Scheduled Construction Lane Closures
Erie | Buffalo/Niagara | Rochester | Syracuse | Utica |Albany | Mid-Hudson | New York
Erie Region
For The Week Starting Monday 05/16/2022
Erie Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
56 & 55 | Bridge Deck Rehabilitation | East: Ramp, NOTE: Closing EB I-90 Slip Ramp To NY RTE 219 For Bridge Work On Rte 219. Monday 5/16/2022 9am -through- 4pm Friday 5/27/2022. | Minimal | None |
58 & 59 | Other | West: Right lane, NOTE: Lane Closure Will Remain In Place For Pavement Repair Work. Monday 5/16/22 7am -through- 2pm Thursday 5/19/22. West: Right lane, NOTE: Bridge Washing Work Scheduled. Monday 5/16/22 7:00am - 1:00pm. | Minimal | None |
61 & 59 | Road Work | East: Right lane, NOTE: Long Term Closure. Lane Closure Will Remain In Place For Duration of Road Work. Monday 5/16/2022 -through- Sunday 5/22/2022. | Minimal | None |
For The Week Starting Monday 05/23/2022
Erie Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
56 & 55 | Bridge Deck Rehabilitation | East: Ramp, NOTE: Closing EB I-90 Slip Ramp To NY RTE 219 For Bridge Work On Rte 219. Monday 5/23/2022 12:01am -through- 4pm Friday 5/27/2022. | Minimal | None |
58 & 59 | Road Work | West: Right lane, NOTE: Mobile Work Unit For Crack Sealing. Monday 5/23/2022 6:00am - 2:00pm. West: Right lane, NOTE: Lane Closure Will Remain In Place For Pavement Repair Work. Tuesday 5/24/2022 6am -through- 2pm Friday. | Minimal | None |
61 & 59 | Road Work | East: Right lane, NOTE: Long Term Closure. Lane Closure Will Remain In Place For Duration of Road Work. Monday 5/23/2022 -through- 6am Friday 5/27/2022. | Minimal | None |
Back to Top
Buffalo/Niagara Region
For The Week Starting Monday 05/16/2022
Buffalo/Niagara Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
52 & 51 | Bridge Inspection | West: Alternating right lane with the left lane, Monday 5/16/2022 10pm -through- 6am Tuesday 5/17/2022. East: Alternating right lane with the left lane, Tuesday 5/17/2022 10pm -through- 6am Wednesday 5/18/2022. | Minimal | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
7 & 5 | Overhead Sign Work | North: Alternating right lane with the left lane, Thursday 5/19/2022 9:00am - 1:00pm. North: Ramp, NOTE: Overhead Sign Inspection Work Will Occur On NB Exit 6 (Elm St) Off-Ramp And Include Oak St On-Ramp To I-190 NB. Friday 5/20/2022 9:00am - 1:00pm. South: Alternating right lane with the left lane, Thursday 5/19/2022 9:00am - 1:00pm. | Minimal | None |
For The Week Starting Monday 05/23/2022
Buffalo/Niagara Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
51 & 50A | Bridge Inspection | East: Alternating right lane with the left lane, Tuesday 5/24/2022 10pm -through- 4am Wednesday 5/25/2022. | Minimal | None |
50A & 52 | Bridge Inspection | West: Alternating right lane with the left lane, Monday 5/23/2022 10pm -through- 4am Tuesday 5/24/2022. | Minimal | None |
51 & 52A | Bridge Inspection | West: Alternating right lane with the left lane, Wednesday 5/25/2022 10pm -through- 4am Thursday 5/26/2022. | Minimal | None |
52 & 51 | Bridge Inspection | East: Alternating right lane with the left lane, Thursday 5/26/2022 10pm -through- 4am Friday 5/27/2022. | Minimal | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
11 & 9 | Bridge Work | North: Right lane, NOTE: I-190 Northbound On-Ramp From Porter Ave Will Be Closed. Monday 5/23/2022 9pm -through- 6am Tuesday 5/24/2022. Tuesday 5/24/2022 9pm -through- 6am Wednesday 5/25/2022. Wednesday 5/25/2022 9pm -through- 6am Thursday 5/26/2022. Thursday 5/26/2022 10pm -through- 6am Friday 5/27/2022. Friday 5/27/2022 10pm -through- 6am Saturday 5/28/2022. South: Right lane, Monday 5/23/2022 9pm -through- 6am Tuesday 5/24/2022. Tuesday 5/24/2022 9pm -through- 6am Wednesday 5/25/2022. Wednesday 5/25/2022 9pm -through- 6am Thursday 5/26/2022. Thursday 5/26/2022 10pm -through- 6am Friday 5/27/2022. Friday 5/27/2022 10pm -through- 6am Saturday 5/28/2022. | Minimal | None |
Back to Top
Rochester Region
For The Week Starting Monday 05/16/2022
Rochester Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
42 & 43 | Other | East: Right lane, MON 3AM-8AM West: Right lane, TUE-THU 6AM-11AM | Minimal | Weather Permitting |
44 & 43 | Road Work | West: Alternating right lane with the left lane, TUE-WED 6PM-6AM East: Alternating right lane with the left lane, TUE-WED 6PM-6AM | Minimal | None |
43 & 45 | Paving | West: Right lane, MON 6PM-7AM | Minor | None |
45 & 44 | Road Work | West: Alternating right lane with the left lane, Tuesday 5/17/2022 6pm -through- 6am Wednesday 5/18/2022. Wednesday 5/18/2022 6pm -through- 6am Thursday 5/19/2022. East: Alternating right lane with the left lane, Tuesday 5/17/2022 9pm -through- 6am Wednesday 5/18/2022. Wednesday 5/18/2022 9pm -through- 6am Thursday 5/19/2022. | Minimal | None |
45 & 44 | Paving | East: Alternating right lane with the left lane, MON 6PM-7AM | Minor | None |
46 & 44 | Paving | East: Alternating right lane with the left lane, TUE-THU 7PM-7AM | Minor | None |
48 & 47 | Road Work | West: Alternating right lane with the left lane, Monday 5/16/2022 7pm -through- 6am Tuesday 5/17/2022. Tuesday 5/17/2022 7pm -through- 6am Wednesday 5/18/2022 East: Alternating right lane with the left lane, Monday 5/16/2022 7pm -through- 6am Tuesday 5/17/2022. Tuesday 5/17/2022 7pm -through- 6am Wednesday 5/18/2022 | Minimal | None |
For The Week Starting Monday 05/23/2022
Rochester Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
42 & 43 | Other | West: Left lane, THU 6AM-11AM West: Right lane, MON 3AM-10AM | Minimal | Weather Permitting |
43 & 44 | Other | West: Right lane, TUE-WED 3AM-10AM | Minimal | Weather Permitting |
46 & 44 | Paving | East: Alternating right lane with the left lane, MON-THU 7PM-midnite | Minor | None |
45 & 46 | Bridge Work | West: Alternating right lane with the left lane, Wednesday 5/25/2022 7:00am - 1:00pm. Thursday 5/26/2022 7:00am - 1:00pm. | Minimal | None |
47 & 45 | Bridge Work | East: Left lane, Monday 5/23/2022 7:00am - 1:00pm. Tuesday 5/24/2022 7:00am - 1:00pm. Wednesday 5/25/2022 7:00am - 1:00pm. | Minimal | None |
46 & 48 | Road Work | West: Left lane, Monday 5/23/2022 7pm -through- 7am Tuesday 5/24/2022. Tuesday 5/24/2022 7pm -through- 7am Wednesday 5/25/2022. Wednesday 5/25/2022 7pm -through- 7am Thursday 5/26/2022. Thursday 5/26/2022 7pm -through- 7am Friday 5/27/2022. | Minimal | None |
Back to Top
Syracuse Region
For The Week Starting Monday 05/16/2022
Syracuse Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Shoulder Work | Road Work | Direction: Interchange 39: Alternating right shoulder or left shoulder, MON-SAT 6AM-5PM | Minimal | Nighttime paving |
33 & 34A | Other | West: Alternating right lane with the left lane, MON-FRI 7:30AM-3PM | Minimal | Weather Permitting |
34A & 34 | Bridge Construction | West: Alternating right lane with the left lane, MON-THU 7AM-2PM , FRI 7AM-noon East: Alternating right lane with the left lane, MON-THU 7AM-2PM, FRI 7AM-noon | Minimal | None |
34A & 34 | Other | East: Right lane, MON-TUE 7AM-2PM | Minimal | Weather Permitting |
34A & 33 | Other | East: Right lane, MON-FRI 7:30AM-3PM | Minimal | Weather Permitting |
36 & 34A | Other | East: Right lane, TUE-THU 8:30AM-2PM | Minimal | Weather Permitting |
39 & 37 | Road Work | West: Left lane, MON-SAT 6AM-3PM and MON 7PM-midnite, TUE-FRI midnite-6AM and 7PM-midnite, SAT midnite-6AM West: Alternating right shoulder or left shoulder, MON-SAT 6AM-5PM East: Left lane, MON-SAT 6AM-3PM East: Alternating right shoulder or left shoulder, MON-SAT 6AM-5PM | Minimal | Nighttime paving |
40 & 41 | Paving | West: Alternating right lane with the left lane, MON,THU,FRI 7PM-7AM and 8PM-7AM | None | None |
40 & 41 | Other | East: Right lane, THU 7AM-2PM West: Alternating right lane with the left lane, MON-TUE 7AM-2PM West: Right lane, WED 7AM-2PM | Minimal | Weather Permitting |
40 & 42 | Paving | West: Alternating right lane with the left lane, MON,THU,FRI 7PM-7AM and 8PM-7AM | None | None |
41 & 42 | Paving | West: Right lane, MON,THU,FRI 7PM-7AM and 8PM-7AM | None | None |
42 & 43 | Other | East: Right lane, MON 3AM-8AM West: Right lane, TUE-THU 6AM-11AM | Minimal | Weather Permitting |
For The Week Starting Monday 05/23/2022
Syracuse Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
33 & 34A | Other | West: Alternating right lane with the left lane, MON-THU 7:30AM-3PM | Minimal | Weather Permitting |
34A & 34 | Other | East: Right lane, TUE-WED 7AM-2PM | Minimal | Weather Permitting |
34A & 33 | Other | East: Right lane, MON-THU 7:30AM-3PM | Minimal | Weather Permitting |
36 & 34A | Other | East: Right lane, MON-THU 8:30AM-3PM | Minimal | Weather Permitting |
37 & 39 | Road Work | West: Left lane, MON 7PM-Midnite, TUE 7PM-Midnite and Midnite to WED 9AM, WED 7PM-Midnite, THU 7PM-Midnite, FRI Midnite to SAT 9AM | Minimal | Nighttime paving |
37 & 38 | Road Work | West: Left lane, MON Midnite-TUE 10AM, THU Midnite-FRI 8AM, | Minimal | Nighttime paving |
39 & 37 | Road Work | West: Left lane, MON Midnite-TUE 9AM, WED Midnite- THU 9AM 285.9-284 MON Midnite-TUE 7AM, TUE 7PM-Midnite, WED Midnite-7AM, THU midnite- FRI 7AM, FRI Midnite-7AM East: Left lane, SUN Midnite to MON 6AM, MON 7PM-Midnite, WED 7PM-Midnite, THU 8PM-Midnite East: Left lane, MON Midnite-TUE 7AM, TUE 7PM-Midnite, WED Midnite-7AM, THU midnite- FRI 7AM, FRI Midnite-7AM East: Left lane, MON Midnite-TUE 7AM, TUE 7PM-Midnite, WED Midnite-7AM, THU midnite- FRI 7AM, FRI Midnite-7AM East: Left lane, MON Midnite-TUE 7AM, TUE 7PM-Midnite, WED Midnite-7AM, THU midnite- FRI 7AM, FRI Midnite-7AM | Minimal | Nighttime paving |
40 & 41 | Paving | West: Alternating right lane with the left lane, MON & THU 8PM-7AM, TUE-WED 7PM-7AM | None | None |
40 & 41 | Other | West: Right lane, THU 7AM-1:30PM East: Right lane, WED 7AM-1:30PM West: Left lane, TUE 7AM-1:30PM | Minimal | Weather Permitting |
42 & 41 | Paving | West: Alternating right lane with the left lane, MON & THU 8PM-7AM, TUE-WED 7PM-7AM West: Right lane, MON & THU 8PM-7AM, TUE-WED 7PM-7AM East: Right lane, MON & THU 8PM-7AM, TUE-WED 7PM-7AM | None | None |
42 & 43 | Other | West: Left lane, THU 6AM-11AM West: Right lane, MON 3AM-10AM | Minimal | Weather Permitting |
Back to Top
Utica Region
For The Week Starting Monday 05/16/2022
Utica Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
28 & 27 | Bridge Work | West: Right lane, Tuesday, 7:00AM - 2:00PM East: Right lane, Wednesday, 7:00AM -2:00PM | Minimal | Weather Permitting |
29 & 28 | Bridge Work | West: Left lane, Monday(5/16), 12:00MIDNIGHT - Wednesday(5/18),11:00AM; * 24-Hour Closure* East: Left lane, Monday(5/16), 7:00AM - Sunday(5/22), 12:00MIDNIGHT * 24 Hour Closure | Minimal | None |
29 & 29A | Other | East: Right lane, WED 7AM-2PM East: Right lane, MON 7AM-2PM East: Right lane, THU 7AM-2PM East: Left lane, MON 7AM-2PM West: Left lane, MON-FRI 7AM-noon | Minimal | Weather Permitting |
31 & 30 | Bridge Construction | West: Left lane, MON-THU 7AM-5PM, FRI 7AM-noon East: Left lane, MON-THU 7AM-5PM, FRI 7AM-noon | Minimal | None |
31 & 32 | Other | West: Right lane, MON-FRI 7AM-3PM | Minimal | Weather Permitting |
32 & 31 | Bridge Construction | West: Alternating right lane with the left lane, MON-THU 7AM-5:30PM, FRI 7AM-2PM East: Alternating right lane with the left lane, MON-THU 7AM-5:30PM, FRI 7AM-1PM | Minimal | None |
32 & 31 | Other | East: Right lane, MON-FRI 7:30AM-3PM | Minimal | Weather Permitting |
34A & 33 | Other | West: Alternating right lane with the left lane, MON-FRI 7:30AM-3PM East: Right lane, MON-FRI 7:30AM-3PM | Minimal | Weather Permitting |
For The Week Starting Monday 05/23/2022
Utica Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
28 & 29 | Road Work | West: Right lane, Wednesday, 7:00AM - 1:00PM | Minimal | weather Permitting |
29 & 28 | Bridge Work | East: Right lane, Monday(5/23), 12:00MIDNIGHT - Wednesday(5/25), 11:00AM * 24 Hour Closure | Minimal | None |
28 & 29 | Road Work | West: Right lane, Tuesday, 6:00AM - 6:00PM | None | None |
29A & 29 | Other | East: Right lane, WED 7AM-2PM East: Right lane, TUE 7AM-2PM East: Right lane, THU 7AM-2PM East: Left lane, MON 7AM-2PM | Minimal | Weather Permitting |
31 & 30 | Bridge Construction | West: Left lane, MON-WED 7AM-5PM, THU 7AM-noon East: Left lane, MON-WED 7AM-5PM, THU 7AM-noon | Minimal | None |
30 & 31 | Other | West: Right lane, MON-WED 7AM-2PM | Minimal | Weather Permitting |
32 & 31 | Other | West: Right lane, MON-THU 7:30AM-3PM East: Right lane, MON 7:30AM-3PM | Minimal | Weather Permitting |
32 & 31 | Bridge Construction | West: Alternating right lane with the left lane, MON-WED 7AM-5:30PM, THU 7AM-noon East: Alternating right lane with the left lane, MON-WED 7AM-5:30PM, THU 7AM-noon | Minimal | None |
32 & 31 | Other | East: Right lane, MON-THU 7:30AM-3PM | Minimal | Weather Permitting |
34A & 33 | Other | West: Alternating right lane with the left lane, MON-THU 7:30AM-3PM East: Right lane, MON-THU 7:30AM-3PM | Minimal | Weather Permitting |
Back to Top
Albany Region
For The Week Starting Monday 05/16/2022
Albany Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
B1 & 21A | Bridge Work | East: Left lane, Monday - Sunday, 12:00MIDNIGHT - 12:00MIDNIGHT West: Right lane, Monday - Sunday, 12:00MIDNIGHT - 12:00MIDNIGHT | Minimal | Stage 2, WB traffic shifted to EB bridge until Nov. 2022 (1 lane in each direction). |
21A & B1 | Road Work | East: Right lane, Thursday, 7:00AM - 1:00PM | None | Weather Permitting |
B1 & B2 | Road Work | East: Right lane, Monday & Tuesday, 7:00AM - 1:00PM | None | Weather Permitting |
B2 & B3 | Road Work | East: Right lane, Monday,7:00AM - 10:00AM | None | Weather Permitting |
B3 & B2 | Guide Rail Installation | West: Right lane, Thursday, 7:00AM -1:00PM West: Left lane, Friday, 7:00AM -1:00PM | None | weather permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Interchange Work | Bridge Inspection | Direction: Interchange 26 shifting lanes left: Right lane, Tuesday, 7:00AM -2:00PM | Minimal | None |
Ramp Work | Bridge Inspection | Direction: Interchange 25A EB Decel Ramp: Ramp, Tuesday, 10:00AM - 12:00NOON | Minimal | Weather Permitting |
Interchange Work | Guide Rail Installation | Direction: Interchange 25 ACCEL Lane: Alternating right lane with the left lane, Monday - Friday, 9:00AM - 2:00PM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
21 & 20 | Road Work | South: Left lane, Tuesday - Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
20 & 21 | Road Work | South: Right lane, Monday, 7:00AM - 2:00PM North: Left lane, Thursday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
21 & 20 | Road Work | South: Right lane, Wednesday, 10:00AM - 2:00PM South: Right lane, Tuesday, 6:00AM - 2:00PM; Wednesday, 6:00AM - 10:00AM | Minimal | Weather Permitting |
21B & 21 | Road Work | North: Right lane, Monday - Wednesday, 6:00AM - 2:00PM; Thursday, 6:00AM - 1:00PM; Friday, 6:00AM - 11:00AM South: Right lane, Monday - Thursday, 6:00AM - 2:00PM; Friday, 6:00AM - 11:00AM | None | None |
21B & 21 | Road Work | South: Right lane, Friday, 7:00PM - 5:00AM * NIGHT WORK * South: Left lane, Thursday, 7:00PM - 5:00AM *NIGHT WORK* | Minimal | Weather Permitting |
21A & 21 | Road Work | North: Right lane, Tuesday, 6:00PM - 6:00AM *NIGHT WORK* South: Left lane, Wednesday, 6:00PM - 5:00AM *NIGHT WORK* | Minimal | Weather Permitting |
21A & 21B | Road Work | North: Left lane, Monday, 6:00PM - 6:00AM; Tuesday, 6:00PM - 5:00AM; Wednesday, 6:00PM - 6:00AM; Thursday, 7:00PM - 6:00AM; Friday, 9:00PM - 5:00AM *NIGHT WORK* South: Left lane, Monday - Wednesday, 6:00PM - 6:00AM; Thursday & Friday, 7:00PM - 6:00AM *NIGHT WORK* | Minimal | Weather Permitting |
21A & 21B | Road Work | North: Right lane, Monday, 8:00AM - 11:00AM; Tuesday, 8:00AM - 2:00PM; Wednesday, 6:00AM - 2:00PM; Thursday, 8:00AM - 1:00PM; Friday, 6:00AM - 10:00AM North: Right lane, Monday, 8:00AM - 11:00AM; Tuesday, 8:00AM - 2:00PM; Wednesday, 6:00AM - 2:00PM; Thursday, 8:00AM - 1:00PM; Friday, 6:00AM - 10:00AM North: Alternating right lane with the left lane, Monday, 8:00AM - 11:00AM; Tuesday, 8:00AM - 2:00PM; Wednesday, 6:00AM - 2:00PM; Thursday, 8:00AM - 1:00PM; Friday, 6:00AM - 10:00AM South: Right lane, Monday - Wednesday, 6:00AM - 2:00PM; Thursday, 6:00AM - 12:00NOON; Friday, 6:00AM - 10:00AM South: Alternating right lane with the left lane, Monday - Wednesday, 6:00AM - 2:00PM; Thursday, 6:00AM - 12:00NOON; Friday, 6:00AM - 10:00AM | None | None |
22 & 23 | Road Work | North: Right shoulder, Monday - Friday, 7:00AM - 5:00PM | None | None |
23 & 24 | Road Work | North: Right lane, Monday - Friday, 8:00AM - 2:00PM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
24 & 25 | Road Work | West: Right lane, Monday - Wednesday, 7:00AM - 2:00PM; Thursday, 7:00AM - 1:00PM; Friday, 7:00AM - 12:00NOON | Minimal | Weather Permitting |
25 & 25A | Bridge Inspection | West: Left lane, Tuesday, 8:00AM - 10:00AM | Minimal | Weather Permitting |
25A & 26 | Road Work | West: Right lane, Monday - Thursday, 7:00AM - 2:00PM; Friday, 7:00AM - 12:00NOON | Minimal | Weather Permitting |
26 & 25 | Road Work | East: Right lane, Monday - Friday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
26 & 27 | Road Work | West: Right lane, Friday, 7:00AM - 12:00NOON | Minimal | weather Permitting |
27 & 26 | Guide Rail Installation | East: Right lane, Thursday & Friday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
26 & 27 | Road Work | East: Right lane, Monday - Thursday, 6:00AM - 6:00PM; Friday, 6:00AM - 2:00PM West: Right lane, Monday - Tuesday, 6:00AM - 6:00PM; Wednesday & Thursday, 6:00AM - 3:00PM; Friday, 6:00AM - 12:00NOON | None | None |
For The Week Starting Monday 05/23/2022
Albany Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
B1 & 21A | Bridge Work | East: Left lane, Monday - Sunday, 12:00MIDNIGHT - 12:00MIDNIGHT West: Right lane, Monday - Sunday, 12:00MIDNIGHT - 12:00MIDNIGHT | Minimal | Stage 2, WB traffic shifted to EB bridge until Nov. 2022 (1 lane in each direction). |
21A & B1 | Road Work | East: Right lane, Thursday, 7:00AM - 1:00PM | None | Weather Permitting |
B1 & B2 | Road Work | East: Right lane, Monday - Wednesday, 7:00AM - 1:00PM | None | Weather Permitting |
B2 & B3 | Road Work | East: Right lane, Monday,7:00AM - 10:00AM | None | Weather Permitting |
B3 & B2 | Guide Rail Installation | West: Left lane, Tuesday, 7:00AM -1:00PM West: Right lane, Monday, 7:00AM -1:00PM West: Right lane, Wednesday, 7:00AM - 1:00PM | None | weather permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
21 & 20 | Road Work | South: Left lane, Tuesday - Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
20 & 21 | Road Work | South: Right lane, Thursday, 7:00AM - 1:00PM North: Left lane, Wednesday, 7:00AM - 2:00PM North: Right lane, Monday, 7:00AM - 11:00AM North: Right lane, Tuesday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
21B & 21 | Road Work | North: Left lane, Thursday, 7:00PM - 6:00AM *NIGHT WORK* South: Left lane, Thursday, 7:00PM - 6:00AM *NIGHT WORK* South: Right lane, Wednesday, 7:00PM - 6:00AM * NIGHT WORK * | Minimal | Weather Permitting |
21A & 21 | Road Work | North: Right lane, Tuesday, 6:00PM - 6:00AM *NIGHT WORK* South: Left lane, Monday, 8:00PM - 6:00AM *NIGHT WORK* | Minimal | Weather Permitting |
21B & 21A | Road Work | North: Left lane, Monday, 6:00PM - 6:00AM; Tuesday, 6:00PM - 5:00AM; Wednesday, 6:00PM - 5:00AM; Thursday, 7:00PM - 5:00AM *NIGHT WORK* | Minimal | Weather Permitting |
21B & 21A | Road Work | North: Right lane, Monday, 8:00AM - 11:00AM; Tuesday, 8:00AM - 3:00PM; Wednesday, 6:00AM - 2:00PM | None | None |
21A & 21B | Road Work | South: Left lane, Monday - Wednesday, 6:00PM - 6:00AM; Thursday, 7:00PM - 6:00AM *NIGHT WORK* | Minimal | Weather Permitting |
21A & 21B | Road Work | South: Left lane, Monday, 8:00AM - 11:00AM; Tuesday & Wednesday, 6:00AM - 2:00PM North: Alternating right lane with the left lane, Monday, 8:00AM - 11:00AM; Tuesday, 8:00AM - 3:00PM; Wednesday, 6:00AM - 2:00PM North: Left lane, Monday, 8:00AM - 11:00AM; Tuesday, 8:00AM - 3:00PM; Wednesday, 6:00AM - 2:00PM South: Alternating right lane with the left lane, Monday, 6:00AM - 11:00AM; Tuesday & Wednesday, 6:00AM - 2:00PM | None | None |
23 & 24 | Road Work | North: Right lane, Monday - Thursday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
24 & 25A | Guide Rail Installation | West: Left lane, Monday - Thursday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
25A & 25 | Road Work | East: Right lane, Monday - Thursday, 8:00AM - 6:00PM | None | None |
26 & 25 | Road Work | East: Right lane, Monday - Thursday, 8:00AM - 2:00PM | Minimal | Weather Permitting |
27 & 26 | Road Work | West: Right lane, Monday & Tuesday, 7:00AM - 1:00PM East: Right lane, Tuesday & Wednesday, 7:00AM - 1:00PM | Minimal | weather Permitting |
26 & 27 | Bridge Construction | West: Right shoulder, Monday - Wednesday, 7:00AM -5:00PM; Thursday 7:00AM - 12:00NOON | None | None |
26 & 27 | Road Work | East: Right lane, Monday - Tuesday, 6:00AM - 6:00PM West: Right lane, Tuesday, 6:00AM - 4:00PM | None | None |
Back to Top
Mid-Hudson Region
For The Week Starting Monday 05/16/2022
Mid-Hudson Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
17 & 16 | Bridge Construction | North: Right lane, Mon 6pm-7am North: Left lane, Tues pm-7am South: Left lane, Thurs 8pm-7am South: Right lane, Wed 6pm-7am | Minor | None |
19 & 18 | Bridge Work | North: Right lane, Thursday, 7:00AM - 1:00PM South: Right lane, Tuesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
21 & 20 | Road Work | South: Left lane, Tuesday - Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
20 & 21 | Road Work | South: Right lane, Monday, 7:00AM - 2:00PM North: Left lane, Thursday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
21 & 20 | Road Work | South: Right lane, Wednesday, 10:00AM - 2:00PM South: Right lane, Tuesday, 6:00AM - 2:00PM; Wednesday, 6:00AM - 10:00AM | Minimal | Weather Permitting |
For The Week Starting Monday 05/23/2022
Mid-Hudson Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
17 & 16 | Bridge Inspection | North: Left shoulder, Tues 11:30am-1:30pm North: Right lane, Tues 9am-11am South: Left shoulder, Wed 9am-11am South: Right 3 lanes, Wed 11:30am-1:30pm | Minimal | None |
17 & 16 | Bridge Construction | North: Left lane, Tues 4am-11am Thurs 4am-9am North: Right lane, Mon/Wed 4am-10am South: Left lane, Tues 9am-3pm South: Right lane, wed 9am-2pm | Minor | None |
19 & 18 | Bridge Work | North: Right lane, Wednesday, 7:00AM - 1:00PM South: Right lane, Tuesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
18 & 19 | Road Work | North: Right shoulder, Tuesday & Wednesday, 7:00AM - 5:00PM; Friday 7:00AM - 12:00Noon | None | None |
21 & 20 | Road Work | South: Left lane, Tuesday - Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
20 & 21 | Road Work | South: Right lane, Thursday, 7:00AM - 1:00PM North: Right lane, Monday, 7:00AM - 11:00AM North: Left lane, Wednesday, 7:00AM - 2:00PM North: Right lane, Tuesday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
Back to Top
New York Region
For The Week Starting Monday 05/16/2022
New York Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Ramp Work | Ramp Work | South: Ramp, ALT RL/LL Mon-Thurs 10pm-5am Fri 11pm-6am North: Ramp, ALL LANES Mon-Thurs 10pm-5am Fri 11pm-6am | Moderate | None |
8 & 10 | Other | North: Right shoulder, Mon-Fri 9am-3pm | Minor | None |
11 & 10 | Bridge Inspection | South: Left 2 lanes, Tues night 1:30am-4am South: Right 2 lanes, Tues night 10pm-1:30am | Minimal | None |
13 & 10 | Bridge Construction | South: Right 2 lanes, Fri 12am-6am South: Right lane, Fri 9pm-6am | None | None |
14 & 13 | Bridge Construction | South: Alternating right lane with the left lane, Tues 11pm-5am | None | None |
14 & 12 | Bridge Construction | South: Right 2 lanes, Thurs 12am-5am | None | None |
14A & 12 | Bridge Construction | South: Right lane, Thurs 9pm-6am | None | None |
14A & 13 | Bridge Construction | South: Left lane, Tues 8pm-6am | None | None |
14B & 12 | Bridge Construction | South: Right 2 lanes, Wed 11pm-5am | None | None |
14B & 13 | Bridge Construction | South: Alternating right lane with the left lane, Mon 11pm-5am | None | None |
14B & 12 | Bridge Construction | South: Right lane, Wed 8pm-6am | None | None |
14B & 13 | Bridge Construction | South: Left lane, Mon 8pm-6am | None | None |
14B & 14A | Bridge Construction | North: Alternating right lane with the left lane, Mon-Tues 9am-3pm Wed 11am-2pm Thurs 9am-12pm Fri 9am-10am South: Alternating right lane with the left lane, Tues-Wed 9am-3pm Thurs 10am-3pm Fri 9am-1pm | Moderate | None |
15 & 14B | Bridge Inspection | North: Left lane, Thurs night 1:30am-4am North: Right lane, Thurs night 10pm-1:30am South: Right lane, Fri night 10pm-1:30am South: Left lane, Fri night 1:30am-4am | Minimal | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
15 & 8B | Paving | North: Left 2 lanes, Mon-Fri 1am-5am North: Right lane, Mon-Fri 10pm-6am North: Right 2 lanes, Mon-Fri 1am-5am South: Right lane, Mon-Fri 10pm-6am South: Left 2 lanes, Mon-Fri 1am-5am | Minimal | None |
14 & 18A | Paving | North: Right 2 lanes, Mon-Fri 11pm-5am North: Right lane, Mon-Fri 9pm-6am North: Left 2 lanes, Mon-Fri 11pm-5am | Minimal | None |
15 & 8B | Paving | South: Right 2 lanes, Mon-Fri 1am-5am | Minimal | None |
17 & 19 | Paving | North: Left and center lanes, Mon-Thurs 11pm-5:30am Fri 12am-6am North: Right and center lanes, Mon-Thurs 11pm-5:30am Fri 12am-6am | Minimal | None |
17 & 18B | Paving | North: Right lane, Mon-Wed 10am-2pm | Minimal | None |
17 & 19 | Paving | North: Alternating right lane with the left lane, Mon-Thurs 7pm-7am Fri 9pm-8am | Minimal | None |
19 & 22 | Paving | North: Alternating right lane with the left lane, Mon-Thurs 7pm-7am Fri 9pm-8am North: Left and center lanes, Mon-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am North: Right and center lanes, Mon-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am | Minimal | None |
20 & 14 | Paving | South: Right 2 lanes, Mon-Fri 11pm-5am South: Right lane, Mon-Fri 9pm-6am South: Left 2 lanes, Mon-Fri 11pm-5am | Minimal | None |
22 & 21 | Paving | South: Alternating right lane with the left lane, Mon-Thurs 8pm-6am Fri 9pm-8am South: Left and center lanes, Mon-Thurs 11pm-5am Fri 12m-6am South: Right and center lanes, Mon-Thurs 11pm-5am Fri 12m-6am | Minimal | None |
For The Week Starting Monday 05/23/2022
New York Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Ramp Work | Ramp Work | North: Ramp, ALL LANES Mon-Wed 10pm-5am South: Ramp, ALT RL/LL Mon-Wed 10pm-5am | Moderate | None |
Ramp Work | Ramp Work | North: Left lane, Exit 16 NB Decel Mon 11am-12:30pm North: Right lane, Exit 16 NB Decel Mon 9am-10:30am | Minimal | None |
8 & 10 | Other | North: Right shoulder, Mon-Wed 9am-3pm Thurs 9am-12pm | Minor | None |
9 & 11 | Bridge Inspection | North: Left lane, Mon 10am-1pm North: Right lane, Mon 7am-10am | Minimal | None |
9 & 10 | Bridge Inspection | North: Left shoulder, Mon 1pm-2pm North: Left lane, Tues 1:30am-5am North: Right shoulder, Tues 10pm-1:30am | Minimal | None |
14 & 12 | Bridge Construction | South: Left 2 lanes, Tues 11pm-5am South: Left 2 lanes, Mon 11pm-5am South: Right 2 lanes, Wed 11pm-5am South: Left lane, Tues 8pm-6am South: Left lane, Mon 8pm-6am South: Right lane, Wed 8pm-6am | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
6 & 7 | Road Work | North: Left lane, Wed 9:30am | Minimal | None |
15 & 8B | Paving | North: Right 2 lanes, Mon-Fri 1am-5am North: Left 2 lanes, Mon-Fri 1am-5am North: Right lane, Mon-Fri 10pm-6am South: Right 2 lanes, Mon-Fri 1am-5am South: Right lane, Mon-Fri 10pm-6am South: Left 2 lanes, Mon-Fri 1am-5am | Minimal | None |
14 & 18A | Paving | North: Right lane, Mon-Fri 9pm-6am North: Right 2 lanes, Mon-Fri 11pm-5am North: Left 2 lanes, Mon-Fri 11pm-5am | Minimal | None |
17 & 19 | Paving | North: Alternating right lane with the left lane, Mon-Thurs 7pm-7am North: Right and center lanes, Mon-Thurs 11pm-5:30am North: Left and center lanes, Mon-Thurs 11pm-5:30am | Minimal | None |
18B & 16 | Road Work | South: Right and center lanes, Mon-Wed 11pm-5:30am | Minimal | None |
18B & 19 | Bridge Inspection | North: Left lane, Wed 1:30am-4am North: Right lane, Wed 10pm-1:30am | Minor | None |
19 & 22 | Paving | North: Right and center lanes, Mon-Wed 11pm-5:30am Thurs 11pm-5am North: Left and center lanes, Mon-Wed 11pm-5:30am Thurs 11pm-5am North: Alternating right lane with the left lane, Mon-Thurs 7pm-7am | Minimal | None |
20 & 14 | Paving | South: Right 2 lanes, Mon-Fri 11pm-5am South: Left 2 lanes, Mon-Fri 11pm-5am South: Right lane, Mon-Fri 9pm-6am | Minimal | None |