Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 11/12/2018
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
56 & 53  Road Work  West: Left 2 lanes,
Monday 11/12/18 10pm -through- 6am Tuesday 11/13/18.

West: Alternating right lane with the left lane,
Sunday 11/11/18 8pm -through- 6am Monday 11/12/18. Monday 11/12/18 7pm -through- 6am Tuesday 11/13/18. Tuesday 11/13/18 7pm -through- 6am Wednesday 11/14/18.

East: Alternating right lane with the left lane,
Sunday 11/11/18 8pm -through- 6am Monday 11/12/18. Tuesday 11/13/18 7pm -through- 6am Wednesday 11/14/18. Wednesday 11/14/18 7pm -through- 6am Thursday 11/15/18. Thursday 11/15/18 8pm -through- 6am Friday 11/16/18. Friday 11/16/18 8pm -through- 6am Saturday 11/17/18

 
Minimal  None 
58 & 57A  Bridge Inspection  West: Alternating right lane with the left lane,
Wednesday 11/14/18 11:30am - 2:00pm.

East: Alternating right lane with the left lane,
Wednesday 11/14/18 7:30am - 10:00am.

West: Alternating right lane with the left lane,
Thursday 11/15/18 11:30am - 2:00pm.

East: Alternating right lane with the left lane,
Thursday 11/15/18 7:30am - 10:00am.

 
Minimal  None 
61 & 60  Other  East: Right lane,
Thursday 11/15/18 9:00am - 2:00pm.

 
Minimal  None 


For The Week Starting Monday 11/19/2018
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
52A & 54  Other  West: Left 2 lanes,
Sunday 11/18/18 10pm -through- 6am Monday 11/19/18. Monday 11/19/18 10pm -through- 6am Tuesday 11/20/18. Tuesday 11/20/18 10pm -through- 6am Wednesday 11/21/18.

West: Left lane,
Sunday 11/18/18 7:00pm - 10:00pm. Monday 11/19/18 7:00pm - 10:00pm. Tuesday 11/20/18 7:00pm - 10:00pm.

 
Minimal  None 
54 & 53  Overhead Sign Work  West: Alternating right lane with the left lane,
NOTE: Lane Closure Includes Portion Of EXIT 54 (NY Route 400) Off-Ramp. Ramp Will Remain Open At All Times. Tuesday 11/20/18 9:00am - 12NOON.

West: Right lane,
NOTE: Lane Closure Includes Portion Of EXIT 54 (NY Route 400) Off-Ramp. Ramp Will Remain Open At All Times. Tuesday 11/20/18 12NOON - 1:00pm.

East: Alternating right lane with the left lane,
NOTE: Lane Closure Includes Portion Of EXIT 54 (NY Route 400) Off-Ramp. Ramp Will Remain Open At All Times. Monday 11/19/18 9:00am - 2:00pm.

 
Minimal  None 
55 & 54  Overhead Sign Work  East: Right lane,
NOTE: Lane Closure Includes Portion Of EXIT 54 (NY Route 400) Off-Ramp. Ramp Will Remain Open At All Times. Monday 11/19/18 2:00pm - 4:00pm.

 
Minimal  None 
61 & 60  Other  East: Right lane,
Thursday 11/15/18 9:00am - 2:00pm.

 
Minimal  None 

Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 11/12/2018
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
56 & 53  Road Work  West: Left 2 lanes,
Monday 11/12/18 10pm -through- 6am Tuesday 11/13/18.

West: Alternating right lane with the left lane,
Sunday 11/11/18 8pm -through- 6am Monday 11/12/18. Monday 11/12/18 7pm -through- 6am Tuesday 11/13/18. Tuesday 11/13/18 7pm -through- 6am Wednesday 11/14/18.

East: Alternating right lane with the left lane,
Sunday 11/11/18 8pm -through- 6am Monday 11/12/18. Tuesday 11/13/18 7pm -through- 6am Wednesday 11/14/18. Wednesday 11/14/18 7pm -through- 6am Thursday 11/15/18. Thursday 11/15/18 8pm -through- 6am Friday 11/16/18. Friday 11/16/18 8pm -through- 6am Saturday 11/17/18

 
Minimal  None 


For The Week Starting Monday 11/19/2018
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
52A & 54  Other  West: Left 2 lanes,
Sunday 11/18/18 10pm -through- 6am Monday 11/19/18. Monday 11/19/18 10pm -through- 6am Tuesday 11/20/18. Tuesday 11/20/18 10pm -through- 6am Wednesday 11/21/18.

West: Left lane,
Sunday 11/18/18 7:00pm - 10:00pm. Monday 11/19/18 7:00pm - 10:00pm. Tuesday 11/20/18 7:00pm - 10:00pm.

 
Minimal  None 
54 & 53  Overhead Sign Work  West: Alternating right lane with the left lane,
NOTE: Lane Closure Includes Portion Of EXIT 54 (NY Route 400) Off-Ramp. Ramp Will Remain Open At All Times. Tuesday 11/20/18 9:00am - 12NOON.

West: Right lane,
NOTE: Lane Closure Includes Portion Of EXIT 54 (NY Route 400) Off-Ramp. Ramp Will Remain Open At All Times. Tuesday 11/20/18 12NOON - 1:00pm.

East: Alternating right lane with the left lane,
NOTE: Lane Closure Includes Portion Of EXIT 54 (NY Route 400) Off-Ramp. Ramp Will Remain Open At All Times. Monday 11/19/18 9:00am - 2:00pm.

 
Minimal  None 
55 & 54  Overhead Sign Work  East: Right lane,
NOTE: Lane Closure Includes Portion Of EXIT 54 (NY Route 400) Off-Ramp. Ramp Will Remain Open At All Times. Monday 11/19/18 2:00pm - 4:00pm.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
2 & 1  Road Work  South: Right lane,
NOTE: Lane Closure Includes I-190 SB Ramp To I-90 WB. Ramp Will Remain OPen At All Times. Sunday 11/18/18 7pm -through- 6am Monday 11/19/18. Monday 11/19/18 7pm -through- 6am Tuesday 11/20/18. Tuesday 11/20/18 7pm -through- 6am Wednesday 11/21/18.

 
Minimal  None 
16 & 17  Road Work  North: Right lane,
Monday 11/19/18 8pm -through- 6am Tuesday 11/20/18. Tuesday 11/20/18 8pm -through- 6am Wednesday 11/21/18.

 
Minimal  None 
21 & 19  Road Work  South: Right lane,
Monday 11/19/18 8pm -through- 6am Tuesday 11/20/18. Tuesday 11/20/18 8pm -through- 6am Wednesday 11/21/18.

 
Minimal  None 

Back to Top

Rochester Region


For The Week Starting Monday 11/12/2018
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
42 & 44  Road Work  West: Shoulder,
7AM-5PM MON-THU, 7AM-3PM FRI

West: Alternating right lane with the left lane,
7PM-7AM TUE

 
Minimal  None 
44 & 42  Bridge Construction  West: Alternating right lane with the left lane,
7PM-7AM MON-THU, 9PM-8AM FRI

East: Alternating right lane with the left lane,
7PM-7AM MON-THU, 9PM-8AM FRI

 
Minor  None 
44 & 42  Road Work  East: Alternating right lane with the left lane,
7PM-7AM TUE

East: Shoulder,
7AM-5PM MON-THU, 7AM-3PM FRI

 
Minimal  None 
43 & 45  Road Work  West: Alternating right lane with the left lane,
7PM-7AM MON-THU, 9PM-9AM FRI, 9PM-7AM SAT

 
Minimal  None 
44 & 46  Road Work  West: Alternating right lane with the left lane,
8PM-6AM MON-WED, 9PM-6AM THU, 10PM-8AM FRI, 10PM-6AM SAT

 
Minimal  None 
45 & 43  Road Work  East: Alternating right lane with the left lane,
7PM-7AM MON-THU, 8PM-8AM FRI, 9PM-7AM SAT

 
Minimal  None 
46 & 44  Road Work  East: Alternating right lane with the left lane,
8PM-7AM MON-TUE,8PM-6AM WED, 9PM-6AM THU, 9PM-8AM FRI, 9PM-7AM SAT

 
Minimal  None 


For The Week Starting Monday 11/19/2018
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
44 & 42  Road Work  West: Shoulder,
7AM-5PM MON-THU, 7AM-3PM FRI

West: Alternating right lane with the left lane,
7PM-7AM TUE

East: Alternating right lane with the left lane,
7PM-7AM TUE

East: Shoulder,
7AM-5PM MON-THU, 7AM-3PM FRI

 
Minimal  None 
43 & 45  Road Work  West: Alternating right lane with the left lane,
7PM-7AM MON-TUE

 
Minimal  None 
44 & 46  Road Work  West: Alternating right lane with the left lane,
8PM-6AM MON-TUE

 
Minimal  None 
45 & 43  Road Work  East: Alternating right lane with the left lane,
7PM-7AM MON-TUE

 
Minimal  None 
46 & 44  Road Work  East: Alternating right lane with the left lane,
8PM-7AM MON-TUE

 
Minimal  None 

Back to Top

Syracuse Region


For The Week Starting Monday 11/12/2018
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
32 & 34  Bridge Construction  West: Left lane,
9AM-3PM TUE. Rain date WED same time

 
Minor  None 
34 & 33  Bridge Construction  East: Left lane,
6:30AM - 12noon TUE. Raindate WED same time

 
Minor  None 
34 & 33  Other  East: Right lane,
7AM-3PM TUE-THU

West: Alternating right lane with the left lane,
7AM-3PM TUE-THU

East: Alternating right lane with the left lane,
7AM-3PM TUE-THU

 
Minimal  None 
33 & 34A  Other  West: Alternating right lane with the left lane,
7AM-3PM TUE-THU

 
Minimal  None 
39 & 38  Other  East: Right lane,
9AM-3PM THU

 
None  None 
40 & 38  Other  East: Right lane,
7:30AM-2PM WED

 
Minimal  None 
40 & 39  Other  West: Right lane,
7:30AM-2PM TUE

West: Right lane,
7:30AM-2PM TUE

East: Right lane,
7:30AM-2PM WED

 
Minimal  None 
41 & 40  Road Work  East: Left lane,
9AM-9PM WED/THU

East: Left lane,
9PM-9AM SUN/MON

East: Left lane,
9AM-9PM TUE/WED

East: Left lane,
9PM-9AM MON/TUE

 
Minimal  None 
42 & 41  Other  East: Right lane,
7AM-2PM TUE-WED

East: Left lane,
7AM-2PM THU

 
Minimal  None 
42 & 41  Bridge Construction  West: Alternating right lane with the left lane,
6PM-9AM THU

East: Alternating right lane with the left lane,
6PM-7AM MON-WED, 6PM-9AM THU, 7PM-8AM FRI

 
Minimal  None 
42 & 44  Road Work  West: Shoulder,
7AM-5PM MON-THU, 7AM-3PM FRI

West: Alternating right lane with the left lane,
7PM-7AM TUE

 
Minimal  None 
44 & 42  Bridge Construction  West: Alternating right lane with the left lane,
7PM-7AM MON-THU, 9PM-8AM FRI

East: Alternating right lane with the left lane,
7PM-7AM MON-THU, 9PM-8AM FRI

 
Minor  None 
44 & 42  Road Work  East: Alternating right lane with the left lane,
7PM-7AM TUE

East: Shoulder,
7AM-5PM MON-THU, 7AM-3PM FRI

 
Minimal  None 


For The Week Starting Monday 11/19/2018
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
32 & 34  Bridge Construction  West: Left lane,
9AM-3PM TUE. Rain date WED same time

 
Minor  None 
34 & 33  Bridge Construction  East: Left lane,
6:30AM - 12noon TUE. Raindate WED same time

 
Minor  None 
34 & 33  Other  East: Right lane,
7AM-3PM MON-TUE

 
Minimal  None 
33 & 34A  Other  West: Left lane,
7AM-3PM TUE-THU

 
Minimal  None 
39 & 38  Other  East: Right lane,
9AM-3PM THU

 
None  None 
41 & 40  Road Work  East: Left lane,
9AM-9PM WED/THU

East: Left lane,
9PM-9AM SUN/MON

East: Left lane,
9AM-9PM TUE/WED

East: Left lane,
9PM-9AM MON/TUE

 
Minimal  None 
42 & 41  Bridge Construction  East: Alternating right lane with the left lane,
6PM-7AM MON-TUE

 
Minimal  None 
44 & 42  Road Work  West: Shoulder,
7AM-5PM MON-THU, 7AM-3PM FRI

West: Alternating right lane with the left lane,
7PM-7AM TUE

East: Alternating right lane with the left lane,
7PM-7AM TUE

East: Shoulder,
7AM-5PM MON-THU, 7AM-3PM FRI

 
Minimal  None 

Back to Top

Utica Region


For The Week Starting Monday 11/12/2018
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 29  Road Work  West: Left lane,
Tuesday - Wednesday, 6:00AM - 5:00PM

 
Minimal  Weather Permitting 
28 & 29A  Road Work  West: Right lane,
Friday, 6:00AM - 1:00PM

 
Minimal  Weather Permitting 
29A & 27  Road Work  East: Left lane,
Tuesday - Thursday, 7:00AM - 5:00PM; *Movable Closures*

 
Minimal  Weather Permitting 
31 & 32  Other  West: Alternating right lane with the left lane,
7AM-3PM TUE-FRI

 
Minimal  None 
32 & 31  Bridge Construction  East: Right lane,
7AM-5PM MON-SAT

 
Minimal  None 
32 & 31  Other  East: Alternating right lane with the left lane,
7AM-3PM TUE-FRI

 
Minimal  None 
33 & 31  Road Work  West: Shoulder,
MON 7AM-5PM, TUE 7AM-1PM Multiple Short Duration Closures

East: Shoulder,
TUE 7AM-1PM, WED 7AM-5PM Multiple Short Duration Closures

 
None  None 
32 & 34  Bridge Construction  West: Left lane,
9AM-3PM TUE. Rain date WED same time

 
Minor  None 
34 & 33  Bridge Construction  East: Left lane,
6:30AM - 12noon TUE. Raindate WED same time

 
Minor  None 
34 & 33  Other  East: Right lane,
7AM-3PM TUE-THU

West: Alternating right lane with the left lane,
7AM-3PM TUE-THU

East: Alternating right lane with the left lane,
7AM-3PM TUE-THU

 
Minimal  None 
33 & 34A  Other  West: Alternating right lane with the left lane,
7AM-3PM TUE-THU

 
Minimal  None 


For The Week Starting Monday 11/19/2018
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
27 & 28  Road Work  West: Left lane,
Tuesday, 6:00AM - 5:00PM

 
Minimal  Weather Permitting 
27 & 29A  Road Work  West: Left lane,
Monday, 6:00AM - 12:00NOON; *Mobile Closure*

 
Minimal  Weather Permitting 
27 & 29  Road Work  West: Left lane,
Wednesday, 6:00AM - 10:00AM

 
Minimal  Weather Permitting 
29 & 28  Paving  East: Right lane,
Tuesday, 7:00AM - 2:00PM

East: Left lane,
Monday, 7:00AM - 2:00PM

 
Minor  Weather Permitting 
29A & 27  Road Work  East: Left lane,
Monday, 12:00NOON - 5:00PM; *Mobile Closure*

 
Minimal  Weather Permitting 
32 & 31  Bridge Construction  East: Right lane,
7AM-5PM MON-TUE

 
Minimal  None 
33 & 31  Road Work  West: Shoulder,
MON 7AM-5PM, TUE 7AM-1PM Multiple Short Duration Closures

East: Shoulder,
TUE 7AM-1PM, WED 7AM-5PM Multiple Short Duration Closures

 
None  None 
32 & 34  Bridge Construction  West: Left lane,
9AM-3PM TUE. Rain date WED same time

 
Minor  None 
34 & 33  Bridge Construction  East: Left lane,
6:30AM - 12noon TUE. Raindate WED same time

 
Minor  None 
34 & 33  Other  East: Right lane,
7AM-3PM MON-TUE

 
Minimal  None 
33 & 34A  Other  West: Left lane,
7AM-3PM TUE-THU

 
Minimal  None 

Back to Top

Albany Region


For The Week Starting Monday 11/12/2018
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21A & B3  Road Work  East: Alternating right lane with the left lane,
Friday, 4:00AM - 12:00NOON; *Mobile Closure*

 
None  None 
21A & B2  Road Work  East: Left lane,
Tuesday & Thursday, 6:00AM - 4:00PM; *no more than 3 miles closed at one time*

 
None  None 
B2 & B1  Bridge Work  West: Right shoulder,
Monday (11/12), 7:00AM to Monday (11/19), 7:00AM; *24 hour shoulder closure*

West: Alternating right lane with the left lane,
Tuesday - Thursday, 7:00AM - 5:00PM

 
Minor  None 
B2 & 21A  Road Work  West: Left lane,
Wednesday, 6:00AM - 4:00PM; *No more than 3 miles at one time*

 
None  None 
B1 & B2  Road Work  East: Left lane,
Wednesday & Thursday, 6:00AM- 5:00PM; Friday, 6:00AM-12:00NOON

East: Right lane,
Tuesday, 6:00AM - 5:00PM

 
Minimal  None 
B1 & B2  Road Work  East: Left lane,
Tuesday, 7:00AM - 5:00PM

 
None  None 
B1 & B2  Road Work  East: Alternating right shoulder or left shoulder,
Monday (11/12), 12:00Midnight to Sunday (11/18), 12:00Midnight

 
Minimal  None 
B3 & B1  Road Work  West: Right lane,
Monday, 7:00AM - 5:00PM

 
None  None 
B2 & B3  Road Work  East: Right lane,
Wednesday - Friday, 7:00AM - 4:00PM

 
None  None 
B3 & B2  Bridge Work  East: Right shoulder,
Monday (11/12), 7:00AM to Monday (11/19) 7:00AM; *24 hour shoulder closure*

East: Right lane,
Monday - Thursday, 7:00AM - 5:00PM

West: Right shoulder,
Monday (11/12), 7:00AM to Monday (11/19) 7:00AM; *24 hour shoulder closure*

West: Right lane,
Monday - Thursday, 7:00AM - 5:00PM

 
Minor  None 
B3 & 21A  Road Work  West: Alternating right lane with the left lane,
Friday, 4:00AM - 12:00NOON; *Mobile Closure*

 
None  None 
B3 & B2  Road Work  West: Right lane,
Friday, 6:00AM - 2:00PM

East: Right lane,
Wednesday, 6:00AM - 2:00PM

West: Right lane,
Thursday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Exit 29 Tandem Lot - Paving: Other,
Monday & Tuesday, 6:00AM - 5:00PM

 
Minimal  Weather Permitting 
Ramp Work  Road Work  Direction: Interchange 29 WB Decel Ramp work, one way alternating traffic with flagger on ramp: Ramp,
Friday, 6:00AM - 4:00PM

 
Minimal  Weather Permitting 
Toll Plaza Work  Road Work  Direction: Interchange 28 Toll Plaza paving, Alternating Left/Right Toll Lanes: Alternating right lane with the left lane,
Wednesday - Thursday, 6:00AM - 5:00PM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Paving  Direction: Exit 23 Toll Entry Lane 2E Closed: Other,
Tuesday (11/13), 10:00PM to Wednesday (11/14), 3:00PM; *Night Work*; *Wednesday/Thursday potential rain dates*

 
Minor  Weather Permitting 
21B & 20  Bridge Work  South: Left lane,
Tuesday, 7:00AM- 2:00PM

South: Right lane,
Wednesday & Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21B & 22  Bridge Construction  North: Right lane,
Tuesday - Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21B & 21A  Bridge Work  North: Right lane,
Wednesday & Thursday, 9:00AM - 2:00PM

 
Minimal  Weather Permitting 
22 & 23  Paving  North: Right lane,
Wednesday & Thursday, 8:00AM - 1:00PM; *Mobile Closures*

 
Minor  Weather Permitting 
22 & 23  Bridge Work  North: Right lane,
Wednesday & Thursday, 9:00AM - 3:00PM

 
Minor  Weather Permitting 
24 & 22  Paving  South: Right lane,
Wednesday & Thursday, 8:00AM - 1:00PM; *Mobile Closures*

 
Minor  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
26 & 27  Road Work  West: Right lane,
Monday - Thursday, 6:00AM - 3:00PM; Friday, 6:00AM - 12:00NOON

 
Minimal  Weather Permitting 


For The Week Starting Monday 11/19/2018
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21A & B1  Guide Rail Installation  East: Right lane,
Tuesday, 6:00AM - 10:00AM

East: Left lane,
Tuesday, 10:00AM - 2:00PM

 
Minimal  Weather Permitting 
B2 & 21A  Road Work  West: Left lane,
Tuesday, 6:00AM - 4:00PM; Wednesday, 6:00AM - 10:00AM

West: Right lane,
Monday, 6:00AM - 4:00PM

 
None  None 
B1 & B2  Road Work  East: Left lane,
Monday & Tuesday, 6:00AM - 5:00PM; Wednesday, 6:00AM - 10:00AM

East: Left shoulder,
Monday (11/19), 12:00Midnight to Sunday (11/25), 12:00Midnight

 
Minimal  None 
B2 & B3  Road Work  East: Right lane,
Monday & Tuesday, 7:00AM - 5:00PM; Wednesday 7:00AM - 10:00AM

 
None  None 
B2 & B3  Road Work  East: Right lane,
Monday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 
B2  Road Work  East: Right lane,
Tuesday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
20 & 21  Bridge Work  North: Right lane,
Monday & Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
21B & 20  Bridge Work  South: Left lane,
Monday, 7:00AM - 2:00PM

South: Right lane,
Tuesday, 7:00AM - 12:00NOON

 
Minimal  Weather Permitting 
21B & 22  Road Work  North: Left shoulder,
Tuesday, 8:00AM - 3:00PM

 
Minimal  None 
21B & 22  Bridge Work  North: Right shoulder,
Monday - Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
26 & 27  Road Work  West: Right lane,
Monday & Tuesday, 7:00AM- 3:00PM; Wednesday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 
27 & 26  Road Work  East: Right lane,
Monday, 8:00AM - 3:00PM

 
Minimal  None 

Back to Top

Mid-Hudson Region


For The Week Starting Monday 11/12/2018
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18 & 17  Bridge Construction  South: Right lane,
Mon 6am-9am Tue-Thur 6am-2pm Fri 6am-11am

 
Minimal  None 
18 & 19  Guide Rail Installation  North: Right lane,
Tuesday (11/13), 5:00AM - Thursday (11/15), 5:00PM; *24 hour lane closure*

 
Minimal  None 
21B & 20  Bridge Work  South: Left lane,
Tuesday, 7:00AM- 2:00PM

South: Right lane,
Wednesday & Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 11/19/2018
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18 & 17  Bridge Construction  South: Right lane,
Mon 6am-9am Tue 6am-11am

 
Minimal  None 
20 & 19  Bridge Work  South: Right lane,
Tuesday, 7:00AM - 11:00AM

South: Right lane,
Monday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Right lane,
Monday & Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
21B & 20  Bridge Work  South: Left lane,
Monday, 7:00AM - 2:00PM

South: Right lane,
Tuesday, 7:00AM - 12:00NOON

 
Minimal  Weather Permitting 

Back to Top

New York Region


For The Week Starting Monday 11/12/2018
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
2 & 1  Other  West: Ramp,
I-287 Interchange 1 EB&WB Tue 10am-3:30pm Wed-Thur 7am-3:30pm Fri 7am-2pm

 
None  None 
5 & 3  Other  West: Ramp,
Interchange 4 WB on-ramp & EB off-ramp shoulder closure Tue 10am-3:30pm Wed-Thur 7am-3:30pm Fri 7am-2pm

 
None  None 
10  Highway Construction  East: Alternating right lane with the left lane,
Tue-Thurs 10PM-6AM Fri 11pm-7am

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Bridge Construction  Direction: WB direction of the Harriman Toll Plaza: Shoulder,
Tue 10am-3pm Wed: 8am-12pm Thurs: 8am-3pm

 
None  None 
1 & 6  Other  North: Right shoulder,
Tue 10am-2pm Wed-Thur 9am-2pm Fri 9am-12pm

 
Minimal  None 
6 & 7  Bridge Construction  North: Left and center lanes,
Thur 7pm-6am Fri 8pm-6am

 
Moderate  None 
6 & 8  Other  North: Right shoulder,
Mon-Thur 9am-12pm Fri 9am-12pm

 
Minimal  None 
6 & 7  Bridge Construction  North: Left lane,
Thur-Fri 6pm-6am

North: Right lane,
Mon 8pm-6am Tue-Wed 6pm-6am

North: Right and center lanes,
Mon 9pm-6am Tue-Wed 7pm-6am

 
Moderate  None 
7 & 6A  Bridge Construction  South: Left lane,
Wed 6pm-6am

South: Left and center lanes,
Wed 7pm-6am

South: Right and center lanes,
Mon 9pm-6am Tue & Thur-Fri 7pm-6am

South: Right lane,
Mon 8pm-6am Tue& Thur-Fri 6pm-6am

 
Moderate  None 
8 & 9  Other  North: Ramp,
I-87 NB Exit 9 Off-ramp shoulder Tue 10am-3:30pm Wed-Thur 7am-3:30pm Fri 7am-2pm

North: Ramp,
I-87 Exit 9 NB on-ramp shoulder closure Tue 10am-3:30pm Wed-Thur: 7am-3:30pm Fri 7am-2pm

 
None  None 
12 & 9  Bridge Construction  South: Left lane,
Tue-Thur 10AM-3PM Fri 10am-1pm

 
Minimal  None 
12 & 10  Bridge Construction  South: Left and center lanes,
Wed 1am-5am

South: Right lane,
Tue 9pm-1am

 
Minimal  None 
13 & 12  Bridge Construction  South: Right lane,
Wed 9pm-1am

South: Left and center lanes,
Thur 1am-5am

 
Minimal  None 
13 & 14  Bridge Construction  North: Left and center lanes,
Fri 1am-5am

North: Right lane,
Thur 9pm-1am

 
Minimal  None 
14 & 14B  Road Work  North: Left 3 lanes,
Wed-Thur 10pm-5am

 
None  None 
15 & 14A  Other  North: Left and center lanes,
Mon 12am-5am Tue-Wed 9pm-5am Thur 10pm-5am Fri 11pm-5am

North: Left lane,
Mon 10pm-12am Tue-Wed 8pm-9pm Thur 8pm-10pm Fri 9pm-11pm Tue-Fri 5am-6am Sat 6am-10am

South: Left and center lanes,
Mon 12am-5am Tue-Wed 10pm-6am Thur 11pm-6am Fri 11pm-7am

South: Left lane,
Mon 10pm-12am & 5am-6am Tue-Wed 7pm-10pm Thur 7pm-11pm Fri 8 pm-11pm Sat 7am-10am

 
Minor  None 
16 & 15A  Other  North: Left and center lanes,
Mon 12am-6am Thur 9pm-6am

North: Left lane,
Tue 10am-1pm Wed 9am-2pm Tue-Wed 7pm-5am Fri 10pm-8am

South: Left and center lanes,
Mon 12am-5am Tue-Wed 9pm-5am Thur 10pm-5am Fri 10pm-7am Sat 7am-11am

South: Left lane,
Mon 11pm-12am Tue-Wed 6pm-9pm Thur-Fri 6pm-10pm Tue-Fri 5am-6am Sat 7am-11am

 
Minor  None 
16 & 15A  Road Work  North: Right lane,
Wed 7pm-5am

North: Right lane,
Thur 9pm-5am

South: Right lane,
Fri 7pm-5am

South: Right lane,
Tue 7pm-5am

 
Minor  None 
16 & 15A  Bridge Construction  North: Ramp,
Exit 16 NB off-ramp one lane closure Tue 10am-3pm & 8pm-5am Wed 7am-3pm & 8pm-5am Thur: 7am-2pm & 9pm-5am

South: Ramp,
Exit 16 SB on-ramp: one lane closures Tue-Wed 10am-6am & 5pm-5am Thur 10am-4pm & 6pm-5am

 
None  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7 & 6A  Bridge Inspection  South: Ramp,
NOTE:Ramp From Niagara Street to SB I-190 Will Have ALT LN Closures. Wednesday 11/14/18 9:00am - 3:30pm. Ramp Will Remain Open at All Times.

 
Minimal  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
12 & 15  Other  North: Right and center lanes,
Mon-Wed 12:30AM-5AM Thurs 1AM-5AM Fri 1am-6am

 
Minor  None 
14 & 16  Bridge Work  North: Left lane,
Thur-Fri 7pm-6am

North: Left and center lanes,
Thur 7pm-6am Fri 9pm-6am

North: Right lane,
Mon 7pm-6am Tue 6pm-6am

North: Right and center lanes,
Mon-Wed 7pm-6am

 
Moderate  None 
18A & 15  Bridge Work  South: Right and center lanes,
Mon-Tue&Thur 7pm-6am Fri 8pm-6am Sat 10pm-8am

South: Left lane,
Wed 6pm-6am

South: Right lane,
Mon-Tue&Thur-Fri 6pm-6am Sat 8pm-8am

South: Left and center lanes,
Wed 7pm-6am

 
Moderate  None 
22 & 21  Bridge Construction
Long Range: Through 2021 
North: Alternating the 2 right lanes with the left lanes,
Tue-Thur 10pm-6am Fri 11pm-6am

North: Alternating right lane with the left lane,
Tue 9pm-6am Wed-Thur 10pm-6am Fri 11pm-7am

North: Alternating the 2 right lanes with the left lanes,
Tue 1am-4am Wed-Thur 1am-3am Fri 1am-5am

South: Alternating the 2 right lanes with the left lanes,
Tue-Thur 11pm-5am Fri 11pm-7am

South: Alternating right lane with the left lane,
Tue 8pm-6am Wed-Thur 9pm-6am Fri 10pm-8am

South: Alternating the 2 right lanes with the left lanes,
Tue 11pm-5am Wed-Thur 12am-5am Fri 12am-6am

 
Severe  None 


For The Week Starting Monday 11/19/2018
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
2 & 1  Other  West: Ramp,
I-287 Interchange 1 Ramp from RT119&Saw Mill to I287 WB/87SB shoulder closure Mon 7am-3:30pm Tue 7am-12pm Ramp from Rt119 to 287 EB alt R/L lane closures Mon 9am-3pm Tue 9am-12pm Ramp from 287WB to 87SB shoulder closures MOn 7am-3:30pm Tue 7am-12pm

 
None  None 
5 & 3  Other  West: Ramp,
Interchange 4 WB on-ramp & EB off-ramp shoulder closure Mon 7am-3:30pm Tue 7am-12pm

 
None  None 
6 & 5  Other  West: Ramp,
Interchange 5 EB&WB ramp should closure Mon 7am-3:30pm Tue 7am-12pm

 
None  None 
10  Highway Construction  East: Alternating right lane with the left lane,
Mon 10PM-6AM

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Bridge Construction  Direction: WB direction of the Harriman Toll Plaza: Shoulder,
Mon 8am-3pm Tue 10am-12pm

 
None  None 
6 & 8  Other  North: Right shoulder,
Mon 6am-4pm Tue 6am-12pm

 
Minimal  None 
7 & 6A  Bridge Construction  South: Left lane,
Mon 6pm-6am Tue 11pm-6am

South: Left and center lanes,
Mon 7pm-6am Tue 12am-6am

 
Moderate  None 
8 & 10  Bridge Construction  North: Left lane,
Mon-Tue 4:30am-2pm

 
Minimal  None 
8 & 9  Other  North: Ramp,
I-87 NB Exit 9 Off-ramp shoulder Mon 7am-3:30pm Tue 7am-12pm

North: Ramp,
I-87 Exit 9 NB on-ramp shoulder closure Mon 7am-3:30pm Tue 7am-12pm

 
None  None 
12 & 9  Bridge Construction  South: Left lane,
Mon-Tue 10AM-3PM

 
Minimal  None 
12 & 13  Other  North: Right shoulder,
Mon 7am-3:30pm Tue 7am-12pm

North: Ramp,
Interchange 12 NB on-ramp shoulder closure Mon 7am-3pm Tue 7am-12pm

 
None  None 
13 & 12  Other  North: Right lane,
Mon 8pm-7am

South: Right lane,
Mon 7pm-6am

 
Minor  None 
13 & 14  Bridge Construction  North: Left and center lanes,
Mon 1am-5am

North: Right lane,
Sun 9pm-1am

 
Minimal  None 
13 & 14A  Bridge Construction  North: Left and center lanes,
Tue 1am-5am

North: Right lane,
Mon 9pm-1am

 
Minimal  None 
13 & 14A  Other  North: Right shoulder,
Mon 7am-3:30pm Tue 7am-12pm

 
None  None 
14 & 13  Other  North: Ramp,
Interchange 14 NB off-ramp shoulder closure Mon 7am-3:30pm Tue 7am-12pm

North: Ramp,
Interchange 14 NB on-ramp shoulder closure Mon 7am-3:30pm Tue 7am-12pm

South: Ramp,
Interchange 14 SB on-ramp RT lane closure Mon 7am-3:30pm Tue 7am-12pm

 
None  None 
14 & 15  Other  North: Left lane,
Mon 7pm-9pm

North: Left and center lanes,
Mon 9pm-5am

 
Minor  None 
14A & 14  Other  South: Ramp,
Interchange 14A SB on-ramp Alt RT/LT lane closure Mon 9am-3pm Tue 9am-12pm

 
None  None 
14B & 14  Other  South: Right shoulder,
Mon 9am-3:30pm Tue 9am-12pm

 
None  None 
15 & 14A  Other  South: Left and center lanes,
Mon 11pm-5am

South: Left lane,
Mon 10pm-11pm Tue 5am-6am

 
Minor  None 
16 & 15A  Other  South: Left and center lanes,
Mon 9pm-5am

South: Left lane,
Mon 11pm-12am Tue 5am-6am

 
Minor  None 
16 & 15A  Bridge Construction  North: Ramp,
Exit 16 NB off-ramp one lane closure Mon 7am-3pm Tue 10am-12pm

South: Ramp,
Exit 16 SB on-ramp: one lane closures Mon 10am-6pm Tue 10am-12pm

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
12 & 15  Other  North: Right and center lanes,
Mon 12:30AM-5AM

 
Minor  None 
16 & 17  Other  North: Ramp,
Interchange 17 off-ramp closure Mon-Tue 10pm-6am

 
Minor  None 
22 & 21  Bridge Construction
Long Range: Through 2021 
North: Alternating the 2 right lanes with the left lanes,
Mon 10pm-6am

North: Alternating right lane with the left lane,
Mon 9pm-6am

South: Alternating the 2 right lanes with the left lanes,
Mon 11pm-5am

North: Alternating the 2 right lanes with the left lanes,
Mon 1am-4am

South: Alternating right lane with the left lane,
Mon 8pm-6am

South: Alternating the 2 right lanes with the left lanes,
Mon 11pm-5am

 
Severe  None 