Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 09/01/2025
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
57A & 55  Highway Construction  East: Left lane,
Tuesday 8/26/25 6:00pm-6:00am Wednesday 8/27/25. Wednesday 8/27/25 6:00pm-6:00am Thursday 8/28/25.

 
Minimal  None 
57A & 57  Road Work  East: Other,
The 443 Eastbound parking area will be closed from 2:30pm on Monday, August 25 until 2:30pm on Tuesday, August 26. The Westbound parking area will be closed from 2:30pm on Monday, August 25 until 2:30pm on Tuesday, August 26.

 
Minimal  None 
58 & 59  Paving  West: Left lane,
Monday 8/25/25 6:00pm-10:00am Wednesday 8/27/25.

West: Right lane,
Tuesday 8/26/25 6:00am-6:00pm. West, LT LN, MP 456.29-456.52, Tuesday 8/26/25 6:00am-6:00pm.

East: Right lane,
Monday 8/25/25 6:00pm-10:00am Wednesday 8/27/25.

West: Right lane,
Monday 8/25/25 6:00pm-10:00am Wednesday 8/27/25.

 
Minimal  None 
58 & 60  Road Work  West: Alternating right lane with the left lane,
Monday 8/25/25-7:00am-12:00pm Thursday 8/28/25.

 
Minimal  None 
60 & 59  Road Work  East: Right lane,
LONG Term Closure: Tuesday 9/2/25-7:00am-12:00pm Friday 9/05/25.

 
Minimal  None 
60 & 59  Road Work  East: Alternating right lane with the left lane,
Monday 8/25/25 7:00am-12:00pm Thursday 8/28/25.

 
Minimal  None 
60 & 58  Road Work  East: Alternating right lane with the left lane,
Sunday 8/24/25 6:00pm-12:00pm Thursday 8/28/25.

 
Minimal  None 
60 & 61  Road Work  West: Left lane,
Tuesday 9/02/25 7:00am-2:00pm.

West: Right lane,
Wednesday 9/03/25 7:00am-2:00pm.

 
Minimal  None 


For The Week Starting Monday 09/08/2025
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
57A & 55  Highway Construction  East: Alternating right lane with the left lane,
Monday 9/8/25 7:00pm-6:00am Tuesday 9/9/25. Tuesday 9/9/25 7:00pm-6:00am Wednesday 9/10/25. Wednesday 9/10/25 7:00pm-6:00am Thursday 9/11/25. Thursday 9/11/25 7:00pm-6:00am Friday 9/12/25.

 
Minimal  None 
57 & 57A  Road Work  West: Right lane,
Saturday 9/6/25 7:00am-2:00pm- Deck Repair

 
Minimal  None 

Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 09/01/2025
Buffalo/Niagara Region

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 20  Bridge Construction  North: Right lane,
Tuesday 9/02/25 10:00pm-6:00am Tuesday 9/03/25. Wednesday 9/03/25 10:00pm-6:00am Thursday 9/04/25. Thursday 9/04/25 10:00pm-6:00am Friday 9/05/25. Friday 09/05/25 10:00pm-6:00am Saturday 9/06/25.

South: Right lane,
Tuesday 9/02/25 10:00pm-6:00am Wednesday 9/03/25. Wednesday 9/03/25 10:00pm-6:00am Thursday 9/04/25. Thursday Thursday 9/04/25 10:00pm-6:00am Friday 9/05/25. Friday 9/05/25 Midnight- 6:00am Saturday 9/06/25.

 
Minimal  None 


For The Week Starting Monday 09/08/2025
Buffalo/Niagara Region

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 20  Bridge Construction  South: Right lane,
Tuesday 9/9/25 10:00pm-6:00am Wednesday 9/10/25. Wednesday 9/10/25 10:00pm-6:00am Thursday 9/11/25. Thursday 9/11/25 10:00pm-6:00am Friday 9/12/25. Friday 09/12/25 12:00am-6:00am Saturday 9/13/25.

 
Minimal  None 

Back to Top

Rochester Region


For The Week Starting Monday 09/01/2025
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
42 & 41  Road Work  West: Left shoulder,
FRI 7:30AM-1PM

East: Left shoulder,
FRI 7:30AM-1PM

 
Minimal  Weather permitting 
42 & 43  Road Work  West: Right lane,
WED 3AM-9AM

 
Minimal  Weather permitting 
44 & 43  Shoulder Work  East: Right shoulder,
THU 9AM-2PM

 
None  None 
43 & 44  Other  West: Shoulder,
THU 7AM-5PM

 
None  None 
43 & 45  Road Work  West: Left lane,
Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25.

 
Minimal  None 
43 & 45  Paving  West: Left lane,
CONTINUOUS

 
Moderate  None 
44 & 45  Paving  West: Center lane,
TUE-WED 9PM to WED-THU 6AM, THU 10PM-FRI 6AM

 
Moderate  None 
45 & 43  Road Work  East: Center lane,
Monday 7/7/25 9:00pm-6:00am Tuesday 7/8/25. Tuesday 7/8/25 9:00pm-6:00am Wednesday 7/9/25. Wednesday 7/9/25 9:00pm-6:00am Thursday 7/10/25. Thursday 7/10/25 9:00pm-6:00am Friday 7/11/25. Friday 7/11/25 9:00pm-6:00am Saturday 7/12/25.

 
Minimal  None 
45 & 44  Paving  West: Center lane,
WED-SAT CONTINUOUS

East: Center lane,
WED-SAT CONTINUOUS

East: Center lane,
TUE-WED 9PM to WED-THU 6AM

 
Moderate  None 
45 & 43  Paving  East: Right lane,
SUN-SAT Continuous

 
Moderate  None 
44 & 45  Road Work  West: Ramp,
Right lane of exit ramp. Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25.- Right Ramp

 
Minimal  None 
46 & 44  Paving  East: Left lane,
Continuous

 
Moderate  None 
46 & 43  Road Work  East: Left lane,
Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25.

 
Minimal  None 
46 & 45  Bridge Construction  West: Alternating right lane with the left lane,
Monday 8/04/25 7:00pm-6:00am Thursday 8/07/25. Nightly Closure

East: Alternating right lane with the left lane,
Monday 8/04/25 7:00pm-6:00am Thursday 8/07/25. Nightly Closure

East: Right lane,
Wednesday 8/06/25 6:00am-8:00am. Waiver to allow placement of concrete.

 
Minimal  None 
45 & 47  Bridge Construction  West: Right shoulder,
Tuesday 9/2/25 6:00am-6:00pm.

 
None  None 
47 & 46  Ramp Work  East: Right lane,
Thursday 9/04/25 7:00pm-9:00am Friday 9/05/25. Friday 9/05/25 8:00pm-9:00am Saturday 9/06/25.

 
Minimal  None 
47 & 46  Road Work  East: Right shoulder,
Tuesday 9/02/25 9:00am-2:00pm.

 
None  None 
46 & 47  Bridge Construction  West: Right lane,
Monday 8/25/25 7:30am-1:00pm.

 
Minimal  None 
46 & 47  Ramp Work  West: Right lane,
Tuesday 9/02/25 6:00pm-9:00am Wednesday 9/03/25. Wednesday 9/03/25 6:00pm-9:00am Thursday 9/04/25.

 
Minimal  None 
47 & 46  Bridge Construction  East: Right lane,
Wednesday 9/03/25 8:00am-1:00pm. Thursday 9/04/25 8:00am-1:00pm.

 
Minimal  None 


For The Week Starting Monday 09/08/2025
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
43 & 42  Shoulder Work  East: Right shoulder,
THU 7AM-5PM

East: Right shoulder,
THU 7AM-5PM

East: Right shoulder,
WED 7AM-5PM

 
None  None 
44 & 42  Shoulder Work  East: Right shoulder,
TUE 7AM-5PM

East: Right shoulder,
MON 7AM-5PM

 
None  None 
44 & 43  Shoulder Work  East: Shoulder,
TUE 7AM-5PM

 
None  None 
43 & 45  Paving  West: Left lane,
CONTINUOUS SUN-SAT

 
Moderate  None 
45 & 44  Paving  West: Left and center lanes,
TUE-WED 9PM-6AM

West: Center lane,
WED-SAT CONTINUOUS

East: Center lane,
SUN-SAT CONTINUOUS

East: Left lane,
MON-WED 9PM-6AM & THU-FRI 10PM-6AM

 
Moderate  None 
45 & 43  Paving  East: Right lane,
SUN-SAT Continuous

 
Moderate  None 
46 & 44  Paving  East: Left lane,
Continuous

 
Moderate  None 
47 & 46  Shoulder Work  East: Right lane,
Monday 9/8/25 6:00pm-9:00am Tuesday 9/9/25. Tuesday 9/9/25 6:00pm-9:00am Wednesday 9/10/25. Wednesday 9/10/25 7:00pm-9:00am Thursday 9/11/25. Thursday 9/11/25 7:00pm-9:00am Friday 9/12/25.

East: Right lane,
Friday 9/12/25 8:00pm-9:00am Saturday 9/13/25.

 
Minimal  None 

Back to Top

Syracuse Region


For The Week Starting Monday 09/01/2025
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
34 & 32  Road Work  East: Left shoulder,
TUE-FRI 7:30AM-2PM

 
Minimal  Weather permitting 
33 & 34  Road Work  West: Right lane,
TUE-FRI 7:30AM-2PM

 
Minimal  Weather permitting 
34 & 35  Bridge Construction
Long Range: Bridge Construction I-481 
West: Alternating right lane with the left lane,
WED 6AM-3PM, THU 6AM-1PM, FRI 6AM-10AM

 
None  Set up as needed 
35 & 34A  Bridge Construction
Long Range: Bridge Construction I-481 
East: Alternating right lane with the left lane,
WED 6AM-2PM, THU 6AM-10AM, FRI 6AM-9AM

 
None  Set up as needed 
34A & 36  Bridge Construction  West: Left lane,
WED 6AM-10AM

 
Minimal  None 
36 & 35  Bridge Construction  East: Left lane,
WED 9AM-1PM

 
Minimal  None 
42 & 40  Other  East: Shoulder,
WED 7AM-5PM

 
None  None 
42 & 41  Road Work  West: Right lane,
THU 6AM-9AM

West: Left shoulder,
FRI 7:30AM-1PM

East: Left shoulder,
FRI 7:30AM-1PM

 
Minimal  Weather permitting 
42 & 43  Road Work  West: Right lane,
WED 3AM-9AM

 
Minimal  Weather permitting 


For The Week Starting Monday 09/08/2025
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
33 & 34A  Road Work  West: Right lane,
MON-TUE 5AM-10AM

 
Minimal  Weather permitting 
35 & 34  Bridge Work  East: Alternating right lane with the left lane,
TUE 5AM-3PM, WED 5AM-2PM

 
Minimal  Weather permitting 
34A & 36  Bridge Construction  West: Left lane,
TUE 6:30AM-10AM, THU-FRI 6AM-2PM

 
Minimal  None 
36 & 35  Bridge Construction  East: Left lane,
TUE 9AM-2PM, THU-FRI 6AM-2PM

 
Minimal  None 
38 & 40  Shoulder Work  West: Right shoulder,
MON-FRI 7AM-5PM

 
Minimal  None 
40 & 39  Shoulder Work  West: Right shoulder,
MON-FRI 7AM-5PM

East: Right shoulder,
MON-FRI 7AM-5PM

East: Right shoulder,
MON-FRI 7AM-5PM

East: Right shoulder,
MON-FRI 7AM-5PM

 
Minimal  None 
41 & 40  Road Work  West: Left shoulder,
MON-THU 7:30AM-2PM

East: Left shoulder,
MON-THU 7:30AM-2PM

East: Right lane,
TUE-WED 7:30AM-1PM

West: Left shoulder,
MON-THU 7:30AM-2PM

East: Left shoulder,
MON-THU 7:30AM-2PM

East: Right lane,
TUE-WED 7:30AM-1PM

 
Minimal  Weather permitting 
43 & 42  Shoulder Work  East: Right shoulder,
THU 7AM-5PM

East: Right shoulder,
THU 7AM-5PM

East: Right shoulder,
WED 7AM-5PM

 
None  None 
44 & 42  Shoulder Work  East: Right shoulder,
TUE 7AM-5PM

East: Right shoulder,
MON 7AM-5PM

 
None  None 

Back to Top

Utica Region


For The Week Starting Monday 09/01/2025
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
27 & 28  Bridge Construction  West: Right lane,
Tuesday - Thursday, 6:00AM - 5:00PM

West: Other,
WB traffic shifted to EB side of bridge until further notice.

 
Minimal  Weather Permitting 
28 & 29  Bridge Work  West: Right lane,
Tuesday - Friday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
28 & 29  Guide Rail Installation  West: Right lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
29 & 29A  Guide Rail Installation  West: Right lane,
Wednesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
29A & 29  Guide Rail Installation  West: Left lane,
WED-THU 6AM-5PM, FRI 6AM-11AM

East: Left lane,
WED-THU 6AM-5PM, FRI 6AM-11AM

 
Minor  None 
30 & 29  Road Work  West: Right lane,
WED 7AM-2PM

East: Right lane,
WED 7AM-2PM

 
Minimal  Weather permitting 
30 & 29A  Road Work  East: Right lane,
WED-THU 7AM-2PM

 
Minimal  Weather permitting 
31 & 30  Bridge Construction  West: Left lane,
WED 7AM-5PM, THU 7AM-1PM, FRI 7AM-10AM

East: Left lane,
WED 7AM-5PM

 
Minimal  None 
31 & 32  Bridge Deck Rehabilitation  West: Right lane,
MON-SUN Continuous - EB traffic shifted to WB, Ex 31 ramp closed, detour in place.

 
Minimal  None 
32 & 31  Road Work  West: Left shoulder,
TUE-FRI 7:30AM-2PM

East: Left shoulder,
TUE-FRI 7:30AM-2PM

 
Minimal  Weather permitting 
32 & 33  Road Work  West: Left shoulder,
TUE 7:30AM-2PM

 
Minimal  Weather permitting 
34 & 32  Road Work  East: Left shoulder,
TUE-FRI 7:30AM-2PM

 
Minimal  Weather permitting 
33 & 34  Road Work  West: Right lane,
TUE-FRI 7:30AM-2PM

 
Minimal  Weather permitting 


For The Week Starting Monday 09/08/2025
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
27 & 28  Bridge Construction  West: Other,
WB traffic shifted to EB side of bridge until further notice.

 
Minimal  Weather Permitting 
28 & 29  Bridge Work  West: Right lane,
Monday - Friday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
28 & 29  Other  West: Right lane,
Thursday, 7:00AM - 5:00PM

 
Minor  Weather Permitting 
28 & 29  Guide Rail Installation  West: Left lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
29 & 29A  Guide Rail Installation  West: Right lane,
Wednesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
29 & 29A  Road Work  West: Right lane,
THU 7AM-2PM

 
Minimal  Weather permitting 
29 & 29A  Guide Rail Installation  West: Left lane,
MON-THU 6AM-5PM, FRI 6AM-11AM

East: Left lane,
MON-THU 6AM-5PM

West: Left lane,
MON 6AM-5PM

West: Left lane,
TUE-THU 6AM-5PM

East: Left lane,
TUE-THU 6AM-5PM

West: Left lane,
FRI 6AM-11AM

West: Left lane,
THU 6AM-5PM, FRI 6AM-11AM

 
Minor  None 
30 & 29  Road Work  East: Right lane,
WED 7AM-2PM

 
Minimal  Weather permitting 
31 & 30  Road Work  East: Right lane,
TUE 7AM-2PM

East: Right lane,
WED-THU 7AM-2PM

 
Minimal  Weather permitting 
30 & 31  Bridge Construction  West: Left lane,
MON-TUE 7AM-5PM, WED 7AM-5PM, THU 7AM-1PM, FRI 7AM-10AM

 
Minimal  None 
31 & 32  Bridge Deck Rehabilitation  West: Right lane,
MON-SUN Continuous - EB traffic shifted to WB, Ex 31 ramp closed, detour in place.

 
Minimal  None 
32 & 31  Road Work  East: Left lane,
MON 7:30AM-2PM

 
Minimal  Weather permitting 
32 & 33  Road Work  West: Alternating right lane with the left lane,
TUE-THU 7:30AM-2PM

 
Minimal  Weather permitting 
32 & 33  Shoulder Work  West: Shoulder,
MON-THU 7AM-5PM

 
None  None 
33 & 32  Road Work  East: Alternating right lane with the left lane,
TUE-THU 7:30AM-2PM

 
Minimal  Weather permitting 
33 & 34A  Road Work  West: Right lane,
MON-TUE 5AM-10AM

 
Minimal  Weather permitting 

Back to Top

Albany Region


For The Week Starting Monday 09/01/2025
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Bridge Construction  East: Other,
Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

West: Left lane,
Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

 
Minimal  Weather Permitting 
B2 & B1  Road Work  West: Right lane,
Wednesday & Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Bridge Work  Direction: Interchange 25: Right lane,
Tuesday - Saturday, 7:00PM - 6:00AM *Night Work*

 
Minor  Weather Permitting 
Interchange Work  Gantry Work  Direction: Interchange 25A: Alternating right shoulder or left shoulder,
Tuesday - Friday, 8:00AM - 5:00PM Eastbound; Tuesday - Friday, 6:00AM - 4:00PM Westbound

Direction: Interchange 25 Interchange Work: Alternating right lane with the left lane,
Tuesday - Friday, 10:00AM - 2:00PM Eastbound; Tuesday - Friday, 9:00AM - 2:00PM Westbound

 
None  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
20 & 21  Road Work  North: Right lane,
Thursday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
21B & 21  Road Work  North: Right lane,
Wednesday, 8:00AM - 12:00 Noon

South: Right lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
22 & 23  Bridge Inspection  North: Right shoulder,
Wednesday, 8:00AM - 10:00AM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
24 & 25  Bridge Inspection  West: Left lane,
Wednesday, 8:00AM - 11:00AM

 
Minor  Weather Permitting 
26 & 25A  Bridge Inspection  East: Right shoulder,
Wednesday, 11:00AM - 1:00PM

 
Minor  Weather Permitting 
26 & 27  Guide Rail Installation  West: Left lane,
Thursday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 09/08/2025
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Bridge Construction  East: Other,
Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

West: Left lane,
Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

 
Minimal  Weather Permitting 
B2 & B1  Bridge Work  West: Right lane,
Monday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
B3 & B2  Guide Rail Installation  West: Alternating right lane with the left lane,
Wednesday & Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Bridge Work  Direction: Interchange 25: Right lane,
Monday - Friday, 7:00PM - 6:00AM *Night Work*

 
Minor  Weather Permitting 
Interchange Work  Gantry Work  Direction: Interchange 25 Interchange Work: Alternating right lane with the left lane,
Monday - Friday, 10:00AM - 2:00PM Eastbound; Monday - Thursday, 9:00AM - 2:00PM; Friday, 9:00AM - 1:00PM Westbound

Direction: Interchange 25A: Alternating right lane with the left lane,
Monday - Friday, 8:00AM - 5:00PM Eastbound; Monday - Friday, 6:00AM - 4:00PM Westbound

 
None  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 20  Road Work  North: Left lane,
Tuesday & Wednesday, 7:00AM - 1:00PM

South: Right lane,
Monday, 7:00AM - 12:00 Noon

 
Minimal  Weather Permitting 
21B & 21A  Road Work  North: Left lane,
Thursday, 9:00AM - 11:00AM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
24 & 25  Bridge Inspection  West: Right shoulder,
Monday, 9:00AM - 2:00PM

 
Minimal  Weather Permitting 
26 & 27  Guide Rail Installation  West: Right lane,
Thursday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 

Back to Top

Mid-Hudson Region


For The Week Starting Monday 09/01/2025
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 16  Other  North: Right lane,
Tue 9pm-10am Wed 7pm-9am Thur 8pm-7am Fri 9pm-7am

North: Right shoulder,
Thur 6am-4pm

North: Left lane,
Tue 9pm-9am Wed 7pm-9am

North: Right lane,
Tue 9pm-9am Wed 7pm-9am

South: Left shoulder,
Wed 6am-6pm

South: Right shoulder,
Thur 6am-6pm

 
None  None 
18 & 16  Other  South: Right lane,
Tue 9pm-7am Wed 6pm-7am Thur 8pm-7am

South: Left lane,
Tue 9pm-7am Wed 6pm-7am Thur 8pm-7am

South: Right lane,
Thur 8pm-7am Fri 8pm-9am

 
None  None 
19 & 18  Bridge Construction  North: Right lane,
Thursday & Friday, 7:00AM - 5:00PM

North: Both lanes,
NB traffic shifted to SB side of bridge until further notice.

South: Left lane,
Thursday & Friday, 7:00AM - 5:00PM

North: Right lane,
Thursday & Friday, 7:00AM - 5:00PM

North: Left lane,
Thursday & Friday, 7:00AM - 5:00PM

South: Left lane,
Thursday & Friday, 7:00AM - 5:00PM

South: Right lane,
Wednesday - Friday, 7:00AM - 5:00PM

South: Left lane,
Tuesday, 7:00AM - 5:00PM Wednesday - Friday, 7:00AM - 5:00PM

 
Minor  Weather Permitting 
20 & 21  Road Work  North: Right lane,
Thursday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 09/08/2025
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 16  Other  North: Alternating right lane with the left lane,
Mon 6pm-11am Tue 7pm-10am

North: Left lane,
Tue 7pm-10am

North: Left lane,
Wed 7pm-9am

North: Left lane,
Thur 8pm-7am

North: Left lane,
Fri 10pm-7am

North: Right shoulder,
Mon 6am-6pm

North: Ramp,
Alt LSH/RSH closure Tue-Wed 6am-6pm Thur 6am-7pm LSH closure Fri 6am-7pm

South: Right lane,
Mon 7pm-7am

South: Alternating right lane with the left lane,
Sun 9pm-7am

 
None  None 
18 & 16  Other  South: Alternating right lane with the left lane,
Thur 8pm-7am Fri 8pm-9am

 
None  None 
18 & 19  Road Work  North: Alternating right lane with the left lane,
Monday, 9:00AM - 11:00AM; Tuesday & Wednesday, 9:00AM - 12:00 Noon; Thursday & Friday, 6:00AM - 2:00PM

 
Moderate  Weather Permitting 
18 & 19  Bridge Construction  North: Both lanes,
NB traffic shifted to SB side of bridge until further notice.

 
Minor  Weather Permitting 
19 & 18  Road Work  South: Alternating right lane with the left lane,
Monday, 6:00AM - 9:00AM; Tuesday & Wednesday, 6:00AM - 12:00 Noon; Thursday, 6:00AM - 10:00AM; Friday, 6:00AM - 9:00AM

 
Moderate  Weather Permitting 
21 & 20  Road Work  North: Left lane,
Tuesday & Wednesday, 7:00AM - 1:00PM

South: Right lane,
Monday, 7:00AM - 12:00 Noon

 
Minimal  Weather Permitting 

Back to Top

New York Region


For The Week Starting Monday 09/01/2025
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 2  Bridge Inspection  East: Right shoulder,
Wed-Thur 10am-3pm

 
None  None 
4 & 5  Bridge Construction  East: Right shoulder,
Wed 10am-2pm

 
None  None 
5 & 1  Bridge Inspection  West: Right shoulder,
Wed-Thur 9am-2pm

 
None  None 
5 & 7  Bridge Construction  East: Right shoulder,
Wed 10am-2pm

 
None  None 
7 & 9  Paving  East: Left lane,
Tue 9pm-6am Wede 8pm-6am

East: Left and center lanes,
Tue 11pm-6am Wed 10pm-6am

 
None  None 
9A & 11  Paving  East: Ramp,
Ramp E Alt RT/LT LN closure Tue 11pm-6am Wed-Thur 10pm-6am

 
None  None 
9A & 12  Paving  East: Ramp,
Ramps C, G, H, Q Tue 11pm-6am Wed-Thur 10pm-6am

 
None  None 
9A & 11  Paving  East: Left lane,
Thur 7pm-6am

 
None  None 
9 & 11  Paving  East: Left and center lanes,
Thur 9pm-6am

 
None  None 
9 & 10  Bridge Construction  East: Right shoulder,
Tue-Fri 10am-3pm

 
None  None 
11 & 8  Paving  West: Right and center lanes,
Tue 11pm-6am Wed-Thur 10pm-6am

West: Right lane,
Tue-Thur 9pm-6am

 
None  None 
11 & 10  Bridge Construction  West: Right shoulder,
Tue-Thur 8am-3pm Fri 8am-2pm

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7 & 8  Bridge Construction  North: Right shoulder,
Tue-Fri 8am-3pm

 
None  None 
12 & 13  Bridge Construction  North: Right shoulder,
Tue-Thur 9am-3pm Fri 9am-1pm

 
None  None 
12 & 14  Bridge Work  North: Left lane,
Tue-Thur 9pm-7am

North: Left and center lanes,
Tue-Thur 12am-6am W

 
None  None 
14 & 13  Bridge Work  South: Left and center lanes,
Tue-Wed 11pm-5am Thur 12am-5am

South: Right lane,
Tue 9pm-6am Wed 8pm-6am Thur 9pm-5am

South: Left lane,
Tue 9pm-6am Wed 8pm-6am Thur 9pm-5am

 
None  None 
14A & 14  Bridge Inspection  South: Left lane,
Wed 11am-12pm

 
Minimal  None 
14B & 15  Shoulder Work  North: Alternating right lane with the left lane,
Wed 6am-11am

North: Right shoulder,
Mon-Fri 6am-3pm

 
None  None 
15A & 14B  Shoulder Work  South: Right shoulder,
Mon & Wed-Fri 10am-3pm

 
None  None 
16 & 14B  Bridge Construction  South: Right shoulder,
Tue-Fri 9am-3pm

 
None  None 
16 & 15  Bridge Construction  South: Right shoulder,
Tue-Fri 9am-2pm

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18A & 14  Shoulder Work  North: Right lane,
Tue 9pm-7am Wed-Thur 7pm-7am Fri 9pm-8am

North: Right and center lanes,
Tue-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am

North: Right shoulder,
Tue-Fri 9am-3pm & 6pm-7am

North: Ramp,
Alt RT/LT shoulder closures: Exit 15 NB on-ramp & off-ramp Exit 16 NB on-ramp & Off-ramp Exit 17 NB off-ramp River St on-ramp to NB 95 Tue-Fri 9am-3:30pm & 7pm-7am

South: Left and center lanes,
Tue-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am

South: Right shoulder,
Tue-Fri 7am-3pm & 7pm-7am

South: Ramp,
Alt RT/LT shoulder closures: Exit 15 SB on-ramp & off-ramp Exit 16 SB on-ramp & Off-ramp Exit 17 SB on-ramp River St on-ramp to NB 95 Tue-Fri 7:30am-3:30pm & 7pm-7am

South: Left lane,
Tue 9pm-7am Wed-Thur 8pm-7am Fri 9pm-8am

 
None  None 
19  Paving  North: Right lane,
RT LN +RSH Wed-Fri 10pm-6am

 
None  None 


For The Week Starting Monday 09/08/2025
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7 & 9  Paving  East: Left lane,
Tue-Thu 8pm-6am

East: Left and center lanes,
Tue-Thur 10pm-6am

 
None  None 
9A & 12  Paving  East: Left lane,
Sun 8pm-6am

 
None  None 
10 & 9  Paving  West: Ramp,
Ramp 9N-S closure Tue-Thur 10pm-6am

 
None  None 
9 & 12  Paving  East: Left and center lanes,
Sun 12am-6am

 
None  None 
9 & 10  Bridge Construction  East: Right shoulder,
Mon-Fri 10am-3pm

 
None  None 
11 & 7  Paving  West: Left and center lanes,
Tue-Thur 10pm-6am

West: Left lane,
Tue-Thur 9pm-6am

 
None  None 
11 & 10  Bridge Construction  West: Right shoulder,
Mon-Thur 8am-3pm Fri 8am-2pm

 
None  None 
12 & 8  Paving  West: Left lane,
Sun, Mon 9pm-6am

West: Left and center lanes,
Sun 11pm-6am Mon 10pm-6am

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7 & 8  Bridge Construction  North: Right shoulder,
Mon-Fri 8am-3pm

 
None  None 
12 & 9  Other
Long Range: Nyack Mtc. 
South: Right and center lanes,
Mon 11:15pm-4:55am

 
Minimal  None 
12 & 13  Bridge Construction  North: Right shoulder,
Mon-Thur 9am-3pm Fri 9am-1pm

 
None  None 
12 & 14  Bridge Work  North: Left lane,
Mon 8pm-6am Tue-Thur 9pm-6am

North: Left and center lanes,
Mon 11pm-6am Tue-Thur 12am-6am

 
None  None 
14 & 13  Bridge Work  South: Right lane,
Mon-Wed 8pm-5am Thur 9pm-5am

South: Left and center lanes,
Mon-Wed 11pm-5am Thur 12am-5am

South: Left lane,
Mon-Wed 8pm-5am Thur 9pm-5am

 
None  None 
14A & 14  Bridge Inspection  South: Left lane,
Wed 11am-12pm

 
Minimal  None 
14B & 15  Shoulder Work  North: Right shoulder,
Mon-Fri 6am-3pm

North: Alternating right lane with the left lane,
Mon-Wed 6am-11am Thur 6am-7am & 9am-10am Fri 6am-7am

 
None  None 
15A & 14B  Shoulder Work  South: Right shoulder,
Mon-Fri 10am-3pm

 
None  None 
16 & 15  Bridge Construction  South: Right shoulder,
Mon-Fri 9am-3pm

South: Right shoulder,
Mon-Fri 9am-2pm

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
14 & 18A  Shoulder Work  North: Right lane,
Mon-Thur 7pm-7am Fri 9pm-8am Sun 10pm-7am

 
None  None 
14 & 16  Bridge Inspection  North: Alternating right lane with the left lane,
Mon 7pm-7am Fri 9pm-8am

 
None  None 
14 & 18A  Shoulder Work  North: Right and center lanes,
Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am Sun 12am-5:30am

North: Ramp,
Alt RT/LT shoulder closures: Exit 15 NB on-ramp & off-ramp Exit 16 NB on-ramp & Off-ramp Exit 17 NB off-ramp River St on-ramp to NB 95 Mon-Fri 9am-3:30pm & 7pm-7am Sun 10pm-9am

North: Right shoulder,
Mon-Fri 9am-3pm & 6pm-7am Sun 6pm-7am

 
None  None 
15 & 16  Bridge Inspection  North: Left lane,
Tue-Wed 10am-10:15am

 
None  None 
17 & 15  Bridge Inspection  South: Left lane,
Tue-Wed 10:30am-10:45am

 
None  None 
17 & 15  Bridge Inspection  South: Alternating right lane with the left lane,
Fri 9pm-9am

South: Alternating right lane with the left lane,
Mon 8pm-6am

 
None  None 
18A & 14  Shoulder Work  South: Left and center lanes,
Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am Sun 12am-5:30am

South: Ramp,
Alt RT/LT shoulder closures: Exit 15 SB on-ramp & off-ramp Exit 16 SB on-ramp & Off-ramp Exit 17 SB on-ramp River St on-ramp to NB 95 Mon-Fri 7:30am-3:30pm & 7pm-7am Sun 7pm-7am

South: Left lane,
Mon-Thur 8pm-7am Fri 9pm-9am Sun 10pm-7am

South: Right shoulder,
Mon-Fri 7am-3pm & 7pm-7am Sun 7pm-7am

 
None  None 
19  Paving  North: Right lane,
RT LN +RSH Mon-Tue 9pm-6am

 
None  None 

Back to Top