Scheduled Construction Lane Closures
Erie | Buffalo/Niagara | Rochester | Syracuse | Utica |Albany | Mid-Hudson | New York
Erie Region
For The Week Starting Monday 05/19/2025
Erie Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
56 & 49 | Bridge Construction | West: Left lane, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. Ramp/Mobile Lane Closure- Multiple Direction- MP- 419-430, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. East: Left lane, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. | None | None |
57 & 55 | Highway Construction | East: Alternating right lane with the left lane, Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. East: Alternating right lane with the left lane, Wednesday 5/21/25 8:00pm-6:00am Thursday 5/22/25. | Minimal | None |
56 & 57 | Highway Construction | East: Alternating right lane with the left lane, Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. West: Alternating right lane with the left lane, Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. | Minimal | None |
60 & 58 | Road Work | East: Left lane, Monday 5/19/25 7:00am-12:00pm. Tuesday 5/20/25 7:00am-12:00pm Wednesday 5/21/25 7:00am-12:00pm. Thursday 5/22/25 7:00am-12:00pm. | Minimal | None |
60 & 59 | Bridge Inspection | West: Left lane, Tuesday 5/6/25 12:00pm-2:00pm. West: Right lane, Tuesday 5/6/25 10:00am-12:00pm. East: Right lane, Tuesday 5/6/25 6:00am-8:00am East: Left lane, Tuesday 5/6/25 8:00am-10:00am | Minimal | None |
60 & 59 | Road Work | East: Alternating right lane with the left lane, Monday 5/19/25 7:00am-12:00pm. Tuesday 5/20/25 7:00am-12:00pm. Wednesday 5/21/25 7:00am-12:00pm. Thursday 5/22/25 7:00am-12:00pm. East: Left lane, Thursday 5/22/25 7:00am-3:00pm. East: Right lane, Monday 5/19/25 7:00am-2:00pm Monday 5/22/25. CONTINUOUS CLOSURE. | Minimal | None |
60 & 61 | Road Work | West: Right lane, Tuesday 5/20/25 6:00am-12:00pm Thursday 5/22/25. Continuous Closure. | Minimal | None |
For The Week Starting Monday 05/26/2025
Erie Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
56 & 49 | Bridge Construction | West: Ramp, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. West: Left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. East: Left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. | None | None |
57 & 55 | Highway Construction | East: Right lane, Wednesday 5/28/25 8:00pm-6:00am Thursday 5/29/25. | Minimal | None |
57A & 56 | Highway Construction | East: Right lane, Friday 5/30/25 8:00pm-6:00am Saturday 5/31/25. | Minimal | None |
57A & 57 | Highway Construction | East: Right lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. | Minimal | None |
58 & 59 | Paving | West: Right lane, Tuesday 5/27/25 7:00am-7:00pm. Wednesday 5/28/25 7:00am-7:00pm. Thursday 5/29/25 7:00am-7:00pm. Long Term Closure 7am Tuesday- 7pm Thursday. | None | None |
60 & 58 | Road Work | East: Right lane, Tuesday 5/27/25 7:00am-12:00pm Wednesday 5/28/25 7:00am-12:00pm. Thursday 5/29/25 7:00am-12:00pm. Friday 5/30/25 7:00am-12:00pm. | Minimal | None |
60 & 59 | Road Work | East: Alternating right lane with the left lane, Tuesday 5/27/25 7:00am-12:00pm. Wednesday 5/28/25 7:00am-12:00pm. Thursday 5/29/25 7:00am-12:00pm. Friday 5/30/25 7:00am-12:00pm. East: Right lane, Tuesday 5/27/25 7:00am-12:00pm Friday 5/30/25. CONTINUOUS CLOSURE. | Minimal | None |
60 & 61 | Road Work | West: Right lane, Tuesday 5/27/25 6:00am-11:00am Friday 5/30/25. Continuous Closure, Tuesday through Friday. | Minimal | None |
Back to Top
Buffalo/Niagara Region
For The Week Starting Monday 05/19/2025
Buffalo/Niagara Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
56 & 49 | Bridge Construction | West: Left lane, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. Ramp/Mobile Lane Closure- Multiple Direction- MP- 419-430, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. East: Left lane, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
1 & 21 | Pavement Striping | North: Alternating right lane with the left lane, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. | Minimal | None |
1 & 4 | Road Work | North: Left 2 lanes, Sunday 5/18/25 11:00pm-5:00am 5/19/25 Monday. Monday 5/19/25 11:00pm-5:00am 5/20/25 Tuesday. Tuesday 5/20/25 11:00pm-5:00am 5/21/25 Wednesday. | Minimal | None |
6 & 7 | Bridge Construction | North: Alternating right lane with the left lane, Monday 5/19/25 6:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 6:00pm-6:00am Wednesday 5/21/25. | None | None |
7 & 8 | Bridge Construction | North: Alternating right lane with the left lane, Wednesday 5/21/25 6:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 6:00pm-6:00am Friday 5/23/25. | None | None |
21 & 20 | Bridge Construction | North: Right lane, Monday 5/12/25 9:00pm-6:00am Tuesday 5/13/25. Thursday 5/15/25 9:00pm-6:00am Friday 5/16/25. South: Right lane, Thursday 5/15/25 9:00pm-6:00am Friday 5/16/25. | Minimal | None |
21 & 1 | Pavement Striping | South: Alternating right lane with the left lane, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. | Minimal | None |
For The Week Starting Monday 05/26/2025
Buffalo/Niagara Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
56 & 49 | Bridge Construction | West: Ramp, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. West: Left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. East: Left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
1 & 21 | Pavement Striping | North: Alternating right lane with the left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. | Minimal | None |
1 & 4 | Road Work | North: Left 2 lanes, Sunday 5/18/25 11:00pm-5:00am 5/19/25 Monday. Monday 5/19/25 11:00pm-5:00am 5/20/25 Tuesday. Tuesday 5/20/25 11:00pm-5:00am 5/21/25 Wednesday. | Minimal | None |
7 & 8 | Paving | North: Alternating right lane with the left lane, Monday 5/26/25 6:00pm-6:00am Tuesday 5/27/25. | None | None |
20 | Bridge Construction | North: Right lane, Tuesday 5/27/25 10:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 10:00pm-6:00am Thursday 5/29/25. Friday 5/30/25 11:00pm-6:00am Saturday 5/31/25. | Minimal | None |
21 & 1 | Pavement Striping | South: Alternating right lane with the left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. | Minimal | None |
Back to Top
Rochester Region
For The Week Starting Monday 05/19/2025
Rochester Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
42 & 43 | Road Work | East: Right lane, WED-THU 2:30AM-7AM West: Right lane, TUE 7:30AM-noon | Minimal | Weather permitting |
43 & 45 | Paving | West: Right 2 lanes, MON-WED 8PM - TUE-THU 5AM West: Left lane, SUN-SAT CONTINUOUS | Moderate | None |
44 & 45 | Paving | West: Right lane, MON-SAT Rt Decel CONTINUOUS | Moderate | None |
45 & 46 | Paving | West: Left lane, Tuesday 5/20/25 6:00pm-8:00am Wednesday 5/21/25. | Minimal | None |
46 & 43 | Paving | East: Left lane, SUN-SAT Continuous East: Right lane, MON-WED 7:30AM - THU 5AM | Moderate | None |
45 & 46 | Paving | East: Left lane, Monday 5/19/25 6:00pm-10:00am. West: Left lane, Wednesday 5/21/25 6:00pm-8:00am 5/22/25 Thursday. | Minimal | None |
46 & 45 | Bridge Work | West: Alternating right lane with the left lane, Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. East: Alternating right lane with the left lane, Sunday 5/18/25 9:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/21/25. East: Right shoulder, Monday 5/19/25 7:00am-4:00pm. Tuesday 5/20/25 7:00am-4:00pm. Wednesday 5/21/25 7:00am-4:00pm. Thursday 5/22/25 7:00am-4:00pm. | Minimal | None |
47 & 46 | Road Work | West: Right lane, Friday 5/16/25 7:00am-10:00am. West: Left lane, Friday 5/16/25 10:00am-2:00pm. East: Alternating right lane with the left lane, Thursday 5/15/25 7:00am-2:00pm. | Minimal | None |
46 & 47 | Bridge Work | West: Right shoulder, Monday 5/19/25 7:00am-4:00pm. Tuesday 5/20/25 7:00am-4:00pm. Wednesday 5/21/25 7:00am-4:00pm. Thursday 5/22/25 7:00am-4:00pm. | Minimal | None |
48 & 47 | Road Work | East: Right lane, Monday 5/12/25 2:00am-7:00am. | None | None |
48A & 49 | Road Work | West: Right lane, Tuesday 5/13/25 2:00am-7:00am. | None | None |
56 & 49 | Bridge Construction | West: Left lane, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. Ramp/Mobile Lane Closure- Multiple Direction- MP- 419-430, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. East: Left lane, Sunday 5/18/25 7:00pm-6:00am Monday 5/19/25. Monday 5/19/25 7:00pm-6:00am Tuesday 5/20/25. Tuesday 5/20/25 7:00pm-6:00am Wednesday 5/21/25. Wednesday 5/21/25 7:00pm-6:00am Thursday 5/22/25. Thursday 5/22/25 7:00pm-6:00am Friday 5/23/25. | None | None |
For The Week Starting Monday 05/26/2025
Rochester Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
42 & 43 | Road Work | West: Right lane, TUE 7PM-9AM, WED 7PM-8AM, THU 8PM-8AM, FRI 10PM-9AM | Minimal | None |
43 & 42 | Road Work | East: Right lane, FRI-SAT 9PM-7AM | Minimal | Weather permitting |
45 & 43 | Paving | West: Right shoulder, TUE-FRI 7AM-5PM West: Left lane, SUN-SAT CONTINUOUS East: Right shoulder, THU-FRI 8PM - SAT 5AM | Moderate | None |
44 & 45 | Paving | West: Right lane, MON-SAT Rt Decel CONTINUOUS | Moderate | None |
45 & 46 | Paving | West: Left lane, Tuesday 5/27/25 6:00pm-8:00am 5/28/25 Wednesday. | Minimal | None |
46 & 43 | Paving | East: Left lane, SUN-SAT Continuous | Moderate | None |
45 & 46 | Paving | West: Left lane, Wednesday 5/28/25 6:00pm-8:00am 5/29/25 Thursday. | Minimal | None |
45 & 46 | Bridge Work | West: Left lane, Monday 5/26/25 9:00pm-6:00am 5/27/25 Tuesday. Waiver for Monday Night West: Alternating right lane with the left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. | Minimal | None |
45 & 46 | Paving | West: Left lane, Thursday 5/29/25 7:00pm-8:00am 5/30/25 Friday. | Minimal | None |
46 & 45 | Bridge Work | East: Alternating right lane with the left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. | Minimal | None |
45 & 46 | Paving | West: Left lane, Friday 5/30/25 8:00pm-10:00am 5/31/25 Saturday. | Minimal | None |
47 & 46 | Road Work | West: Right lane, Friday 5/16/25 7:00am-10:00am. West: Left lane, Friday 5/16/25 10:00am-2:00pm. East: Alternating right lane with the left lane, Thursday 5/15/25 7:00am-2:00pm. | Minimal | None |
48 & 47 | Road Work | East: Right lane, Monday 5/12/25 2:00am-7:00am. | None | None |
48A & 49 | Road Work | West: Right lane, Tuesday 5/13/25 2:00am-7:00am. | None | None |
56 & 49 | Bridge Construction | West: Ramp, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. West: Left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. East: Left lane, Tuesday 5/27/25 7:00pm-6:00am Wednesday 5/28/25. Wednesday 5/28/25 7:00pm-6:00am Thursday 5/29/25. Thursday 5/29/25 7:00pm-6:00am Friday 5/30/25. Friday 5/30/25 7:00pm-6:00am Saturday 5/31/25. | None | None |
Back to Top
Syracuse Region
For The Week Starting Monday 05/19/2025
Syracuse Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
34 & 33 | Road Work | East: Right lane, TUE-WED 8AM-1PM | Minimal | Weather permitting |
34A & 34 | Road Work | East: Left lane, MON-WED 7AM-2PM, THU 7AM-noon | Minimal | Weather permitting |
35 & 34 | Ramp Work | West: Alternating right lane with the left lane, TUE 9AM-1PM East: Alternating right lane with the left lane, MON-WED 7AM-2PM, THU 7AM-noon | Minimal | None |
34A & 36 | Bridge Construction | West: Right lane, MON-WED 6:30AM-1PM, THU 6:30AM-noon | Minimal | None |
37 & 35 | Road Work | East: Left lane, TUE-WED 7AM-2PM, THU 7AM-noon | Minimal | Weather permitting |
38 & 36 | Road Work | East: Right lane, WED 7AM-2PM | Minimal | Weather permitting |
40 & 39 | Road Work | East: Right lane, WED 7:30AM-2PM | Minimal | Weather permitting |
39 & 41 | Road Work | West: Right lane, TUE 7:30AM-2PM | Minimal | Weather permitting |
40 & 41 | Road Work | West: Alternating right lane with the left lane, MON 7:30AM-2PM East: Alternating right lane with the left lane, MON 7:30AM-2PM West: Alternating right lane with the left lane, MON-WED 7:30AM-2PM | Minimal | Weather permitting |
41 & 40 | Bridge Construction | West: Alternating right lane with the left lane, MON 6AM-1PM, TUE 6AM-3PM East: Alternating right lane with the left lane, MON 6AM-1PM, TUE 6AM-3PM | None | None |
40 & 42 | Road Work | West: Right lane, TUE 6PM-9AM, WED 7PM-8AM West: Left lane, MON 6PM-9AM, THU 7PM-8AM | Minimal | None |
42 & 43 | Road Work | East: Right lane, WED-THU 2:30AM-7AM West: Right lane, TUE 7:30AM-noon | Minimal | Weather permitting |
For The Week Starting Monday 05/26/2025
Syracuse Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Ramp Work | Paving | Direction: Exit 44 off-ramp: Ramp, FRI 8PM - SAT 5AM | Moderate | None |
34 & 34A | Road Work | West: Left lane, TUE-THU 7AM-2PM | Minimal | Weather permitting |
34 & 34A | Pavement Striping | West: Right lane, THU 7PM-9PM West: Left lane, FRI midnite-2AM | Minimal | None |
34A & 34 | Road Work | East: Right lane, WED 7AM-2PM | Minimal | Weather permitting |
34A & 34 | Pavement Striping | East: Left lane, FRI 2AM-5AM West: Right lane, FRI 9PM-11PM West: Left lane, SAT 1AM-3AM East: Right lane, THU 9PM-midnite | Minimal | None |
34 & 35 | Ramp Work | West: Alternating right shoulder or left shoulder, TUE-FRI 9PM-7AM, FRI/SAT 9PM-7AM | Minimal | None |
34A & 34 | Pavement Striping | East: Left lane, SAT 3AM-5AM East: Right lane, FRI-SAT 11PM-1AM | Minimal | None |
34A & 36 | Bridge Construction | West: Left lane, TUE-FRI 9AM-2PM | Minimal | None |
36 & 35 | Bridge Construction | East: Left lane, TUE-FRI 9AM-2PM | Minimal | None |
37 & 35 | Road Work | East: Left lane, TUE-WED 7AM-2PM | Minimal | Weather permitting |
39 & 40 | Road Work | West: Right lane, THU 7:30AM-2:30PM | Minimal | Weather permitting |
39 & 41 | Road Work | West: Right lane, TUE 7:30AM-2PM | Minimal | Weather permitting |
40 & 41 | Bridge Work | West: Alternating right lane with the left lane, TUE-THU 6AM-10AM, FRI 6AM-9AM | Minimal | None |
41 & 40 | Bridge Construction | West: Alternating right lane with the left lane, TUE-THU 6AM-10AM, FRI 6AM-9AM East: Alternating right lane with the left lane, TUE-THU 6AM-10AM, FRI 6AM-9AM | Minimal | None |
42 & 43 | Road Work | West: Right lane, TUE 7PM-9AM, WED 7PM-8AM, THU 8PM-8AM, FRI 10PM-9AM | Minimal | None |
43 & 42 | Road Work | East: Right lane, FRI-SAT 9PM-7AM | Minimal | Weather permitting |
Back to Top
Utica Region
For The Week Starting Monday 05/19/2025
Utica Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
28 & 27 | Bridge Construction | West: Alternating right lane with the left lane, Monday - Wednesday, 7:00AM - 5:00PM Thursday, 7:00AM - 12:00 Noon East: Alternating right lane with the left lane, Monday - Wednesday, 7:00AM - 5:00PM Thursday, 7:00AM - 12:00 Noon | Minimal | Weather Permitting |
29A & 29 | Road Work | East: Right lane, MON-WED 6AM-5PM, THU 6AM-noon | Minor | None |
31 & 29A | Bridge Construction | West: Alternating right lane with the left lane, MON-WED 7AM-4PM, THU 7AM-noon East: Alternating right lane with the left lane, MON-WED 7AM-4PM, THU 7AM-noon | Minimal | None |
32 & 31 | Road Work | West: Right lane, MON 8AM-2PM East: Left lane, MON 7:30AM-2PM | Minimal | Weather permitting |
32 & 31 | Bridge Construction | West: Alternating right lane with the left lane, MON-WED 6AM-7PM, THU 6AM-noon East: Alternating right lane with the left lane, MON-WED 6AM-7PM, THU 6AM-noon | Minimal | None |
34 & 33 | Road Work | East: Right lane, TUE-WED 8AM-1PM | Minimal | Weather permitting |
For The Week Starting Monday 05/26/2025
Utica Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
27 & 28 | Bridge Construction | West: Other, WB traffic shifted to EB side of bridge until further notice. | Minimal | Weather Permitting |
29A & 29 | Road Work | East: Right lane, WED-THU 6AM-5PM, FRI 6AM-noon | Minor | None |
30 & 29A | Road Work | East: Right lane, WED-THU 7AM-2PM | Minimal | Weather permitting |
31 & 32 | Road Work | West: Right lane, MON 8AM-2PM East: Left lane, WED-THU 7:30AM-2PM West: Right lane, WED-THU 8AM-2PM | Minimal | Weather permitting |
Back to Top
Albany Region
For The Week Starting Monday 05/19/2025
Albany Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
B1 & 21A | Road Work | East: Left lane, Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice. West: Left lane, Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice. | Minimal | Weather Permitting |
21A & B2 | Pavement Striping | East: Alternating right lane with the left lane, Tuesday, 7:00PM - 10:00PM Wednesday, 12:00 Midnight - 3:00AM *Night Work* *Mobile Maintenance* | Minimal | Weather Permitting |
B1 & B3 | Pavement Striping | East: Alternating right lane with the left lane, Wednesday, 7:00PM - 10:00PM Thursday, 12:00 Midnight - 3:00AM | Minimal | Weather Permitting |
B2 & 21A | Pavement Striping | West: Alternating right lane with the left lane, Tuesday, 10:00PM - 12:00 Midnight Wednesday, 3:00AM - 6:00AM *Night Work* *Mobile Maintenance* | Minimal | Weather Permitting |
B3 & B1 | Pavement Striping | West: Alternating right lane with the left lane, Wednesday, 10:00PM - 12:00 Midnight Thursday, 3:00AM - 6:00AM *Night Work* *Mobile Maintenance* | Minimal | Weather Permitting |
B2 & B3 | Road Work | East: Left lane, Monday - Wednesday, 7:00AM - 2:00PM Thursday, 7:00AM - 12:00 Noon | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Road Work | Road Work | Direction: Interchange 25A: Right lane, Monday, 7:00AM - 4:00PM | Minimal | Weather Permitting |
Interchange Work | Road Work | Direction: Interchange 25A: Right shoulder, Tuesday & Wednesday, 7:00AM - 5:00PM Direction: Interchange 25: Right lane, Tuesday, 9:00AM - 3:00PM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
21B & 20 | Pavement Striping | North: Left lane, Monday - Tuesday, 11:00PM - 2:00AM *Night Work* *Mobile maintenance* North: Right lane, Monday, 7:00PM - 8:00PM *Night Work* *Mobile maintenance* South: Left lane, Monday, 8:00PM - 11:00PM *Night Work* *Mobile Maintenance* | Minimal | Weather Permitting |
21 & 21B | Road Work | North: Right lane, Tuesday, 9:00AM - 1:00PM | Moderate | Weather Permitting |
21A & 22 | Road Work | North: Left shoulder, Monday, 7:00AM - 2:00PM | None | Weather Permitting |
21A & 23 | Road Work | North: Right lane, Wednesday, 9:00AM - 12:00 Noon | Moderate | Weather Permitting |
22 & 21A | Road Work | South: Left shoulder, Monday, 7:00AM - 2:00PM | None | Weather Permitting |
23 & 22 | Toll Plaza Work | North: Alternating right lane with the left lane, Wednesday, 9:00AM - 12:00 Noon South: Alternating right lane with the left lane, Thursday, 7:00AM - 9:00AM | Minimal | Weather Permitting |
23 & 24 | Bridge Work | North: Left lane, Monday, 8:00AM - 10:00AM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
24 & 25 | Road Work | West: Right lane, Thursday, 7:00AM - 12:00 Noon *Mobile Maintenance* West: Right 2 lanes, Tuesday & Wednesday, 7:00AM - 1:00PM *Mobile Maintenance* | Minimal | Weather Permitting |
25 & 24 | Road Work | East: Right lane, Tuesday, 9:00AM - 4:00PM | Minimal | Weather Permitting |
24 & 25A | Road Work | West: Right lane, Tuesday, 7:00AM - 4:00PM | Minimal | Weather Permitting |
25 & 24 | Road Work | East: Right lane, Tuesday - Wednesday, 10:00AM - 1:00PM Thursday, 10AM - 12:00 Noon * Mobile Maintenance* | Minimal | Weather Permitting |
25A & 25 | Road Work | West: Right lane, Wednesday, 8:00AM - 4:00PM East: Right lane, Wednesday, 8:00AM - 4:00PM West: Left lane, Monday & Tuesday, 6:00AM - 4:00PM East: Left lane, Monday & Tuesday, 8:00AM - 5:00PM | Minimal | Weather Permitting |
26 & 25A | Road Work | East: Left lane, Tuesday, 8:00AM - 4:00PM | Minimal | Weather Permitting |
27 & 26 | Road Work | East: Left lane, Wednesday, 7:00AM - 1:00PM East: Left lane, Tuesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
26 & 27 | Guide Rail Installation | West: Right lane, Monday, 7:00AM - 1:00PM Thursday, 7:00AM - 12:00 Noon | Minimal | Weather Permitting |
For The Week Starting Monday 05/26/2025
Albany Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
21A & B1 | Bridge Construction | East: Other, Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice. | Minimal | Weather Permitting |
B1 & 21A | Other | West: Left lane, Thursday & Friday, 7:00AM - 5:00PM | Minor | Weather Permitting |
B1 & 21A | Bridge Construction | West: Left lane, Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice. | Minimal | Weather Permitting |
B2 & B1 | Bridge Work | East: Right lane, Wednesday, 7:00AM - 10:00AM West: Right lane, Wednesday, 11:00 - 2:00PM | Minimal | Weather Permitting |
B3 & B2 | Bridge Work | East: Right lane, Thursday, 7:00AM - 10:00AM West: Right lane, Thursday, 11:00 - 2:00PM | Minimal | Weather Permitting |
B2 & B3 | Road Work | East: Right lane, Wednesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Road Work | Road Work | Direction: Interchange 26: Right lane, Tuesday & Wednesday, 7:00AM - 4:00PM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
Interchange Work | Toll Plaza Work | Direction: Interchange 26: Alternating right lane with the left lane, Friday, 7:00AM - 2:00PM | Minimal | Weather Permitting |
21 & 21B | Other | North: Right lane, Tuesday, 7:00AM - 2:00PM Wednesday, 7:00AM - 1:00PM Thursday, 7:00AM - 11:00AM | Minimal | Weather Permitting |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
24 & 25 | Ramp Work | West: Left lane, Wednesday & Thursday, 9:00AM - 12:00 Noon | Minimal | Weather Permitting |
25A & 24 | Road Work | East: Right lane, Wednesday, 11:00AM - 2:00PM * Mobile Maintenance* | Minimal | Weather Permitting |
25A & 25 | Road Work | East: Right lane, Tuesday - Friday, 8:00AM - 5:00PM | Minimal | Weather Permitting |
26 & 25 | Road Work | West: Left lane, Thursday, 7:00AM - 4:00PM East: Left lane, Thursday, 8:00AM - 4:00PM | Minimal | Weather Permitting |
26 & 25A | Road Work | East: Right shoulder, Tuesday - Friday, 7:00AM - 4:00PM | Minimal | Weather Permitting |
26 & 24 | Road Work | East: Right lane, Tuesday - Friday, 8:00AM - 2:00PM | Minimal | Weather Permitting |
25A & 27 | Road Work | West: Left lane, Thursday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
27 & 26 | Guide Rail Installation | East: Right lane, Wednesday, 7:00AM - 1:00PM | Minimal | Weather Permitting |
27 & 26 | Bridge Inspection | West: Left lane, Wednesday, 10:00AM - 11:00AM West: Left lane, Wednesday, 11:00AM - 1:00PM East: Right lane, Wednesday, 7:00AM - 9:00AM East: Right lane, Wednesday, 9:00AM - 10:00AM | Minimal | Weather Permitting |
Back to Top
Mid-Hudson Region
For The Week Starting Monday 05/19/2025
Mid-Hudson Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
17 & 16 | Other | North: Left lane, Mon 6pm-9am Tues-Wed 7pm-9am Thurs 10pm-6am South: Right lane, Tues-Wed 6pm-7am Thurs 9pm-6am South: Right lane, Mon 7pm-7am | None | None |
18 & 19 | Road Work | North: Alternating right lane with the left lane, Tuesday, 2:00AM - 2:00PM *Night Work* | Minor | Weather Permitting |
18 & 19 | Road Work | North: Right lane, Tuesday, 9:00AM - 5:00PM Wednesday, 9:00AM - 11:00AM Thursday, 9:00AM - 12:00 Noon NB traffic shifted to SB side of bridge until further notice. | Minor | Weather Permitting |
19 & 20 | Bridge Work | North: Right lane, Tuesday, 5:00AM - 2:00PM South: Right lane, Tuesday, 5:00AM - 2:00PM North: Right lane, Wednesday, 5:00AM - 12:00 Noon | Minor | Weather Permitting |
21B & 20 | Pavement Striping | North: Left lane, Monday - Tuesday, 11:00PM - 2:00AM *Night Work* *Mobile maintenance* North: Right lane, Monday, 7:00PM - 8:00PM *Night Work* *Mobile maintenance* South: Left lane, Monday, 8:00PM - 11:00PM *Night Work* *Mobile Maintenance* | Minimal | Weather Permitting |
For The Week Starting Monday 05/26/2025
Mid-Hudson Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
17 & 16 | Other | North: Left lane, Thurs 8pm-7am South: Right lane, Tues-Wed 6pm-7am South: Left lane, Thurs 8pm-7am | None | None |
18 & 16 | Other | South: Right lane, Fri 8pm-9am | None | None |
18 & 19 | Bridge Construction | North: Right lane, Tuesday, 6:00AM - 10:00AM Wednesday, 6:00AM - 1:00PM NB traffic shifted to SB side of bridge until further notice. | Minor | Weather Permitting |
Back to Top
New York Region
For The Week Starting Monday 05/19/2025
New York Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
1 & 3 | Bridge Construction | East: Right shoulder, Mon-Thurs 9am-3pm | None | None |
5 & 1 | Pavement Striping | West: Alternating right lane with the left lane, LL/CL/RL Mon-Wed 9pm-5am | None | None |
5 & 2 | Bridge Construction | West: Right shoulder, Mon-Thurs 9am-3pm | None | None |
7 & 10 | Paving | East: Right and center lanes, Sun 10pm-6am Mon-Wed 8pm-6am | None | None |
9A | Paving | East: Right and center lanes, Wed 8pm-6am | None | None |
9 & 8 | Bridge Construction | West: Right shoulder, Mon-Thurs 9am-3pm | None | None |
9A & 9 | Bridge Construction | East: Right shoulder, Mon-Thurs 9am-3pm | None | None |
10 & 9 | Bridge Construction | East: Right shoulder, Mon-Thurs 9am-3pm West: Right shoulder, Mon-Thurs 9am-3pm | None | None |
11 & 9 | Bridge Construction | West: Right shoulder, Mon-Thurs 9am-3pm | None | None |
11 & 10 | Bridge Construction | West: Right shoulder, Mon-Thurs 9am-3pm | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
7A & 9 | Bridge Construction | North: Right shoulder, Mon-Fri 9am-3pm | None | None |
7A & 8 | Paving | North: Right shoulder, Mon-Thurs 9am-3pm | Minimal | None |
14B & 15 | Shoulder Work | North: Right shoulder, Mon-Thurs 6am-3pm North: Alternating right lane with the left lane, Mon-Thurs 6am-11am | None | None |
15A & 14B | Shoulder Work | South: Alternating right lane with the left lane, Mon-Thurs 11am-2pm | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
8C & 22 | Bridge Washing | North: Alternating right lane with the left lane, Sun-Thurs 10pm-6am | Minimal | None |
13 & 8C | Road Work | South: Right and center lanes, Mon-Wed 12am-5:30am Thurs 1am-5am South: Right lane, Mon-Wed 10pm-6am | None | None |
18A & 14 | Shoulder Work | North: Right lane, Mon-Thurs 7pm-7am North: Center lane, Mon-Wed 11pm-5:30am Thurs 11pm-5am North: Alternating right shoulder or left shoulder, Mon-Thurs 7:30am-3:30pm North: Right shoulder, Mon-Fri 7am-3pm North: Right shoulder, Mon-Thurs 6pm-8am South: Center lane, Mon-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am South: Right shoulder, Night Mon-Thurs 6pm-8am Day Mon-Thurs 7am-3pm South: Right lane, Mon-Thurs 8pm-7am | None | None |
19 | Paving | North: Right 3 lanes, RSH,RL,CL Mon 8pm-6am Wed 10pm-6am North: Left 3 lanes, LSH, LL, CL Sun 10pm-6am Tues 9pm-6am | None | None |
22 & 8B | Bridge Washing | South: Alternating right lane with the left lane, Sun-Thurs 10pm-6am | Minimal | None |
For The Week Starting Monday 05/26/2025
New York Region
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
5 & 1 | Pavement Striping | West: Alternating right lane with the left lane, LL/CL/RL Tues-Thurs 9pm-5am Fri 10pm-5am | None | None |
7 & 10 | Paving | East: Left and center lanes, Wed-Thurs 8pm-6am | None | None |
9 & 8 | Bridge Construction | West: Right shoulder, Tues-Fri 9am-3pm | None | None |
9A & 9 | Bridge Construction | East: Right shoulder, Tues-Fri 9am-3pm | None | None |
9 | Paving | East: Right and center lanes, Tues 7pm-6am Mon-Wed 8pm-6am | None | None |
10 & 9 | Bridge Construction | East: Right shoulder, Tues-Fri 9am-3pm West: Right shoulder, Tues-Fri 9am-3pm | None | None |
11 & 9 | Bridge Construction | West: Right shoulder, Tues-Fri 9am-3pm | None | None |
11 & 10 | Bridge Construction | West: Right shoulder, Tues-Fri 9am-3pm | None | None |
12 & 1 | Paving | West: Right lane, Actual MP 10.80-7.50 Tues-Thurs 7pm-7am | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
7 & 8 | Bridge Construction | North: Right shoulder, Tues-Fri 9am-3pm | None | None |
10 & 9 | Bridge Inspection | South: Shoulder, Tue 9am-3pm Thurs-Fri 9am-3pm South: Right lane, Wed 9am-3pm | Minimal | None |
14B & 15 | Shoulder Work | North: Alternating right lane with the left lane, Tues 10am-1pm Wed-Thurs 6am-1pm Fri 6am-11am North: Right shoulder, Tues 10am-3pm Wed-Fri 6am-3pm | None | None |
Between Exits | Work Description | Lane Closure Information | Likely Impacts | Comments |
---|---|---|---|---|
8C & 22 | Bridge Washing | North: Alternating right lane with the left lane, Tues-Fri 10pm-5am | Minimal | None |
13 & 8C | Road Work | South: Right lane, Tues-Thurs 9pm-6am Fri 11pm-8am South: Right and center lanes, Tues-Wed 12am-5:30am Thurs 1am-5am Fri 1am-6am | None | None |
14 & 18A | Shoulder Work | North: Right lane, Tues-Fri 7pm-7am North: Center lane, Tues-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am | None | None |
14 & 16 | Road Work | North: Left and center lanes, Tues-Thurs 8pm-7am Fri 9pm-7am | None | None |
14 & 18A | Shoulder Work | North: Alternating right shoulder or left shoulder, Tues-Thurs 7:30am-3:30pm North: Right shoulder, Tues-Fri 7am-3pm North: Right shoulder, Mon-Thurs 6pm-8am | None | None |
18A & 15 | Road Work | South: Left and center lanes, Tues-Thurs 8pm-7am Fri 9pm-7am | None | None |
18A & 14 | Shoulder Work | South: Center lane, Tues-Wed 11pm-5:30am Thurs 11pm-5am Fri 12am-6am South: Right shoulder, Night Tues-Fri 6pm-8am Day Tues-Fri 7am-3pm South: Right lane, Tues-Fri 8pm-7am | None | None |
19 & 18B | Bridge Inspection | North: Deceleration lane, Right Decleration LN Thurs 11am-1pm South: Right shoulder, Thurs 9am-11am | None | None |
19 | Paving | North: Right 3 lanes, RSH,RL,CL Wed/Fri 10pm-6am North: Left 3 lanes, LSH, LL, CL Tues 9pm-6am Thurs 10pm-6am | None | None |
22 & 8B | Bridge Washing | South: Alternating right lane with the left lane, Tues-Fri 10pm-5am | Minimal | None |