Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 11/22/2021
Erie Region

Between Exits Work Description Lane Closure Information Likely Impacts Comments
*** No Scheduled Lane Closures Reported ***


For The Week Starting Monday 11/29/2021
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
54 & 52A  Road Work  West: Alternating right lane with the left lane,
Monday 11/29/2021 7pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 7pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 7pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 7pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 7pm -through- 6am Saturday 12/4/2021.

West: Alternating the 2 right lanes with the left lanes,
Monday 11/29/2021 9pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 9pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 9pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 9pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 9pm -through- 6am Saturday 12/4/2021.

East: Alternating right lane with the left lane,
Monday 11/29/2021 7pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 7pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 7pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 7pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 7pm -through- 6am Saturday 12/4/2021.

 
Minimal  None 
55 & 52A  Road Work  East: Alternating the 2 right lanes with the left lanes,
Monday 11/29/2021 9pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 9pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 9pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 9pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 9pm -through- 6am Saturday 12/4/2021.

 
Minimal  None 

Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 11/22/2021
Buffalo/Niagara Region

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
4 & 2  Road Work  South: Center lane,
NOTE: Road Work Includes Concrete Repairs. Saturday 11/20/2021 12NOON -through- 5am Monday 11/22/2021.

 
Minimal  None 


For The Week Starting Monday 11/29/2021
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
50 & 49  Road Work  East: Left lane,
NOTE: Temporary Closure Includes A-Ramp 290 EB to 90 EB. Tuesday 11/30/2021 9:00am - 1:00pm. Wednesday 12/1/2021 9:00am - 1:00pm.

 
Minimal  None 
54 & 52A  Road Work  West: Alternating right lane with the left lane,
Monday 11/29/2021 7pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 7pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 7pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 7pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 7pm -through- 6am Saturday 12/4/2021.

West: Alternating the 2 right lanes with the left lanes,
Monday 11/29/2021 9pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 9pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 9pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 9pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 9pm -through- 6am Saturday 12/4/2021.

East: Alternating right lane with the left lane,
Monday 11/29/2021 7pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 7pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 7pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 7pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 7pm -through- 6am Saturday 12/4/2021.

 
Minimal  None 
55 & 52A  Road Work  East: Alternating the 2 right lanes with the left lanes,
Monday 11/29/2021 9pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 9pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 9pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 9pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 9pm -through- 6am Saturday 12/4/2021.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
2 & 1  Road Work  South: Alternating right lane with the left lane,
NOTE Closure Includes I-190 Ramp To I-90 WB And MP 426.5. Monday 11/29/2021 7pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 7pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 7pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 7pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 7pm -through- 6am Saturday 12/4/2021.

 
Minimal  None 
16 & 14  Road Work  North: Alternating right lane with the left lane,
Monday 11/29/2021 8pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 8pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 8pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 8pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 8pm -through- 6am Saturday 12/4/2021.

South: Alternating right lane with the left lane,
Monday 11/29/2021 8pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 8pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 8pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 8pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 8pm -through- 6am Saturday 12/4/2021.

 
Minimal  None 
15 & 18A  Road Work  North: Alternating right lane with the left lane,
Monday 11/29/2021 8pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 8pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 8pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 8pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 8pm -through- 6am Saturday 12/4/2021.

 
Minimal  None 
18A & 16  Road Work  South: Alternating right lane with the left lane,
Monday 11/29/2021 8pm -through- 6am Tuesday 11/30/2021. Tuesday 11/30/2021 8pm -through- 6am Wednesday 12/1/2021. Wednesday 12/1/2021 8pm -through- 6am Thursday 12/2/2021. Thursday 12/2/2021 8pm -through- 6am Friday 12/3/2021. Friday 12/3/2021 8pm -through- 6am Saturday 12/4/2021.

 
Minimal  None 
20 & 19  Road Work  South: Left lane,
Monday 11/29/2021 9:00am - 5:00pm.

 
Minimal  None 

Back to Top

Rochester Region


For The Week Starting Monday 11/22/2021
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
44 & 43  Other  East: Right lane,
TUE-WED 7AM-noon

 
Minor  Weather Permitting 


For The Week Starting Monday 11/29/2021
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
44 & 42  Other  East: Alternating right lane with the left lane,
WED 7AM-4PM

 
Minimal  None 
43 & 44  Other  West: Alternating right lane with the left lane,
WED 7AM-4PM

 
Minimal  None 
45 & 46  Other  East: Alternating right lane with the left lane,
WED 7AM-4PM

West: Alternating right lane with the left lane,
WED 7AM-4PM

 
Minimal  None 
47 & 46  Other  West: Alternating right lane with the left lane,
THU 7AM-4PM

East: Alternating right lane with the left lane,
THU 7AM-4PM

 
Minimal  None 
46 & 47  Road Work  West: Right lane,
Tuesday 11/30/2021 7:00am - 4:00pm. Wednesday 12/1/2021 7:00am - 4:00pm. Thursday 12/2/2021 7:00am - 4:00pm.

 
Minimal  None 
48 & 46  Road Work  East: Alternating right lane with the left lane,
Thursday 12/2/2021 7:00am - 4:00pm.

 
Minimal  None 
47 & 48  Road Work  West: Alternating right lane with the left lane,
Thursday 12/2/2021 7:00am - 4:00pm.

 
Minimal  None 
48 & 46  Other  East: Alternating right lane with the left lane,
THU 7AM-4PM

 
Minimal  None 
47 & 48  Other  West: Alternating right lane with the left lane,
THU 7AM-4PM

 
Minimal  None 
50 & 49  Road Work  East: Left lane,
NOTE: Temporary Closure Includes A-Ramp 290 EB to 90 EB. Tuesday 11/30/2021 9:00am - 1:00pm. Wednesday 12/1/2021 9:00am - 1:00pm.

 
Minimal  None 

Back to Top

Syracuse Region


For The Week Starting Monday 11/22/2021
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Other  Direction: Interchange 34: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 33: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 32: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 31: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 30: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 29A: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

 
Minimal  None 
33 & 34A  Bridge Construction  West: Right lane,
MON 9AM-2PM, TUE 9AM-noon

 
Minimal  None 
34A & 34  Bridge Construction  East: Right lane,
MON 6AM-2PM, TUE 6AM-noon

 
Minimal  None 
34A & 34  Bridge Work  East: Alternating right lane with the left lane,
MON-TUE 6AM-2PM **NOTE 11/21/21** SUN 6PM-6AM

 
Minimal  None 


For The Week Starting Monday 11/29/2021
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Other  Direction: Interchange 34: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 29A: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 30: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 31: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 32: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 33: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

 
Minimal  None 
33 & 34A  Bridge Construction  West: Left lane,
TUE-THU 6AM-2PM, FRI 6AM-10AM

 
Minimal  None 
34A & 34  Bridge Work  East: Alternating right lane with the left lane,
MON 6PM-midnite, TUE-THU midnite-2PM and 6PM-midnite, FRI 6AM-10AM

 
Minimal  None 
34A & 34  Other  East: Alternating right lane with the left lane,
MON 7AM-4PM

 
Minimal  None 
34 & 35  Other  West: Alternating right lane with the left lane,
MON 7AM-4PM

 
Minimal  None 
37 & 35  Other  East: Alternating right lane with the left lane,
TUE 7AM-4PM

 
Minimal  None 
36 & 38  Other  West: Alternating right lane with the left lane,
TUE 7AM-4PM

 
Minimal  None 
38 & 40  Other  West: Alternating right lane with the left lane,
TUE 7AM-4PM

 
Minimal  None 
39 & 38  Other  East: Alternating right lane with the left lane,
TUE 7AM-4PM

 
Minimal  None 
39 & 40  Other  West: Right lane,
MON 7AM-1:30PM

 
Minor  Weather Permitting 
40 & 41  Other  West: Right lane,
WED 7AM-1:30PM

 
Minor  Weather Permitting 
41 & 40  Bridge Work  East: Left lane,
TUE-WED 6AM-2PM

 
Minimal  None 
41 & 40  Other  West: Right lane,
THU 7AM-1:30PM

East: Left lane,
TUE 7AM-1:30PM

 
Minor  Weather Permitting 
44 & 42  Other  East: Alternating right lane with the left lane,
WED 7AM-4PM

 
Minimal  None 

Back to Top

Utica Region


For The Week Starting Monday 11/22/2021
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 29A  Road Work  West: Left lane,
Monday & Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
33 & 34A  Bridge Construction  West: Right lane,
MON 9AM-2PM, TUE 9AM-noon

 
Minimal  None 


For The Week Starting Monday 11/29/2021
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Bridge Work  East: Right lane,
Monday - Friday, 3:00AM - 10:00AM

 
Minimal  None 
33 & 34A  Bridge Construction  West: Left lane,
TUE-THU 6AM-2PM, FRI 6AM-10AM

 
Minimal  None 

Back to Top

Albany Region


For The Week Starting Monday 11/22/2021
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  None  Direction: Interchange B1: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange B2: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 
Toll Plaza Work  Road Work  Direction: Interchange B2: Other,
Friday & Saturday, 7:00AM - 1:00PM; Installation of transverse speed reduction markings in plaza.

 
None  Weather Permitting 
B3 & B2  None  East: Alternating right lane with the left lane,
Monday, 7:00AM - 5:00PM; Tuesday, 7:00AM - 2:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

West: Alternating right lane with the left lane,
Monday. 7:00AM - 5:00PM; Tuesday, 7:00AM - 12:00NOON; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 29: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 26: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 25: Alternating right lane with the left lane,
Monday - Tuesday, 9:00AM - 7:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 27: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 21B: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 28: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 20E: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 22: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 20W: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 21: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 25A: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 19: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 23: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 
Ramp Work  Bridge Work  Direction: Interchange 24: Right lane,
Monday (11/22), 7:00AM to Tuesday (11/23), 3:00PM; SB ACCEL ramp; 24 hour closure

Direction: Interchange 24: Right shoulder,
Monday (11/22), 7:00AM to Sunday (11/28), 7:00AM; SB ACCEL ramp; 24 hour closure

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Guide Rail Installation  Direction: Interchange 25A: Right lane,
Monday & Tuesday, 9:00AM - 2:00PM; EB ACCEL lane

 
Minimal  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 24: Alternating right lane with the left lane,
Monday - Tuesday, 5:00AM - 3:00PM, Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 
21 & 20  Bridge Inspection  South: Right lane,
Tuesday, 6:00AM - 10:00AM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Both lanes,
Monday - Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0". 
21A & 21B  Bridge Inspection  North: Right lane,
Monday, 10:00AM - 12:00NOON

South: Right lane,
Monday, 7:00AM - 9:00AM

 
Minimal  Weather Permitting 
24 & 23  Road Work  North: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 3:00PM

North: Left 2 lanes,
Monday, 7:00PM - 6:00AM; Tuesday, 9:00PM - 6:00AM; Night work

South: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 3:00PM

South: Left 2 lanes,
Monday, 7:00PM - 6:00AM; Tuesday, 8:00PM - 6:00AM; Night work

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25 & 24  Road Work  West: Alternating right lane with the left lane,
Monday, 8:00AM - 2:00PM; Tuesday, 9:00AM - 12:00NOON

West: Left 2 lanes,
Monday, 10:00PM - 7:00AM; Tuesday, 11:00PM - 7:00AM; Night work

East: Left 2 lanes,
Monday & Tuesday, 9:00PM - 6:00AM; Night work

East: Alternating right lane with the left lane,
Monday, 6:00AM - 3:00PM

 
None  None 
25A & 25  Road Work  West: Left 2 lanes,
Monday, 7:00PM - 6:00AM; Tuesday, 9:00PM - 6:00AM; Night work

West: Alternating right lane with the left lane,
Monday & Tuesday, 6:00AM - 3:00PM

East: Alternating right lane with the left lane,
Monday - Tuesday, 6:00AM - 3:00PM

East: Right 2 lanes,
Monday, 7:00PM - 6:00AM; Tuesday, 8:00PM - 6:00AM; Night work

 
None  None 
26 & 25A  Road Work  West: Alternating right lane with the left lane,
Monday, 6:00AM - 3:00PM; Tuesday, 6:00AM - 12:00NOON

East: Alternating right lane with the left lane,
Monday & Tuesday, 8:00AM - 3:00PM

 
None  None 


For The Week Starting Monday 11/29/2021
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  None  Direction: Interchange B1: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 
Road Work  Road Work  Direction: Interchange B1: Alternating right lane with the left lane,
WB travel lanes closed from Int.B1 to Int.21A WB, Monday (11/29), 5:00AM to Friday (12/03), 5:00PM. All WB traffic to be diverted Int.B1 during that time.

 
Minimal  Weather Permitting 
21A & B1  Road Work  East: Right lane,
Monday (11/29), 7:00AM to Friday (12/03), 5:00PM

 
Minimal  Weather Permitting 
B2 & B1  Guide Rail Installation  West: Right lane,
Tuesday - Thursday, 7:00AM - 2:00PM

 
None  Weather Permitting 
B2 & B3  Road Work  East: Right lane,
Wednesday - Friday, 7:00AM - 2:00PM

East: Right lane,
Wednesday - Friday, 7:00AM - 2:00PM

 
None  Weather Permitting 
B2  Road Work  East: Right lane,
Wednesday - Friday, 7:00AM - 2:00PM

 
None  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 25A: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Bridge Work  Direction: Interchange 24: Right shoulder,
Friday (12/03), 4:00PM to Monday (12/06), 7:00AM; SB ACCEL ramp; 24 hour closure

Direction: Interchange 24: Right lane,
Monday (11/29), 7:00AM to Friday (12/03), 4:00PM; SB ACCEL ramp; 24 hour closure

 
Minimal  Weather Permitting 
Toll Plaza Work  Road Work  Direction: Interchange 24: Alternating right lane with the left lane,
Monday - Friday, 5:00AM - 3:00PM, Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 27: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 29: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 25: Alternating right lane with the left lane,
Monday - Friday, 9:00AM - 7:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 23: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 22: Alternating right lane with the left lane,
Monday - Tuesday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 28: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 
Interchange Work  Guide Rail Installation  Direction: Interchange 25A: Right lane,
Monday - Friday, 9:00AM - 2:00PM; EB ACCEL lane

 
Minimal  None 
Toll Plaza Work  Road Work  Direction: Interchange 26: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Guide Rail Installation  Direction: Interchange 24: Left lane,
Monday - Friday, 10:00PM - 6:00AM; WB ACCEL Ramp; Night work

 
Minimal  None 
20 & 21B  Road Work  North: Left lane,
Friday, 7:00AM - 2:00PM

North: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting; Mobile closures 
20 & 21  Road Work  North: Left lane,
Monday - Wednesday, 6:00AM - 4:00PM

North: Both lanes,
Monday - Wednesday; NB driving and passing lanes shifted.

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0 
20 & 21  Bridge Inspection  North: Right lane,
Monday, 6:00AM - 1:00PM

 
Minimal  Weather Permitting 
21 & 20  Road Work  South: Right lane,
Monday - Wednesday, 6:00AM - 4:00PM

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0 
21 & 20  Bridge Inspection  South: Right lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
21 & 21B  Road Work  North: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting; Mobile closures 
21B & 20  Road Work  South: Left lane,
Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting; Mobile closures 
21B & 21  Road Work  South: Left lane,
Monday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting; Mobile closures 
23 & 22  Road Work  North: Alternating right lane with the left lane,
Monday, Thursday & Friday, 6:00AM - 7:00AM; Tuesday, 9:00AM - 3:00PM; Wednesday, 8:00AM - 3:00PM

South: Alternating right lane with the left lane,
Monday, Thursday & Friday, 6:00AM - 9:00AM; Tuesday, 6:00AM - 12:00NOON; Wednesday, 6:00AM - 8:00AM

 
Minimal  None 
24 & 23  Road Work  North: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 3:00PM

North: Left 2 lanes,
Monday - Thursday, 7:00PM - 6:00AM; Friday, 8:00PM - 6:00AM; Night work

South: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 3:00PM

South: Left 2 lanes,
Monday - Friday, 7:00PM - 6:00AM; Night work

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25 & 24  Road Work  West: Alternating right lane with the left lane,
Monday & Thursday, 10:00AM - 2:00PM; Tuesday, 10:00AM - 3:00PM; Wednesday, 11:00AM - 2:00PM; Friday, 6:00AM - 11:00AM

West: Left 2 lanes,
Monday - Friday, 10:00PM - 6:00AM; Night work

East: Left 2 lanes,
Monday - Friday, 9:00PM - 6:00AM; Night work

East: Alternating right lane with the left lane,
Monday & Thursday, 10:00AM - 2:00PM; Tuesday, 10:00AM - 3:00PM; Wednesday, 11:00AM - 2:00PM

 
None  None 
25A & 24  Bridge Inspection  West: Left 2 lanes,
Tuesday, 11:00PM - 2:00AM; Night work

West: Right lane,
Wednesday, 2:00AM - 5:00AM; Night work

East: Left 2 lanes,
Tuesday, 2:00AM - 5:00AM; Night work

East: Right lane,
Monday, 11:00PM - 2:00AM; Partial ramp closure at Int.25; Night work

 
Minimal  Weather Permitting 
25 & 25A  Road Work  West: Left 2 lanes,
Monday - Thursday, 7:00PM - 6:00AM; Friday, 8:00PM - 6:00AM; Night work

West: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 3:00PM

 
None  None 
25A & 25  Guide Rail Installation  East: Left lane,
Monday - Friday, 9:00AM - 2:00PM

 
Minimal  None 
25A & 25  Road Work  East: Right 2 lanes,
Monday - Friday, 7:00PM - 6:00AM; Night work

East: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 3:00PM

 
None  None 
26 & 25A  Road Work  West: Alternating right lane with the left lane,
Monday - Thursday, 6:00AM - 3:00PM; Friday, 6:00AM - 12:00NOON

East: Alternating right lane with the left lane,
Monday - Friday, 8:00AM - 3:00PM

 
None  None 

Back to Top

Mid-Hudson Region


For The Week Starting Monday 11/22/2021
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 19  Toll Plaza Work  North: Left lane,
Mon 7am-3pm Tues 7am-1pm

 
Minimal  None 
20 & 18  Road Work  South: Left lane,
Monday, 7:00AM - 9:00AM; Moveable lane closure.

 
Minimal  Weather Permitting 
21 & 20  Bridge Inspection  South: Right lane,
Tuesday, 6:00AM - 10:00AM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Both lanes,
Monday - Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0". 


For The Week Starting Monday 11/29/2021
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 19  Toll Plaza Work  North: Left lane,
.

 
Minimal  None 
19 & 20  Bridge Inspection  North: Right lane,
Wednesday, 6:00AM - 10:00AM

 
Minimal  Weather Permitting 
20 & 18  Road Work  South: Left lane,
Tuesday - Friday, 7:00AM - 1:00PM; Moveable lane closure.

 
Minimal  Weather Permitting 
20 & 19  Bridge Inspection  South: Right lane,
Wednesday, 10:00AM - 4:00PM

 
Minimal  Weather Permitting 
20 & 21B  Road Work  North: Left lane,
Friday, 7:00AM - 2:00PM

North: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting; Mobile closures 
20 & 21  Road Work  North: Left lane,
Monday - Wednesday, 6:00AM - 4:00PM

North: Both lanes,
Monday - Wednesday; NB driving and passing lanes shifted.

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0 
20 & 21  Bridge Inspection  North: Right lane,
Monday, 6:00AM - 1:00PM

 
Minimal  Weather Permitting 
21 & 20  Road Work  South: Right lane,
Monday - Wednesday, 6:00AM - 4:00PM

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0 
21 & 20  Bridge Inspection  South: Right lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
21B & 20  Road Work  South: Left lane,
Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting; Mobile closures 

Back to Top

New York Region


For The Week Starting Monday 11/22/2021
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Road Work  Bridge Construction  Direction: WB: Alternating right shoulder or left shoulder,
RS/LL I-287 MP 10.4 - 9.7 Mon 9pm-5am

East: Alternating right shoulder or left shoulder,
RS/LL I-287 MP 8.5-9.7 Mon 9pm-5am

 
Minimal  None 
8 & 9  Other  East: Ramp,
Mon 7pm-6am

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Bridge Construction  Direction: NB: Ramp,
Exit 15 off-ramp to be fully closed Wed-Thurs 9pm-5am

 
None  None 
Ramp Work  Other  Direction: SB: Ramp,
.

Direction: SB: Ramp,


Direction: NB: Left lane,


 
Minor  None 
Ramp Work  Bridge Construction  Direction: SB: Ramp,
Exit 15 off-ramp ALT LL or RT Wed-Thurs 9pm-5am

 
None  None 
6A & 7A  Bridge Inspection  North: Alternating right lane with the left lane,
Tues 9pm-5am

 
Minimal  None 
7A & 7  Bridge Inspection  South: Alternating right lane with the left lane,
Tues 9pm-5am

 
Minimal  None 
9 & 10  Other  North: Right lane,
Sun 9pm-1am

North: Left lane,
Sun 1am-5am

 
None  None 
9 & 11  Other  North: Right lane,
Mon 1am-5am

North: Left lane,
Mon 9pm-1am

 
None  None 
14B & 14A  Bridge Construction  North: Alternating right lane with the left lane,
Mon 6am-3pm Tues 9am-12pm

North: Other,
.

South: Alternating right lane with the left lane,
Tues 10am-12pm

 
None  None 
16 & 14B  Pavement Striping  South: Left lane,
Mon 7pm-5am

South: Left 2 lanes,
Mon 9pm-5am

 
Minimal  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
19 & 18A  Paving  North: Other,
RL+CL LL+CL Sun 12am-5:30am Mon 11pm-5:30am Tues 12am-5am

North: Alternating right lane with the left lane,
Sun 10pm-7am Mon 7pm-6am Tues 8:30pm-6am

South: Alternating the 2 right lanes with the left lanes,
Sun 12am-5:30am Mon 11pm-5:30am Tues 12am-5am

South: Alternating right lane with the left lane,
Sun 10pm-7am Mon 8pm-6am Tues 9pm-6am

 
Minimal  None 
19 & 20  Paving  North: Alternating right lane with the left lane,
Sun 10pm-7am Mon 8pm-6am Tues 9pm-6am

North: Alternating the 2 right lanes with the left lanes,
Sun 12am-5:30am Mon 11pm-5:30am Tues 12am-5am

 
Minimal  None 
22 & 19  Paving  South: Alternating right lane with the left lane,
Sun 10pm-6am Mon 8pm-6am Tues 9pm-6am

South: Alternating the 2 right lanes with the left lanes,
Sun 12am-5am Mon 11pm-5am Tues 12am-5am

 
Minimal  None 


For The Week Starting Monday 11/29/2021
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Road Work  Bridge Construction  Direction: WB: Alternating right shoulder or left shoulder,
RS/LL I-287 MP 10.4 - 9.7 Mon 9pm-5am

East: Alternating right shoulder or left shoulder,
RS/LL I-287 MP 8.5-9.7 Mon 9pm-5am

 
Minimal  None 
8 & 9  Bridge Construction  East: Alternating right lane with the left lane,
Tues 9pm-5am

 
Minimal  None 
10 & 9A  Bridge Construction  West: Alternating right lane with the left lane,
Wed 9pm-5am

 
Minimal  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Bridge Construction  Direction: NB: Ramp,
Exit 15 off-ramp to be fully closed Wed-Thurs 9pm-5am

 
None  None 
Ramp Work  Other  Direction: NB: Left lane,


Direction: SB: Ramp,


Direction: SB: Ramp,
.

 
Minor  None 
Ramp Work  Bridge Construction  Direction: SB: Ramp,
Exit 15 off-ramp ALT LL or RT Wed-Thurs 9pm-5am

 
None  None 
6A & 7A  Bridge Inspection  North: Alternating right lane with the left lane,
Fri 9pm-5am

 
Minimal  None 
7A & 7  Bridge Inspection  South: Alternating right lane with the left lane,
Fri 9pm-5am

 
Minimal  None 
8 & 7  Bridge Inspection  North: Right lane,
Thurs 9am-3pm

South: Right lane,
Fri 9am-3pm

 
Minimal  None 
12 & 13  Bridge Construction  North: Alternating right lane with the left lane,
Fri 10pm-6am

North: Left 2 lanes,
Mon-Wed 10pm-6am Thurs 11pm-6am Fri 12am-6am

North: Left lane,
Mon-Thurs 8pm-6am

 
None  None 
14 & 12  Bridge Construction  South: Left 2 lanes,
Mon-Thurs 11pm-5am Fri 11pm-6am

South: Left lane,
Mon-Wed 7pm-6am Thurs-Fri 8pm-6am

 
None  None 
13 & 14A  Bridge Construction  North: Left and center lanes,
Mon-Wed 10pm-6am Thurs 11pm-6am Fri 12am-6am

North: Left lane,
Mon-Thurs 8pm-6am Fri 10pm-6am

 
None  None 
14A & 14B  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Wed 5am-3pm Night Mon-Wed 7pm-6am Thurs 8pm-6am Fri 9pm-9am

 
None  None 
14B & 13  Bridge Construction  South: Alternating right lane with the left lane,
Mon-Wed 7pm-6am Thurs-Fri 8pm-6am

South: Other,
Mon-Thurs 11pm-5am Fri 11pm-6am

 
None  None 
14B & 14A  Bridge Construction  South: Other,
ML & LL/RL Mon-Wed 9pm-5am Thurs 10pm-5am Fri 10pm-7am

South: Alternating right lane with the left lane,
Tues-Wed 10am-3pm Thurs-Fri 10am-2pm Night Mon-Thurs 7pm-6am Fri 7pm-9am

 
None  None 
15 & 16  Pavement Striping  North: Right lane,
Mon 7pm-7am

North: Right 2 lanes,
Mon 10pm-7am

North: Left 2 lanes,
Tues 10pm-7am

North: Left lane,
Tues 7pm-7am

 
Minimal  None 
16 & 14B  Pavement Striping  South: Left 2 lanes,
Wed 9pm-5am Thurs 9:30pm-5am

South: Left lane,
Wed 7pm-5am Thurs 8pm-5am

 
Minimal  None 
16 & 15A  Pavement Striping  South: Right lane,
Mon 7pm-6am

South: Left 2 lanes,
Tues 9pm-6am

South: Right 2 lanes,
Mon 9pm-6am

South: Left lane,
Tues 7pm-6am

 
Minimal  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
19 & 18A  Paving  North: Alternating right lane with the left lane,
Mon-Wed 10pm-2am Mon-Thurs 7pm-6am Fri 9pm-6am

North: Other,
RL+CL LL+CL Mon-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-5am

South: Alternating the 2 right lanes with the left lanes,
Mon-Tues 11pm-5am Wed-Thurs 12am-5am Fri 12am-6am

South: Alternating right lane with the left lane,
Mon-Thurs 8pm-6am Fri 9pm-6am

 
Minimal  None 
19 & 20  Paving  North: Alternating right lane with the left lane,
Mon-Thurs 7pm-6am Fri 9pm-6am

North: Alternating the 2 right lanes with the left lanes,
Mon-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am

 
Minimal  None 
22 & 19  Paving  South: Alternating right lane with the left lane,
Mon-Tues 8pm-6am Wed 9pm-6am Thurs 8pm-6am Fri 9pm-8am

South: Alternating the 2 right lanes with the left lanes,
RL+CL/LL+CL Mon-Wed 11pm-5am Thurs 12am-5am Fri 12am-6am

 
Minimal  None 