Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 05/19/2025
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
56 & 49  Bridge Construction  West: Left lane,
Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. Ramp/Mobile Lane Closure- Multiple Direction- MP- 419-430, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25.

East: Left lane,
Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25.

 
None  None 
57 & 55  Highway Construction  East: Alternating right lane with the left lane,
Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25.

East: Alternating right lane with the left lane,
Wednesday 5/21/25 8:00pm-6:00am Thursday 5/22/25.

 
Minimal  None 
56 & 57  Highway Construction  East: Alternating right lane with the left lane,
Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25.

West: Alternating right lane with the left lane,
Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25.

 
Minimal  None 
60 & 58  Road Work  East: Left lane,
Monday 5/19/25 7:00am-12:00pm. Tuesday 5/20/25 7:00am-12:00pm Wednesday 5/21/25 7:00am-12:00pm. Thursday 5/22/25 7:00am-12:00pm.

 
Minimal  None 
60 & 59  Bridge Inspection  West: Left lane,
Tuesday 5/6/25 12:00pm-2:00pm.

West: Right lane,
Tuesday 5/6/25 10:00am-12:00pm.

East: Right lane,
Tuesday 5/6/25 6:00am-8:00am

East: Left lane,
Tuesday 5/6/25 8:00am-10:00am

 
Minimal  None 
60 & 59  Road Work  East: Alternating right lane with the left lane,
Monday 5/19/25 7:00am-12:00pm. Tuesday 5/20/25 7:00am-12:00pm. Wednesday 5/21/25 7:00am-12:00pm. Thursday 5/22/25 7:00am-12:00pm.

East: Left lane,
Thursday 5/22/25 7:00am-3:00pm.

East: Right lane,
Monday 5/19/25 7:00am-2:00pm Monday 5/22/25. CONTINUOUS CLOSURE.

 
Minimal  None 
60 & 61  Road Work  West: Right lane,
Tuesday 5/20/25 6:00am-12:00pm Thursday 5/22/25. Continuous Closure.

 
Minimal  None 


For The Week Starting Monday 05/26/2025
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
56 & 49  Bridge Construction  West: Ramp,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

West: Left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

East: Left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

 
None  None 
57 & 55  Highway Construction  East: Right lane,
Wednesday 5/28/25 8:00pm-6:00am Thursday 5/29/25.

 
Minimal  None 
57A & 56  Highway Construction  East: Right lane,
Friday 5/30/25 8:00pm-6:00am Saturday 5/31/25.

 
Minimal  None 
57A & 57  Highway Construction  East: Right lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25.

 
Minimal  None 
58 & 59  Paving  West: Right lane,
Tuesday 5/27/25 7:00am-7:00pm. Wednesday 5/28/25 7:00am-7:00pm. Thursday 5/29/25 7:00am-7:00pm. Long Term Closure 7am Tuesday- 7pm Thursday.

 
None  None 
60 & 58  Road Work  East: Right lane,
Tuesday 5/27/25 7:00am-12:00pm Wednesday 5/28/25 7:00am-12:00pm. Thursday 5/29/25 7:00am-12:00pm. Friday 5/30/25 7:00am-12:00pm.

 
Minimal  None 
60 & 59  Road Work  East: Alternating right lane with the left lane,
Tuesday 5/27/25 7:00am-12:00pm. Wednesday 5/28/25 7:00am-12:00pm. Thursday 5/29/25 7:00am-12:00pm. Friday 5/30/25 7:00am-12:00pm.

East: Right lane,
Tuesday 5/27/25 7:00am-12:00pm Friday 5/30/25. CONTINUOUS CLOSURE.

 
Minimal  None 
60 & 61  Road Work  West: Right lane,
Tuesday 5/27/25 6:00am-11:00am Friday 5/30/25. Continuous Closure, Tuesday through Friday.

 
Minimal  None 

Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 05/19/2025
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
56 & 49  Bridge Construction  West: Left lane,
Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. Ramp/Mobile Lane Closure- Multiple Direction- MP- 419-430, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25.

East: Left lane,
Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25.

 
None  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 21  Pavement Striping  North: Alternating right lane with the left lane,
Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25.

 
Minimal  None 
1 & 4  Road Work  North: Left 2 lanes,
Sunday 5/18/25 11:00pm-5:00am 5/19/25 Monday. Monday 5/19/25 11:00pm-5:00am 5/20/25 Tuesday. Tuesday 5/20/25 11:00pm-5:00am 5/21/25 Wednesday.

 
Minimal  None 
6 & 7  Bridge Construction  North: Alternating right lane with the left lane,
Monday 5/19/25 6:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 6:00pm-6:00am Wednesday 5/21/25.

 
None  None 
7 & 8  Bridge Construction  North: Alternating right lane with the left lane,
Wednesday 5/21/25 6:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 6:00pm-6:00am Friday 5/23/25.

 
None  None 
21 & 20  Bridge Construction  North: Right lane,
Monday 5/12/25 9:00pm-6:00am Tuesday 5/13/25. Thursday 5/15/25 9:00pm-6:00am Friday 5/16/25.

South: Right lane,
Thursday 5/15/25 9:00pm-6:00am Friday 5/16/25.

 
Minimal  None 
21 & 1  Pavement Striping  South: Alternating right lane with the left lane,
Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25.

 
Minimal  None 


For The Week Starting Monday 05/26/2025
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
56 & 49  Bridge Construction  West: Ramp,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

West: Left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

East: Left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

 
None  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 21  Pavement Striping  North: Alternating right lane with the left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

 
Minimal  None 
1 & 4  Road Work  North: Left 2 lanes,
Sunday 5/18/25 11:00pm-5:00am 5/19/25 Monday. Monday 5/19/25 11:00pm-5:00am 5/20/25 Tuesday. Tuesday 5/20/25 11:00pm-5:00am 5/21/25 Wednesday.

 
Minimal  None 
7 & 8  Paving  North: Alternating right lane with the left lane,
Monday 5/26/25 6:00pm-6:00am Tuesday 5/27/25.

 
None  None 
20  Bridge Construction  North: Right lane,
Tuesday 5/27/25 10:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 10:00pm-6:00am Thursday 5/29/25. Friday 5/30/25 11:00pm-6:00am Saturday 5/31/25.

 
Minimal  None 
21 & 1  Pavement Striping  South: Alternating right lane with the left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

 
Minimal  None 

Back to Top

Rochester Region


For The Week Starting Monday 05/19/2025
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
42 & 43  Road Work  East: Right lane,
WED-THU 2:30AM-7AM

West: Right lane,
TUE 7:30AM-noon

 
Minimal  Weather permitting 
43 & 45  Paving  West: Right 2 lanes,
MON-WED 8PM - TUE-THU 5AM

West: Left lane,
SUN-SAT CONTINUOUS

 
Moderate  None 
44 & 45  Paving  West: Right lane,
MON-SAT Rt Decel CONTINUOUS

 
Moderate  None 
45 & 46  Paving  West: Left lane,
Tuesday 5/20/25 6:00pm-8:00am Wednesday 5/21/25.

 
Minimal  None 
46 & 43  Paving  East: Left lane,
SUN-SAT Continuous

East: Right lane,
MON-WED 7:30AM - THU 5AM

 
Moderate  None 
45 & 46  Paving  East: Left lane,
Monday 5/19/25 6:00pm-10:00am.

West: Left lane,
Wednesday 5/21/25 6:00pm-8:00am 5/22/25 Thursday.

 
Minimal  None 
46 & 45  Bridge Work  West: Alternating right lane with the left lane,
Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25.

East: Alternating right lane with the left lane,
Sunday 5/18/25 9:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/21/25.

East: Right shoulder,
Monday 5/19/25 7:00am-4:00pm. Tuesday 5/20/25 7:00am-4:00pm. Wednesday 5/21/25 7:00am-4:00pm. Thursday 5/22/25 7:00am-4:00pm.

 
Minimal  None 
47 & 46  Road Work  West: Right lane,
Friday 5/16/25 7:00am-10:00am.

West: Left lane,
Friday 5/16/25 10:00am-2:00pm.

East: Alternating right lane with the left lane,
Thursday 5/15/25 7:00am-2:00pm.

 
Minimal  None 
46 & 47  Bridge Work  West: Right shoulder,
Monday 5/19/25 7:00am-4:00pm. Tuesday 5/20/25 7:00am-4:00pm. Wednesday 5/21/25 7:00am-4:00pm. Thursday 5/22/25 7:00am-4:00pm.

 
Minimal  None 
48 & 47  Road Work  East: Right lane,
Monday 5/12/25 2:00am-7:00am.

 
None  None 
48A & 49  Road Work  West: Right lane,
Tuesday 5/13/25 2:00am-7:00am.

 
None  None 
56 & 49  Bridge Construction  West: Left lane,
Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. Ramp/Mobile Lane Closure- Multiple Direction- MP- 419-430, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25.

East: Left lane,
Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25.

 
None  None 


For The Week Starting Monday 05/26/2025
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
42 & 43  Road Work  West: Right lane,
TUE 7PM-9AM, WED 7PM-8AM, THU 8PM-8AM, FRI 10PM-9AM

 
Minimal  None 
43 & 42  Road Work  East: Right lane,
FRI-SAT 9PM-7AM

 
Minimal  Weather permitting 
45 & 43  Paving  West: Right shoulder,
TUE-FRI 7AM-5PM

West: Left lane,
SUN-SAT CONTINUOUS

East: Right shoulder,
THU-FRI 8PM - SAT 5AM

 
Moderate  None 
44 & 45  Paving  West: Right lane,
MON-SAT Rt Decel CONTINUOUS

 
Moderate  None 
45 & 46  Paving  West: Left lane,
Tuesday 5/27/25 6:00pm-8:00am 5/28/25 Wednesday.

 
Minimal  None 
46 & 43  Paving  East: Left lane,
SUN-SAT Continuous

 
Moderate  None 
45 & 46  Paving  West: Left lane,
Wednesday 5/28/25 6:00pm-8:00am 5/29/25 Thursday.

 
Minimal  None 
45 & 46  Bridge Work  West: Left lane,
Monday 5/26/25 9:00pm-6:00am 5/27/25 Tuesday. Waiver for Monday Night

West: Alternating right lane with the left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25.

 
Minimal  None 
45 & 46  Paving  West: Left lane,
Thursday 5/29/25 7:00pm-8:00am 5/30/25 Friday.

 
Minimal  None 
46 & 45  Bridge Work  East: Alternating right lane with the left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25.

 
Minimal  None 
45 & 46  Paving  West: Left lane,
Friday 5/30/25 8:00pm-10:00am 5/31/25 Saturday.

 
Minimal  None 
47 & 46  Road Work  West: Right lane,
Friday 5/16/25 7:00am-10:00am.

West: Left lane,
Friday 5/16/25 10:00am-2:00pm.

East: Alternating right lane with the left lane,
Thursday 5/15/25 7:00am-2:00pm.

 
Minimal  None 
48 & 47  Road Work  East: Right lane,
Monday 5/12/25 2:00am-7:00am.

 
None  None 
48A & 49  Road Work  West: Right lane,
Tuesday 5/13/25 2:00am-7:00am.

 
None  None 
56 & 49  Bridge Construction  West: Ramp,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

West: Left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

East: Left lane,
Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25.

 
None  None 

Back to Top

Syracuse Region


For The Week Starting Monday 05/19/2025
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
34 & 33  Road Work  East: Right lane,
TUE-WED 8AM-1PM

 
Minimal  Weather permitting 
34A & 34  Road Work  East: Left lane,
MON-WED 7AM-2PM, THU 7AM-noon

 
Minimal  Weather permitting 
35 & 34  Ramp Work  West: Alternating right lane with the left lane,
TUE 9AM-1PM

East: Alternating right lane with the left lane,
MON-WED 7AM-2PM, THU 7AM-noon

 
Minimal  None 
34A & 36  Bridge Construction  West: Right lane,
MON-WED 6:30AM-1PM, THU 6:30AM-noon

 
Minimal  None 
37 & 35  Road Work  East: Left lane,
TUE-WED 7AM-2PM, THU 7AM-noon

 
Minimal  Weather permitting 
38 & 36  Road Work  East: Right lane,
WED 7AM-2PM

 
Minimal  Weather permitting 
40 & 39  Road Work  East: Right lane,
WED 7:30AM-2PM

 
Minimal  Weather permitting 
39 & 41  Road Work  West: Right lane,
TUE 7:30AM-2PM

 
Minimal  Weather permitting 
40 & 41  Road Work  West: Alternating right lane with the left lane,
MON 7:30AM-2PM

East: Alternating right lane with the left lane,
MON 7:30AM-2PM

West: Alternating right lane with the left lane,
MON-WED 7:30AM-2PM

 
Minimal  Weather permitting 
41 & 40  Bridge Construction  West: Alternating right lane with the left lane,
MON 6AM-1PM, TUE 6AM-3PM

East: Alternating right lane with the left lane,
MON 6AM-1PM, TUE 6AM-3PM

 
None  None 
40 & 42  Road Work  West: Right lane,
TUE 6PM-9AM, WED 7PM-8AM

West: Left lane,
MON 6PM-9AM, THU 7PM-8AM

 
Minimal  None 
42 & 43  Road Work  East: Right lane,
WED-THU 2:30AM-7AM

West: Right lane,
TUE 7:30AM-noon

 
Minimal  Weather permitting 


For The Week Starting Monday 05/26/2025
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Paving  Direction: Exit 44 off-ramp: Ramp,
FRI 8PM - SAT 5AM

 
Moderate  None 
34 & 34A  Road Work  West: Left lane,
TUE-THU 7AM-2PM

 
Minimal  Weather permitting 
34 & 34A  Pavement Striping  West: Right lane,
THU 7PM-9PM

West: Left lane,
FRI midnite-2AM

 
Minimal  None 
34A & 34  Road Work  East: Right lane,
WED 7AM-2PM

 
Minimal  Weather permitting 
34A & 34  Pavement Striping  East: Left lane,
FRI 2AM-5AM

West: Right lane,
FRI 9PM-11PM

West: Left lane,
SAT 1AM-3AM

East: Right lane,
THU 9PM-midnite

 
Minimal  None 
34 & 35  Ramp Work  West: Alternating right shoulder or left shoulder,
TUE-FRI 9PM-7AM, FRI/SAT 9PM-7AM

 
Minimal  None 
34A & 34  Pavement Striping  East: Left lane,
SAT 3AM-5AM

East: Right lane,
FRI-SAT 11PM-1AM

 
Minimal  None 
34A & 36  Bridge Construction  West: Left lane,
TUE-FRI 9AM-2PM

 
Minimal  None 
36 & 35  Bridge Construction  East: Left lane,
TUE-FRI 9AM-2PM

 
Minimal  None 
37 & 35  Road Work  East: Left lane,
TUE-WED 7AM-2PM

 
Minimal  Weather permitting 
39 & 40  Road Work  West: Right lane,
THU 7:30AM-2:30PM

 
Minimal  Weather permitting 
39 & 41  Road Work  West: Right lane,
TUE 7:30AM-2PM

 
Minimal  Weather permitting 
40 & 41  Bridge Work  West: Alternating right lane with the left lane,
TUE-THU 6AM-10AM, FRI 6AM-9AM

 
Minimal  None 
41 & 40  Bridge Construction  West: Alternating right lane with the left lane,
TUE-THU 6AM-10AM, FRI 6AM-9AM

East: Alternating right lane with the left lane,
TUE-THU 6AM-10AM, FRI 6AM-9AM

 
Minimal  None 
42 & 43  Road Work  West: Right lane,
TUE 7PM-9AM, WED 7PM-8AM, THU 8PM-8AM, FRI 10PM-9AM

 
Minimal  None 
43 & 42  Road Work  East: Right lane,
FRI-SAT 9PM-7AM

 
Minimal  Weather permitting 

Back to Top

Utica Region


For The Week Starting Monday 05/19/2025
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Bridge Construction  West: Alternating right lane with the left lane,
Monday - Wednesday, 7:00AM - 5:00PM Thursday, 7:00AM - 12:00 Noon

East: Alternating right lane with the left lane,
Monday - Wednesday, 7:00AM - 5:00PM Thursday, 7:00AM - 12:00 Noon

 
Minimal  Weather Permitting 
29A & 29  Road Work  East: Right lane,
MON-WED 6AM-5PM, THU 6AM-noon

 
Minor  None 
31 & 29A  Bridge Construction  West: Alternating right lane with the left lane,
MON-WED 7AM-4PM, THU 7AM-noon

East: Alternating right lane with the left lane,
MON-WED 7AM-4PM, THU 7AM-noon

 
Minimal  None 
32 & 31  Road Work  West: Right lane,
MON 8AM-2PM

East: Left lane,
MON 7:30AM-2PM

 
Minimal  Weather permitting 
32 & 31  Bridge Construction  West: Alternating right lane with the left lane,
MON-WED 6AM-7PM, THU 6AM-noon

East: Alternating right lane with the left lane,
MON-WED 6AM-7PM, THU 6AM-noon

 
Minimal  None 
34 & 33  Road Work  East: Right lane,
TUE-WED 8AM-1PM

 
Minimal  Weather permitting 


For The Week Starting Monday 05/26/2025
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
27 & 28  Bridge Construction  West: Other,
WB traffic shifted to EB side of bridge until further notice.

 
Minimal  Weather Permitting 
29A & 29  Road Work  East: Right lane,
WED-THU 6AM-5PM, FRI 6AM-noon

 
Minor  None 
30 & 29A  Road Work  East: Right lane,
WED-THU 7AM-2PM

 
Minimal  Weather permitting 
31 & 32  Road Work  West: Right lane,
MON 8AM-2PM

East: Left lane,
WED-THU 7:30AM-2PM

West: Right lane,
WED-THU 8AM-2PM

 
Minimal  Weather permitting 

Back to Top

Albany Region


For The Week Starting Monday 05/19/2025
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Road Work  East: Left lane,
Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

West: Left lane,
Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

 
Minimal  Weather Permitting 
21A & B2  Pavement Striping  East: Alternating right lane with the left lane,
Tuesday, 7:00PM - 10:00PM Wednesday, 12:00 Midnight - 3:00AM *Night Work* *Mobile Maintenance*

 
Minimal  Weather Permitting 
B1 & B3  Pavement Striping  East: Alternating right lane with the left lane,
Wednesday, 7:00PM - 10:00PM Thursday, 12:00 Midnight - 3:00AM

 
Minimal  Weather Permitting 
B2 & 21A  Pavement Striping  West: Alternating right lane with the left lane,
Tuesday, 10:00PM - 12:00 Midnight Wednesday, 3:00AM - 6:00AM *Night Work* *Mobile Maintenance*

 
Minimal  Weather Permitting 
B3 & B1  Pavement Striping  West: Alternating right lane with the left lane,
Wednesday, 10:00PM - 12:00 Midnight Thursday, 3:00AM - 6:00AM *Night Work* *Mobile Maintenance*

 
Minimal  Weather Permitting 
B2 & B3  Road Work  East: Left lane,
Monday - Wednesday, 7:00AM - 2:00PM Thursday, 7:00AM - 12:00 Noon

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Road Work  Road Work  Direction: Interchange 25A: Right lane,
Monday, 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
Interchange Work  Road Work  Direction: Interchange 25A: Right shoulder,
Tuesday & Wednesday, 7:00AM - 5:00PM

Direction: Interchange 25: Right lane,
Tuesday, 9:00AM - 3:00PM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21B & 20  Pavement Striping  North: Left lane,
Monday - Tuesday, 11:00PM - 2:00AM *Night Work* *Mobile maintenance*

North: Right lane,
Monday, 7:00PM - 8:00PM *Night Work* *Mobile maintenance*

South: Left lane,
Monday, 8:00PM - 11:00PM *Night Work* *Mobile Maintenance*

 
Minimal  Weather Permitting 
21 & 21B  Road Work  North: Right lane,
Tuesday, 9:00AM - 1:00PM

 
Moderate  Weather Permitting 
21A & 22  Road Work  North: Left shoulder,
Monday, 7:00AM - 2:00PM

 
None  Weather Permitting 
21A & 23  Road Work  North: Right lane,
Wednesday, 9:00AM - 12:00 Noon

 
Moderate  Weather Permitting 
22 & 21A  Road Work  South: Left shoulder,
Monday, 7:00AM - 2:00PM

 
None  Weather Permitting 
23 & 22  Toll Plaza Work  North: Alternating right lane with the left lane,
Wednesday, 9:00AM - 12:00 Noon

South: Alternating right lane with the left lane,
Thursday, 7:00AM - 9:00AM

 
Minimal  Weather Permitting 
23 & 24  Bridge Work  North: Left lane,
Monday, 8:00AM - 10:00AM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
24 & 25  Road Work  West: Right lane,
Thursday, 7:00AM - 12:00 Noon *Mobile Maintenance*

West: Right 2 lanes,
Tuesday & Wednesday, 7:00AM - 1:00PM *Mobile Maintenance*

 
Minimal  Weather Permitting 
25 & 24  Road Work  East: Right lane,
Tuesday, 9:00AM - 4:00PM

 
Minimal  Weather Permitting 
24 & 25A  Road Work  West: Right lane,
Tuesday, 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
25 & 24  Road Work  East: Right lane,
Tuesday - Wednesday, 10:00AM - 1:00PM Thursday, 10AM - 12:00 Noon * Mobile Maintenance*

 
Minimal  Weather Permitting 
25A & 25  Road Work  West: Right lane,
Wednesday, 8:00AM - 4:00PM

East: Right lane,
Wednesday, 8:00AM - 4:00PM

West: Left lane,
Monday & Tuesday, 6:00AM - 4:00PM

East: Left lane,
Monday & Tuesday, 8:00AM - 5:00PM

 
Minimal  Weather Permitting 
26 & 25A  Road Work  East: Left lane,
Tuesday, 8:00AM - 4:00PM

 
Minimal  Weather Permitting 
27 & 26  Road Work  East: Left lane,
Wednesday, 7:00AM - 1:00PM

East: Left lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
26 & 27  Guide Rail Installation  West: Right lane,
Monday, 7:00AM - 1:00PM Thursday, 7:00AM - 12:00 Noon

 
Minimal  Weather Permitting 


For The Week Starting Monday 05/26/2025
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21A & B1  Bridge Construction  East: Other,
Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

 
Minimal  Weather Permitting 
B1 & 21A  Other  West: Left lane,
Thursday & Friday, 7:00AM - 5:00PM

 
Minor  Weather Permitting 
B1 & 21A  Bridge Construction  West: Left lane,
Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

 
Minimal  Weather Permitting 
B2 & B1  Bridge Work  East: Right lane,
Wednesday, 7:00AM - 10:00AM

West: Right lane,
Wednesday, 11:00 - 2:00PM

 
Minimal  Weather Permitting 
B3 & B2  Bridge Work  East: Right lane,
Thursday, 7:00AM - 10:00AM

West: Right lane,
Thursday, 11:00 - 2:00PM

 
Minimal  Weather Permitting 
B2 & B3  Road Work  East: Right lane,
Wednesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Road Work  Road Work  Direction: Interchange 26: Right lane,
Tuesday & Wednesday, 7:00AM - 4:00PM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Toll Plaza Work  Direction: Interchange 26: Alternating right lane with the left lane,
Friday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21 & 21B  Other  North: Right lane,
Tuesday, 7:00AM - 2:00PM Wednesday, 7:00AM - 1:00PM Thursday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
24 & 25  Ramp Work  West: Left lane,
Wednesday & Thursday, 9:00AM - 12:00 Noon

 
Minimal  Weather Permitting 
25A & 24  Road Work  East: Right lane,
Wednesday, 11:00AM - 2:00PM * Mobile Maintenance*

 
Minimal  Weather Permitting 
25A & 25  Road Work  East: Right lane,
Tuesday - Friday, 8:00AM - 5:00PM

 
Minimal  Weather Permitting 
26 & 25  Road Work  West: Left lane,
Thursday, 7:00AM - 4:00PM

East: Left lane,
Thursday, 8:00AM - 4:00PM

 
Minimal  Weather Permitting 
26 & 25A  Road Work  East: Right shoulder,
Tuesday - Friday, 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
26 & 24  Road Work  East: Right lane,
Tuesday - Friday, 8:00AM - 2:00PM

 
Minimal  Weather Permitting 
25A & 27  Road Work  West: Left lane,
Thursday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
27 & 26  Guide Rail Installation  East: Right lane,
Wednesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
27 & 26  Bridge Inspection  West: Left lane,
Wednesday, 10:00AM - 11:00AM

West: Left lane,
Wednesday, 11:00AM - 1:00PM

East: Right lane,
Wednesday, 7:00AM - 9:00AM

East: Right lane,
Wednesday, 9:00AM - 10:00AM

 
Minimal  Weather Permitting 

Back to Top

Mid-Hudson Region


For The Week Starting Monday 05/19/2025
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 16  Other  North: Left lane,
Mon 6pm-9am Tues-Wed 7pm-9am Thurs 10pm-6am

South: Right lane,
Tues-Wed 6pm-7am Thurs 9pm-6am

South: Right lane,
Mon 7pm-7am

 
None  None 
18 & 19  Road Work  North: Alternating right lane with the left lane,
Tuesday, 2:00AM - 2:00PM *Night Work*

 
Minor  Weather Permitting 
18 & 19  Road Work  North: Right lane,
Tuesday, 9:00AM - 5:00PM Wednesday, 9:00AM - 11:00AM Thursday, 9:00AM - 12:00 Noon NB traffic shifted to SB side of bridge until further notice.

 
Minor  Weather Permitting 
19 & 20  Bridge Work  North: Right lane,
Tuesday, 5:00AM - 2:00PM

South: Right lane,
Tuesday, 5:00AM - 2:00PM

North: Right lane,
Wednesday, 5:00AM - 12:00 Noon

 
Minor  Weather Permitting 
21B & 20  Pavement Striping  North: Left lane,
Monday - Tuesday, 11:00PM - 2:00AM *Night Work* *Mobile maintenance*

North: Right lane,
Monday, 7:00PM - 8:00PM *Night Work* *Mobile maintenance*

South: Left lane,
Monday, 8:00PM - 11:00PM *Night Work* *Mobile Maintenance*

 
Minimal  Weather Permitting 


For The Week Starting Monday 05/26/2025
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 16  Other  North: Left lane,
Thurs 8pm-7am

South: Right lane,
Tues-Wed 6pm-7am

South: Left lane,
Thurs 8pm-7am

 
None  None 
18 & 16  Other  South: Right lane,
Fri 8pm-9am

 
None  None 
18 & 19  Bridge Construction  North: Right lane,
Tuesday, 6:00AM - 10:00AM Wednesday, 6:00AM - 1:00PM NB traffic shifted to SB side of bridge until further notice.

 
Minor  Weather Permitting 

Back to Top

New York Region


For The Week Starting Monday 05/19/2025
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 3  Bridge Construction  East: Right shoulder,
Mon-Thurs 9am-3pm

 
None  None 
5 & 1  Pavement Striping  West: Alternating right lane with the left lane,
LL/CL/RL Mon-Wed 9pm-5am

 
None  None 
5 & 2  Bridge Construction  West: Right shoulder,
Mon-Thurs 9am-3pm

 
None  None 
7 & 10  Paving  East: Right and center lanes,
Sun 10pm-6am Mon-Wed 8pm-6am

 
None  None 
9A  Paving  East: Right and center lanes,
Wed 8pm-6am

 
None  None 
9 & 8  Bridge Construction  West: Right shoulder,
Mon-Thurs 9am-3pm

 
None  None 
9A & 9  Bridge Construction  East: Right shoulder,
Mon-Thurs 9am-3pm

 
None  None 
10 & 9  Bridge Construction  East: Right shoulder,
Mon-Thurs 9am-3pm

West: Right shoulder,
Mon-Thurs 9am-3pm

 
None  None 
11 & 9  Bridge Construction  West: Right shoulder,
Mon-Thurs 9am-3pm

 
None  None 
11 & 10  Bridge Construction  West: Right shoulder,
Mon-Thurs 9am-3pm

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7A & 9  Bridge Construction  North: Right shoulder,
Mon-Fri 9am-3pm

 
None  None 
7A & 8  Paving  North: Right shoulder,
Mon-Thurs 9am-3pm

 
Minimal  None 
14B & 15  Shoulder Work  North: Right shoulder,
Mon-Thurs 6am-3pm

North: Alternating right lane with the left lane,
Mon-Thurs 6am-11am

 
None  None 
15A & 14B  Shoulder Work  South: Alternating right lane with the left lane,
Mon-Thurs 11am-2pm

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
8C & 22  Bridge Washing  North: Alternating right lane with the left lane,
Sun-Thurs 10pm-6am

 
Minimal  None 
13 & 8C  Road Work  South: Right and center lanes,
Mon-Wed 12am-5:30am Thurs 1am-5am

South: Right lane,
Mon-Wed 10pm-6am

 
None  None 
18A & 14  Shoulder Work  North: Right lane,
Mon-Thurs 7pm-7am

North: Center lane,
Mon-Wed 11pm-5:30am Thurs 11pm-5am

North: Alternating right shoulder or left shoulder,
Mon-Thurs 7:30am-3:30pm

North: Right shoulder,
Mon-Fri 7am-3pm

North: Right shoulder,
Mon-Thurs 6pm-8am

South: Center lane,
Mon-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am

South: Right shoulder,
Night Mon-Thurs 6pm-8am Day Mon-Thurs 7am-3pm

South: Right lane,
Mon-Thurs 8pm-7am

 
None  None 
19  Paving  North: Right 3 lanes,
RSH,RL,CL Mon 8pm-6am Wed 10pm-6am

North: Left 3 lanes,
LSH, LL, CL Sun 10pm-6am Tues 9pm-6am

 
None  None 
22 & 8B  Bridge Washing  South: Alternating right lane with the left lane,
Sun-Thurs 10pm-6am

 
Minimal  None 


For The Week Starting Monday 05/26/2025
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
5 & 1  Pavement Striping  West: Alternating right lane with the left lane,
LL/CL/RL Tues-Thurs 9pm-5am Fri 10pm-5am

 
None  None 
7 & 10  Paving  East: Left and center lanes,
Wed-Thurs 8pm-6am

 
None  None 
9 & 8  Bridge Construction  West: Right shoulder,
Tues-Fri 9am-3pm

 
None  None 
9A & 9  Bridge Construction  East: Right shoulder,
Tues-Fri 9am-3pm

 
None  None 
Paving  East: Right and center lanes,
Tues 7pm-6am Mon-Wed 8pm-6am

 
None  None 
10 & 9  Bridge Construction  East: Right shoulder,
Tues-Fri 9am-3pm

West: Right shoulder,
Tues-Fri 9am-3pm

 
None  None 
11 & 9  Bridge Construction  West: Right shoulder,
Tues-Fri 9am-3pm

 
None  None 
11 & 10  Bridge Construction  West: Right shoulder,
Tues-Fri 9am-3pm

 
None  None 
12 & 1  Paving  West: Right lane,
Actual MP 10.80-7.50 Tues-Thurs 7pm-7am

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7 & 8  Bridge Construction  North: Right shoulder,
Tues-Fri 9am-3pm

 
None  None 
10 & 9  Bridge Inspection  South: Shoulder,
Tue 9am-3pm Thurs-Fri 9am-3pm

South: Right lane,
Wed 9am-3pm

 
Minimal  None 
14B & 15  Shoulder Work  North: Alternating right lane with the left lane,
Tues 10am-1pm Wed-Thurs 6am-1pm Fri 6am-11am

North: Right shoulder,
Tues 10am-3pm Wed-Fri 6am-3pm

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
8C & 22  Bridge Washing  North: Alternating right lane with the left lane,
Tues-Fri 10pm-5am

 
Minimal  None 
13 & 8C  Road Work  South: Right lane,
Tues-Thurs 9pm-6am Fri 11pm-8am

South: Right and center lanes,
Tues-Wed 12am-5:30am Thurs 1am-5am Fri 1am-6am

 
None  None 
14 & 18A  Shoulder Work  North: Right lane,
Tues-Fri 7pm-7am

North: Center lane,
Tues-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am

 
None  None 
14 & 16  Road Work  North: Left and center lanes,
Tues-Thurs 8pm-7am Fri 9pm-7am

 
None  None 
14 & 18A  Shoulder Work  North: Alternating right shoulder or left shoulder,
Tues-Thurs 7:30am-3:30pm

North: Right shoulder,
Tues-Fri 7am-3pm

North: Right shoulder,
Mon-Thurs 6pm-8am

 
None  None 
18A & 15  Road Work  South: Left and center lanes,
Tues-Thurs 8pm-7am Fri 9pm-7am

 
None  None 
18A & 14  Shoulder Work  South: Center lane,
Tues-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am

South: Right shoulder,
Night Tues-Fri 6pm-8am Day Tues-Fri 7am-3pm

South: Right lane,
Tues-Fri 8pm-7am

 
None  None 
19 & 18B  Bridge Inspection  North: Deceleration lane,
Right Decleration LN Thurs 11am-1pm

South: Right shoulder,
Thurs 9am-11am

 
None  None 
19  Paving  North: Right 3 lanes,
RSH,RL,CL Wed/Fri 10pm-6am

North: Left 3 lanes,
LSH, LL, CL Tues 9pm-6am Thurs 10pm-6am

 
None  None 
22 & 8B  Bridge Washing  South: Alternating right lane with the left lane,
Tues-Fri 10pm-5am

 
Minimal  None 

Back to Top