Skip to Main Content
Skip to Navigation

New York Division Projects

Future Projects

  • NY Division: Bridge Preservation for MP 29.54 - Thruway over Suffren-Mt. Ivy Route 202
  • New York Division - On-Demand Repair Contract - 2025-2026
    • Estimated Letting Year: 2024
  • I-287 (MP 11.3) to Governor Mario M. Cuomo Bridge Toll Barrier (MP 13.0): Pavement Resurfacing
  • New York Division - On-Demand Repair Contract - 2027-2028
    • Estimated Letting Year: 2026
  • New York Division: Paint 5 Bridges with Poor Paint Condition Ratings
  • New York Division: Paint 5 Bridges with Poor Paint Condition Ratings
  • New York Division: Paint 5 Bridges with Poor Paint Condition Ratings
  • New York Division: Paint 5 Bridges with Poor Paint Condition Ratings
  • New York Division: Paint 5 Bridges with Poor Paint Condition Ratings
  • Thruway Bridges over Abandoned RR (South of Airmont Road): Rehabilitations
  • Thruway Bridges over Abandoned RR (South of Airmont Road): Rehabilitations
  • New York Division: Thruway Bridge over Erskine Place and Amtrak RR MP 600.41 - Bridge Rehabilitations- 2024-2025
  • Harriman Maintenance Section and Toll Building (Exit 16, MP 45.2): Connect to Municipal Water, Sewer and Gas
  • Harriman Maintenance Section and Toll Building (Exit 16, MP 45.2): Connect to Municipal Water, Sewer and Gas
  • Harriman Maintenance Section and Toll Building (Exit 16, MP 45.2): Connect to Municipal Water, Sewer and Gas
  • MP 608.8 to MP 610.8 and MP 610.8 to MP 613.3: Pavement Resurfacing
  • MP 608.8 to MP 610.8 and MP 610.8 to MP 613.3: Pavement Resurfacing
  • MP 45.2: Replacement of a Deteriorated Roof at the Harriman Maintenance Section Renovations and Roof Replacement
  • I-95 Highway Rehabilitation MP 600.0 to MP 604.00, and 7 Bridge Rehabilitations, MP 600.23, MP 600.42, MP 601.11, MP 601.56, MP 601.61, MP 602.10, MP 603.94
  • Term Agreement for Materials Testing and Inspection in the New York Division
    • Estimated Letting Year: 2020
  • New York Division: Pavement Safety Striping - 2023
    • Estimated Letting Year: 2022
  • Term Agreement for Land Surveying and Right-of-Way Mapping Services - New York and Albany Divisions ($900,000)
    • Estimated Letting Year: 2022
  • NY Division: Bridge Preservation for MP 23.53 - Garden State Parkway Connector over Thruway
  • Term Agreement for Consultant Inspection Support Services in New York Division
    • Estimated Letting Year: 2021
  • I-95 New England Thruway Viaduct, Railroad Span, (MP 605.09), Chatsworth Ave over I-95, (MP 607.64) Rehabilitaions and Larchmont Station Plaza Substructure Repairs, (MP 607.72)
  • Term Agreement for Construction Inspection Support Services - NY DIvision (H353.1)
    • Estimated Letting Year: 2021
  • Term Agreement for Highway Design Services Primarily in the New York Division
    • Estimated Letting Year: 2017
  • Term Agreement for Bridge Design Services Primarily in the New York Division
    • Estimated Letting Year: 2017
  • Term Agreement for Highway Design Support Services - NY Division (excl. I95)
    • Estimated Letting Year: 2021
  • Term Agreement for Construction Inspection Support Services - NY Division
    • Estimated Letting Year: 2021
  • Term Agreement for Bridge Design Support Services - New York Division
    • Estimated Letting Year: 2021
  • MP 72.5 to 76.5 Pavement Reconstruction 2027 -2028
    • Estimated Letting Year: 2026
  • Term Agreement for Construction Inspection Support Services in the New York Division for I-95 Contracts including the North Avenue Bridge Replacement
    • Estimated Letting Year: 2019
  • Term Agreement for Construction Inspection Support Services in the New York Division
    • Estimated Letting Year: 2018
  • Major Deegan Expressway (MP 0.00) to Cross Westchester Expressway (Exit 8, MP 11.3): Pavement Resurfacing
  • Term Agreement for Materials Testing and Inspection in the New York Division
    • Estimated Letting Year: 2020
  • Term Agreement for Construction Inspection Support Services - NY Division
    • Estimated Letting Year: 2021
  • Term Agreement for Construction Inspection Support Services - NY Division
    • Estimated Letting Year: 2021

Go to Top | Bottom

Under Construction Projects

  • MP NE5.76: North Avenue Bridge over I-95 (New England Thruway) - Replacement
    • Location: NORTH AVENUE Bridge
    • Letting Date: 08/24/2022
    • Estimated Completion Year: 2025
    • Low Bid Amount: $31,827,000.00
    • Contract Number: TANE 22-22B/D214321
    • Contractor: J. D'ANNUNZIO & SONS, INC.
    • View this project location on the map
  • MP 58.43: Thruway Bridge over Newburgh-Cambell Hall Road (Route 207) - Replacement
    • Location: NEWBURGH-CAMBELL HALL RT207 Bridge
    • Letting Date: 12/11/2019
    • Estimated Completion Year: 2022
    • Low Bid Amount: $15,872,158.72
    • Contract Number: TANY 19-29B/D214742
    • Contractor: Harrison & Burrowes Bridge Constructors, Inc.
    • View this project location on the map
  • New York Division: On-Demand Repair Contract - 2023-2024
    • Letting Date: 01/18/2023
    • Estimated Completion Year: 2024
    • Low Bid Amount: $2,974,100.00
    • Contract Number: TANY 23-7/D214911
    • Contractor: HVB Construction
  • South of New Paltz (MP 74.1) to New Paltz (Exit 18, MP 76.5): Pavement Resurfacing
    • Location: ML - MP: 74.5 to 76.5
    • Letting Date: 08/31/2022
    • Estimated Completion Year: 2023
    • Low Bid Amount: $5,237,091.00
    • Contract Number: TANY 22-33/D214902
    • Contractor: D.A Collins Construction
    • View this project location on the map
  • Garden State Parkway Connector (MP GS0.00 to MP GS2.40): Pavement Resurfacing
    • Location: GS - MP: 640 to 642.4
    • Letting Date: 02/16/2022
    • Estimated Completion Year: 2022
    • Low Bid Amount: $6,386,590.00
    • Contract Number: TAGS 22-5/D214853
    • Contractor: Crisdel Group, Inc.
    • View this project location on the map
  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2023
    • Location: NE - MP: 600.17 to 614.11
    • Letting Date: 01/18/2023
    • Estimated Completion Year: 2023
    • Low Bid Amount: $495,272.00
    • Contract Number: TANE 23-2B/D214896
    • Contractor: Fleetwash, Inc
    • View this project location on the map
  • New York Division: On-Demand Repair Contract - 2022-2023
    • Letting Date: 10/06/2021
    • Estimated Completion Year: 2023
    • Low Bid Amount: $2,978,650.00
    • Contract Number: TANY 21-17/D214846
    • Contractor: HBV Construction, Inc.
  • South of Harriman Toll Barrier (Exit 16, MP 43.5) to north of Woodbury Toll Barrier (MP 46.0): Pavement Resurfacing
    • Location: ML - MP: 43 to 46
    • Letting Date: 01/26/2022
    • Estimated Completion Year: 2022
    • Low Bid Amount: $6,738,296.70
    • Contract Number: TANY 22-4/D214852
    • Contractor: Kubricky Construction Corporation
    • View this project location on the map
  • I-95 (New England Thruway), Highway Replacement from Port Chester (MP NE14.1) to Connecticut State Line (MP NE15.0), Replacement of the CWE Ramp (EB) over I-95 and Grace Street over I-95 Bridges and Rehabilitation of Four I-95 Bridges
    • Location: NE - MP: 614.1 to 615
    • Letting Date: 04/11/2018
    • Estimated Completion Year: 2022
    • Low Bid Amount: $135,909,000.00
    • Contract Number: TANE 18-7/D214568
    • Contractor: Ecco III Enterprises, Inc
    • View this project location on the map
  • MP 12.85: Improvements to I-87 Interchange 9 Ramp Intersection with Route 9 and Construct Route 9/I-87 Pedestrian Bridge
    • Location: ML - MP: 12.85
    • Letting Date: 09/14/2022
    • Estimated Completion Year: 2024
    • Low Bid Amount: $13,927,229.47
    • Contract Number: TANY 22-24/D214865
    • Contractor: Gianfia Corp
    • View this project location on the map
  • I-95, New England Thruway: Highway Improvements 2020-2021
    • Location: NE - MP: 600 to 614.1
    • Letting Date: 11/20/2019
    • Estimated Completion Year: 2021
    • Low Bid Amount: $11,398,985.00
    • Contract Number: TANE 19-40/D214758
    • Contractor: Grace Industries
    • View this project location on the map
  • Pavement repairs at various locations on the New England Thruway (I-95) from MP 600.17 to MP 614.10: Highway Improvements 2023-2024
    • Location: NE - MP: 600.17 to 614.1
    • Letting Date: 01/18/2023
    • Estimated Completion Year: 2024
    • Low Bid Amount: $7,897,124.82
    • Contract Number: TANE 23-5/D214909
    • Contractor: JR Cruz Corp
    • View this project location on the map
  • South of Nyack (MP 16.2) to south of Spring Valley Toll Barrier: Pavement Resurfacing
    • Location: ML - MP: 16.2 to 24
    • Letting Date: 02/02/2022
    • Estimated Completion Year: 2022
    • Low Bid Amount: $17,755,000.00
    • Contract Number: TANY 22-6/D214854
    • Contractor: Crisdel Group, Inc.
    • View this project location on the map
  • New York Division Pavement Repairs at Various Locations
    • Letting Date: 04/20/2022
    • Estimated Completion Year: 2023
    • Low Bid Amount: $8,990,009.22
    • Contract Number: TANY 22-18/D214873
    • Contractor: Grace Industries, LLC.
  • I-95, New England Thruway: North of Exit 17 to north of Exit 18B Northbound Only and north of Exit 19 to north of Exit 21: Pavement Resurfacing
    • Location: NE - MP: 613 to 614.1
    • Letting Date: 05/05/2021
    • Estimated Completion Year: 2022
    • Low Bid Amount: $19,911,907.00
    • Contract Number: TANE 21-9/D214781
    • Contractor: Yonkers Contracting Company, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • I-95, New England Thruway: North of Exit 17 to north of Exit 18B Northbound Only and north of Exit 19 to north of Exit 21: Pavement Resurfacing
    • Location: BOSTON POST ROAD RT. 1 Bridge
    • Letting Date: 05/05/2021
    • Estimated Completion Year: 2022
    • Low Bid Amount: $19,911,907.00
    • Contract Number: TANE 21-9/D214781
    • Contractor: Yonkers Contracting Company, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • I-95, New England Thruway: North of Exit 17 to north of Exit 18B Northbound Only and north of Exit 19 to north of Exit 21: Pavement Resurfacing
    • Location: NE - MP: 608.8 to 610.8
    • Letting Date: 05/05/2021
    • Estimated Completion Year: 2022
    • Low Bid Amount: $19,911,907.00
    • Contract Number: TANE 21-9/D214781
    • Contractor: Yonkers Contracting Company, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • I-95, New England Thruway: North of Exit 17 to north of Exit 18B Northbound Only and north of Exit 19 to north of Exit 21: Pavement Resurfacing
    • Location: OLD WHITE PLAINS ROAD Bridge
    • Letting Date: 05/05/2021
    • Estimated Completion Year: 2022
    • Low Bid Amount: $19,911,907.00
    • Contract Number: TANE 21-9/D214781
    • Contractor: Yonkers Contracting Company, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • I-95, New England Thruway: North of Exit 17 to north of Exit 18B Northbound Only and north of Exit 19 to north of Exit 21: Pavement Resurfacing
    • Location: WEST STREET Bridge
    • Letting Date: 05/05/2021
    • Estimated Completion Year: 2022
    • Low Bid Amount: $19,911,907.00
    • Contract Number: TANE 21-9/D214781
    • Contractor: Yonkers Contracting Company, Inc.
    • View this project location on the map (Note: This is 1 of 5 locations for this project)
  • Term Agreement for Construction Inspection Support Services in the New York Division
    • Letting Date: 12/30/2019
    • Estimated Completion Year: 2023
    • Low Bid Amount: $.00
    • Contract Number: NO TA
  • Replacement of ITS Equipment in New York Division
    • Letting Date: 02/22/2023
    • Estimated Completion Year: 2024
    • Low Bid Amount: $4,392,494.00
    • Contract Number: TANY 23-10IR/D214851
  • MP NE5.76: North Avenue Bridge over I-95 (New England Thruway) - Relocate Utilities for Replacement
    • Location: NORTH AVENUE Bridge
    • Letting Date: 03/17/2021
    • Estimated Completion Year: 2022
    • Low Bid Amount: $1,984,640.00
    • Contract Number: TANE 21-12B/D214734
    • Contractor: Triumph Construction Corp
    • View this project location on the map
  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2024
    • Location: NE - MP: 600.17 to 614.11
    • Letting Date: 01/17/2024
    • Estimated Completion Year: 2025
    • Low Bid Amount: $533,672.00
    • Contract Number: TANE 24-4B/D214949
    • Contractor: Fleetwash Inc.
    • View this project location on the map
  • MP 24.0 to MP 29.4: 2" Mill and Overlay: Pavement Resurfacing and Bridge Deck Repairs at MP 25.10
    • Location: ML - MP: 24 to 29.4
    • Letting Date: 03/13/2024
    • Estimated Completion Year: 2024
    • Low Bid Amount: $18,366,748.02
    • Contract Number: TANY 24-10/D214962
    • Contractor: JR Cruz Corp
    • View this project location on the map
  • Replace Three Bridges over Thruway: MP 23.62 - Scotland Hill Road, MP 24.62 - Hungry Hollow Road, and MP 26.37 - College Road
    • Location: SCOTLAND HILL ROAD Bridge
    • Letting Date: 01/22/2020
    • Estimated Completion Year: 2022
    • Low Bid Amount: $30,819,344.65
    • Contract Number: TANY 19-27B/D214736
    • Contractor: A Servidone/B Anthony Construction Corporation
    • View this project location on the map
  • Newburgh (Exit 17, MP 60.1) to south of New Paltz (MP 68.0): Pavement Resurfacing
    • Location: ML - MP: 60.1 to 68
    • Letting Date: 01/11/2023
    • Estimated Completion Year: 2023
    • Low Bid Amount: $9,687,662.99
    • Contract Number: TANY 23-3/D214906
    • Contractor: Callanan Industries Inc.
    • View this project location on the map
  • Term Agreement for Construction Inspection Support Services in the New York Division
    • Letting Date: 01/17/2019
    • Estimated Completion Year: 2022
    • Low Bid Amount: $.00
    • Contract Number: NO TA
  • I-287/Route 17S (Exit 15, MP 29.4) to north of Suffern (MP 38.7): Pavement Resurfacing
    • Location: ML - MP: 29.4 to 38.7
    • Letting Date: 05/11/2022
    • Estimated Completion Year: 2023
    • Low Bid Amount: $44,611,789.00
    • Contract Number: TANY 22-21/D214875
    • Contractor: Yonkers Contracting Company, Inc.
    • View this project location on the map
  • New York Division: Pavement Safety Striping - 2022
    • Letting Date: 11/17/2021
    • Estimated Completion Year: 2022
    • Low Bid Amount: $566,404.90
    • Contract Number: TANY 21-20/D214856
    • Contractor: Safety Marketing, Inc.

Go to Top | Bottom

Completed Projects

  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2021
    • Location: NE - MP: 600.17 to 614.11
    • Letting Date: 02/10/2021
    • Completion Date: 07/08/2021
    • Construction Amount: $490,700.00
    • Contract Number: TANE 21-10B/D214819
    • Contractor: Deangelo Bros., LLC.
    • View this project location on the map
  • I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2022
    • Location: NE - MP: 600.17 to 614.11
    • Letting Date: 01/19/2022
    • Completion Date: 07/11/2022
    • Construction Amount: $497,498.00
    • Contract Number: TANE 22-9B/D214861
    • Contractor: Fleetwash, Inc.
    • View this project location on the map
  • New York Division: On-Demand Repair Contract - 2019-2021
    • Letting Date: 11/21/2018
    • Completion Date: 12/31/2021
    • Construction Amount: $4,004,400.00
    • Contract Number: TANY 18-40B/D214710
    • Contractor: HVB Construction, Inc.
  • New York Division: Pavement Safety Striping - 2021
    • Letting Date: 04/07/2021
    • Completion Date: 08/27/2021
    • Construction Amount: $330,231.82
    • Contract Number: TANY 21-2/D214801
    • Contractor: Accent Stripe, Inc.
  • I-95, New England Thruway: Highway Improvements 2022-2023
    • Location: NE - MP: 600 to 614.1
    • Letting Date: 09/15/2021
    • Completion Date: 07/11/2023
    • Construction Amount: $8,494,250.00
    • Contract Number: TANE 21-13/D214827
    • Contractor: Grace Industries, LLC.
    • View this project location on the map
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: AIRMONT ROAD (EB) Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: ERIE RR (NB) Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: ERIE RR RT.17 RAMAPO R.(NB) Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: FREETOWN ROAD Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: GARDEN STATE PARKWAY CONN. Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: HEMION ROAD Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: MAIN ST. RT. 59 Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: MEADOW HILL ROAD Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: NJ STATE L.-CONGERS RT.303 Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: SAW MILL RIVER RD. RT. 9A Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: SEVEN LAKES DR.RT. 210 (SB) Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: TUCKAHOE ROAD Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: CROSS COUNTY PARKWAY Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: ERIE RR (SB) Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: MOODNA CREEK Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: SEVEN LAKES DR.RT. 210 (NB) Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: SUFFERN INTERCHANGE (RAMP B) Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: SO. NYACK INTERCHANGE Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: STRAWTOWN ROAD Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: SUFFERN INTERCHANGE RAMP C Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: HACKENSACK RIVER Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: MAIN ST. RT. 45 Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)
  • New York Division Joint Replacements on Various Bridges - 2019
    • Location: TANDEM TRUCK ACCESS BRIDGE Bridge
    • Letting Date: 04/24/2019
    • Completion Date: 11/09/2021
    • Construction Amount: $6,313,000.00
    • Contract Number: TANY 19-10B/D214716
    • Contractor: HVB Construction Enterprises, Inc.
    • View this project location on the map (Note: This is 1 of 23 locations for this project)

Go to Top | Bottom