Syracuse Division Projects

Future Projects

No Projects at this time

Go to Top | Bottom

Under Construction Projects

  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 221.425
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 222.77
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 222.99
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.02
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.23
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.24
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 253.56
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 279.79
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 210.62
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 221.375
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.04
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.1
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.29
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 239.97
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 245.55
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 207.03
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 212
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 216.91
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 232.84
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 262.28
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 278.41
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 310.3
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 316.06
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 348.76
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 205.83
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 206.44
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 211.93
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.3
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 276.58
    • Letting Date: 03/06/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: On-Demand Repair Contract - 2020-2021
    • Location: HALSEY CORN. SAVANNAH RT 89 Bridge
    • Letting Date: 01/23/2019
    • Estimated Completion Year: 2022
    • Low Bid Amount: $3,279,950.00
    • Contract Number: TAS 19-14B/D214675
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Syracuse Division: On-Demand Repair Contract - 2020-2021
    • Location: KINNE RD RT 298 Bridge
    • Letting Date: 01/23/2019
    • Estimated Completion Year: 2022
    • Low Bid Amount: $3,279,950.00
    • Contract Number: TAS 19-14B/D214675
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Syracuse Division: On-Demand Repair Contract - 2020-2021
    • Location: PINE PLAIN-KIRKVILLE RD. Bridge
    • Letting Date: 01/23/2019
    • Estimated Completion Year: 2022
    • Low Bid Amount: $3,279,950.00
    • Contract Number: TAS 19-14B/D214675
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)

Go to Top | Bottom

Completed Projects

  • Replacement of the Manchester Interchange (Exit 43) and Chapin-Palmyra Bridges, Pavement Resurfacing between the Bridges (East of Manchester, Exit 43) and Replacement of the Sulphur Brook Culverts at MP 335.20
    • Location: MANCHESTER INTERCHANGE Bridge
    • Letting Date: 11/08/2017
    • Completion Date: 11/04/2019
    • Construction Amount: $17,831,044.53
    • Contract Number: TAS 17-29B/D214576
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map
  • Lyons: Fabrication of New Gates for Lyons Section Dry Dock, Wayne County
    • Letting Date: 06/08/2016
    • Completion Date: 04/30/2017
    • Construction Amount: $788,744.00
    • Contract Number: TAS 16-25C/D214480
    • Contractor: CP Ward, Inc.
  • Syracuse Division: On-Demand Repair Contract - 2014-2016
    • Location: ML - MP: 197.9 to 350.6
    • Letting Date: 11/13/2013
    • Completion Date: 10/18/2016
    • Construction Amount: $834,487.80
    • Contract Number: TAS 13-56B/D214262
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map
  • Syracuse Division: On-Demand Repair Contract - 2014-2016
    • Location: WEEDSPORT-CATO RT 34 Bridge
    • Letting Date: 11/13/2013
    • Completion Date: 10/18/2016
    • Construction Amount: $834,487.80
    • Contract Number: TAS 13-56B/D214262
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map
  • East of Rome (MP 240.9) to Verona (Exit 33, MP 252.2): Safety Upgrades
    • Location: ML - MP: 240.9 to 252.2
    • Letting Date: 10/04/2017
    • Completion Date: 10/31/2018
    • Construction Amount: $3,238,980.59
    • Contract Number: TAS 17-36/D214586
    • Contractor: Hanson Aggregates New York, Inc.
    • View this project location on the map
  • MP 345.01 and MP 345.98: Farmington Road and Pumpkin Hook Road Bridges over Thruway - Rehabilitation
    • Location: FARMINGTON RD. Bridge
    • Letting Date: 11/30/2016
    • Completion Date: 06/01/2017
    • Construction Amount: $412,289.79
    • Contract Number: TAS 16-43B/D214526
    • Contractor: Bothar Construction, LLC.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 345.01 and MP 345.98: Farmington Road and Pumpkin Hook Road Bridges over Thruway - Rehabilitation
    • Location: PUMPKIN HOOK RD. Bridge
    • Letting Date: 11/30/2016
    • Completion Date: 06/01/2017
    • Construction Amount: $412,289.79
    • Contract Number: TAS 16-43B/D214526
    • Contractor: Bothar Construction, LLC.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Weedsport (Exit 40, MP 304.5) to east of Waterloo (MP 313.75): Pavement Resurfacing
    • Location: ML - MP: 304.5 to 313.75
    • Letting Date: 07/11/2018
    • Completion Date: 07/12/2019
    • Construction Amount: $5,629,408.29
    • Contract Number: TAS 18-30/D214685
    • Contractor: Hanson Aggregates New York, Inc.
    • View this project location on the map
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: INDIAN CSTL.RD NOWADAGA(EB) Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: INDIAN CSTL.RD NOWADAGA(WB) Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: OWASCO OUTLET Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: CHITTENANGO CREEK (EB) Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: HERKIMER INTERCHANGE Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: MEMPHIS RD. CO. RD. 64 Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: ONONDAGA LAKE OUTLET Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: STERLING CREEK (EB) Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: STERLING CREEK (WB) Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Joint and Structural Rehabilitation on 10 Syracuse Division Bridges
    • Location: LIMESTONE CREEK (EB) Bridge
    • Letting Date: 05/04/2016
    • Completion Date: 11/30/2017
    • Construction Amount: $2,168,494.01
    • Contract Number: TAS 16-13B/D214466
    • Contractor: Slate Hill Construction Corporation
    • View this project location on the map (Note: This is 1 of 10 locations for this project)
  • Syracuse Division: On-Demand Repair Contract - 2017-2018
    • Letting Date: 11/23/2016
    • Completion Date: 11/12/2018
    • Construction Amount: $2,003,657.66
    • Contract Number: TAS 16-47B/D214547
    • Contractor: Harrison & Burrowes Bridge Constructors, Inc.
  • Canastota (Exit 34, MP 262.0) to west of Syracuse (MP 279.3): Pavement Resurfacing
    • Location: ML - MP: 268 to 279.3
    • Letting Date: 11/09/2016
    • Completion Date: 12/15/2017
    • Construction Amount: $10,057,792.51
    • Contract Number: TAS 16-31/D214448
    • Contractor: Dolomite Products Co., Inc. DBA A.L. Blades
    • View this project location on the map
  • MP 282.93: Interchange 36 Bridge Replacement and Ramp Realignment
    • Location: SYRACUSE INTER. I-81 Bridge
    • Letting Date: 12/17/2014
    • Completion Date: 10/11/2016
    • Construction Amount: $11,729,747.10
    • Contract Number: TAS 14-18B/D214310
    • Contractor: Cold Spring Construction Co.
    • View this project location on the map
  • Construct Facilities at the Old Erie Canal Port Byron Rest Area
    • Location: ML - MP: 308
    • Letting Date: 03/04/2015
    • Completion Date: 01/31/2017
    • Construction Amount: $3,168,281.83
    • Contract Number: TAS 15-16A/D214384
    • Contractor: Bette & Cring, LLC.
    • View this project location on the map
  • MP 292 WB: Warners Service Area - Rehabilitate Wastewater Treatment Plant
    • Location: Warners Service Area
    • Letting Date: 04/20/2016
    • Completion Date: 06/16/2017
    • Construction Amount: $932,555.52
    • Contract Number: TAS 16-6A/D214366
    • Contractor: MA Bongiovanni, Inc.
    • View this project location on the map
  • Syracuse Division: Bridge Culvert Repairs at Various Locations
    • Location: ML - MP: 334.01
    • Letting Date: 02/10/2016
    • Completion Date: 12/06/2016
    • Construction Amount: $1,194,196.59
    • Contract Number: TAS 16-1B/D214432
    • Contractor: CP Ward, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • Syracuse Division: Bridge Culvert Repairs at Various Locations
    • Location: LEY CREEK Bridge
    • Letting Date: 02/10/2016
    • Completion Date: 12/06/2016
    • Construction Amount: $1,194,196.59
    • Contract Number: TAS 16-1B/D214432
    • Contractor: CP Ward, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • Syracuse Division: Bridge Culvert Repairs at Various Locations
    • Location: ML - MP: 341.53
    • Letting Date: 02/10/2016
    • Completion Date: 12/06/2016
    • Construction Amount: $1,194,196.59
    • Contract Number: TAS 16-1B/D214432
    • Contractor: CP Ward, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • MP 227 WB and MP 244 EB: Schuyler and Oneida Service Areas - Rehabilitate/Replace Wastewater Treatment Plants
    • Location: Oneida Service Area
    • Letting Date: 08/12/2015
    • Completion Date: 10/27/2016
    • Construction Amount: $1,523,860.98
    • Contract Number: TAS 15-39A/D214443
    • Contractor: Henderson Bros. Contracting, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 227 WB and MP 244 EB: Schuyler and Oneida Service Areas - Rehabilitate/Replace Wastewater Treatment Plants
    • Location: Schuyler Service Area
    • Letting Date: 08/12/2015
    • Completion Date: 10/27/2016
    • Construction Amount: $1,523,860.98
    • Contract Number: TAS 15-39A/D214443
    • Contractor: Henderson Bros. Contracting, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 253.52: Thruway Bridge over CSX Railroad and Stony Creek - Rehabilitation
    • Location: NYCRR Bridge
    • Letting Date: 01/25/2017
    • Completion Date: 07/31/2018
    • Construction Amount: $1,621,084.20
    • Contract Number: TAS 17-12B/D214499
    • Contractor: ABHE & SVOBODA, Inc.
    • View this project location on the map
  • Reconstruct Buildings at the Old Erie Canal Port Byron Lock Rest Area
    • Location: ML - MP: 308
    • Letting Date: 09/17/2014
    • Completion Date: 06/01/2016
    • Construction Amount: $3,180,743.65
    • Contract Number: TAS 14-33A/D214335
    • Contractor: Bouley Associates, Inc.
    • View this project location on the map
  • MP 304.2 and 340.2: Weedsport and Manchester Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: ML - MP: 304.2
    • Letting Date: 01/25/2017
    • Completion Date: 04/13/2018
    • Construction Amount: $1,169,602.64
    • Contract Number: TAS 17-15A/D214560
    • Contractor: Crane Hogan Structural Systems, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 304.2 and 340.2: Weedsport and Manchester Maintenance Sections - Equipment Storage Building Wash Bay
    • Location: ML - MP: 340.2
    • Letting Date: 01/25/2017
    • Completion Date: 04/13/2018
    • Construction Amount: $1,169,602.64
    • Contract Number: TAS 17-15A/D214560
    • Contractor: Crane Hogan Structural Systems, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Rehabilitation of Two Syracuse Division Mainline Bridges over the RR at MP 306.72 and MP 326.74
    • Location: NYCRR (MAIN LINE) Bridge
    • Letting Date: 02/06/2019
    • Completion Date: 05/30/2020
    • Construction Amount: $2,622,127.40
    • Contract Number: TAS 19-5B/D214706
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map
  • MP 219.7: Herkimer Maintenance Section: Equipment Storage Building Wash Bay
    • Location: ML - MP: 219.7
    • Letting Date: 01/18/2017
    • Completion Date: 11/07/2017
    • Construction Amount: $440,669.71
    • Contract Number: TAS 17-16A/D214561
    • Contractor: Beebe Construction Services
    • View this project location on the map
  • Herkimer (Exit 30, MP 220.0) to west of Utica (MP 233.5): Pavement Resurfacing
    • Location: ML - MP: 220 to 233.5
    • Letting Date: 04/27/2016
    • Completion Date: 12/02/2016
    • Construction Amount: $8,368,761.27
    • Contract Number: TAS 16-11/D214458
    • Contractor: Hanson Aggregates New York, Inc.
    • View this project location on the map
  • East Syracuse (MP 279.3) to Syracuse - Electronics Parkway (MP 284.1): Pavement Resurfacing and MP 284.1 to MP 289.3 - Interim Pavement Repairs
    • Location: ML - MP: 284.1 to 289.3
    • Letting Date: 04/05/2017
    • Completion Date: 10/22/2018
    • Construction Amount: $9,933,358.85
    • Contract Number: TAS 17-8/D214544
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • East Syracuse (MP 279.3) to Syracuse - Electronics Parkway (MP 284.1): Pavement Resurfacing and MP 284.1 to MP 289.3 - Interim Pavement Repairs
    • Location: ML - MP: 279.3 to 284.1
    • Letting Date: 04/05/2017
    • Completion Date: 10/22/2018
    • Construction Amount: $9,933,358.85
    • Contract Number: TAS 17-8/D214544
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • East of Fulton (Exit 39, MP 289.3) to west of Weedsport (Exit 40, MP 304.5): Concrete Pavement Restoration
    • Location: ML - MP: 289.3 to 304.5
    • Letting Date: 02/20/2019
    • Completion Date: 10/16/2020
    • Construction Amount: $11,892,898.50
    • Contract Number: TAS 19-3/D214701
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map
  • Canandaigua (Exit 44, MP 347.1) to Rochester (Exit 45, MP 351.4): Concrete Pavement Restoration
    • Location: ML - MP: 347.1 to 351.4
    • Letting Date: 02/15/2017
    • Completion Date: 05/31/2019
    • Construction Amount: $16,313,671.64
    • Contract Number: TAS 17-5/D214546
    • Contractor: Sealand Contractors Corporation
    • View this project location on the map
  • Geneva (Exit 42, MP 327.5) to Canandaigua (Exit 44, MP 347.1) Pavement Resurfacing
    • Location: ML - MP: 335.16
    • Letting Date: 02/22/2017
    • Completion Date: 12/03/2018
    • Construction Amount: $24,820,135.66
    • Contract Number: TAS 17-7/D214543
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Geneva (Exit 42, MP 327.5) to Canandaigua (Exit 44, MP 347.1) Pavement Resurfacing
    • Location: ML - MP: 327.5 to 337.5
    • Letting Date: 02/22/2017
    • Completion Date: 12/03/2018
    • Construction Amount: $24,820,135.66
    • Contract Number: TAS 17-7/D214543
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Geneva (Exit 42, MP 327.5) to Canandaigua (Exit 44, MP 347.1) Pavement Resurfacing
    • Location: ML - MP: 335.21
    • Letting Date: 02/22/2017
    • Completion Date: 12/03/2018
    • Construction Amount: $24,820,135.66
    • Contract Number: TAS 17-7/D214543
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map (Note: This is 1 of 3 locations for this project)
  • Newark: Replace Lower Miter Gates at Lock E-28B
    • Location: Lock - E-28B (Newark)
    • Letting Date: 09/23/2015
    • Completion Date: 05/13/2016
    • Construction Amount: $1,310,783.53
    • Contract Number: TAS 15-28C/D214402
    • Contractor: BVR Construction Company, Inc.
    • View this project location on the map
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: CANASTOTA INTERCHANGE Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: CIDER ST. CO. RT. 23 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: PORT GIBSON RD. Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: GENEVA-LYONS RT 14 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: JORDAN-BALDWINSVILLE RT 31 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: MORGAN ROAD Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: ROUTE 31 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: WESTMLAND-LOWELL CO RD 52 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: CANADAIGUA INTER. RT 332 Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: CLYDE WATERLOO INTERCHANGE Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: FALL BROOK (EB) Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: HORATIO STREET (RAMP) Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: SAND HILL ROAD Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • May's Point: Movable Dam 18 - Rehabilitation, Seneca County
    • Location: Movable Dam - 18 (E-25 May's Point)
    • Letting Date: 09/02/2015
    • Completion Date: 06/30/2018
    • Construction Amount: $6,774,893.36
    • Contract Number: TAS 15-24C/D214410
    • Contractor: D.A. Collins Construction Co., Inc.
    • View this project location on the map
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: TOWN LINE RD. Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: COURT STREET Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: FALL BROOK (WB) Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: NORTH MAIN ST. Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: NORTH MANLIUS RD Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Syracuse Division: Paint 19 Bridges with Poor Paint Condition Ratings - 2016
    • Location: PERU RD. Bridge
    • Letting Date: 12/02/2015
    • Completion Date: 10/07/2016
    • Construction Amount: $5,349,042.28
    • Contract Number: TAS 15-35BP/D214431
    • Contractor: Southern Road and Bridge
    • View this project location on the map (Note: This is 1 of 19 locations for this project)
  • Replacement of the Thruway Bridges over Vine Street (MP 284.80) and CSX Railroad (Salina) (MP 284.74)
    • Location: VINE STREET Bridge
    • Letting Date: 11/23/2016
    • Completion Date: 10/31/2019
    • Construction Amount: $18,449,443.86
    • Contract Number: TAS 16-23B/D214479
    • Contractor: Tioga Construction Company, Inc.
    • View this project location on the map
  • Utica: Taintor Gate and Dam - Rehabilitation, Oneida County
    • Location: Taintor Gate - Utica
    • Letting Date: 11/28/2012
    • Completion Date: 08/24/2016
    • Construction Amount: $9,635,661.70
    • Contract Number: TAS 12-35C/D214068
    • Contractor: Tioga Construction Co., Inc.
    • View this project location on the map
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: BARGE CANAL,MOHW. RIVER(WB) Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: CANANDAIGUA OUTLET (WB) Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: CIDER ST. CO. RT. 23 Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: PERU RD. Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: TOWN LINE ROAD Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: VERNON-VERONA STAT.RD RT 31 Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: VERONA INTERCHANGE Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: CO. RD. 188 Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: GENEVA-LYONS INTERCHANGE Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: ONONDAGA PARKWAY Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: RANDALL ROAD Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: STERLING CREEK (WB) Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: BARGE CANAL Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: CANANDAIGUA OUTLET (EB) Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: LELAND AVENUE Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • Rehabilitation of 16 Syracuse Division Bridges
    • Location: ONEIDA-VERONA RT 365 Bridge
    • Letting Date: 08/02/2017
    • Completion Date: 11/16/2018
    • Construction Amount: $3,323,992.65
    • Contract Number: TAS 17-25B/D214569
    • Contractor: Harrison and Burrowes Bridge Constructors, Inc
    • View this project location on the map (Note: This is 1 of 16 locations for this project)
  • MP 283.79: Electronics Parkway Interchange (Exit 37) Ramp Bridge over Thruway - Replacement
    • Location: ELEC. PKY. INTERCHANGE Bridge
    • Letting Date: 12/18/2019
    • Completion Date: 12/02/2020
    • Construction Amount: $4,192,579.74
    • Contract Number: TAS 19-39B/D214757
    • Contractor: Economy Paving Co., Inc.
    • View this project location on the map