Scheduled Construction Lane Closures
Erie | Buffalo/Niagara | Rochester | Syracuse | Utica |Albany | Mid-Hudson | New York
Erie Region
For The Week Starting Monday 09/01/2025
Erie Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
57A & 55 | Highway Construction | East: Left lane, Tuesday 8/26/25 6:00pm-6:00am Wednesday 8/27/25. Wednesday 8/27/25 6:00pm-6:00am Thursday 8/28/25. | Minimal | None |
57A & 57 | Road Work | East: Other, The 443 Eastbound parking area will be closed from 2:30pm on Monday, August 25 until 2:30pm on Tuesday, August 26. The Westbound parking area will be closed from 2:30pm on Monday, August 25 until 2:30pm on Tuesday, August 26. | Minimal | None |
58 & 59 | Paving | West: Left lane, Monday 8/25/25 6:00pm-10:00am Wednesday 8/27/25. West: Right lane, Tuesday 8/26/25 6:00am-6:00pm. West, LT LN, MP 456.29-456.52, Tuesday 8/26/25 6:00am-6:00pm. East: Right lane, Monday 8/25/25 6:00pm-10:00am Wednesday 8/27/25. West: Right lane, Monday 8/25/25 6:00pm-10:00am Wednesday 8/27/25. | Minimal | None |
58 & 60 | Road Work | West: Alternating right lane with the left lane, Monday 8/25/25-7:00am-12:00pm Thursday 8/28/25. | Minimal | None |
60 & 59 | Road Work | East: Right lane, LONG Term Closure: Tuesday 9/2/25-7:00am-12:00pm Friday 9/05/25. | Minimal | None |
60 & 59 | Road Work | East: Alternating right lane with the left lane, Monday 8/25/25 7:00am-12:00pm Thursday 8/28/25. | Minimal | None |
60 & 58 | Road Work | East: Alternating right lane with the left lane, Sunday 8/24/25 6:00pm-12:00pm Thursday 8/28/25. | Minimal | None |
60 & 61 | Road Work | West: Left lane, Tuesday 9/02/25 7:00am-2:00pm. West: Right lane, Wednesday 9/03/25 7:00am-2:00pm. | Minimal | None |
For The Week Starting Monday 09/08/2025
Erie Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
57A & 55 | Highway Construction | East: Alternating right lane with the left lane, Monday 9/8/25 7:00pm-6:00am Tuesday 9/9/25. Tuesday 9/9/25 7:00pm-6:00am Wednesday 9/10/25. Wednesday 9/10/25 7:00pm-6:00am Thursday 9/11/25. Thursday 9/11/25 7:00pm-6:00am Friday 9/12/25. | Minimal | None |
57 & 57A | Road Work | West: Right lane, Saturday 9/6/25 7:00am-2:00pm- Deck Repair | Minimal | None |
Back to Top
Buffalo/Niagara Region
For The Week Starting Monday 09/01/2025
Buffalo/Niagara Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
21 & 20 | Bridge Construction | North: Right lane, Tuesday 9/02/25 10:00pm-6:00am Tuesday 9/03/25. Wednesday 9/03/25 10:00pm-6:00am Thursday 9/04/25. Thursday 9/04/25 10:00pm-6:00am Friday 9/05/25. Friday 09/05/25 10:00pm-6:00am Saturday 9/06/25. South: Right lane, Tuesday 9/02/25 10:00pm-6:00am Wednesday 9/03/25. Wednesday 9/03/25 10:00pm-6:00am Thursday 9/04/25. Thursday Thursday 9/04/25 10:00pm-6:00am Friday 9/05/25. Friday 9/05/25 Midnight- 6:00am Saturday 9/06/25. | Minimal | None |
For The Week Starting Monday 09/08/2025
Buffalo/Niagara Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
21 & 20 | Bridge Construction | South: Right lane, Tuesday 9/9/25 10:00pm-6:00am Wednesday 9/10/25. Wednesday 9/10/25 10:00pm-6:00am Thursday 9/11/25. Thursday 9/11/25 10:00pm-6:00am Friday 9/12/25. Friday 09/12/25 12:00am-6:00am Saturday 9/13/25. | Minimal | None |
Back to Top
Rochester Region
For The Week Starting Monday 09/01/2025
Rochester Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
42 & 41 | Road Work | West: Left shoulder, FRI 7:30AM-1PM East: Left shoulder, FRI 7:30AM-1PM | Minimal | Weather permitting |
42 & 43 | Road Work | West: Right lane, WED 3AM-9AM | Minimal | Weather permitting |
44 & 43 | Shoulder Work | East: Right shoulder, THU 9AM-2PM | None | None |
43 & 44 | Other | West: Shoulder, THU 7AM-5PM | None | None |
43 & 45 | Road Work | West: Left lane, Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25. | Minimal | None |
43 & 45 | Paving | West: Left lane, CONTINUOUS | Moderate | None |
44 & 45 | Paving | West: Center lane, TUE-WED 9PM to WED-THU 6AM, THU 10PM-FRI 6AM | Moderate | None |
45 & 43 | Road Work | East: Center lane, Monday 7/7/25 9:00pm-6:00am Tuesday 7/8/25. Tuesday 7/8/25 9:00pm-6:00am Wednesday 7/9/25. Wednesday 7/9/25 9:00pm-6:00am Thursday 7/10/25. Thursday 7/10/25 9:00pm-6:00am Friday 7/11/25. Friday 7/11/25 9:00pm-6:00am Saturday 7/12/25. | Minimal | None |
45 & 44 | Paving | West: Center lane, WED-SAT CONTINUOUS East: Center lane, WED-SAT CONTINUOUS East: Center lane, TUE-WED 9PM to WED-THU 6AM | Moderate | None |
45 & 43 | Paving | East: Right lane, SUN-SAT Continuous | Moderate | None |
44 & 45 | Road Work | West: Ramp, Right lane of exit ramp. Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25.- Right Ramp | Minimal | None |
46 & 44 | Paving | East: Left lane, Continuous | Moderate | None |
46 & 43 | Road Work | East: Left lane, Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25. | Minimal | None |
46 & 45 | Bridge Construction | West: Alternating right lane with the left lane, Monday 8/04/25 7:00pm-6:00am Thursday 8/07/25. Nightly Closure East: Alternating right lane with the left lane, Monday 8/04/25 7:00pm-6:00am Thursday 8/07/25. Nightly Closure East: Right lane, Wednesday 8/06/25 6:00am-8:00am. Waiver to allow placement of concrete. | Minimal | None |
45 & 47 | Bridge Construction | West: Right shoulder, Tuesday 9/2/25 6:00am-6:00pm. | None | None |
47 & 46 | Ramp Work | East: Right lane, Thursday 9/04/25 7:00pm-9:00am Friday 9/05/25. Friday 9/05/25 8:00pm-9:00am Saturday 9/06/25. | Minimal | None |
47 & 46 | Road Work | East: Right shoulder, Tuesday 9/02/25 9:00am-2:00pm. | None | None |
46 & 47 | Bridge Construction | West: Right lane, Monday 8/25/25 7:30am-1:00pm. | Minimal | None |
46 & 47 | Ramp Work | West: Right lane, Tuesday 9/02/25 6:00pm-9:00am Wednesday 9/03/25. Wednesday 9/03/25 6:00pm-9:00am Thursday 9/04/25. | Minimal | None |
47 & 46 | Bridge Construction | East: Right lane, Wednesday 9/03/25 8:00am-1:00pm. Thursday 9/04/25 8:00am-1:00pm. | Minimal | None |
For The Week Starting Monday 09/08/2025
Rochester Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
43 & 42 | Shoulder Work | East: Right shoulder, THU 7AM-5PM East: Right shoulder, THU 7AM-5PM East: Right shoulder, WED 7AM-5PM | None | None |
44 & 42 | Shoulder Work | East: Right shoulder, TUE 7AM-5PM East: Right shoulder, MON 7AM-5PM | None | None |
44 & 43 | Shoulder Work | East: Shoulder, TUE 7AM-5PM | None | None |
43 & 45 | Paving | West: Left lane, CONTINUOUS SUN-SAT | Moderate | None |
45 & 44 | Paving | West: Left and center lanes, TUE-WED 9PM-6AM West: Center lane, WED-SAT CONTINUOUS East: Center lane, SUN-SAT CONTINUOUS East: Left lane, MON-WED 9PM-6AM & THU-FRI 10PM-6AM | Moderate | None |
45 & 43 | Paving | East: Right lane, SUN-SAT Continuous | Moderate | None |
46 & 44 | Paving | East: Left lane, Continuous | Moderate | None |
47 & 46 | Shoulder Work | East: Right lane, Monday 9/8/25 6:00pm-9:00am Tuesday 9/9/25. Tuesday 9/9/25 6:00pm-9:00am Wednesday 9/10/25. Wednesday 9/10/25 7:00pm-9:00am Thursday 9/11/25. Thursday 9/11/25 7:00pm-9:00am Friday 9/12/25. East: Right lane, Friday 9/12/25 8:00pm-9:00am Saturday 9/13/25. | Minimal | None |
Back to Top
Syracuse Region
For The Week Starting Monday 09/01/2025
Syracuse Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
34 & 32 | Road Work | East: Left shoulder, TUE-FRI 7:30AM-2PM | Minimal | Weather permitting |
33 & 34 | Road Work | West: Right lane, TUE-FRI 7:30AM-2PM | Minimal | Weather permitting |
34 & 35 | Bridge Construction Long Range: Bridge Construction I-481 | West: Alternating right lane with the left lane, WED 6AM-3PM, THU 6AM-1PM, FRI 6AM-10AM | None | Set up as needed |
35 & 34A | Bridge Construction Long Range: Bridge Construction I-481 | East: Alternating right lane with the left lane, WED 6AM-2PM, THU 6AM-10AM, FRI 6AM-9AM | None | Set up as needed |
34A & 36 | Bridge Construction | West: Left lane, WED 6AM-10AM | Minimal | None |
36 & 35 | Bridge Construction | East: Left lane, WED 9AM-1PM | Minimal | None |
42 & 40 | Other | East: Shoulder, WED 7AM-5PM | None | None |
42 & 41 | Road Work | West: Right lane, THU 6AM-9AM West: Left shoulder, FRI 7:30AM-1PM East: Left shoulder, FRI 7:30AM-1PM | Minimal | Weather permitting |
42 & 43 | Road Work | West: Right lane, WED 3AM-9AM | Minimal | Weather permitting |
For The Week Starting Monday 09/08/2025
Syracuse Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
33 & 34A | Road Work | West: Right lane, MON-TUE 5AM-10AM | Minimal | Weather permitting |
35 & 34 | Bridge Work | East: Alternating right lane with the left lane, TUE 5AM-3PM, WED 5AM-2PM | Minimal | Weather permitting |
34A & 36 | Bridge Construction | West: Left lane, TUE 6:30AM-10AM, THU-FRI 6AM-2PM | Minimal | None |
36 & 35 | Bridge Construction | East: Left lane, TUE 9AM-2PM, THU-FRI 6AM-2PM | Minimal | None |
38 & 40 | Shoulder Work | West: Right shoulder, MON-FRI 7AM-5PM | Minimal | None |
40 & 39 | Shoulder Work | West: Right shoulder, MON-FRI 7AM-5PM East: Right shoulder, MON-FRI 7AM-5PM East: Right shoulder, MON-FRI 7AM-5PM East: Right shoulder, MON-FRI 7AM-5PM | Minimal | None |
41 & 40 | Road Work | West: Left shoulder, MON-THU 7:30AM-2PM East: Left shoulder, MON-THU 7:30AM-2PM East: Right lane, TUE-WED 7:30AM-1PM West: Left shoulder, MON-THU 7:30AM-2PM East: Left shoulder, MON-THU 7:30AM-2PM East: Right lane, TUE-WED 7:30AM-1PM | Minimal | Weather permitting |
43 & 42 | Shoulder Work | East: Right shoulder, THU 7AM-5PM East: Right shoulder, THU 7AM-5PM East: Right shoulder, WED 7AM-5PM | None | None |
44 & 42 | Shoulder Work | East: Right shoulder, TUE 7AM-5PM East: Right shoulder, MON 7AM-5PM | None | None |
Back to Top
Utica Region
For The Week Starting Monday 09/01/2025
Utica Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
27 & 28 | Bridge Construction | West: Right lane, Tuesday - Thursday, 6:00AM - 5:00PM West: Other, WB traffic shifted to EB side of bridge until further notice. | Minimal | Weather Permitting |
28 & 29 | Bridge Work | West: Right lane, Tuesday - Friday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
28 & 29 | Guide Rail Installation | West: Right lane, Tuesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
29 & 29A | Guide Rail Installation | West: Right lane, Wednesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
29A & 29 | Guide Rail Installation | West: Left lane, WED-THU 6AM-5PM, FRI 6AM-11AM East: Left lane, WED-THU 6AM-5PM, FRI 6AM-11AM | Minor | None |
30 & 29 | Road Work | West: Right lane, WED 7AM-2PM East: Right lane, WED 7AM-2PM | Minimal | Weather permitting |
30 & 29A | Road Work | East: Right lane, WED-THU 7AM-2PM | Minimal | Weather permitting |
31 & 30 | Bridge Construction | West: Left lane, WED 7AM-5PM, THU 7AM-1PM, FRI 7AM-10AM East: Left lane, WED 7AM-5PM | Minimal | None |
31 & 32 | Bridge Deck Rehabilitation | West: Right lane, MON-SUN Continuous - EB traffic shifted to WB, Ex 31 ramp closed, detour in place. | Minimal | None |
32 & 31 | Road Work | West: Left shoulder, TUE-FRI 7:30AM-2PM East: Left shoulder, TUE-FRI 7:30AM-2PM | Minimal | Weather permitting |
32 & 33 | Road Work | West: Left shoulder, TUE 7:30AM-2PM | Minimal | Weather permitting |
34 & 32 | Road Work | East: Left shoulder, TUE-FRI 7:30AM-2PM | Minimal | Weather permitting |
33 & 34 | Road Work | West: Right lane, TUE-FRI 7:30AM-2PM | Minimal | Weather permitting |
For The Week Starting Monday 09/08/2025
Utica Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
27 & 28 | Bridge Construction | West: Other, WB traffic shifted to EB side of bridge until further notice. | Minimal | Weather Permitting |
28 & 29 | Bridge Work | West: Right lane, Monday - Friday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
28 & 29 | Other | West: Right lane, Thursday, 7:00AM - 5:00PM | Minor | Weather Permitting |
28 & 29 | Guide Rail Installation | West: Left lane, Tuesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
29 & 29A | Guide Rail Installation | West: Right lane, Wednesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
29 & 29A | Road Work | West: Right lane, THU 7AM-2PM | Minimal | Weather permitting |
29 & 29A | Guide Rail Installation | West: Left lane, MON-THU 6AM-5PM, FRI 6AM-11AM East: Left lane, MON-THU 6AM-5PM West: Left lane, MON 6AM-5PM West: Left lane, TUE-THU 6AM-5PM East: Left lane, TUE-THU 6AM-5PM West: Left lane, FRI 6AM-11AM West: Left lane, THU 6AM-5PM, FRI 6AM-11AM | Minor | None |
30 & 29 | Road Work | East: Right lane, WED 7AM-2PM | Minimal | Weather permitting |
31 & 30 | Road Work | East: Right lane, TUE 7AM-2PM East: Right lane, WED-THU 7AM-2PM | Minimal | Weather permitting |
30 & 31 | Bridge Construction | West: Left lane, MON-TUE 7AM-5PM, WED 7AM-5PM, THU 7AM-1PM, FRI 7AM-10AM | Minimal | None |
31 & 32 | Bridge Deck Rehabilitation | West: Right lane, MON-SUN Continuous - EB traffic shifted to WB, Ex 31 ramp closed, detour in place. | Minimal | None |
32 & 31 | Road Work | East: Left lane, MON 7:30AM-2PM | Minimal | Weather permitting |
32 & 33 | Road Work | West: Alternating right lane with the left lane, TUE-THU 7:30AM-2PM | Minimal | Weather permitting |
32 & 33 | Shoulder Work | West: Shoulder, MON-THU 7AM-5PM | None | None |
33 & 32 | Road Work | East: Alternating right lane with the left lane, TUE-THU 7:30AM-2PM | Minimal | Weather permitting |
33 & 34A | Road Work | West: Right lane, MON-TUE 5AM-10AM | Minimal | Weather permitting |
Back to Top
Albany Region
For The Week Starting Monday 09/01/2025
Albany Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
B1 & 21A | Bridge Construction | East: Other, Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice. West: Left lane, Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice. | Minimal | Weather Permitting |
B2 & B1 | Road Work | West: Right lane, Wednesday & Thursday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Interchange Work | Bridge Work | Direction: Interchange 25: Right lane, Tuesday - Saturday, 7:00PM - 6:00AM *Night Work* | Minor | Weather Permitting |
Interchange Work | Gantry Work | Direction: Interchange 25A: Alternating right shoulder or left shoulder, Tuesday - Friday, 8:00AM - 5:00PM Eastbound; Tuesday - Friday, 6:00AM - 4:00PM Westbound Direction: Interchange 25 Interchange Work: Alternating right lane with the left lane, Tuesday - Friday, 10:00AM - 2:00PM Eastbound; Tuesday - Friday, 9:00AM - 2:00PM Westbound | None | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
20 & 21 | Road Work | North: Right lane, Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
21B & 21 | Road Work | North: Right lane, Wednesday, 8:00AM - 12:00 Noon South: Right lane, Tuesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
22 & 23 | Bridge Inspection | North: Right shoulder, Wednesday, 8:00AM - 10:00AM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
24 & 25 | Bridge Inspection | West: Left lane, Wednesday, 8:00AM - 11:00AM | Minor | Weather Permitting |
26 & 25A | Bridge Inspection | East: Right shoulder, Wednesday, 11:00AM - 1:00PM | Minor | Weather Permitting |
26 & 27 | Guide Rail Installation | West: Left lane, Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
For The Week Starting Monday 09/08/2025
Albany Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
B1 & 21A | Bridge Construction | East: Other, Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice. West: Left lane, Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice. | Minimal | Weather Permitting |
B2 & B1 | Bridge Work | West: Right lane, Monday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
B3 & B2 | Guide Rail Installation | West: Alternating right lane with the left lane, Wednesday & Thursday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Interchange Work | Bridge Work | Direction: Interchange 25: Right lane, Monday - Friday, 7:00PM - 6:00AM *Night Work* | Minor | Weather Permitting |
Interchange Work | Gantry Work | Direction: Interchange 25 Interchange Work: Alternating right lane with the left lane, Monday - Friday, 10:00AM - 2:00PM Eastbound; Monday - Thursday, 9:00AM - 2:00PM; Friday, 9:00AM - 1:00PM Westbound Direction: Interchange 25A: Alternating right lane with the left lane, Monday - Friday, 8:00AM - 5:00PM Eastbound; Monday - Friday, 6:00AM - 4:00PM Westbound | None | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
21 & 20 | Road Work | North: Left lane, Tuesday & Wednesday, 7:00AM - 1:00PM South: Right lane, Monday, 7:00AM - 12:00 Noon | Minimal | Weather Permitting |
21B & 21A | Road Work | North: Left lane, Thursday, 9:00AM - 11:00AM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
24 & 25 | Bridge Inspection | West: Right shoulder, Monday, 9:00AM - 2:00PM | Minimal | Weather Permitting |
26 & 27 | Guide Rail Installation | West: Right lane, Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
Back to Top
Mid-Hudson Region
For The Week Starting Monday 09/01/2025
Mid-Hudson Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
17 & 16 | Other | North: Right lane, Tue 9pm-10am Wed 7pm-9am Thur 8pm-7am Fri 9pm-7am North: Right shoulder, Thur 6am-4pm North: Left lane, Tue 9pm-9am Wed 7pm-9am North: Right lane, Tue 9pm-9am Wed 7pm-9am South: Left shoulder, Wed 6am-6pm South: Right shoulder, Thur 6am-6pm | None | None |
18 & 16 | Other | South: Right lane, Tue 9pm-7am Wed 6pm-7am Thur 8pm-7am South: Left lane, Tue 9pm-7am Wed 6pm-7am Thur 8pm-7am South: Right lane, Thur 8pm-7am Fri 8pm-9am | None | None |
19 & 18 | Bridge Construction | North: Right lane, Thursday & Friday, 7:00AM - 5:00PM North: Both lanes, NB traffic shifted to SB side of bridge until further notice. South: Left lane, Thursday & Friday, 7:00AM - 5:00PM North: Right lane, Thursday & Friday, 7:00AM - 5:00PM North: Left lane, Thursday & Friday, 7:00AM - 5:00PM South: Left lane, Thursday & Friday, 7:00AM - 5:00PM South: Right lane, Wednesday - Friday, 7:00AM - 5:00PM South: Left lane, Tuesday, 7:00AM - 5:00PM Wednesday - Friday, 7:00AM - 5:00PM | Minor | Weather Permitting |
20 & 21 | Road Work | North: Right lane, Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
For The Week Starting Monday 09/08/2025
Mid-Hudson Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
17 & 16 | Other | North: Alternating right lane with the left lane, Mon 6pm-11am Tue 7pm-10am North: Left lane, Tue 7pm-10am North: Left lane, Wed 7pm-9am North: Left lane, Thur 8pm-7am North: Left lane, Fri 10pm-7am North: Right shoulder, Mon 6am-6pm North: Ramp, Alt LSH/RSH closure Tue-Wed 6am-6pm Thur 6am-7pm LSH closure Fri 6am-7pm South: Right lane, Mon 7pm-7am South: Alternating right lane with the left lane, Sun 9pm-7am | None | None |
18 & 16 | Other | South: Alternating right lane with the left lane, Thur 8pm-7am Fri 8pm-9am | None | None |
18 & 19 | Road Work | North: Alternating right lane with the left lane, Monday, 9:00AM - 11:00AM; Tuesday & Wednesday, 9:00AM - 12:00 Noon; Thursday & Friday, 6:00AM - 2:00PM | Moderate | Weather Permitting |
18 & 19 | Bridge Construction | North: Both lanes, NB traffic shifted to SB side of bridge until further notice. | Minor | Weather Permitting |
19 & 18 | Road Work | South: Alternating right lane with the left lane, Monday, 6:00AM - 9:00AM; Tuesday & Wednesday, 6:00AM - 12:00 Noon; Thursday, 6:00AM - 10:00AM; Friday, 6:00AM - 9:00AM | Moderate | Weather Permitting |
21 & 20 | Road Work | North: Left lane, Tuesday & Wednesday, 7:00AM - 1:00PM South: Right lane, Monday, 7:00AM - 12:00 Noon | Minimal | Weather Permitting |
Back to Top
New York Region
For The Week Starting Monday 09/01/2025
New York Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
1 & 2 | Bridge Inspection | East: Right shoulder, Wed-Thur 10am-3pm | None | None |
4 & 5 | Bridge Construction | East: Right shoulder, Wed 10am-2pm | None | None |
5 & 1 | Bridge Inspection | West: Right shoulder, Wed-Thur 9am-2pm | None | None |
5 & 7 | Bridge Construction | East: Right shoulder, Wed 10am-2pm | None | None |
7 & 9 | Paving | East: Left lane, Tue 9pm-6am Wede 8pm-6am East: Left and center lanes, Tue 11pm-6am Wed 10pm-6am | None | None |
9A & 11 | Paving | East: Ramp, Ramp E Alt RT/LT LN closure Tue 11pm-6am Wed-Thur 10pm-6am | None | None |
9A & 12 | Paving | East: Ramp, Ramps C, G, H, Q Tue 11pm-6am Wed-Thur 10pm-6am | None | None |
9A & 11 | Paving | East: Left lane, Thur 7pm-6am | None | None |
9 & 11 | Paving | East: Left and center lanes, Thur 9pm-6am | None | None |
9 & 10 | Bridge Construction | East: Right shoulder, Tue-Fri 10am-3pm | None | None |
11 & 8 | Paving | West: Right and center lanes, Tue 11pm-6am Wed-Thur 10pm-6am West: Right lane, Tue-Thur 9pm-6am | None | None |
11 & 10 | Bridge Construction | West: Right shoulder, Tue-Thur 8am-3pm Fri 8am-2pm | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
7 & 8 | Bridge Construction | North: Right shoulder, Tue-Fri 8am-3pm | None | None |
12 & 13 | Bridge Construction | North: Right shoulder, Tue-Thur 9am-3pm Fri 9am-1pm | None | None |
12 & 14 | Bridge Work | North: Left lane, Tue-Thur 9pm-7am North: Left and center lanes, Tue-Thur 12am-6am W | None | None |
14 & 13 | Bridge Work | South: Left and center lanes, Tue-Wed 11pm-5am Thur 12am-5am South: Right lane, Tue 9pm-6am Wed 8pm-6am Thur 9pm-5am South: Left lane, Tue 9pm-6am Wed 8pm-6am Thur 9pm-5am | None | None |
14A & 14 | Bridge Inspection | South: Left lane, Wed 11am-12pm | Minimal | None |
14B & 15 | Shoulder Work | North: Alternating right lane with the left lane, Wed 6am-11am North: Right shoulder, Mon-Fri 6am-3pm | None | None |
15A & 14B | Shoulder Work | South: Right shoulder, Mon & Wed-Fri 10am-3pm | None | None |
16 & 14B | Bridge Construction | South: Right shoulder, Tue-Fri 9am-3pm | None | None |
16 & 15 | Bridge Construction | South: Right shoulder, Tue-Fri 9am-2pm | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
18A & 14 | Shoulder Work | North: Right lane, Tue 9pm-7am Wed-Thur 7pm-7am Fri 9pm-8am North: Right and center lanes, Tue-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am North: Right shoulder, Tue-Fri 9am-3pm & 6pm-7am North: Ramp, Alt RT/LT shoulder closures: Exit 15 NB on-ramp & off-ramp Exit 16 NB on-ramp & Off-ramp Exit 17 NB off-ramp River St on-ramp to NB 95 Tue-Fri 9am-3:30pm & 7pm-7am South: Left and center lanes, Tue-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am South: Right shoulder, Tue-Fri 7am-3pm & 7pm-7am South: Ramp, Alt RT/LT shoulder closures: Exit 15 SB on-ramp & off-ramp Exit 16 SB on-ramp & Off-ramp Exit 17 SB on-ramp River St on-ramp to NB 95 Tue-Fri 7:30am-3:30pm & 7pm-7am South: Left lane, Tue 9pm-7am Wed-Thur 8pm-7am Fri 9pm-8am | None | None |
19 | Paving | North: Right lane, RT LN +RSH Wed-Fri 10pm-6am | None | None |
For The Week Starting Monday 09/08/2025
New York Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
7 & 9 | Paving | East: Left lane, Tue-Thu 8pm-6am East: Left and center lanes, Tue-Thur 10pm-6am | None | None |
9A & 12 | Paving | East: Left lane, Sun 8pm-6am | None | None |
10 & 9 | Paving | West: Ramp, Ramp 9N-S closure Tue-Thur 10pm-6am | None | None |
9 & 12 | Paving | East: Left and center lanes, Sun 12am-6am | None | None |
9 & 10 | Bridge Construction | East: Right shoulder, Mon-Fri 10am-3pm | None | None |
11 & 7 | Paving | West: Left and center lanes, Tue-Thur 10pm-6am West: Left lane, Tue-Thur 9pm-6am | None | None |
11 & 10 | Bridge Construction | West: Right shoulder, Mon-Thur 8am-3pm Fri 8am-2pm | None | None |
12 & 8 | Paving | West: Left lane, Sun, Mon 9pm-6am West: Left and center lanes, Sun 11pm-6am Mon 10pm-6am | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
7 & 8 | Bridge Construction | North: Right shoulder, Mon-Fri 8am-3pm | None | None |
12 & 9 | Other Long Range: Nyack Mtc. | South: Right and center lanes, Mon 11:15pm-4:55am | Minimal | None |
12 & 13 | Bridge Construction | North: Right shoulder, Mon-Thur 9am-3pm Fri 9am-1pm | None | None |
12 & 14 | Bridge Work | North: Left lane, Mon 8pm-6am Tue-Thur 9pm-6am North: Left and center lanes, Mon 11pm-6am Tue-Thur 12am-6am | None | None |
14 & 13 | Bridge Work | South: Right lane, Mon-Wed 8pm-5am Thur 9pm-5am South: Left and center lanes, Mon-Wed 11pm-5am Thur 12am-5am South: Left lane, Mon-Wed 8pm-5am Thur 9pm-5am | None | None |
14A & 14 | Bridge Inspection | South: Left lane, Wed 11am-12pm | Minimal | None |
14B & 15 | Shoulder Work | North: Right shoulder, Mon-Fri 6am-3pm North: Alternating right lane with the left lane, Mon-Wed 6am-11am Thur 6am-7am & 9am-10am Fri 6am-7am | None | None |
15A & 14B | Shoulder Work | South: Right shoulder, Mon-Fri 10am-3pm | None | None |
16 & 15 | Bridge Construction | South: Right shoulder, Mon-Fri 9am-3pm South: Right shoulder, Mon-Fri 9am-2pm | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
14 & 18A | Shoulder Work | North: Right lane, Mon-Thur 7pm-7am Fri 9pm-8am Sun 10pm-7am | None | None |
14 & 16 | Bridge Inspection | North: Alternating right lane with the left lane, Mon 7pm-7am Fri 9pm-8am | None | None |
14 & 18A | Shoulder Work | North: Right and center lanes, Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am Sun 12am-5:30am North: Ramp, Alt RT/LT shoulder closures: Exit 15 NB on-ramp & off-ramp Exit 16 NB on-ramp & Off-ramp Exit 17 NB off-ramp River St on-ramp to NB 95 Mon-Fri 9am-3:30pm & 7pm-7am Sun 10pm-9am North: Right shoulder, Mon-Fri 9am-3pm & 6pm-7am Sun 6pm-7am | None | None |
15 & 16 | Bridge Inspection | North: Left lane, Tue-Wed 10am-10:15am | None | None |
17 & 15 | Bridge Inspection | South: Left lane, Tue-Wed 10:30am-10:45am | None | None |
17 & 15 | Bridge Inspection | South: Alternating right lane with the left lane, Fri 9pm-9am South: Alternating right lane with the left lane, Mon 8pm-6am | None | None |
18A & 14 | Shoulder Work | South: Left and center lanes, Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am Sun 12am-5:30am South: Ramp, Alt RT/LT shoulder closures: Exit 15 SB on-ramp & off-ramp Exit 16 SB on-ramp & Off-ramp Exit 17 SB on-ramp River St on-ramp to NB 95 Mon-Fri 7:30am-3:30pm & 7pm-7am Sun 7pm-7am South: Left lane, Mon-Thur 8pm-7am Fri 9pm-9am Sun 10pm-7am South: Right shoulder, Mon-Fri 7am-3pm & 7pm-7am Sun 7pm-7am | None | None |
19 | Paving | North: Right lane, RT LN +RSH Mon-Tue 9pm-6am | None | None |