Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 07/26/2021
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
56 & 54  Bridge Washing  West: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 11pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 11pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 11pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 11pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 11pm -through- 5am Saturday 7/24/2021.

East: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 11pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 11pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 11pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 11pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 11pm -through- 5am Saturday 7/24/2021.

 
Minimal  None 
55 & 57  Road Work  West: Alternating right lane with the left lane,
NOTE: Guiderail Installation Work At Exit 56 (Blasdell). Exit Will Remain Open At All Times. Monday 7/26/2021 7:00am - 4:00pm. Tuesday 7/27/2021 7:00am - 4:00pm. Wednesday 7/28/2021 7:00am - 4:00pm. Thursday 7/29/2021 7:00am - 4:00pm. Friday 7/30/2021 7:00am - 4:00pm.

 
Minimal  None 
57 & 56  Bridge Washing  West: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 8pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 8pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 8pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 8pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 8pm -through- 5am Saturday 7/24/2021.

East: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 8pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 8pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 8pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 8pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 8pm -through- 5am Saturday 7/24/2021.

 
Minimal  None 
57 & 57A  Road Work  West: Alternating right lane with the left lane,
NOTE: Lane Closure Will Remain In Place For Full Depth Reconstruction And Paving Work Exit 57 (Hamburg). Exit Will Remain Open At All Times. Monday 7/26/2021 7am -through- 6am Friday 7/30/2021.

 
Minimal  None 
58 & 57A  Bridge Washing  West: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 6pm -through- 8am Tuesday 7/20/2021. Tuesday 7/20/2021 6pm -through- 8am Wednesday 7/21/2021. Wednesday 8/21/2021 6pm -through- 8am Thursday 7/22/2021. Thursday 8/22/2021 6pm -through- 8am Friday 7/23/2021. Friday 7/23/2021 6pm -through- 8am Saturday 7/24/2021.

East: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 6pm -through- 8am Tuesday 7/20/2021. Tuesday 7/20/2021 6pm -through- 8am Wednesday 7/21/2021. Wednesday 8/21/2021 6pm -through- 8am Thursday 7/22/2021. Thursday 8/22/2021 6pm -through- 8am Friday 7/23/2021. Friday 7/23/2021 6pm -through- 8am Saturday 7/24/2021.

 
Minimal  None 
57A & 59  Road Work  West: Alternating right lane with the left lane,
NOTE: Lane Closure Will Remain In Place For Full Depth Reconstruction Work Exit 58 (Silver Creek). Exit Will Remain Open At All Times. Tuesday 7/27/2021 7am -through- 6am Friday 7/30/2021.

 
Minimal  None 
59 & 58  Bridge Work  West: Left lane,
Monday 7/19/2021 7:00am - 7:00pm Tuesday 7/20/2021 7:00am - 7:00pm. Wednesday 7/21/2021 7:00am - 7:00pm. Thursday 7/22/2021 7:00am - 7:00pm. Friday 7/23/2021 7:00am - 3:00pm.

East: Left lane,
Monday 7/19/2021 7:00am - 7:00pm Tuesday 7/20/2021 7:00am - 7:00pm. Wednesday 7/21/2021 7:00am - 7:00pm. Thursday 7/22/2021 7:00am - 7:00pm. Friday 7/23/2021 7:00am - 3:00pm.

 
Minimal  None 
61 & 60  Road Work  East: Right lane,
NOTE: Lane Closure Will Remain In Place. Monday 7/26/2021 1am -through- 1am Saturday 7/31/2021.

 
Minimal  None 
60 & 61  Road Work  West: Left lane,
NOTE: Long Term Lane Closure Will Remain In Place For Full Depth Re-Construction At Ripley Toll Barrier. Sunday 7/25/2021 7am -through- 6am Saturday 7/31/2021.

 
Minimal  None 
61 & 60  Road Work  East: Left lane,
NOTE: Lane Closure Will Remain In Place. Monday 7/26/2021 1am -through- 1am Saturday 7/31/2021.

 
Minimal  None 


For The Week Starting Monday 08/02/2021
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
55 & 57  Road Work  West: Alternating right lane with the left lane,
NOTE: Guiderail Installation Work At Exit 56 (Blasdell). Exit Will Remain Open At All Times. Monday 7/26/2021 7:00am - 4:00pm. Tuesday 7/27/2021 7:00am - 4:00pm. Wednesday 7/28/2021 7:00am - 4:00pm. Thursday 7/29/2021 7:00am - 4:00pm. Friday 7/30/2021 7:00am - 4:00pm.

 
Minimal  None 
57 & 57A  Road Work  West: Alternating right lane with the left lane,
NOTE: Lane Closure Will Remain In Place For Full Depth Reconstruction And Paving Work Exit 57 (Hamburg). Exit Will Remain Open At All Times. Monday 7/26/2021 7am -through- 6am Friday 7/30/2021.

 
Minimal  None 
57A & 59  Road Work  West: Alternating right lane with the left lane,
NOTE: Lane Closure Will Remain In Place For Full Depth Reconstruction Work Exit 58 (Silver Creek). Exit Will Remain Open At All Times. Tuesday 7/27/2021 7am -through- 6am Friday 7/30/2021.

 
Minimal  None 
59 & 58  Bridge Work  West: Left lane,
Monday 8/2/2021 7:00am - 7:00pm Tuesday 8/3/2021 7:00am - 7:00pm. Wednesday 8/4/2021 7:00am - 7:00pm. Thursday 8/5/2021 7:00am - 7:00pm. Friday 8/6/2021 7:00am - 3:00pm.

East: Left lane,
Monday 8/2/2021 7:00am - 7:00pm Tuesday 8/3/2021 7:00am - 7:00pm. Wednesday 8/4/2021 7:00am - 7:00pm. Thursday 8/5/2021 7:00am - 7:00pm. Friday 8/6/2021 7:00am - 3:00pm.

 
Minimal  None 
61 & 60  Road Work  East: Right lane,
NOTE: Lane Closure Will Remain In Place. Monday 8/2/2021 1am -through- 1am Saturday 8/7/2021.

 
Minimal  None 
60 & 61  Road Work  West: Left lane,
NOTE: Long Term Lane Closure Will Remain In Place For Full Depth Re-Construction At Ripley Toll Barrier. Sunday 7/25/2021 7am -through- 6am Saturday 7/31/2021.

 
Minimal  None 

Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 07/26/2021
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
50 & 52  Bridge Work  West: Left 2 lanes,
NOTE: NY Rte 33 WB to I-90 WB Will Be Closed. Monday 7/19/2021 10pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 10pm -through- 5am Wednesday 7/21/2021.

 
Minimal  None 
50A & 52  Bridge Work  West: Left lane,
Monday 7/19/2021 9pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 9pm -through- 6am Wednesday 7/21/2021.

 
Minimal  None 
56 & 54  Bridge Washing  West: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 11pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 11pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 11pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 11pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 11pm -through- 5am Saturday 7/24/2021.

East: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 11pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 11pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 11pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 11pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 11pm -through- 5am Saturday 7/24/2021.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 6  Pavement Striping  North: Alternating right lane with the left lane,
Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
2 & 1  Pavement Striping  South: Ramp,
NOTE: Striping Work Includes Exit 1 (South Ogden Street). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

South: Ramp,
NOTE: Striping Work Includes Exit 2 (Clinton Street). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
3 & 2  Pavement Striping  South: Ramp,
NOTE: Striping Work Includes Exit 3 (Seneca Street). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
4 & 3  Pavement Striping  South: Ramp,
NOTE: Striping Work Includes Exit 4 (Smith Street). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
5 & 6  Pavement Striping  North: Ramp,
NOTE: Striping Work Includes Exit 5 (Hamburg Street). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
6 & 12  Bridge Washing  North: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Taking Double Left at 12Midnight to 5am. Monday 7/19/2021 7pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 7pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 7pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 7pm -through- 5am Saturday 7/24/2021.

 
Minimal  None 
7 & 5  Bridge Washing  South: Ramp,
NOTE: Mobile Bridge Washing Work Unit Exit 7 NY Route 5(Skyway) Ramps. Monday 7/19/2021 9:00am - 3:00pm. Tuesday 7/20/2021 9:00am - 3:00pm. Wednesday 8/21/2021 9:00am - 3:00pm. Thursday 8/22/2021 9:00am - 3:00pm. Friday 7/23/2021 9:00m - 3:00pm.

 
Minimal  None 
8 & 1  Pavement Striping  South: Alternating right lane with the left lane,
Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
9 & 6  Bridge Washing  South: Ramp,
NOTE: Mobile Bridge Washing Work Unit Exit 8 Niagara Street Ramps. Monday 7/19/2021 9:00am - 3:00pm. Tuesday 7/20/2021 9:00am - 3:00pm. Wednesday 8/21/2021 9:00am - 3:00pm. Thursday 8/22/2021 9:00am - 3:00pm. Friday 7/23/2021 9:00m - 3:00pm.

 
Minimal  None 
9 & 11  Bridge Work  North: Alternating right lane with the left lane,
Monday 7/26/2021 7pm -through- 6am Tuesday 7/27/2021. Tuesday 7/27/2021 7pm -through- 6am Wednesday 7/28/2021. Wednesday 8/28/2021 7pm -through- 6am Thursday 7/29/2021. Thursday 8/29/2021 7pm -through- 6am Friday 7/30/2021. Friday 7/30/2021 7pm -through- 6am Saturday 7/31/2021.

 
Minor  None 
11 & 8  Bridge Washing  South: Ramp,
NOTE: Mobile Bridge Washing Work Unit Exit 9 Peace Bridge-Porter Avenue Ramps. Monday 7/19/2021 9:00am - 3:00pm. Tuesday 7/20/2021 9:00am - 3:00pm. Wednesday 8/21/2021 9:00am - 3:00pm. Thursday 8/22/2021 9:00am - 3:00pm. Friday 7/23/2021 9:00m - 3:00pm.

 
Minimal  None 
11 & 9  Bridge Work  South: Alternating right lane with the left lane,
Monday 7/26/2021 7pm -through- 6am Tuesday 7/27/2021. Tuesday 7/27/2021 7pm -through- 6am Wednesday 7/28/2021. Wednesday 8/28/2021 7pm -through- 6am Thursday 7/29/2021. Thursday 8/29/2021 7pm -through- 6am Friday 7/30/2021. Friday 7/30/2021 7pm -through- 6am Saturday 7/31/2021.

 
Minor  None 
12 & 6  Bridge Washing  South: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Taking Double Left at 12Midnight to 5am. Monday 7/19/2021 7pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 7pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 7pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 7pm -through- 5am Saturday 7/24/2021.

 
Minimal  None 
17 & 15  Bridge Washing  North: Alternating right lane with the left lane,
NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 11pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 11pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 11pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 11pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 11pm -through- 5am Saturday 7/24/2021.

South: Alternating right lane with the left lane,
T NOTE: Mobile Bridge Washing Work Unit. Monday 7/19/2021 11pm -through- 5am Tuesday 7/20/2021. Tuesday 7/20/2021 11pm -through- 5am Wednesday 7/21/2021. Wednesday 8/21/2021 11pm -through- 5am Thursday 7/22/2021. Thursday 8/22/2021 11pm -through- 5am Friday 7/23/2021. Friday 7/23/2021 11pm -through- 5am Saturday 7/24/2021.

 
Minimal  None 


For The Week Starting Monday 08/02/2021
Buffalo/Niagara Region

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
3 & 4  Guide Rail Installation  North: Right lane,
NOTE: Guiderail Repair Work Includes Temporary Closure Seneca St. On-Ramp NB. Contact Craig Overkamp (O) 716-877-7344, (C) 716-481-1806. Monday 8/2/2021 8pm -through- 5am Tuesday 8/3/2021.

 
Minimal  None 
11 & 9  Bridge Work  North: Alternating right lane with the left lane,
Monday 8/2/2021 7pm -through- 6am Tuesday 8/3/2021. Tuesday 8/3/2021 7pm -through- 6am Wednesday 8/4/2021. Wednesday 8/4/2021 7pm -through- 6am Thursday 8/5/2021. Thursday 8/5/2021 7pm -through- 6am Friday 8/6/2021. Friday 8/6/2021 7pm -through- 6am Saturday 8/7/2021.

South: Alternating right lane with the left lane,
Monday 8/2/2021 7pm -through- 6am Tuesday 8/3/2021. Tuesday 8/3/2021 7pm -through- 6am Wednesday 8/4/2021. Wednesday 8/4/2021 7pm -through- 6am Thursday 8/5/2021. Thursday 8/5/2021 7pm -through- 6am Friday 8/6/2021. Friday 8/6/2021 7pm -through- 6am Saturday 8/7/2021.

 
Minor  None 

Back to Top

Rochester Region


For The Week Starting Monday 07/26/2021
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
45 & 44  Other  West: Alternating right shoulder or left shoulder,
MON-FRI 7AM-5PM

East: Alternating right shoulder or left shoulder,
MON-FRI 7AM-5PM

 
Minimal  None 
46 & 45  Pavement Striping  East: Alternating right lane with the left lane,
NOTE: Work Includes Parking Area 9 Miles East of Rochester. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
45 & 47  Pavement Striping  West: Ramp,
NOTE: Striping Work Includes Exit 46 (Henrietta). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
46 & 48  Pavement Striping  West: Ramp,
NOTE: Striping Work Includes Exit 47 (LeRoy). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
48 & 47  Pavement Striping  East: Ramp,
NOTE: Striping Work Includes Exit 48 (Batavia). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
48 & 49  Pavement Striping  West: Alternating right lane with the left lane,
Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
48A & 48  Pavement Striping  East: Ramp,
NOTE: Striping Work Includes Exit 48A (Pembroke). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
49 & 48  Pavement Striping  East: Alternating right lane with the left lane,
Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 
48A & 49  Overhead Sign Work  West: Right lane,
Monday 7/26/2021 9:00am - 10:00am.

 
Minimal  None 
49 & 48A  Pavement Striping  East: Ramp,
NOTE: Striping Work Includes Exit 49 (Depew). Ramp Will Remain Open At All Times. Sunday 7/18/2021 7pm -through- 6am Monday 7/19/2021. Monday 7/19/2021 7pm -through- 6am Tuesday 7/20/2021. Tuesday 7/20/2021 7pm -through- 6am Wednesday 7/21/2021. Wednesday 7/21/2021 7pm -through- 6am Thursday 7/22/2021. Thursday 7/22/2021 7pm -through- 6am Friday 7/23/2021.

 
Minimal  None 


For The Week Starting Monday 08/02/2021
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
45 & 44  Other  East: Alternating right lane with the left lane,
SUN-THU 8PM-6AM

 
Minor  None 
45 & 44  Other  West: Alternating right shoulder or left shoulder,
MON-WED 7AM-5PM

East: Alternating right shoulder or left shoulder,
MON-WED 7AM-5PM

 
Minimal  None 

Back to Top

Syracuse Region


For The Week Starting Monday 07/26/2021
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Other  Direction: Interchange 29A: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 44: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 39: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 34A: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 30: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

 
Minor  None 
37 & 39  Other  West: Left lane,
THU 7AM-noon

West: Right lane,
WED 7AM-noon

 
Minimal  Weather Permitting 
38 & 39  Other  West: Left lane,
TUE 7AM-noon

West: Right lane,
MON 7AM-noon

 
Minimal  Weather Permitting 


For The Week Starting Monday 08/02/2021
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Other  Direction: Interchange 39: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 30: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 29A: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 40: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 31: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 34: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 32: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 33: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 34A: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 44: Alternating right lane with the left lane,
MON-TUE 6AM-6PM

 
Minor  None 
37 & 39  Other  West: Left lane,
WED 7AM-noon

West: Right lane,
WED 7AM-noon

 
Minimal  Weather Permitting 
38 & 39  Other  West: Left lane,
MON 7AM-noon

West: Right lane,
MON 7AM-noon

 
Minimal  Weather Permitting 

Back to Top

Utica Region


For The Week Starting Monday 07/26/2021
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Bridge Work  West: Right lane,
Tuesday - Thursday, 7:00AM - 2:00PM

East: Right lane,
Tuesday - Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
28 & 27  Road Work  East: Right lane,
Wednesday & Thursday, 7:00AM - 2:00PM

East: Right lane,
Tuesday & Wednesday, 7:00AM - 2:00PM

East: Right lane,
Monday & Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
29A & 29  Other  West: Right lane,
MON-FRI 7AM-2PM

East: Right lane,
TUE-WED 7AM-2PM

 
Minimal  Weather Permitting 
29A & 30  Other  East: Right lane,
TUE 7AM-2PM

West: Right lane,
THU 7AM-2PM

 
Minimal  Weather Permitting 
29A & 31  Other  West: Left lane,
MON 7AM-2PM

 
Minimal  Weather Permitting 
31 & 30  Other  East: Right lane,
THU 7AM-2PM

 
Minimal  Weather Permitting 
32 & 33  Other  West: Right lane,
MON-THU 6AM-3PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 08/02/2021
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Bridge Work  West: Right lane,
Wednesday, 7:00AM - 2:00PM; Thursday, 7:00AM - 1:00PM

East: Right lane,
Wednesday & Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
28 & 27  Road Work  East: Right lane,
Wednesday & Thursday, 7:00AM - 2:00PM

East: Right lane,
Tuesday & Wednesday, 7:00AM - 2:00PM

East: Right lane,
Monday & Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
29A & 28  Bridge Inspection  West: Left lane,
Tuesday, 7:00AM - 9:00AM

West: Right lane,
Tuesday, 9:00AM - 10:00AM

East: Left lane,
Tuesday, 10:00AM - 11:00AM

East: Right lane,
Tuesday, 11:00AM - 12:00NOON

 
Minimal  None 
29 & 29A  Other  West: Left lane,
MON-FRI 7AM-2PM

East: Left lane,
TUE-WED 7AM-2PM

West: Right lane,
WED 7AM-2PM

 
Minimal  Weather Permitting 
30 & 29  Other  East: Right lane,
THU 7AM-2PM

 
Minimal  Weather Permitting 
30 & 29A  Other  East: Left lane,
TUE 7AM-2PM

East: Left lane,
MON 7AM-2PM

 
Minimal  Weather Permitting 
32 & 31  Other  West: Alternating right lane with the left lane,
THU 7AM-3PM

East: Alternating right lane with the left lane,
THU 7AM-3PM

East: Left lane,
TUE-THU 7AM-2PM

 
Minimal  Weather Permitting 
32 & 33  Other  West: Right lane,
TUE-THU 6AM-3PM

 
Minimal  Weather Permitting 

Back to Top

Albany Region


For The Week Starting Monday 07/26/2021
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Road Work  Direction: Interchange B1: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange B2: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 
B1 & 21A  Bridge Construction  East: Left lane,
Monday (07/26), 12:00MIDNIGHT to Sunday (08/01), 12:00MIDNIGHT

West: Left lane,
Monday (07/26), 12:00MIDNIGHT to Sunday (08/01), 12:00MIDNIGHT

 
Minimal  Weather Permitting 
B1 & 21A  Bridge Work  East: Right lane,
Monday - Thursday, 7:00AM - 2:00PM

West: Right lane,
Monday - Thursday, 7:00AM - 2:00PM

 
None  Weather Permitting 
B2 & B1  Road Work  West: Left lane,
Wednesday & Thursday, 7:00AM - 2:00PM

 
None  Weather Permitting 
B3 & B2  Bridge Work  East: Right shoulder,
24 hour closure until further notice

West: Right shoulder,
24 hour closure until further notice

 
None  Shoulders sclosed with Temporary Concrete Barrier 
B3 & B2  Road Work  East: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM

West: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM

 
Minimal  None 
B3 & B2  Road Work  West: Left lane,
Monday - Wednesday, 7:00AM - 2:00PM

West: Right lane,
Wednesday & Thursday, 7:00AM - 2:00PM

 
None  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 21B: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 23: Right lane,
Monday (07/26), 6:00AM to Saturday (08/01), 6:00AM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps; 24 hour closure; 1 lane alternating traffic on Int.23 SB ACCEL/DECEL ramps, Monday - Friday, 7:00PM- 6:00AM.

Direction: Interchange 22: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 24: Alternating right lane with the left lane,
Monday (07/26), 6:00AM to Saturday (08/01), 6:00AM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 
Interchange Work  Road Work  Direction: Interchange 20W: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 28: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 20E: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 21: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 19: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 26: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 29: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 27: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
20 & 21  Road Work  North: Right lane,
Monday - Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Both lanes,
Monday - Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0". 
22 & 23  Road Work  North: Both lanes,
Monday- Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Day & Night Work; Temp. Conc. Barrier NB & SB 
24 & 22  Road Work  South: Both lanes,
Monday - Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Day & Night Work; Temp. Conc. Barrier NB & SB 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
24 & 25  Road Work  West: Left lane,
Thursday & Friday, 9:00AM - 11:00AM

 
Minor  Weather Permitting 
25 & 25A  Road Work  West: Right lane,
Tuesday, 8:00AM - 2:00PM

West: Right lane,
Monday, 8:00AM - 2:00PM

 
Minor  Weather Permitting 
25A & 26  Guide Rail Installation  West: Left lane,
Tuesday, 8:00AM - 2:00PM

 
Minor  Weather Permitting 
26 & 25A  Road Work  East: Right lane,
Wednesday, 8:00AM - 2:00PM

 
Minor  Weather Permitting 
27 & 26  Bridge Inspection  West: Right lane,
Wednesday, 7:00AM - 11:00AM

East: Right lane,
Wednesday, 11:00AM - 3:00PM

 
Minimal  None 


For The Week Starting Monday 08/02/2021
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Bridge Construction  East: Left lane,
Monday (08/02), 12:00MIDNIGHT to Sunday (08/08), 12:00MIDNIGHT

West: Left lane,
Monday (08/02), 12:00MIDNIGHT to Sunday (08/08), 12:00MIDNIGHT

 
Minimal  Weather Permitting 
B2 & B1  Road Work  West: Left lane,
Tuesday, 7:00AM - 2:00PM; Thursday, 7:00AM - 11:00AM

 
None  Weather Permitting 
B3 & B2  Bridge Work  East: Right shoulder,
24 hour closure until further notice

West: Right shoulder,
24 hour closure until further notice

 
None  Shoulders sclosed with Temporary Concrete Barrier 
B3 & B2  Road Work  East: Right lane,
Tuesday, 7:00AM - 2:00PM; Thursday, 7:00AM - 12:00NOON

West: Left lane,
Monday, 7:00AM - 12:00NOON

West: Right lane,
Tuesday - Thursday, 7:00AM - 2:00PM

 
None  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 26: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 28: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 27: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 29: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 20E: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 24: Alternating right lane with the left lane,
Monday (08/02), 6:00AM to Saturday (08/07), 6:00AM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 19: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 20W: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 23: Right lane,
Monday (07/26), 6:00AM to Saturday (08/01), 6:00AM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps; 24 hour closure; 1 lane alternating traffic on Int.23 SB ACCEL/DECEL ramps, Monday - Friday, 7:00PM- 6:00AM.

Direction: Interchange 21B: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 21: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 
20 & 21  Guide Rail Installation  North: Right lane,
Tuesday, 6:00AM - 11:00AM; Wednesday, 6:00AM - 10:00AM

 
Minimal  Weather Permitting 
21 & 20  Other  South: Right lane,
Monday, 7:00AM - 10:00AM; Tuesday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Both lanes,
Monday - Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0". 
21B & 21  Road Work  South: Right lane,
Wednesday, 7:00AM - 10:00AM; Thursday, 7:00AM - 9:00AM

South: Right lane,
Monday, 7:00AM - 10:00AM; Tuesday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 
22 & 23  Road Work  North: Both lanes,
Monday- Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Day & Night Work; Temp. Conc. Barrier NB & SB 
24 & 22  Road Work  South: Both lanes,
Monday - Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Day & Night Work; Temp. Conc. Barrier NB & SB 
24 & 23  Bridge Construction  South: Right lane,
Thursday, 8:00AM - 2:00PM; Individual closures not to exceed 3 miles in length.

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
26 & 25A  Road Work  East: Right lane,
Thursday, 8:00AM - 1:00PM

 
Minimal  None 
25A & 26  Road Work  East: Right lane,
Tuesday & Wednesday, 8:00AM - 2:00PM

West: Right lane,
Monday, 8:00AM - 1:00PM

 
Minimal  None 

Back to Top

Mid-Hudson Region


For The Week Starting Monday 07/26/2021
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 16  Bridge Inspection  North: Right lane,
Tue 8am-11am

South: Left lane,
Wed 9am-11:30am

South: Right lane,
Wed 11:30am-2pm

 
Minimal  None 
19 & 18  Road Work  North: Both lanes,
Tuesday & Wednesday, 9:00AM - 10:00AM; Traffic slow-downs for removal of overhead power lines.

South: Both lanes,
Tuesday & Wednesday, 9:00AM - 10:00AM; Traffic slow-downs for removal of overhead power lines.

 
Moderate  NB and SB Traffic slow-downs. 
19 & 20  Guide Rail Installation  North: Right lane,
Tuesday & Wednesday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 
20 & 21  Road Work  North: Right lane,
Monday - Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Both lanes,
Monday - Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0". 


For The Week Starting Monday 08/02/2021
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18 & 17  Bridge Inspection  North: Right lane,
Wed 11pm-2am

North: Left lane,
Thur 2am-5am

South: Right lane,
Fri 2am-5am

South: Left lane,
Thur 11pm-2am

 
Minimal  None 
20 & 21  Guide Rail Installation  North: Right lane,
Tuesday, 6:00AM - 11:00AM; Wednesday, 6:00AM - 10:00AM

 
Minimal  Weather Permitting 
21 & 20  Other  South: Right lane,
Monday, 7:00AM - 10:00AM; Tuesday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Both lanes,
Monday - Sunday; NB driving and passing lanes shifted until further notice.

 
Minimal  Weather Permitting; Lane widths reduced to 11'-0". 

Back to Top

New York Region


For The Week Starting Monday 07/26/2021
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Other  Direction: NB: Ramp,
Exit 2 Off-ramp right shoulder closures Mon-Thurs 9am-3pm Fri 9am-2pm

 
None  None 
12 & 10  Bridge Construction  East: Left lane,
Actual MP 10.5-10.7 Fri 8pm-7am

West: Right lane,
Actual MP 10.7-10.5 Mon-Thur 7pm-6am

West: Right 2 lanes,
Actual MP 10.7-10.5 Mon-Thur 10pm-6am

 
Minimal  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Other  Direction: NB: Ramp,
Exit 12 On-ramp left lane closures Exit 12 Off-ramp right shoulder closures Mon-Thurs 9am-3pm Fri 9am-2pm

Direction: SB: Ramp,
Exit 14 On-ramp right shoulder closures Exit 12 On-ramp left shoulder closures Exit 12 Off-ramp left lane closures Mon-Thurs 9am-3pm Fri 9am-2pm

 
Minor  None 
7A & 9  Bridge Inspection  North: Right shoulder,
Wed 8:30am-11:30am

 
Minimal  None 
14B & 14A  Bridge Construction  North: Alternating right lane with the left lane,
Mon 6am-3pm Tue-Wed 9am-3pm Thurs 10am-2pm Fri 9am-11am Sat 6am-10am

South: Alternating right lane with the left lane,
Tues-Wed 10am-3pm Thurs-Fri 10am-2pm Sat 6am-9:30 am

 
None  None 
14B & 15  Pavement Striping  North: Ramp,
I-87 Exit 15 NB Off-ramp, mobile ramp closures Sun 10pm-5am Mon-Tue 9pm-5am

 
Minor  None 
14B & 15  Bridge Construction  North: Ramp,
North, RAMP, MP 29.8 - 30, I-87 Exit 15 NB Off-ramp, Ramp closure Mon-Thurs 9pm-5am Fri 10pm-6am South, RAMP, MP 30.7 - 30.5, I-87 Exit 15 SB Off-ramp, alt RL/LL Mon-Thurs 10pm-5am Fri 11pm-6am

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 15  Bridge Inspection  South: Right shoulder,
Tue 9 am- 12:45pm

 
None  None 
19 & 18A  Paving  North: Alternating the 2 right lanes with the left lanes,
Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am

North: Alternating right lane with the left lane,
Mon-Wed 10am-2pm Mon-Thur 7pm-6am Fri 9pm-6am

South: Alternating the 2 right lanes with the left lanes,
Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am

South: Alternating right lane with the left lane,
Mon-Wed 10am-2pm Mon-Thur 8pm-6am Fri 9pm-6am

 
Minimal  None 
19 & 20  Paving  North: Alternating right lane with the left lane,
Mon-Thur 7pm-6am Fri 9pm-6am

North: Alternating the 2 right lanes with the left lanes,
Wed 11pm-5:30am Thur 11pm - 5am Fri 12am-6am

 
Minimal  None 
21  Bridge Inspection  North: Right lane,
Mon-Tue 11pm-5am

 
Minimal  None 
22 & 19  Paving  South: Alternating right lane with the left lane,
Mon-Thur 9pm-6am Fri 10pm-6am

South: Alternating the 2 right lanes with the left lanes,
Mon-Thur 12am-5am Fri 12am-6am

 
Minimal  None 
22 & 21  Bridge Inspection  South: Right lane,
Tue & Thur 11pm-5am

 
Minimal  None 


For The Week Starting Monday 08/02/2021
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Other  Direction: NB: Ramp,
Exit 2 Off-ramp right shoulder closures Mon-Thurs 9am-3pm Fri 9am-2pm

 
None  None 
10 & 12  Bridge Construction  East: Left lane,
Actual MP 10.5-10.7 Mon-Thurs 7pm-6am Fri 8pm-7am

 
Minimal  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Other  Direction: NB: Ramp,
Exit 12 Off-ramp right shoulder closures Mon-Thurs 9am-3pm Fri 9am-2pm

Direction: SB: Ramp,
Exit 14 On-ramp right shoulder closures Exit 12 On-ramp left shoulder closures Exit 12 Off-ramp left lane closures Mon-Thurs 9am-3pm Fri 9am-2pm

 
Minor  None 
Ramp Work  Toll Plaza Work  Direction: NB+SB: Ramp,
I-87 Exit 18 ramps Entering I-87 Mon-Thurs 7am-5pm Fri 7am-4pm Exiting I-87 Mon-Wed 7am-5pm Thurs 7am-4pm Fri 7am-3pm

 
Minimal  None 
14B & 14A  Bridge Construction  North: Alternating right lane with the left lane,
Mon 6am-3pm Tue-Wed 9am-3pm Thurs 10am-2pm Fri 9am-11am Sat 6am-10am

South: Alternating right lane with the left lane,
Tues-Wed 10am-3pm Thurs-Fri 10am-2pm Sat 6am-9 am

 
None  None 
14B & 15  Bridge Construction  North: Ramp,
North, RAMP, MP 29.8 - 30, I-87 Exit 15 NB Off-ramp, Ramp closure Mon-Thurs 9pm-5am Fri 10pm-6am South, RAMP, MP 30.7 - 30.5, I-87 Exit 15 SB Off-ramp, alt RL/LL Mon-Thurs 10pm-5am Fri 11pm-6am

 
None  None 
16 & 15A  Bridge Inspection  North: Right lane,
Tue 8am-1pm

South: Right lane,
Wed 9am-2pm

 
Minimal  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
16 & 15  Bridge Inspection  South: Right shoulder,
Tue 12:30pm-2:30pm

 
None  None 
18A & 17  Bridge Inspection  South: Right shoulder,
Tue 9 am- 11:30am

 
None  None 
19 & 18A  Paving  North: Alternating the 2 right lanes with the left lanes,
Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am

North: Alternating right lane with the left lane,
Mon-Wed 10am-2pm Mon-Thur 7pm-6am

South: Alternating right lane with the left lane,
Mon-Wed 10am-2pm Mon-Thur 8pm-6am

South: Alternating the 2 right lanes with the left lanes,
Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am

 
Minimal  None 
19 & 20  Paving  North: Alternating the 2 right lanes with the left lanes,
Wed 11pm-5:30am Thur 11pm - 5am Fri 12am-6am

North: Alternating right lane with the left lane,
Mon-Thur 7pm-6am Fri 9pm-6am

 
Minimal  None 
19 & 22  Bridge Inspection  North: Ramp,
I-95 NB Exit 21 Off-ramp Mon 11 pm- 3am LL Tue 11 pm-3am RL

 
Minimal  None 
22 & 19  Paving  South: Alternating right lane with the left lane,
Mon-Thur 9pm-6am Fri 10pm-6am

South: Alternating the 2 right lanes with the left lanes,
Mon-Thur 12am-5am Fri 12am-6am

 
Minimal  None 