Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 09/29/2025
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
55 & 56  Highway Construction  West: Right lane,
Monday 9/29/25 6:00am-7:00am Tuesday 9/30/25.

 
Minimal  None 
57 & 55  Highway Construction  East: Right lane,
Monday 9/29/25 8:00am-9:00am Tuesday 9/30/25. Tuesday 9/30/25 8:00am-9:00am Wednesday 10/1/25.

 
Minimal  None 
56 & 57A  Highway Construction  West: Right lane,
Monday 9/29/25 7:00am-8:00am Tuesday 9/30/25.

 
Minimal  None 
57A & 57  Highway Construction  East: Right lane,
Monday 9/29/25 8:00am-9:00am Tuesday 9/30/25. Tuesday 9/30/25 8:00am-9:00am Wednesday 10/1/25.

 
Minimal  None 
57 & 57A  Bridge Construction  West: Left lane,
Wednesday 9/17/25 7:00am-1:00pm. Thursday 9/18/25 7:00am-1:00pm.

 
Minimal  None 
57 & 57A  Bridge Work  West: Right lane,
Saturday 9/13/25 7:00am-1:00pm.

 
Minimal  None 
57A & 59  Road Work  West: Left lane,
Tuesday 9/30/25 7:00am-1:00pm.

 
Minimal  None 
60 & 59  Bridge Inspection  East: Right lane,
Thursday 9/18/25 7:00am-2:00pm.

 
Minimal  None 
61 & 60  Bridge Inspection  West: Alternating right lane with the left lane,
Thursday 9/18/25 10:00am-2:00pm.

East: Alternating right lane with the left lane,
Thursday 9/18/25 7:00am-10:00am.

 
Minimal  None 


Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 09/29/2025
Buffalo/Niagara Region

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 20  Bridge Construction  South: Right lane,
Monday 9/29/25 10:00pm-6:00am Tuesday 9/30/25. Tuesday 9/30/25 10:00pm-6:00am Wednesday 10/1/25. Wednesday 10/1/25 10:00pm-6:00am Thursday 10/2/25. Thursday 10/2/25 10:00pm-6:00am Friday 10/3/25.

 
Minimal  None 


Back to Top

Rochester Region


For The Week Starting Monday 09/29/2025
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
43 & 42  Road Work  West: Left shoulder,
MON 7AM-2PM

East: Left shoulder,
MON 7AM-2PM

 
Minimal  Weather permitting 
44 & 43  Road Work  East: Right lane,
TUE-WED 2:30AM-7AM

 
Minimal  Weather permitting 
43 & 46  Paving  West: Left lane,
SUN-SAT CONTINUOUS

 
Moderate  None 
43 & 45  Shoulder Work  West: Right shoulder,
WED 7AM-5PM

 
None  None 
45 & 43  Paving  East: Right lane,
CONTINUOUS SUN-SAT

 
Moderate  None 
44 & 45  Shoulder Work  West: Right shoulder,
THU 7AM-5PM

 
None  None 
45 & 44  Paving  East: Alternating right lane with the left lane,
MON-WED 8PM-7AM, THU 8PM-6AM

East: Right lane,
MON-SAT Continuous

 
Moderate  None 
44 & 46  Paving  West: Center lane,
MON-WED 8PM-6AM, TUE-THU 9PM-6AM

 
Moderate  None 
44 & 45  Shoulder Work  West: Left shoulder,
MON-TUE 7AM-5PM

 
None  None 
46 & 44  Paving  East: Center lane,
MON-WED 8PM-6AM, THU-FRI 9PM-6AM

 
Moderate  None 
46 & 45  Shoulder Work  East: Left lane,
Friday 10/3/25 4:00am-1:00pm.

 
Minimal  None 
46 & 47  Road Work  West: Shoulder,
Monday 9/29/25 6:00am-6:00pm. Tuesday 9/30/25 6:00am-6:00pm.

 
Minimal  None 
47 & 45  Shoulder Work  East: Shoulder,
Thursday 10/2/25 4:00am-2:00pm.

East: Left lane,
Thursday 10/22/25 4:00am-2:00pm.

 
Minimal  None 
47 & 46  Road Work  East: Left lane,
Monday 9/22/25 8:00am-12:00pm.

 
Minimal  None 
47 & 46  Shoulder Work  East: Left lane,
Tuesday 9/30/25 4:00am-2:00pm.

East: Left lane,
Monday 9/29/25 4:00am-1:00pm.

 
Minimal  None 
47 & 46  Road Work  East: Right lane,
Tuesday 9/23/25 7:30am-2:00pm.

 
Minimal  None 
47 & 48  Road Work  West: Shoulder,
Tuesday 9/30/25 7:00am-4:00pm. Wednedsday 10/1/25 7:00am-4:00pm.

 
Minimal  None 
48A & 48  Road Work  East: Shoulder,
Tuesday 9/30/25 7:00am-4:00pm. Wednedsday 10/1/25 7:00am-4:00pm.

 
Minimal  None 
49 & 48A  Road Work  East: Shoulder,
Tuesday 9/30/25 7:00am-4:00pm. Wednedsday 10/1/25 7:00am-4:00pm.

 
Minimal  None 


Back to Top

Syracuse Region


For The Week Starting Monday 09/29/2025
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
33 & 34  Road Work  West: Right lane,
MON-TUE 6PM-1PM

 
Minimal  Weather permitting 
34A & 33  Road Work  West: Alternating right lane with the left lane,
MON-FRI 7AM-noon

East: Alternating right lane with the left lane,
MON-THU 7:30AM-2, FRI 7:30-noon

 
Minimal  Weather permitting 
34 & 35  Bridge Construction
Long Range: Bridge Construction I-481 
West: Alternating right lane with the left lane,
MON 4AM-2PM, TUE-THU 4AM-3PM, FRI 4AM-1PM, SAT 4AM-11AM

 
None  Set up as needed 
35 & 34A  Bridge Construction
Long Range: Bridge Construction I-481 
East: Alternating right lane with the left lane,
MON-THU 4AM-3PM, FRI 4AM-10AM, SAT 4AM-4PM

 
None  Set up as needed 
34A & 36  Bridge Construction  West: Right lane,
MON/TUE/FRI 7AM-3PM, WED/FRI/SAT 7AM-2PM

 
Minimal  None 
36 & 35  Bridge Construction  East: Left lane,
TUE/THU/SAT 8AM-3PM, WED 8AM-2PM

 
Minimal  None 
40 & 39  Road Work  East: Right lane,
TUE 7:30AM-1PM

 
Minimal  Weather permitting 
41 & 40  Road Work  East: Right lane,
THU 7:30AM-1PM

East: Right lane,
MON-WED 7:30AM-1PM

 
Minimal  Weather permitting 
41 & 40  Shoulder Work  East: Right shoulder,
MON-FRI 7AM-5PM

East: Right shoulder,
MON-FRI 7AM-5PM

 
Minimal  None 
40 & 41  Road Work  West: Right lane,
MON-WED 7:30AM-2PM

 
Minimal  Weather permitting 
41 & 40  Shoulder Work  East: Right shoulder,
MON-FRI 7AM-5PM

 
Minimal  None 
40 & 42  Road Work  West: Alternating right lane with the left lane,
MON 7PM-2PM, TUE 6PM-11AM, WED 7PM-10AM

 
Minimal  None 
41 & 40  Shoulder Work  East: Right shoulder,
MON-FRI 7AM-5PM

 
Minimal  None 
42 & 40  Shoulder Work  East: Right shoulder,
MON-FRI 7AM-5PM

 
Minimal  None 
42 & 40  Road Work  East: Right lane,
THU 6PM-8AM, FRI 8PM-9AM

 
Minimal  None 
43 & 42  Road Work  West: Left shoulder,
MON 7AM-2PM

East: Left shoulder,
MON 7AM-2PM

 
Minimal  Weather permitting 


Back to Top

Utica Region


For The Week Starting Monday 09/29/2025
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
27 & 28  Bridge Work  West: Right lane,
Monday - Thursday, 7:00AM - 7:00AM *24 Hour Closure* Friday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
27 & 28  Bridge Construction  West: Other,
WB traffic shifted to EB side of bridge until further notice.

 
Minimal  Weather Permitting 
28 & 29  Road Work  West: Left lane,
Wednesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
29A & 29  Guide Rail Installation  East: Left lane,
MON-THU 6AM-5PM, FRI 6AM-noon

 
Minor  None 
29A & 29  Road Work  East: Shoulder,
MON 7AM-2PM

 
Minimal  Weather permitting 
29A & 29  Guide Rail Installation  East: Left lane,
MON-THU 6AM-5PM, FRI 6AM-2PM

 
Minor  None 
29 & 30  Road Work  West: Left lane,
WED 7AM-2PM

 
Minimal  Weather permitting 
29A & 30  Road Work  West: Right lane,
WED 7AM-2PM

 
Minimal  Weather permitting 
31 & 30  Road Work  East: Left lane,
THU 7AM-2PM

East: Right lane,
WED 7AM-2PM

 
Minimal  Weather permitting 
31 & 30  Bridge Construction  East: Right lane,
MON 7AM-5PM

 
Minimal  None 
31 & 30  Road Work  East: Right lane,
TUE 7AM-2PM

 
Minimal  Weather permitting 
31 & 32  Bridge Deck Rehabilitation  West: Right lane,
MON-SUN Continuous - WB ramp closed over N. Genesee. Detour in place. EB traffic shifted to rehabbed EB lane for stage 3

 
Minimal  None 
31 & 32  Shoulder Work  West: Shoulder,
MON-THU 7AM-5PM

 
None  None 
33 & 31  Road Work  West: Alternating right lane with the left lane,
MON-THU 7:30AM-2PM, FRI 7:30AM-noon

East: Alternating right lane with the left lane,
MON-THU 7:30AM-2, FRI 7:30-noon

 
Minimal  Weather permitting 
33 & 34  Road Work  West: Right lane,
MON-TUE 6PM-1PM

 
Minimal  Weather permitting 
34A & 33  Road Work  West: Alternating right lane with the left lane,
MON-FRI 7AM-noon

East: Alternating right lane with the left lane,
MON-THU 7:30AM-2, FRI 7:30-noon

 
Minimal  Weather permitting 


Back to Top

Albany Region


For The Week Starting Monday 09/29/2025
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Bridge Construction  East: Other,
Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

West: Left lane,
Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

 
Minimal  Weather Permitting 
B1 & B2  Bridge Work  East: Right lane,
Monday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
B2 & B3  Other  East: Right lane,
Monday - Thursday, 7:00AM - 7:00AM *24 Hour Closure*; Friday, 7:00AM - 12:00 Noon

 
Minimal  Weather Permitting 
B3 & B2  Guide Rail Installation  West: Alternating right lane with the left lane,
Thursday & Friday, 7:00AM - 10:00AM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Road Work  Direction: Interchange 21: Deceleration lane,
Monday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Gantry Work  Direction: Interchange 25A: Alternating right lane with the left lane,
Monday - Friday, 8:00AM - 5:00PM *Eastbound*

Direction: Interchange 25: Alternating right lane with the left lane,
Wednesday - Friday, 6:00PM - 7:00AM *Night Work* *Westbound*

Direction: Interchange 25: Alternating right lane with the left lane,
Monday - Friday, 7:00PM - 6:00AM *Night Work* *Eastbound*

 
None  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Road Work  Direction: Interchange 21: Acceleration lane,
Wednesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Gantry Work  Direction: Interchange 25A: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 4:00PM *Westbound*

 
None  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
22 & 21B  Bridge Work  South: Left lane,
Tuesday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25 & 24  Bridge Work
Long Range: Interchange 24 
East: Ramp,
Monday, 10:00PM - 5:00AM *Night Work*

 
Minimal  Weather Permitting 
25 & 24  Ramp Work  East: Right lane,
Tuesday & Wednesday, 9:30AM - 2:00PM

 
Minor  Weather Permitting 
25A & 24  Bridge Work
Long Range: Interchange 24 
West: Right lane,
Thursday, 10:00PM - 5:00AM *Night Work*

East: Ramp,
Thursday, 10:00PM - 5:00AM *Night Work*

 
Minimal  Weather Permitting 
25 & 26  Bridge Inspection  West: Right lane,
Thursday, 8:00AM - 1:00PM

 
Minimal  Weather Permitting 
27 & 26  Other  East: Right lane,
Wednesday, 8:00AM - 5:00PM

 
Minor  Weather Permitting 
26 & 27  Road Work  West: Right lane,
Monday, 7:00AM - 1:00PM

East: Left lane,
Thursday, 7:00AM - 1:00PM

West: Right lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 


Back to Top

Mid-Hudson Region


For The Week Starting Monday 09/29/2025
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
16 & 17  Bridge Inspection  North: Right lane,
RL,RDL, and RSH Wed 9am-12pm

 
None  None 
18 & 16  Bridge Inspection  South: Right lane,
RL, RAL, and RSH Wed 10:30pm-2:30am

 
None  None 
18 & 19  Road Work  North: Alternating right lane with the left lane,
Tuesday, 6:00AM - 1:00PM, Wednesday, 6:00AM - 11:00AM

 
Moderate  Weather Permitting 
18 & 19  Bridge Construction  North: Both lanes,
NB traffic shifted to SB side of bridge until further notice.

 
Minor  Weather Permitting 
19 & 18  Road Work  South: Alternating right lane with the left lane,
Monday, 6:00AM - 11:00AM; Tuesday - Thursday, 6:00AM - 2:00PM; Friday, 6:00AM - 12:00 Noon

 
Moderate  Weather Permitting 


Back to Top

New York Region


For The Week Starting Monday 09/29/2025
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
6 & 9  Bridge Construction  East: Ramp,
Ramp A, B,C Tue 10pm-6am

 
None  None 
7 & 9  Bridge Construction  East: Left lane,
Sun 10pm-6am Mon 8pm-6am

East: Right lane,
Tue 8pm-6am

East: Right and center lanes,
Tue 10pm-6am

East: Left lane,
Sun 11pm-6am Mon 10pm-6am

 
None  None 
8 & 11  Bridge Construction  East: Left lane,
Wed-Thur 8pm-6am

East: Left and center lanes,
Wed-Thur 10pm-6am

 
None  None 
9 & 7  Bridge Construction  West: Right and center lanes,
Sun 11pm-6am Mon-Thur 10pm-6am

West: Right lane,
Sun 9pm-6am Mon-Thur 9pm-6am

West: Ramp,
Ramp T Sun 11pm-6am Mon-Thur 10pm-6am

 
None  None 
9 & 10  Bridge Construction  East: Right shoulder,
Mon-Thur 8am-3pm Fri 8am-2pm

 
None  None 
11 & 10  Bridge Construction  West: Right shoulder,
Mon-Thur 8am-3pm Fri 8am-2pm

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
6A & 7  Bridge Construction  North: Right shoulder,
8AM-3PM Monday-Friday

 
None  None 
7 & 8  Bridge Construction  North: Right shoulder,
Mon-Fri 8am-3pm

 
None  None 
12 & 13  Bridge Construction  North: Right shoulder,
Mon-Thur 9am-2pm Fri 9am-12pm

 
None  None 
12 & 14  Bridge Work  North: Left lane,
Mon 8pm-6am Tuesday-Friday 9pm-6am

North: Left and center lanes,
Mon-Tue 11pm-6am Wed-Fri 12am-6am

 
None  None 
14 & 13  Bridge Work  South: Alternating right lane with the left lane,
Mon-Tue 8pm-6am Wed-Fri 9pm-6am (Sat)

South: Left lane,
Mon-Tue 8pm-6am Wed-Fri 9pm-6am

South: Left and center lanes,
Mon-Thurs 11pm-5am Fri(Sat) 12am-5am

 
None  None 
14B & 14A  Bridge Work  South: Right lane,
Sat 6am-12pm

 
Minimal  None 
14B & 15  Shoulder Work  North: Right shoulder,
Mon-Tue 6am-3pm Wed-Thur 6am-12pm Fri 6am-3pm

North: Alternating right lane with the left lane,
Mon-Tue 6am-1pm & 7pm-6am Wed-Thurs 9am-12Noon & 9pm-6am Fri 6am-10am & 9pm-7am

North: Alternating the 2 right lanes with the left lanes,
Mon-9pm-6am Tue-Wed 10pm-6am Thur 11pm-6am Fri 11pm-7am

 
None  None 
15A & 14B  Shoulder Work  South: Right shoulder,
Mon-Tue & Fri 10am-3pm Wed-Thur 10am-12pm

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18A & 14  Shoulder Work  North: Alternating right lane with the left lane,
Mon-Thur 7pm-7am Fri 9pm-8am Sun 10pm-7am

North: Alternating the 2 right lanes with the left lanes,
Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am Sun 12am-5:30am

North: Right shoulder,
Mon-Fri 9am-3pm & 6pm-7am Sun 6pm-7am

North: Ramp,
Alt RT/LT shoulder closures: Exit 15 NB on-ramp & off-ramp Exit 16 NB on-ramp & off-ramp Exit 17 NB off-ramp River St on-ramp to 95NB Mon-Fri: 9am-3:30pm & 7pm-9am Sun: 10pm-9am

South: Alternating the 2 right lanes with the left lanes,
Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am Sun 12am-5:30am

South: Right shoulder,
Mon-Fri 7am-3pm & 7pm-7am Sun 9pm-7am

South: Ramp,
Alt RT/LT shoulder closures: Exit 15 SB on-ramp & off-ramp Exit 16 SB on-ramp & off-ramp Exit 17 SB on-ramp River St on-ramp to 95SB Mon-Fri 7am-3:30pm & 7pm-7am Sun 10pm-9am Mon-Fri: 9am-3:30pm & 7pm-9am Sun: 10pm-7am

South: Alternating right lane with the left lane,
Mon-Thur 7pm-7am Fri 9pm-9am Sun 10pm-7am

 
None  None 