Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 06/07/2021
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
57 & 56  Bridge Inspection  West: Right lane,
Tuesday 6/8/2021 8:00am - 10:00am.

East: Right lane,
Tuesday 6/8/2021 11:00am - 12NOON.

 
Minimal  None 
57A & 56  Road Work  East: Alternating right lane with the left lane,
Monday 6/7/2021 7:00am - 2:00pm. Wednesday 6/9/2021 7:00am - 2:00pm. Thursday 6/10/2021 7:00am - 2:00pm. Friday 6/11/2021 7:00am - 2:00pm.

 
Minimal  None 
59 & 58  Bridge Inspection  West: Alternating right lane with the left lane,
Tuesday 6/8/2021 6:45am - 12NOON.

East: Alternating right lane with the left lane,
Tuesday 6/8/2021 6:45am - 12NOON.

 
Minimal  None 
59 & 58  Bridge Work  West: Left lane,
Monday 6/7/2021 7:00am - 7:00pm. Tuesday 6/8/2021 7:00am - 7:00pm. Wednesday 6/9/2021 7:00am - 7:00pm. Thursday 6/10/2021 7:00am - 7:00pm. Friday 6/11/2021 7:00am - 3:00pm.

East: Left lane,
Monday 6/7/2021 7:00am - 7:00pm. Tuesday 6/8/2021 7:00am - 7:00pm. Wednesday 6/9/2021 7:00am - 7:00pm. Thursday 6/10/2021 7:00am - 7:00pm. Friday 6/11/2021 7:00am - 3:00pm.

 
Minimal  None 
60 & 59  Other  East: Right lane,
NOTE: Temporary Lane Closure Will Remain In Place. Contact Doug Voigt (C) 716-640-5601. Monday 6/7/2021 -through- 2pm Friday 6/11/2021.

East: Alternating right lane with the left lane,
NOTE: Bridge Work Contact Mike Willey (O) 716-326-2231 (C) 716-720-3425. Wednesday 6/9/2021 6:00am - 2:00pm.

 
Minimal  None 


For The Week Starting Monday 06/14/2021
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
57 & 56  Bridge Inspection  West: Left lane,
Wednesday 6/16/2021 10:30am - 12:30pm.

West: Right lane,
Tuesday 6/15/2021 10:30am - 12:30pm.

East: Right lane,
Tuesday 6/15/2021 8:30am - 10:30am.

East: Left lane,
Wednesday 6/16/2021 8:30am - 10:30am.

 
Minimal  None 
57A & 58  Road Work  West: Alternating right lane with the left lane,
NOTE: Toll Plaza Removal and Full Depth Reconstruction Work At Exit 57A (Eden-Angola). Exit Will Remain Open At All Times. Monday 6/14/2021 7am -through- 6am Tuesday 6/15/2021. Tuesday 6/15/2021 7am -through- 6am Wednesday 6/16/2021. Wednesday 6/16/2021 7am -through- 6am Thursday 6/17/2021. Thursday 6/17/2021 7am -through- 6am Friday 6/18/2021. Friday 6/18/2021 7am -through- 6am Saturday 6/19/2021.

 
Minimal  None 
59 & 58  Bridge Work  West: Left lane,
Monday 6/14/2021 7:00am - 7:00pm. Tuesday 6/15/2021 7:00am - 7:00pm. Wednesday 6/16/2021 7:00am - 7:00pm. Thursday 6/17/2021 7:00am - 7:00pm. Friday 6/18/2021 7:00am - 3:00pm.

East: Left lane,
Monday 6/14/2021 7:00am - 7:00pm. Tuesday 6/15/2021 7:00am - 7:00pm. Wednesday 6/16/2021 7:00am - 7:00pm. Thursday 6/17/2021 7:00am - 7:00pm. Friday 6/18/2021 7:00am - 3:00pm.

 
Minimal  None 
60 & 59  Road Work  East: Right lane,
NOTE: Lane Closure Will Remain In Place For Pavement Repair Work. Monday 6/14/2021 7am -through- 2pm Thursday 6/17/2021.

 
Minimal  None 
61 & 60  Road Work  West: Alternating right lane with the left lane,
NOTE: Toll Canopy Removal Work At Ripley Toll Barrier. Sunday 6/13/2021 10pm -through- 6am Monday 6/14/2021.

East: Alternating right lane with the left lane,
NOTE: Toll Canopy Removal Work At Ripley Toll Barrier. Sunday 6/13/2021 10pm -through- 6am Monday 6/14/2021.

 
Minimal  None 

Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 06/07/2021
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
50 & 52  Bridge Work  West: Left 2 lanes,
Monday 6/7/2021 10pm -through- 5am Tuesday 6/8/2021. Tuesday 6/8/2021 10pm -through- 5am Wednesday 6/9/2021. Wednesday 6/9/2021 10pm -through- 5am Thursday 6/10/2021.

 
Minimal  None 
50A & 52  Bridge Work  West: Left lane,
Monday 6/7/2021 9pm -through- 6am Tuesday 6/8/2021. Tuesday 6/8/2021 9pm -through- 6am Wednesday 6/9/2021. Wednesday 6/9/2021 9pm -through- 6am Thursday 6/10/2021.

 
Minimal  None 
52 & 51  Bridge Work  East: Right lane,
Monday 6/7/2021 9pm -through- 6am Tuesday 6/8/2021. Tuesday 6/8/2021 9pm -through- 6am Wednesday 6/9/2021. Wednesday 6/9/2021 9pm -through- 6am Thursday 6/10/2021. Thursday 6/10/2021 9pm -through- 6am Friday 6/11/2021. Friday 6/11/2021 9pm -through- 6am Saturday 6/12/2021.

East: Right 2 lanes,
Monday 6/7/2021 10pm -through- 5am Tuesday 6/8/2021. Tuesday 6/8/2021 10pm -through- 5am Wednesday 6/9/2021. Wednesday 6/9/2021 10pm -through- 5am Thursday 6/10/2021. Thursday 6/10/2021 10pm -through- 5am Friday 6/11/2021. Friday 6/11/2021 10pm -through- 5am Saturday 6/12/2021.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
9 & 11  Bridge Work  North: Left lane,
Monday 6/7/2021 7pm -through- 6am Tuesday 6/8/2021. Tuesday 6/8/2021 7pm -through- 6am Wednesday 6/9/2021. Wednesday 6/9/2021 7pm -through- 6am Thursday 6/10/2021. Thursday 6/10/2021 7pm -through- 6am Friday 6/11/2021. Friday 6/11/2021 7pm -through- 6am Saturday 6/12/2021.

 
Minor  None 


For The Week Starting Monday 06/14/2021
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
52 & 51  Bridge Work  East: Right lane,
Monday 6/14/2021 9pm -through- 6am Tuesday 6/15/2021. Tuesday 6/15/2021 9pm -through- 6am Wednesday 6/16/2021. Wednesday 6/16/2021 9pm -through- 6am Thursday 6/17/2021. Thursday 6/17/2021 9pm -through- 6am Friday 6/18/2021. Friday 6/18/2021 9pm -through- 6am Saturday 6/19/2021.

East: Right 2 lanes,
Monday 6/14/2021 10pm -through- 5am Tuesday 6/15/2021. Tuesday 6/15/2021 10pm -through- 5am Wednesday 6/16/2021. Wednesday 6/16/2021 10pm -through- 5am Thursday 6/17/2021. Thursday 6/17/2021 10pm -through- 5am Friday 6/18/2021. Friday 6/18/2021 10pm -through- 5am Saturday 6/19/2021.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
4 & 2  Road Work  South: Right lane,
NOTE: Closure Includes Exit 3 (Seneca St) Off-Ramp (Fri. and Mon. Only). Contact-Jack Cosentino (O) 716-874-7490 (C) 716-998-3312. Monday 6/14/2021 10:00am - 1:00pm.

South: Right 2 lanes,
NOTE-1: Closure Includes Exit 3 (Seneca St) Off-Ramp. Contact-Craig Overkamp (O) 716-877-7344, (C) 716-481-1806 Monday 6/14/2021 7:00am - 10:00am.

 
Minimal  None 
11 & 9  Bridge Work  North: Alternating right lane with the left lane,
Monday 6/14/2021 7pm -through- 6am Tuesday 6/15/2021. Tuesday 6/15/2021 7pm -through- 6am Wednesday 6/16/2021. Wednesday 6/16/2021 7pm -through- 6am Thursday 6/17/2021. Thursday 6/17/2021 7pm -through- 6am Friday 6/18/2021. Friday 6/18/2021 7pm -through- 6am Saturday 6/19/2021.

South: Alternating right lane with the left lane,
Monday 6/14/2021 7pm -through- 6am Tuesday 6/15/2021. Tuesday 6/15/2021 7pm -through- 6am Wednesday 6/16/2021. Wednesday 6/16/2021 7pm -through- 6am Thursday 6/17/2021. Thursday 6/17/2021 7pm -through- 6am Friday 6/18/2021. Friday 6/18/2021 7pm -through- 6am Saturday 6/19/2021.

 
Minor  None 

Back to Top

Rochester Region


For The Week Starting Monday 06/07/2021
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
48 & 47  Road Work  East: Right lane,
Thursday 6/10/2021 10pm -through- 1pm Friday 6/11/2021.

East: Right lane,
Tuesday 6/8/2021 10pm -through- 1pm Wednesday 6/9/2021. Wednesday 6/9/2021 10pm -through- 1pm Thursday 6/10/2021.

East: Right lane,
Sunday 6/6/2021 10pm -through- 1pm Monday 6/7/2021. Monday 6/7/2021 10pm -through- 1pm Tuesday 6/8/2021.

 
Minimal  None 
48 & 47  Road Work  East: Alternating right lane with the left lane,
NOTE: Toll Plaza Removal And Full Depth Reconstruction At Exit 48 (Batavia). Single Lane Of Traffic Will Be Maintained In Both Directions. Exit Will Remain Open At All Times. Monday 6/7/2021 7:00am - 6:00am. Tuesday 6/8/2021 7:00am - 6:00am. Wednesday 6/9/2021 7:00am - 6:00am. Thursday 6/10/2021 7:00am - 6:00am. Friday 6/11/2021 7:00am - 6:00am.

 
Minimal  None 
48A & 48  Road Work  East: Alternating right lane with the left lane,
NOTE: Final Paving And Guiderail Work At Exit 48A (Pembroke). Exit Will Remain Open At All Times. Monday 6/7/2021 7:00am - 4:00pm. Tuesday 6/8/2021 7:00am - 4:00pm. Wednesday 6/9/2021 7:00am - 4:00pm. Thursday 6/10/2021 7:00am - 4:00pm. Friday 6/11/2021 7:00am - 4:00pm.

 
Minimal  None 


For The Week Starting Monday 06/14/2021
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
44 & 45  Other  West: Alternating right lane with the left lane,
TUE 7AM-1:30PM

 
Minimal  Weather Permitting 
48 & 47  Road Work  East: Alternating right lane with the left lane,
NOTE: Final Paving Work At Exit 48 (Batavia). Single Lane Of Traffic Will Be Maintained In Both Directions. Exit Will Remain Open At All Times. Monday 6/14/2021 7:00am - 4:00pm. Tuesday 6/15/2021 7:00am - 4:00pm. Wednesday 6/16/2021 7:00am - 4:00pm. Thursday 6/17/2021 7:00am - 4:00pm. Friday 6/18/2021 7:00am - 4:00pm.

 
Minimal  None 
48A & 48  Road Work  East: Alternating right lane with the left lane,
NOTE: Site Restoration-Cleanup Work At Exit 48A (Pembroke). Exit Will Remain Open At All Times. Monday 6/14/2021 7:00am - 4:00pm. Tuesday 6/15/2021 7:00am - 4:00pm. Wednesday 6/16/2021 7:00am - 4:00pm. Thursday 6/17/2021 7:00am - 4:00pm. Friday 6/18/2021 7:00am - 4:00pm.

 
Minimal  None 

Back to Top

Syracuse Region


For The Week Starting Monday 06/07/2021
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Other  Direction: Interchange 36: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 35: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 39: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 40: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 34: Alternating right lane with the left lane,
MON 6AM-6PM, MON-TUE 6PM-6PM, TUE-WED 6PM-6PM, WED-THU 6PM-6PM, THU-FRI 6PM-6PM

 
Minor  None 
32 & 34  Other  West: Right lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 
33 & 34  Other  West: Right lane,
TUE-THU 6AM-5PM

 
Minimal  Weather Permitting 
34A & 34  Other  East: Right lane,
MON-TUE 6AM-3PM

 
Minimal  Weather Permitting 
35 & 34A  Bridge Work  East: Alternating right lane with the left lane,
MON-FRI 6AM-3PM

 
Minimal  None 
36 & 34A  Other  East: Right lane,
MON-TUE 6AM-3PM

 
Minimal  Weather Permitting 
39 & 37  Other  West: Left lane,
WED-THU 6AM-3PM

East: Right lane,
MON-FRI 9AM-3PM

 
Minimal  Weather Permitting 
38 & 39  Other  West: Left lane,
TUE-THU 6AM-3PM

 
Minimal  Weather Permitting 
40 & 39  Other  East: Alternating right lane with the left lane,
MON-TUE 7AM-2:30PM

West: Alternating right lane with the left lane,
THU 7AM-2:30PM

East: Alternating right lane with the left lane,
WED 7AM-2:30PM

 
Minimal  Weather Permitting 
40 & 41  Bridge Work  West: Right lane,
MON-TUE 6AM-1PM

 
Minimal  None 
41 & 40  Other  East: Right lane,
TUE 7AM-2:30PM

 
Minimal  Weather Permitting 
42 & 40  Other  East: Left lane,
WED 7AM-2:30PM

 
Minimal  Weather Permitting 
41 & 42  Other  West: Alternating right lane with the left lane,
MON 7AM-1:30PM

East: Left lane,
TUE 7AM-1:30PM

West: Alternating right lane with the left lane,
WED-THU 7AM-1:30PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 06/14/2021
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Other  Direction: Interchange 34: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 41: Alternating right lane with the left lane,
WED-FRI 6AM-6PM

Direction: Interchange 35: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 40: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 36: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 33: Alternating right lane with the left lane,
FRI 6AM-6PM

Direction: Interchange 39: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

 
Minor  None 
32 & 34  Other  West: Right lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 
34A & 34  Other  East: Right lane,
WED-THU 9AM-2PM

East: Right lane,
MON-TUE 9AM-4PM

 
Minimal  Weather Permitting 
35 & 34A  Bridge Work  East: Alternating right lane with the left lane,
MON-THU 5AM-3PM, FRI 5AM-11AM

 
Minimal  None 
37 & 39  Other  West: Alternating right lane with the left lane,
MON-TUE 6AM-3PM

 
Minimal  Weather Permitting 
38 & 39  Other  West: Alternating right lane with the left lane,
WED-THU 6AM-3PM

West: Right lane,
TUE 7AM-2PM

 
Minimal  Weather Permitting 
40 & 39  Other  East: Alternating right lane with the left lane,
WED 7AM-3PM

 
Minimal  Weather Permitting 
41 & 40  Other  West: Alternating right lane with the left lane,
WED 7AM-2:30PM

East: Alternating right lane with the left lane,
THU 7AM-3PM

West: Alternating right lane with the left lane,
MON 7AM-2:30PM

East: Alternating right lane with the left lane,
TUE 7AM-2:30PM

 
Minimal  Weather Permitting 
42 & 40  Other  East: Left lane,
WED 7AM-2:30PM

 
Minimal  Weather Permitting 
41 & 42  Other  East: Right lane,
WED 7AM-1:30PM

West: Alternating right lane with the left lane,
WED-THU 7AM-1:30PM

West: Right lane,
THU 7AM-1:30PM

 
Minimal  Weather Permitting 

Back to Top

Utica Region


For The Week Starting Monday 06/07/2021
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
26 & 28  Bridge Inspection  West: Right lane,
Thursday, 9:00AM - 11:00AM

 
Minimal  None 
28 & 27  Bridge Inspection  East: Right lane,
Thursday, 7:00AM - 9:00AM

 
Minimal  None 
28 & 27  Bridge Work  East: Right lane,
Tuesday - Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
29A & 29  Other  East: Left lane,
MON-FRI 7AM-2PM

 
Minimal  Weather Permitting 
31 & 32  Other  West: Right lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 
33 & 32  Other  East: Alternating right lane with the left lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 
32 & 34  Other  West: Right lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 
33 & 34  Other  West: Right lane,
TUE-THU 6AM-5PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 06/14/2021
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
27 & 28  Bridge Work  West: Right lane,
Tuesday - Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
28 & 29  Guide Rail Installation  West: Right lane,
Monday - Wednesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
29A & 29  Other  East: Left lane,
MON 7AM to THU 2PM

East: Left lane,
THU 7AM-2PM

 
Minimal  Weather Permitting 
31 & 32  Other  West: Right lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 
33 & 31  Other  West: Alternating right lane with the left lane,
MON-THU 6AM-3PM

East: Alternating right lane with the left lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 
32 & 34  Other  West: Right lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 

Back to Top

Albany Region


For The Week Starting Monday 06/07/2021
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange B1: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange B2: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 
21A & B1  Road Work  East: Left lane,
Wednesday, 7:00AM - 3:00PM

East: Right lane,
Monday & Tuesday, 7:00AM - 3:00PM

 
None  Weather Permitting 
B3 & B2  Bridge Inspection  East: Right lane,
Tuesday, 7:00AM - 11:00AM

West: Alternating right lane with the left lane,
Tuesday, 10:30AM - 12:00NOON

 
None  Weather Permitting 
B3 & B2  Road Work  East: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps

West: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps

 
Minimal  Day and Night work 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 21B: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 
Interchange Work  Road Work  Direction: Interchange 20W: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 
Toll Plaza Work  Road Work  Direction: Interchange 21: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 20E: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 19: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 24: Alternating right lane with the left lane,
Monday (06/07), 6:00AM to Friday (06/11), 3:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps; 24 hour closure; Exit 1S ramp to Western Avenue closed until 3:00PM each day.

 
Minimal  Day and Night work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 25: Alternating right lane with the left lane,
Monday - Friday, 9:00AM - 7:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  Day and Night work 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 22: Alternating right lane with the left lane,
Monday (6/7), 12:00MIDNIGHT to Friday (6/11), 12:00MIDNIGHT; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 25A: Alternating right shoulder or left shoulder,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  Day and Night work 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 19  Road Work  South: Left lane,
Thursday, 7:00AM - 12:00NOON

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Right lane,
Monday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21 & 20  Bridge Work  South: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Left lane,
Monday, 6:00PM - 10:00AM; Tuesday, 6:00PM - 9:00AM; Wednesday, 7:00PM - 7:00AM; Thursday, 9:00PM - 7:00AM; Friday, 11:00PM - 7:00AM

North: Left shoulder,
Tuesday, 10:00AM - 6:00PM; Wednesday, 9:00AM - 7:00PM

 
Minimal  Weather Permitting; Day & Night Work 
21B & 21A  Road Work  North: Right lane,
Wednesday, 9:00AM - 1:00PM

 
Minimal  Weather Permitting 
22 & 23  Road Work  North: Alternating right lane with the left lane,
Tuesday, 9:00AM - 12:00NOON

 
Moderate  None 
22 & 23  Road Work  North: Both lanes,
Monday - Sunday, NB driving and passing lanes shifted until further notice.

 
None  None 
24 & 22  Road Work  South: Alternating the 2 right lanes with the left lanes,
Sunday, 9:00PM - 6:00AM; Monday & Tuesday, 7:00PM to 6:00AM; Mobile closures and Trooper assisted traffic slowdowns.

 
Minimal  Weather Permitting; Night Work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
24 & 25  Bridge Work  East: Left lane,
Monday, 9:00AM - 3:00PM

East: Left lane,
Monday, 9:00AM - 11:00AM

West: Left lane,
Tuesday, 9:00AM - 11:00AM

 
None  Weather Permitting 
25 & 25A  Road Work  West: Right lane,
Tuesday, 8:00AM - 3:00PM

West: Right lane,
Wednesday, 8:00AM - 3:00PM

West: Right lane,
Thursday, 8:00AM - 3:00PM

 
None  Weather Permitting 
26 & 28  Bridge Inspection  West: Right lane,
Thursday, 9:00AM - 11:00AM

 
Minimal  None 


For The Week Starting Monday 06/14/2021
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Bridge Work  West: Left lane,
Monday - Wednesday, 7:00AM -3:00PM

 
None  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Road Work  Direction: Interchange 20W: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 
Toll Plaza Work  Road Work  Direction: Interchange 19: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 20E: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 23: Right lane,
Monday (06/14), 6:00PM to Friday (06/18), 6:00AM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 21B: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 22: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 24: Alternating right lane with the left lane,
Monday (06/14), 5:00AM to Friday (06/18), 7:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps; 24 hour closure; Exit 1S ramp to Western Avenue closed Monday.

 
Minimal  Day and Night work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 25A: Alternating right shoulder or left shoulder,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 25: Alternating right lane with the left lane,
Monday - Friday, 9:00AM - 7:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  Day and Night work 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 21: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 
20 & 21  Road Work  North: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Right lane,
Monday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Left lane,
Monday, 3:00AM - 11:00AM & 6:00PM - 10:00AM; Tuesday, 6:00PM - 9:00AM

 
Minimal  Weather Permitting; Day & Night Work 
21 & 20  Bridge Work  South: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21B & 21A  Road Work  North: Right lane,
Monday, 9:00AM - 2:00PM

 
Minimal  Weather Permitting 
22 & 23  Road Work  North: Both lanes,
Monday - Sunday, 7:00AM - 7:00PM; NB driving and passing lanes shifted until further notice.

 
None  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25 & 24  Bridge Work  East: Left lane,
Monday, 9:00AM - 3:00PM

East: Left lane,
Monday, 9:00AM - 11:00AM

East: Left lane,
Tuesday, 9:00AM - 11:00AM

 
None  Weather Permitting 
25 & 25A  Road Work  West: Right lane,
Tuesday, 8:00AM - 3:00PM

West: Right lane,
Wednesday, 8:00AM - 3:00PM

West: Right lane,
Thursday, 8:00AM - 3:00PM

 
None  Weather Permitting 

Back to Top

Mid-Hudson Region


For The Week Starting Monday 06/07/2021
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
19 & 20  Guide Rail Installation  North: Right lane,
Monday, 7:00AM -12:00NOON

 
Minimal  Weather Permitting 
20 & 19  Road Work  North: Left lane,
Tuesday, 7:00AM - 2:00PM

South: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21 & 19  Road Work  South: Left lane,
Thursday, 7:00AM - 12:00NOON

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Right lane,
Monday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21 & 20  Bridge Work  South: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Left lane,
Monday, 6:00PM - 10:00AM; Tuesday, 6:00PM - 9:00AM; Wednesday, 7:00PM - 7:00AM; Thursday, 9:00PM - 7:00AM; Friday, 11:00PM - 7:00AM

North: Left shoulder,
Tuesday, 10:00AM - 6:00PM; Wednesday, 9:00AM - 7:00PM

 
Minimal  Weather Permitting; Day & Night Work 


For The Week Starting Monday 06/14/2021
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18 & 16  Bridge Inspection  South: Left shoulder,
Wed 8:30am-12pm

 
Minimal  None 
20 & 19  Road Work  South: Right lane,
Thursday, 6:00AM - 3:00PM

North: Left lane,
Tuesday, 6:00AM - 3:00PM

South: Right lane,
Wednesday, 6:00AM - 3:00PM

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Right lane,
Monday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Left lane,
Monday, 3:00AM - 11:00AM & 6:00PM - 10:00AM; Tuesday, 6:00PM - 9:00AM

 
Minimal  Weather Permitting; Day & Night Work 
21 & 20  Bridge Work  South: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 

Back to Top

New York Region


For The Week Starting Monday 06/07/2021
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 12  Bridge Construction  East: Left lane,
Actual MP 10.5-10.7 Thurs 7pm-6am

East: Right lane,
Actual MP 10.5-10.7 Wed 7pm-6am Fri 8pm-6am

 
Minimal  None 
6 & 2  Bridge Washing  East: Alternating right lane with the left lane,
Mon-Tues 8pm-5am

East: Left 2 lanes,
Wed-Thurs 10pm-5am

West: Alternating right lane with the left lane,
Mon-Tues 9pm-5am

West: Left 2 lanes,
Wed-Thurs 10pm-5am

 
None  None 
10  Highway Construction  East: Left lane,
Intermittent traffic stops Mon-Wed 7pm-6am

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7 & 6A  Bridge Inspection  North: Left lane,
Tues 12:30pm-2:30pm

North: Right lane,
Tues 10am-12pm

South: Left lane,
Wed 11am-1pm

South: Right lane,
Wed 9am-11am

 
Minimal  None 
12 & 13  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Thurs 8pm-6am Fri 9pm-6am

North: Center lane,
*ML & LL/RL* Tues-Wed 10pm-5am Thurs 11pm-6am Fri 12am-6am

North: Left 2 lanes,
ML & RL/LL Tues-Fri 12pm-6am

 
None  None 
14 & 12  Bridge Construction  South: Left 2 lanes,
Tues-Wed 10pm-6am Thurs 11pm-6am Fri 12am-6am

South: Left lane,
Mon-Wed 7pm-6am Thurs-Fri 8pm-6am

 
None  None 
14A & 13  Bridge Construction  North: Left lane,
Mon-Thurs 8pm-6am Fri 9pm-6am

North: Left 2 lanes,
Mon-Wed 10pm-6am Thurs-Fri 11pm-6am

South: Left 2 lanes,
Mon-Wed 10pm-5am Thurs 11pm-5am Fri 11pm-6am

South: Left lane,
Mon-Wed 7pm-6am Thurs-Fri 8pm-6am

 
None  None 
14B & 14A  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Wed 5am-3pm Thurs 5am-2pm Fri 5am-11am Night Mon-Wed 7pm-6am Thurs 8pm-6am Fri 9pm-6am

North: Center lane,
*ML & LL/RL* Mon-Tues 10pm-6am Wed 9pm-6am Thurs 10pm-6am Fri 11pm-7am

South: Alternating right lane with the left lane,
Tues-Thurs 8pm-6am Fri 9pm-6am

South: Left 2 lanes,
ML & LL/RL Tues and Thurs 10pm-6am Wed 9pm-6am Fri 11pm-7am

South: Left lane,
Tues-Wed 10am-3pm Thurs-Fri 9am-12pm

South: Center lane,
*ML & LL/RL* Mon-Wed 9pm-5am Thurs 10pm-5am Fri 10pm-7am

South: Alternating right lane with the left lane,
Mon-Wed 9am-3pm Thurs-Fri 10am-2pm Night Mon-Thurs 7pm-6am Fri 7pm-9am

 
None  None 
16 & 15A  Toll Plaza Work  North: Other,
Alternating Toll Lanes Mon-Wed 12am-12am

South: Right lane,
Wed 8pm-7am Thurs-Fri 8pm-7am

 
Minimal  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
16 & 18B  Bridge Construction  North: Right and center lanes,
Tues-Thurs 11pm-5:30am Fri 12pm-5:30am

 
None  None 
22 & 21  Highway Construction  North: Left lane,
Intermittent Traffic Stops Mon-Thurs 10am-2pm

South: Left lane,
Intermittent traffic stops Mon-Thurs 10am-2pm

 
Minor  None 


For The Week Starting Monday 06/14/2021
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 2  Bridge Inspection  East: Right shoulder,
Actual MP 11.5-0.0 Tues 10am-12pm

 
None  None 
1 & 12  Bridge Construction  East: Right lane,
Actual MP 10.5-10.7 Mon/Wed/Fri 7pm-6am

East: Left lane,
Actual MP 10.5-10.7 Tues/Thurs 7pm-6am

 
Minimal  None 
6 & 1  Bridge Washing  East: Left 2 lanes,
Wed-Thurs 10pm-5am

East: Right lane,
Mon-Tues 8pm-12am

West: Left 2 lanes,
Wed-Thurs 10pm-5am

West: Left lane,
Mon-Tues 12am-5am

 
None  None 
10  Highway Construction  East: Left lane,
Intermittent traffic stops Mon-Wed 7pm-6am

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
12 & 13  Bridge Construction  North: Center lane,
*ML & LL/RL* Tues-Wed 10pm-6am Thurs 11pm-6am Fri 12am-6am

North: Left 2 lanes,
ML & RL/LL Tues-Wed 10pm-6am Thurs 11pm-6am Fri 12pm-6am

North: Alternating right lane with the left lane,
Mon-Thurs 8pm-6am Fri 9pm-6am

 
None  None 
14 & 12  Bridge Construction  South: Left 2 lanes,
Mon-Wed 11pm-6am Thurs 11pm-5am Fri 11pm-6am

South: Left lane,
Mon-Wed 7pm-6am Thurs-Fri 8pm-6am

 
None  None 
14A & 13  Bridge Construction  North: Left 2 lanes,
Mon-Wed 10pm-6am Thurs 10pm-6am Fri 12am-6am

North: Left lane,
Mon-Thurs 8pm-6am Fri 10pm-6am

South: Left lane,
Mon-Wed 7pm-6am Thurs-Fri 8pm-6am

South: Left 2 lanes,
Mon-Wed 11pm-5am Thurs 11pm-5am Fri 11pm-6am

 
None  None 
14B & 14A  Bridge Construction  North: Center lane,
*ML & LL/RL* Mon-Tues 10pm-6am Wed 9pm-6am Thurs 10pm-6am Fri 11pm-7am

North: Alternating right lane with the left lane,
Mon-Wed 5am-3pm Thurs 5am-2pm Fri 5am-11am Night Mon-Wed 7pm-6am Thurs 8pm-6am Fri 9pm-6am

South: Alternating right lane with the left lane,
Tues-Thurs 8pm-6am Fri 9pm-6am

South: Left 2 lanes,
ML & LL/RL Tues and Thurs 10pm-6am Wed 9pm-6am Fri 11pm-7am

South: Left lane,
Tues-Wed 10am-3pm Thurs-Fri 9am-12pm

South: Alternating right lane with the left lane,
Mon 10am-3pm Tues-Wed 9am-3pm Thurs-Fri 10am-2pm Night Mon-Thurs 7pm-6am Fri 7pm-9am

South: Center lane,
*ML & LL/RL* Mon-Wed 9pm-5am Thurs 10pm-5am Fri 10pm-7am

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
8B & 22  Bridge Washing  North: Left lane,
Wed-Thurs 10pm-5am

North: Right 2 lanes,
Mon 10pm-5am

 
None  None 
18B & 17  Paving  North: Alternating right lane with the left lane,
Tues/Wed 10pm-2am

South: Alternating right lane with the left lane,
Tues/Wed 10pm-2am

 
Minimal  None 
18A & 20  Bridge Construction  North: Right and center lanes,
Mon-Wed 11pm-5:30am Thurs 11pm-5am Fri 12pm-6am

 
None  None 
19 & 18A  Paving  South: Alternating right lane with the left lane,
Tues/Wed 10pm-2am

 
Minimal  None 
19 & 18B  Paving  South: Alternating right lane with the left lane,
Tues/Wed 10pm-2am

 
Minimal  None 
19 & 20  Paving  North: Alternating right lane with the left lane,
Tues/Wed 10pm-2am

 
Minimal  None 
20 & 18A  Bridge Construction  South: Right and center lanes,
Mon-Wed 11pm-5:30am Thurs 11pm-5am Fri 12pm-6am

 
None  None 
21 & 22  Highway Construction  North: Left lane,
Intermittent Traffic Stops Mon-Fri 10am-2pm

 
Minor  None 
22 & 20  Paving  South: Alternating right lane with the left lane,
Tues/Wed 10pm-2am

 
Minimal  None 
22 & 8B  Bridge Washing  South: Right 2 lanes,
Sun 10pm-5am

South: Left lane,
Tues 10pm-5am

 
None  None 
22 & 21  Highway Construction  South: Left lane,
Intermittent traffic stops Mon-Fri 10am-2pm

 
Minor  None 

Back to Top