number: TAB 16-3BP/D214444
    • Contractor: Amstar of Western New York, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Buffalo Division: Paint 7 Bridges with Poor Paint Condition Ratings
    • Location: FOREST ROAD Bridge
    • Letting Date: 03/02/2016
    • Completion Date: 01/13/2017
    • Construction Amount: $3,225,998.00
    • Contract Number: TAB 16-3BP/D214444
    • Contractor: Amstar of Western New York, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Buffalo Division: Paint 7 Bridges with Poor Paint Condition Ratings
    • Location: HAMBURG INTERCHANGE Bridge
    • Letting Date: 03/02/2016
    • Completion Date: 01/13/2017
    • Construction Amount: $3,225,998.00
    • Contract Number: TAB 16-3BP/D214444
    • Contractor: Amstar of Western New York, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Buffalo Division: Paint 7 Bridges with Poor Paint Condition Ratings
    • Location: HARRIS HILL ROAD Bridge
    • Letting Date: 03/02/2016
    • Completion Date: 01/13/2017
    • Construction Amount: $3,225,998.00
    • Contract Number: TAB 16-3BP/D214444
    • Contractor: Amstar of Western New York, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Buffalo Division: Paint 7 Bridges with Poor Paint Condition Ratings
    • Location: KENSINGTON EXPRY.-RT. 33 Bridge
    • Letting Date: 03/02/2016
    • Completion Date: 01/13/2017
    • Construction Amount: $3,225,998.00
    • Contract Number: TAB 16-3BP/D214444
    • Contractor: Amstar of Western New York, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Buffalo Division: Paint 7 Bridges with Poor Paint Condition Ratings
    • Location: MIDDLE ROAD Bridge
    • Letting Date: 03/02/2016
    • Completion Date: 01/13/2017
    • Construction Amount: $3,225,998.00
    • Contract Number: TAB 16-3BP/D214444
    • Contractor: Amstar of Western New York, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Buffalo Division: Paint 7 Bridges with Poor Paint Condition Ratings
    • Location: WILLIAM ST. Bridge
    • Letting Date: 03/02/2016
    • Completion Date: 01/13/2017
    • Construction Amount: $3,225,998.00
    • Contract Number: TAB 16-3BP/D214444
    • Contractor: Amstar of Western New York, Inc.
    • View this project location on the map (Note: This is 1 of 7 locations for this project)
  • Albany Division: On-Demand Repair Contract - 2014-2016
    • Letting Date: 05/28/2014
    • Completion Date: 12/31/2016
    • Construction Amount: $1,499,632.68
    • Contract Number: TAA 14-25B/D214322
    • Contractor: D.A. Collins Construction Co., Inc.
  • Berkshire Thruway, I-87 (Exit 21A, MP B0.0) to I-90 (Exit B1, MP B5.7): Pavement Resurfacing
    • Location: B - MP: 800 to 805.7
    • Letting Date: 12/16/2015
    • Completion Date: 09/15/2016
    • Construction Amount: $2,943,838.08
    • Contract Number: TABS 15-43/D214455
    • Contractor: Callanan Industries, Inc.
    • View this project location on the map
  • Buffalo Division: Culvert Repairs and Installation of Safety Ladders in Fairport on the Erie Canal
    • Letting Date: 11/04/2015
    • Completion Date: 08/12/2016
    • Construction Amount: $1,598,547.41
    • Contract Number: TAB 15-19/D214396
    • Contractor: Keeler Construction Company Inc.
  • I-390 (Exit 46, MP 362.3) to LeRoy (Exit 47, MP 378.2): Pavement Resurfacing
    • Location: ML - MP: 362.3 to 378.2
    • Letting Date: 03/30/2016
    • Completion Date: 08/17/2017
    • Construction Amount: $21,577,413.20
    • Contract Number: TAB 16-5/D214429
    • Contractor: Villager Construction, Inc.
    • View this project location on the map
  • MP 362.4 and 390.13: West Henrietta and Batavia Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: ML - MP: 362.4
    • Letting Date: 08/17/2016
    • Completion Date: 04/27/2017
    • Construction Amount: $922,564.25
    • Contract Number: TAB 16-34A/D214509
    • Contractor: Crane Hogan Structural Systems, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 362.4 and 390.13: West Henrietta and Batavia Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: ML - MP: 390.13
    • Letting Date: 08/17/2016
    • Completion Date: 04/27/2017
    • Construction Amount: $922,564.25
    • Contract Number: TAB 16-34A/D214509
    • Contractor: Crane Hogan Structural Systems, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 187: Construct Rest Area with Amenities and Truck Parking west of Fultonville near Erie Canal Lock 13
    • Location: ML - MP: 187
    • Letting Date: 08/13/2014
    • Completion Date: 07/11/2016
    • Construction Amount: $9,218,232.45
    • Contract Number: TAA 14-41/D214255
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map