Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 05/03/2021
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
59 & 58  Bridge Work  West: Left lane,
Monday 4/26/2021 7:00am - 7:00pm. Tuesday 4/27/2021 7:00am - 7:00pm. Wednesday 4/28/2021 7:00am - 7:00pm. Thursday 4/29/2021 7:00am - 7:00pm. Friday 4/30/2021 7:00am - 3:00pm.

East: Left lane,
Monday 4/26/2021 7:00am - 7:00pm. Tuesday 4/27/2021 7:00am - 7:00pm. Wednesday 4/28/2021 7:00am - 7:00pm. Thursday 4/29/2021 7:00am - 7:00pm. Friday 4/30/2021 7:00am - 3:00pm.

 
Minimal  None 
60 & 59  Road Work  East: Right lane,
NOTE: Lane Closure Will Remain In Place. Contact Doug Voigt (C) 716-460-5601. Monday 5/3/2021 7am -through- 2pm Thursday 5/6/2021.

 
Minimal  None 


For The Week Starting Monday 05/10/2021
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
59 & 58  Bridge Work  West: Left lane,
Monday 5/10/2021 7:00am -through- 7:00pm. Tuesday 5/11/2021 7:00am -through- 7:00pm. Wednesday 5/12/2021 7:00am -through- 7:00pm. Thursday 5/13/2021 7:00am -through- 7:00pm. Friday 5/14/2021 7:00am -through- 3:00pm.

East: Left lane,
Monday 5/10/2021 7:00am -through- 7:00pm. Tuesday 5/11/2021 7:00am -through- 7:00pm. Wednesday 5/12/2021 7:00am -through- 7:00pm. Thursday 5/13/2021 7:00am -through- 7:00pm. Friday 5/14/2021 7:00am -through- 3:00pm.

 
Minimal  None 
60 & 59  Road Work  East: Right lane,
NOTE: Lane Closure Will Remain In Place. Contact Doug Voigt (C) 716-460-5601. Monday 5/10/2021 7am -through- 2pm Thursday 5/13/2021.

 
Minimal  None 

Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 05/03/2021
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
49 & 50  Road Work  West: Alternating right lane with the left lane,
*Tuesday 5/4/2021 10:00am - 12NOON. Tuesday 5/4/2021 8pm -through- 6am Wednesday 5/5/2021. Wednesday 5/5/2021 8pm -through- 6am Thursday 5/6/2021. Thursday 5/6/2021 8pm -through- 6am Friday 5/7/2021. Friday 5/7/2021 8pm -through- 6am Saturday 5/8/2021. Saturday 5/8/2021 8pm -through- 6am Sunday 5/9/2021.

 
Minimal  None 
50 & 49  Other  East: Right lane,
Tuesday 5/4/2021 6pm -through- 7am Wednesday 5/5/2021.

 
Minimal  None 
50A & 49  Road Work  East: Alternating right lane with the left lane,
Tuesday 5/4/2021 8pm -through- 6am Wednesday 5/5/2021. Wednesday 5/5/2021 8pm -through- 6am Thursday 5/6/2021. Thursday 5/6/2021 8pm -through- 6am Friday 5/7/2021. Friday 5/7/2021 8pm -through- 6am Saturday 5/8/2021. Saturday 5/8/2021 8pm -through- 6am Sunday 5/9/2021.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
8 & 5  Bridge Work  South: Right lane,
NOTE: Temporary Closure Of SB Elm St. (Exit 6) Off-Ramp. Monday 5/3/2021 7pm -through- 6am Tuesday 5/4/2021. Tuesday 5/4/2021 7pm -through- 6am Wednesday 5/5/2021. Wednesday 5/5/2021 7pm -through- 6am Thursday 5/6/2021. Thursday 5/6/2021 7pm -through- 6am Friday 5/7/2021. Friday 5/7/2021 7pm -through- 6am Saturday 5/8/2021.

 
Minor  None 


For The Week Starting Monday 05/10/2021
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
50 & 52  Bridge Work  West: Left 2 lanes,
Wednesday 5/12/2021 10pm -through- 5am Thursday 5/13/2021. Thursday 5/13/2021 10pm -through- 5am Friday 5/14/2021. Friday 5/14/2021 10pm -through- 5am Saturday 5/15/2021.

 
Minimal  None 
50A & 52  Bridge Work  West: Left lane,
Wednesday 5/12/2021 9pm -through- 6am Thursday 5/13/2021. Thursday 5/13/2021 9pm -through- 6am Friday 5/14/2021. Friday 5/14/2021 9pm -through- 6am Saturday 5/15/2021.

 
Minimal  None 
52 & 51  Bridge Work  East: Right lane,
Wednesday 5/12/2021 9pm -through- 6am Thursday 5/13/2021. Thursday 5/13/2021 9pm -through- 6am Friday 5/14/2021. Friday 5/14/2021 9pm -through- 6am Saturday 5/15/2021.

East: Right 2 lanes,
Wednesday 5/12/2021 10pm -through- 5am Thursday 5/13/2021. Thursday 5/13/2021 10pm -through- 5am Friday 5/14/2021. Friday 5/14/2021 10pm -through- 5am Saturday 5/15/2021.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
8 & 5  Bridge Work  South: Right lane,
NOTE: Temporary Closure Of SB Elm St. (Exit 6) Off-Ramp. Monday 5/10/2021 7pm -through- 6am Tuesday 5/11/2021. Tuesday 5/11/2021 7pm -through- 6am Wednesday 5/12/2021. Wednesday 5/12/2021 7pm -through- 6am Thursday 5/13/2021. Thursday 5/13/2021 7pm -through- 6am Friday 5/14/2021. Friday 5/14/2021 7pm -through- 6am Saturday 5/15/2021.

 
Minor  None 
8 & 11  Bridge Inspection  North: Alternating right lane with the left lane,
NOTE: Bridge Inspection Work Includes Lanes On Exit 9 (Porter Ave-Canada) NB Off-Ramp. Ramp Will Remain Open At All Times. Monday 5/10/2021 9:00am - 12Noon.

 
Minimal  None 
20 & 21  Road Work  North: Alternating right lane with the left lane,
Monday 5/10/2021 9pm -through- 6am Tuesday 5/11/2021. Tuesday 5/11/2021 9pm -through- 6am Wednesday 5/12/2021.

 
Minimal  None 

Back to Top

Rochester Region


For The Week Starting Monday 05/03/2021
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
42 & 43  Other  West: Right lane,
WED-THU 7:30-2:30

 
Minimal  Weather Permitting 
42 & 44  Other  West: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
44 & 43  Other  East: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
43 & 45  Other  West: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
45 & 44  Other  West: Shoulder,
MON-WED 7AM-5PM

East: Shoulder,
MON-WED 7AM-5PM

 
Minimal  None 
45 & 44  Other  East: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
45 & 46  Other  West: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
45 & 46  Road Work  West: Alternating right lane with the left lane,
Monday 5/3/2021 6pm -through- 6am Tuesday 5/4/2021. Tuesday 5/4/2021 6pm -through- 6am Wednesday 5/5/2021. Wednesday 5/5/2021 6pm -through- 6am Thursday 5/6/2021. Thursday 5/6/2021 6pm -through- 6am Friday 5/7/2021. Friday 5/7/2021 6pm -through- 6am Saturday 5/8/2021.

 
Minimal  None 
46 & 45  Other  East: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
46 & 45  Road Work  East: Alternating right lane with the left lane,
Monday 5/3/2021 6pm -through- 6am Tuesday 5/4/2021. Tuesday 5/4/2021 6pm -through- 6am Wednesday 5/5/2021. Wednesday 5/5/2021 6pm -through- 6am Thursday 5/6/2021. Thursday 5/6/2021 6pm -through- 6am Friday 5/7/2021. Friday 5/7/2021 6pm -through- 6am Saturday 5/8/2021.

 
Minimal  None 
45 & 47  Bridge Inspection  West: Alternating right lane with the left lane,
Tuesday 5/4/2021 7:00am - 2:00pm.

 
Minimal  None 
47 & 46  Bridge Inspection  East: Alternating right lane with the left lane,
Monday 5/3/2021 7:00am - 2:00pm.

 
Minimal  None 
49 & 50  Road Work  West: Alternating right lane with the left lane,
*Tuesday 5/4/2021 10:00am - 12NOON. Tuesday 5/4/2021 8pm -through- 6am Wednesday 5/5/2021. Wednesday 5/5/2021 8pm -through- 6am Thursday 5/6/2021. Thursday 5/6/2021 8pm -through- 6am Friday 5/7/2021. Friday 5/7/2021 8pm -through- 6am Saturday 5/8/2021. Saturday 5/8/2021 8pm -through- 6am Sunday 5/9/2021.

 
Minimal  None 
50 & 49  Other  East: Right lane,
Tuesday 5/4/2021 6pm -through- 7am Wednesday 5/5/2021.

 
Minimal  None 
50A & 49  Road Work  East: Alternating right lane with the left lane,
Tuesday 5/4/2021 8pm -through- 6am Wednesday 5/5/2021. Wednesday 5/5/2021 8pm -through- 6am Thursday 5/6/2021. Thursday 5/6/2021 8pm -through- 6am Friday 5/7/2021. Friday 5/7/2021 8pm -through- 6am Saturday 5/8/2021. Saturday 5/8/2021 8pm -through- 6am Sunday 5/9/2021.

 
Minimal  None 


For The Week Starting Monday 05/10/2021
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
41 & 43  Other  West: Right lane,
THU 7AM-2:30PM

 
Minimal  Weather Permitting 
43 & 42  Other  East: Right lane,
WED 7AM-2:30PM

 
Minimal  Weather Permitting 
47 & 46  Bridge Inspection  West: Right lane,
Tuesday 5/11/2021 7:30am - 3:00pm.

East: Right lane,
Monday 5/10/2021 7:30am - 3:00pm.

 
Minimal  None 
49 & 48A  Road Work  East: Left lane,
Wednesday 5/12/2021 6:00am - 3:00pm.

 
Minimal  None 

Back to Top

Syracuse Region


For The Week Starting Monday 05/03/2021
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Other  Direction: Interchange 38: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 36: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 29A: Alternating right lane with the left lane,
MON-WED 6AM-5PM, WED-FRI 6PM-6PM

Direction: Interchange 37: Other,
MON-FRI 6AM-6PM

 
Minor  None 
34 & 32  Other  West: Right lane,
MON-FRI 6AM-4PM

East: Right lane,
MON-FRI 6AM-4PM

 
Minimal  Weather Permitting 
33 & 34  Other  West: Right lane,
MON-FRI 6AM-4PM

 
Minimal  Weather Permitting 
34A & 34  Other  East: Right lane,
TUE-WED 9AM-2PM

East: Right lane,
MON 9AM-2PM

 
Minimal  Weather Permitting 
36 & 34A  Bridge Work  East: Alternating right lane with the left lane,
THU 7AM-4PM, FRI 7AM-2PM

 
Minimal  None 
39 & 38  Other  East: Alternating right lane with the left lane,
MON-THU 9AM-3PM

 
Minimal  Weather Permitting 
38 & 39  Other  West: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
39 & 40  Other  West: Right lane,
MON-TUE 7:30AM-3PM

 
Minimal  Weather Permitting 
40 & 38  Other  East: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
40 & 39  Other  West: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

East: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 
40 & 41  Other  East: Alternating right lane with the left lane,
TUE-WED 7:30AM-3PM

West: Right lane,
THU-FRI 6:30AM-3PM

 
Minimal  Weather Permitting 
40 & 41  Bridge Work  West: Right lane,
MON 7AM-3PM, TUE 7AM-5PM, WED 7AM-4PM

 
Minimal  None 
40 & 41  Other  East: Alternating right lane with the left lane,
THU 7:30AM-3PM

West: Alternating right lane with the left lane,
MON-TUE 7:30AM-2:30PM

 
Minimal  Weather Permitting 
40 & 42  Other  West: Right lane,
WED-THU 7AM-2:30PM

 
Minimal  Weather Permitting 
42 & 41  Other  East: Right lane,
MON-TUE 7:30-2:30

 
Minimal  Weather Permitting 
42 & 43  Other  West: Right lane,
WED-THU 7:30-2:30

 
Minimal  Weather Permitting 
42 & 44  Other  West: Alternating right lane with the left lane,
MON-FRI 6PM-6AM

 
Minor  None 


For The Week Starting Monday 05/10/2021
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Other  Direction: Interchange 29A: Alternating right lane with the left lane,
MON-WED 6PM-6PM, MON 6AM-6PM

Direction: Interchange 30: Alternating right lane with the left lane,
MON-WED 6AM-5PM, WED-FRI 6PM-6PM

Direction: Interchange 34A: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 38: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

Direction: Interchange 37: Alternating right lane with the left lane,
MON-FRI 6AM-6PM

 
Minor  None 
32 & 34  Other  West: Right lane,
MON-FRI 6AM-4PM

 
Minimal  Weather Permitting 
33 & 34A  Bridge Construction  West: Right lane,
WED 9AM-3PM

West: Left lane,
THU 7AM-3PM

 
Minimal  None 
34A & 34  Bridge Construction  East: Left lane,
THU 7AM-3PM

East: Right lane,
WED 7AM-3PM

 
Minimal  None 
39 & 38  Other  East: Right lane,
WED-THU 5AM-3PM

East: Right lane,
TUE-WED 5AM-3PM

East: Left lane,
MON-TUE 5AM-3PM

 
Minimal  Weather Permitting 
40 & 39  Other  West: Alternating right lane with the left lane,
TUE-THU 7:30AM-3PM

East: Alternating right lane with the left lane,
TUE-THU 7:30AM-3PM

 
Minimal  Weather Permitting 
40 & 41  Bridge Work  West: Right lane,
MON 6:30AM-3PM TUE 6:30AM-5PM, WED 6:30AM-4PM, THU 6:30AM-2PM

 
Minimal  None 
40 & 41  Other  East: Right lane,
THU 7AM-2:30PM

West: Alternating right lane with the left lane,
MON-TUE 7:30AM-2:30PM

 
Minimal  Weather Permitting 
42 & 40  Other  West: Right lane,
MON-TUE 7AM-2:30PM

East: Right lane,
WED 7AM-2:30PM

 
Minimal  Weather Permitting 
41 & 43  Other  West: Right lane,
THU 7AM-2:30PM

 
Minimal  Weather Permitting 
43 & 42  Other  East: Right lane,
WED 7AM-2:30PM

 
Minimal  Weather Permitting 

Back to Top

Utica Region


For The Week Starting Monday 05/03/2021
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
27 & 28  Bridge Work  West: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
27 & 28  Bridge Work  West: Right lane,
Monday, 7:00AM - 3:00PM

 
Minimal  Weather Permitting 
28 & 27  Bridge Work  East: Right lane,
Friday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
28 & 27  Road Work  East: Right lane,
Monday - Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
29A & 29  Other  East: Right lane,
MON-FRI 7AM-2PM

 
Minimal  Weather Permitting 
30 & 29A  Other  East: Right lane,
TUE 7AM-2PM

 
Minimal  Weather Permitting 
29A & 31  Other  West: Right lane,
WED 7AM-2PM

 
Minimal  Weather Permitting 
30 & 31  Other  West: Right lane,
MON 7AM-2PM

 
Minimal  Weather Permitting 
32 & 31  Other  West: Right lane,
THU 7AM-2PM

West: Right lane,
MON-FRI 6AM-4PM

East: Right lane,
MON-FRI 6AM-4PM

 
Minimal  Weather Permitting 
34 & 32  Other  West: Right lane,
MON-FRI 6AM-4PM

East: Right lane,
MON-FRI 6AM-4PM

 
Minimal  Weather Permitting 
33 & 34  Other  West: Right lane,
MON-FRI 6AM-4PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 05/10/2021
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Road Work  East: Right lane,
Monday - Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
28 & 29  Overhead Sign Work  West: Right lane,
Thursday, 7:00AM - 10:00AM

West: Left lane,
Thursday, 10:00AM - 1:00PM

 
Minimal  Weather Permitting 
29A & 29  Other  East: Right lane,
MON-FRI 7AM-2PM

 
Minimal  Weather Permitting 
31 & 29A  Other  West: Right lane,
WED 7AM-2PM

East: Right lane,
THU 7AM-2PM

 
Minimal  Weather Permitting 
31 & 30  Other  West: Right lane,
THU 7AM-2PM

East: Right lane,
TUE 7AM-2PM

 
Minimal  Weather Permitting 
32 & 31  Other  West: Right lane,
MON-FRI 6AM-4PM

East: Right lane,
MON-FRI 6AM-4PM

 
Minimal  Weather Permitting 
32 & 34  Other  West: Right lane,
MON-FRI 6AM-4PM

 
Minimal  Weather Permitting 
33 & 34A  Bridge Construction  West: Left lane,
THU 7AM-3PM

West: Right lane,
WED 9AM-3PM

 
Minimal  None 

Back to Top

Albany Region


For The Week Starting Monday 05/03/2021
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange B2: Alternating right lane with the left lane,
Monday, 7:00AM to Friday, 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps

Direction: Interchange B1: Alternating right lane with the left lane,
Monday (05/03), 7:00AM to Saturday (05/08), 12:00MIDNIGHT; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps

 
Minimal  Day and Night work 
B1 & 21A  Bridge Work  East: Right lane,
Monday - Friday, 6:00AM - 6:00AM; 24 hour closure

West: Right lane,
Monday - Friday, 6:00AM - 6:00AM; 24 hour closure

 
None  Weather Permitting 
21A & B1  Bridge Inspection  East: Right lane,
Friday, 7:00AM - 3:00PM

 
None  Weather Permitting 
B2 & B1  Bridge Inspection  East: Right lane,
Tuesday, 7:00AM - 3:00PM

West: Right lane,
Monday & Wednesday, 7:00AM - 3:00PM

 
None  Weather Permitting 
B3 & B2  Road Work  East: Alternating right lane with the left lane,
Sunday (05/02), 12:00MIDNIGHT to Sunday (05/09), 12:00MIDNIGHT; 24 hour closure with temporary concrete barrier in place until further notice.

West: Alternating right lane with the left lane,
Sunday (05/02), 12MIDNIGHT to Sunday (05/09) 12:00MIDNIGHT; 24 hour closure with temporary concrete barrier in place until further notice.

 
Minimal  Day and Night work 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Road Work  Direction: Interchange 20W: Alternating right lane with the left lane,
Monday (05/03), 7:00AM to Friday (05/07), 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps

 
Minimal  Day and Night work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 27: Alternating right lane with the left lane,
Monday (05/03), 6:00AM to Tuesday (05/04), 6:00AM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 25A: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 25: Alternating right lane with the left lane,
Monday (05/03), 9:00AM to Monday (05/10), 7:00AM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

Direction: Interchange 29: Alternating right lane with the left lane,
Monday (05/03), 6:00AM to Wednesday (05/05), 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  Day and Night work 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 21B: Alternating right lane with the left lane,
Tuesday (05/04), 7:00AM to Friday (05/07), 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  Day and Night work 
19 & 21  Road Work  North: Right lane,
Tuesday, 6:00AM - 3:00PM

 
Minimal  Weather Permitting 
21 & 20  Road Work  North: Right lane,
Wednesday, 6:00AM - 2:00PM

South: Right lane,
Monday, 6:00AM - 3:00PM

 
Minimal  Weather Permitting 
21 & 20  Road Work  South: Left lane,
Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Right lane,
Tuesday, 7:00AM - 3:00PM; Wednesday, 7:00AM - 11:00AM

North: Right lane,
Wednesday, 11:00AM - 3:00PM

 
Minimal  Weather Permitting 
21B & 21  Road Work  South: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21A & 21B  Bridge Work  North: Right lane,
Tuesday, 11:00AM - 3:00PM

South: Right lane,
Tuesday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 
23 & 22  Bridge Inspection  North: Left lane,
Wednesday, 12:00NOON - 1:00PM

North: Right lane,
Wednesday, 11:00AM - 12:00PM

South: Left lane,
Wednesday, 10:00AM - 11:00AM

South: Right lane,
Wednesday, 9:00AM - 10:00AM

 
None  Weather Permitting 
22 & 23  Road Work  North: Left lane,
Tuesday & Wednesday, 9:00AM - 2:00PM

North: Right lane,
Thursday & Friday, 8:00PM - 5:00AM; Night Work

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25 & 25A  Road Work  West: Right lane,
Tuesday, 7:00AM - 3:00PM

 
None  Weather Permitting 
25A & 26  Road Work  West: Right lane,
Wednesday, 7:00AM - 3:00PM

 
None  Weather Permitting 
26 & 25A  Road Work  East: Right lane,
Thursday, 7:00AM - 3:00PM

 
None  Weather Permitting 
27 & 26  Bridge Work  East: Left lane,
Tuesday - Thursday, 7:00AM - 3:00PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 05/10/2021
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange B1: Alternating right lane with the left lane,
Monday (05/10), 7:00AM to Friday (05/14), 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps

Direction: Interchange B2: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps

 
Minimal  None 
B1 & 21A  Bridge Work  East: Right lane,
Monday - Friday, 6:00AM - 6:00AM; 24 hour closure

West: Right lane,
Monday - Friday, 6:00AM - 6:00AM; 24 hour closure

 
None  Weather Permitting 
21A & B1  Bridge Inspection  East: Right lane,
Friday, 7:00AM - 3:00PM

 
None  Weather Permitting 
B2 & B1  Bridge Inspection  West: Right lane,
Friday, 7:00AM - 3:00PM

 
None  Weather Permitting 
B2 & B1  Bridge Inspection  West: Right lane,
Thursday, 7:00AM - 12:00NOON

West: Left lane,
Thursday, 12:00NOON - 3:00PM

 
None  Weather Permitting 
B3 & B2  Road Work  East: Alternating right lane with the left lane,
Sunday (05/09), 12:00MIDNIGHT to Sunday (05/16), 12:00MIDNIGHT; 24 hour closure with temporary concrete barrier in place until further notice.

West: Alternating right lane with the left lane,
Sunday (05/09), 12MIDNIGHT to Sunday (05/16) 12:00MIDNIGHT; 24 hour closure with temporary concrete barrier in place until further notice.

 
Minimal  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 21B: Alternating right lane with the left lane,
Monday - Friday, 7:00AM - 5:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 25: Alternating right lane with the left lane,
Monday - Friday, 9:00AM - 7:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Other  Direction: Interchange 24: Left lane,
Monday and Tuesday, 7:00AM - 5:00PM; SB ACCEL lane

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Road Work  Direction: Interchange 25A: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps.

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Road Work  Direction: Interchange 20W: Alternating right lane with the left lane,
Monday- Friday, 7:00AM - 6:00PM; Demolition and reconstruction of Toll Plaza pavement, buildings and ramps

 
Minimal  None 
Interchange Work  Road Work  Direction: Interchange 19: Ramp,
Monday - Thursday, 6:00AM - 3:00PM; SB ACCEL lane, 1 lane Alternating traffic.

 
Minimal  Weather Permitting 
Ramp Work  Bridge Work  Direction: Interchange 23: Other,
SB entrance ramps closed with posted detour from Thursday night to Friday morning.

 
None  None 
20 & 21  Bridge Work  North: Right lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
21 & 20  Road Work  South: Left lane,
Wednesday, 7:00AM - 2:00PM

South: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
21B & 21  Road Work  South: Right lane,
Monday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
23 & 22  Guide Rail Installation  South: Left shoulder,
Wednesday, 8:00AM - 11:00AM

 
None  None 
23 & 22  Bridge Inspection  North: Right lane,
Wednesday, 9:00AM - 2:00PM

South: Right lane,
Tuesday, 8:00AM - 2:00PM

 
None  None 
24 & 23  Other  South: Right 2 lanes,
Friday, 9:00AM - 11:00AM

South: Right lane,
Friday, 7:00AM - 5:00PM

South: Right lane,
Wednesday & Thursday, 7:00AM - 5:00PM

South: Right lane,
Monday and Tuesday, 7:00AM - 5:00PM

 
Minimal  Weather Permitting 
23 & 24  Guide Rail Installation  North: Right shoulder,
Tuesday, 8:00AM - 11:00AM

 
None  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25A & 25  Road Work  West: Alternating right lane with the left lane,
Thursday, 7:00AM - 3:00PM

East: Alternating right lane with the left lane,
Thursday, 8:00AM - 5:00PM

 
None  None 
26 & 25A  Road Work  West: Left shoulder,
Tuesday (5/11), 7:00AM to Thursday (5/13), 5:00PM

West: Right shoulder,
Tuesday (5/11), 7:00AM to Thursday (5/13), 5:00PM

East: Right shoulder,
Tuesday (5/11), 7:00AM to Thursday (5/13), 5:00PM

East: Left shoulder,
Tuesday (5/11), 7:00AM to Thursday (5/13), 5:00PM

 
Minimal  Weather Permitting; Day & Night Work; Traffic Stops Tuesday & Thursday, 8:00AM - 3:00PM 
26 & 27  Bridge Work  West: Right lane,
Monday - Wednesday, 7:00AM - 3:00PM

 
Minimal  Weather Permitting 

Back to Top

Mid-Hudson Region


For The Week Starting Monday 05/03/2021
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 15A  Toll Plaza Work  South: Left lane,
Wed 6pm-7am

South: Right lane,
Wed 6pm-7am

 
Minimal  None 
17 & 16  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Tues 6am-3pm Wed 5am-3pm Thurs 5am-2pm Fri 6am-11pm

South: Alternating right lane with the left lane,
Mon/Tues 9am-5pm Wed 8am-3:30pm Thurs 9am-3pm Fri 8am-12pm

 
Minor  None 
19 & 17  Toll Plaza Work  North: Alternating right lane with the left lane,
Alternating Toll Lanes Mon-Fri 7am-5pm

South: Alternating right lane with the left lane,
Alternating Toll Lanes Mon-Fri 7am-5pm

 
Minimal  None 
18 & 19  Road Work  North: Left lane,
Thursday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 
19 & 20  Guide Rail Installation  North: Right lane,
Tuesday & Wednesday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 
19 & 21  Road Work  North: Right lane,
Tuesday, 6:00AM - 3:00PM

 
Minimal  Weather Permitting 
21 & 20  Road Work  North: Right lane,
Wednesday, 6:00AM - 2:00PM

South: Right lane,
Monday, 6:00AM - 3:00PM

 
Minimal  Weather Permitting 
21 & 20  Road Work  South: Left lane,
Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Right lane,
Tuesday, 7:00AM - 3:00PM; Wednesday, 7:00AM - 11:00AM

North: Right lane,
Wednesday, 11:00AM - 3:00PM

 
Minimal  Weather Permitting 


For The Week Starting Monday 05/10/2021
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 15A  Toll Plaza Work  South: Left lane,
Tues 6pm-7am

 
Minimal  None 
16 & 17  Bridge Construction  North: Alternating right lane with the left lane,
Mon/Tues 5am-3pm

 
Minor  None 
19 & 17  Toll Plaza Work  North: Alternating right lane with the left lane,
Alternating Toll Lanes Mon-Fri 7am-5pm

South: Alternating right lane with the left lane,
Alternating Toll Lanes Mon-Fri 7am-5pm

 
Minimal  None 
19 & 18  Bridge Work  South: Right lane,
Thursday, 10:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 18  Bridge Work  South: Right lane,
Thursday, 6:00AM - 10:00AM

South: Right lane,
Thursday, 6:00AM - 10:00AM

 
Minimal  Weather Permitting 
20 & 19  Road Work  South: Right lane,
Monday - Thursday, 6:00AM - 3:00PM

 
Minimal  Weather Permitting 
19 & 20  Guide Rail Installation  North: Right lane,
Wednesday, 6:00AM - 3:00PM; Thursday, 6:00AM - 2:00PM; Friday, 6:00AM - 11:00AM

 
Minimal  Weather Permitting 
20 & 19  Other  South: Right lane,
Wednesday - Friday, 6:00AM - 3:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Work  North: Right lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
21 & 20  Road Work  South: Right lane,
Tuesday, 7:00AM - 2:00PM

South: Left lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 

Back to Top

New York Region


For The Week Starting Monday 05/03/2021
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
10  Highway Construction  East: Left lane,
Intermittent traffic stops Mon-Thurs 7pm-6am Fri 8pm-6am

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
10 & 9  Bridge Inspection  South: Right lane,
Thurs 10am-4pm

South: Left lane,
Mon/Tues/Wed/Fri 10am-4pm

 
None  None 
13 & 14A  Bridge Construction  North: Right lane,
Mon-Thurs 8pm-6am Fri 9pm-6am

North: Right 2 lanes,
Mon-Thurs 10pm-6am Fri 11pm-6am

 
None  None 
14 & 14B  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Wed 5am-3pm Thurs 5am-2pm Fri 5am-11am

North: Right lane,
Thurs 8pm-6am Fri 9pm-9am

North: Left 2 lanes,
Mon 9pm-6am Tues-Wed 8pm-6am

North: Right 2 lanes,
Thurs 9:30pm-6am Fri 10pm-7am

North: Left lane,
Mon-Wed 7pm-6am

 
None  None 
14A & 13  Bridge Construction  South: Right lane,
Mon-Wed 7pm-6am Thurs-Fri 8pm-6am

South: Right 2 lanes,
Mon-Thurs 10pm-5am Fri 10pm-6am

 
None  None 
14B & 14  Bridge Construction  South: Alternating right lane with the left lane,
Mon-Wed 9am-3pm Thurs-Fri 9am-2pm

South: Right lane,
Thurs 7pm-6am Fri 7pm-9am

South: Left 2 lanes,
Mon-Wed 8pm-5am

South: Right 2 lanes,
Thurs 9pm-5am Fri 10pm-7am

South: Left lane,
Mon-Wed 7pm-6am

 
None  None 
14B & 15  Bridge Inspection  North: Right lane,
Mon 10am-2pm

 
Minimal  None 
15A & 16  Toll Plaza Work  North: Left lane,
Tues/Wed 7pm-7am

 
Minimal  None 
17 & 15A  Toll Plaza Work  South: Left lane,
Wed 6pm-7am

South: Right lane,
Wed 6pm-7am

 
Minimal  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
12 & 15  Bridge Construction  North: Right and center lanes,
Mon/Wed 12am-5:30am Fri 12:30am-5am

 
None  None 
16 & 18B  Bridge Construction  North: Right and center lanes,
Thurs 11am-5:30am Fri 12am-5am

 
None  None 
17 & 18B  Bridge Construction  North: Right and center lanes,
Tues 12am-5:30am

 
None  None 
19 & 22  Highway Construction  North: Left lane,
Intermittent traffic stops Mon-Thurs 11pm-5am Fri 12am-5am

 
Minor  None 
22 & 20  Highway Construction  South: Left lane,
Mon-Fri 11pm-5am

 
Minor  None 
22 & 21  Highway Construction  North: Left lane,
Intermittent traffic stops Mon/Tues 11pm-5am Wed-Fri 12am-5am

South: Left lane,
Mon-Tues 11pm-5am Wed-Fri 12am-5am

 
Minor  None 


For The Week Starting Monday 05/10/2021
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
10  Highway Construction  East: Left lane,
Intermittent traffic stops Mon-Thurs 7pm-6am Fri 8pm-6am

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
9 & 10  Bridge Inspection  North: Left lane,
Tues 9am-12pm

 
Minimal  None 
11 & 9  Bridge Inspection  South: Right lane,
Tues 12pm-3pm

 
Minimal  None 
13 & 14A  Bridge Construction  North: Right 2 lanes,
Mon-Thurs 10pm-6am Fri 11pm-6am

North: Right lane,
Mon-Thurs 8pm-6am Fri 9pm-6am

 
None  None 
14 & 14B  Bridge Construction  North: Left 2 lanes,
Mon-Wed 9pm-6am Thurs 9:30pm-6am Fri 10pm-7am

North: Right lane,
Thurs 8pm-6am Fri 9pm-9am

North: Right 2 lanes,
Thurs 9:30pm-6am Fri 10pm-7am

North: Left lane,
Mon-Wed 7pm-6am

North: Alternating right lane with the left lane,
Mon-Wed 5am-3pm Thurs 5am-2pm Fri 5am-11am

 
None  None 
14A & 13  Bridge Construction  South: Right 2 lanes,
Mon-Thurs 10pm-5am Fri 10:30pm-6am

South: Right lane,
Mon-Wed 7pm-6am Thurs-Fri 8pm-6am

 
None  None 
14B & 14  Bridge Construction  South: Right lane,
Thurs 7pm-6am Fri 7pm-9am

South: Left lane,
Mon-Wed 7pm-6am

South: Left 2 lanes,
Mon-Wed 9pm-5am

South: Alternating right lane with the left lane,
Mon-Wed 9am-3pm Thurs-Fri 9am-2pm

South: Right 2 lanes,
Thurs 9pm-5am Fri 10pm-7am

 
None  None 
15A & 16  Toll Plaza Work  North: Left lane,
Tues 7pm-7am

North: Right lane,
Mon 7pm-7am

 
Minimal  None 
17 & 15A  Toll Plaza Work  South: Left lane,
Tues 6pm-7am

 
Minimal  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
15 & 16  Bridge Inspection  North: Right shoulder,
Wed 11:30am-2pm

 
None  None 
17 & 15  Bridge Inspection  South: Right shoulder,
Tues 10am-2pm

 
None  None 
16 & 18B  Bridge Construction  North: Right and center lanes,
Thurs 11am-5:30am Fri 12am-5am

 
None  None 
19 & 18B  Bridge Inspection  North: Right lane,
Thurs 10am-12:30pm

South: Right lane,
Tues 10pm-1am

 
Minimal  None 
20 & 18B  Bridge Inspection  South: Right lane,
Thurs 12:30pm-2:30pm

 
Minimal  None 
19 & 22  Highway Construction  North: Left lane,
Intermittent traffic stops Mon-Thurs 11pm-5am Fri 12am-5am

 
Minor  None 
22 & 20  Highway Construction  South: Left lane,
Mon-Fri 11pm-5am

 
Minor  None 
22 & 21  Highway Construction  North: Left lane,
Intermittent traffic stops Mon 1am-5am Tues 12am-4am Wed-Fri 1am-4am

South: Left lane,
Mon-Tues 11pm-5am Wed-Fri 12am-5am

 
Minor  None 