Last Updated time: 06/03/2013 8:22:17 AM CompletedCapProject: ID DIVISION CONTRACTNO CONTRACTOR LETTINGDATE COMPLETIONDATE DESCRIPTION CONSTRUCTIONAMOUNT LATITUDE LONGITUDE YEAR_TYPE_CODE PROGRAM_YEAR B962.1 Albany TABS 11-11BR/D214014 Piasecki Steel Construction Corporation 04/11/2012 08/30/2012 MP 801.08: Castleton Bridge - Repair Gusset Plates $1,042,998.73 42.508508 -73.770431 CPP 2012 C237.1 Albany TAA 12-38C/D214174 Rifenburg Construction, Inc. 02/06/2013 05/10/2013 Canajoharie: Installation of Required Railroad Crossing Signal System on Access Road to Lock E-14, Montgomery County $.00 42.909404 -74.577710 CPP 2012 C250.1 Albany TAA 11-55CR/D214136 Tioga Construction Co., Inc. 01/11/2012 06/08/2012 Scotia & Rotterdam: Lighting Repairs to MD 4 at Lock E-8 and Partial Upright and Lighting Repairs to MD 5 at Lock E-9, Schenectady Co. (Partial FEMA) $.00 CPP 2012 PlannedCapProject: ID DIVISION ESTIMATEDLETTINGDATE DESCRIPTION APPROVEDCONSTRUCTIONAMOUNT LATITUDE LONGITUDE YEAR_TYPE_CODE PROGRAM_YEAR A3.1 New York 2014 Ardsley Service Area (MP 6.0 NB): Replace Aging Water Supply Main and Demolition of Obsolete Fire Water Supply System $1,700,000.00 40.983997 -73.852874 CPP 2012 A347.1 New York 2013 MP 45.03: Repair Deteriorating Utility Tunnels at Woodbury Toll Barrier in New York Division $500,000.00 CPP 2012 A350.1 Syracuse 2013 Installation of Authority supplied Generators at Indian Castle, Chittenango and Clifton Springs Service Areas $750,000.00 CPP 2012 A811.1 New York 2013 MP 33: Ramapo and Sloatsburg Service Areas - Demolition of Aging Wastewater Facility and Construct Connection to Municipal System $1,450,000.00 CPP 2012 A839.2 Albany 2013 MP 141.92: Administrative Headquarters Building - Replacement of Outdated High Voltage Switch Gear System $1,640,000.00 CPP 2012 A842.1 New York 2013 Sloatsburg Service Area (MP 33.0) and Modena Service Area (MP 66.0): Replacement of Deteriorated Roofs $1,000,000.00 41.147114 -74.186172 CPP 2012 A856.1 Syracuse 2013 MP 324W and MP 337E: Replacement of Deteriorated Pitched Roofs at the Junius Ponds and Clifton Springs Service Areas $800,000.00 CPP 2012 A856.2 Syracuse 2013 MP 324W and MP 337E: Replacement of Deteriorated Flat Roofs at the Junius Ponds and Clifton Springs Service Areas $800,000.00 CPP 2012 A866.1 Syracuse 2014 MP's 227 WB, 280 EB, 292 WB and 310 EB: Replacement of Deteriorated Pitched Roofs at the Schuyler, DeWitt, Warners and Port Byron Service Areas $1,600,000.00 CPP 2012 A866.2 Syracuse 2015 MP's 227 WB, 280 EB, 292 WB and 310 EB: Replacement of Deteriorated Flat Roofs at the Schuyler, DeWitt, Warners and Port Byron Service Areas $1,600,000.00 CPP 2012 A867.1 Syracuse 2014 MP's 227 WB, 244 EB, 292 WB and 324 WB: Schuyler, Oneida, Warners and Junius Ponds Service Areas - Rehab/Replace Wastewater Treatment Plants $2,000,000.00 CPP 2012 A868.1 Syracuse 2014 MP 210.0: Iroquois Service Area - Rehabilitate/Replace Aging Water System $1,000,000.00 43.017114 -74.802191 CPP 2012 B49.1 New York 2014 MP 26.37: College Road (Almshouse Road) Bridge over Thruway - Rehabilitation $1,500,000.00 41.111252 -74.089921 CPP 2012 B84.1 Albany 2014 MP 90.55: Thruway over Hurley Avenue - Rehabilitation $3,350,000.00 41.938769 -74.036428 CPP 2012 B88.1 Albany 2015 MP 91.88: Sawkill Road (County Route 42) Bridge over Thruway - Replacement $4,000,000.00 41.952919 -74.020030 CPP 2012 B103.1 Albany 2014 MP 140.98: Thruway Bridge over Route 9W - Rehabilitation $4,000,000.00 42.620222 -73.780601 CPP 2012 B148.1 Albany 2014 MP 816.26: Route 295 Bridge over Berkshire Thruway - Rehabilitation $3,000,000.00 42.408647 -73.530896 CPP 2012 B194.1 Buffalo 2015 MP 420.33, MP 420.34 and MP 420.36: I-90/I-290 Interchange (Exit 50) Bridges - Rehabilitations $3,300,000.00 42.949363 -78.763431 CPP 2012 B284.1 New York 2014 MP NE5.76: North Avenue Bridge over I-95 (New England Thruway) (Phase 3): Replacement $10,800,000.00 40.914084 -73.783514 CPP 2012 B326.2 Buffalo 2013 MP 921.12: North Grand Island Bridge Southbound - Deck Replacement $70,000,000.00 43.068340 -78.990741 CPP 2012 B412.1 Syracuse 2013 MP 337.53: Thruway Bridge (Westbound) over Canandaigua Outlet - Replacement $4,700,000.00 42.974082 -77.181659 CPP 2012 B441.1 Buffalo 2014 MP 380.57: West Bergen Road Bridge over Thruway - Replacement $5,200,000.00 43.029831 -78.006967 CPP 2012 B466.1 Thruway Wide 2014 Thruway Wide - Bridge Painting $12,000,000.00 CPP 2012 B471.2 Buffalo 2015 MP 454.31: Four Mile Level Road (Route 438) Bridge over Thruway - Replacement $4,500,000.00 42.564503 -79.092268 CPP 2012 B471.3 Buffalo 2015 MP 453.46: Mile Strip Road Bridge over Thruway - Rehabilitation $2,500,000.00 42.573196 -79.081944 CPP 2012 B510.1 Buffalo 2015 West Seneca (Exit 54, MP 427.9) to Lackawanna Barrier (MP 430.6): Pavement Resurfacing and Replacement of Thruway Bridge over NYCRR/Penn RR (MP 430.05) and Rehabilitate Four Other Bridges $20,000,000.00 42.818330 -78.791267 CPP 2012 B527.1 Buffalo 2014 MP 407.27: South Newstead Road Bridge over Thruway - Replacement $5,500,000.00 42.973904 -78.514765 CPP 2012 B531.1 Buffalo 2014 MP 420.70: Cleveland Drive Bridge over Thruway - Replacement $10,000,000.00 42.944119 -78.766369 CPP 2012 B560.1 Buffalo 2015 MP 427.95: Route 400 Ramp Bridge over Harlem Road - Replacement (NYSDOT Project) $500,000.00 42.848287 -78.791008 CPP 2012 B583.1 New York 2014 MP 58.43: Thruway Bridge over Newburgh-Cambell Hall Road (Route 207) - Rehabilitation $2,000,000.00 41.485160 -74.079527 CPP 2012 B596.1 New York 2014 MP NE9.55: Old White Plains Road Bridge over I-95 (New England Thruway) - Rehabilitation $1,500,000.00 40.957642 -73.741460 CPP 2012 B611.1 Syracuse 2014 MP282.93: Interchange 36 Bridge Replacement and Ramp Realignment $9,000,000.00 43.094380 -76.167351 CPP 2012 B612.1 Syracuse 2013 Syracuse Division: Concrete Repairs to 3 Major Culverts $1,000,000.00 43.125978 -75.247040 CPP 2012 B614.1 Buffalo 2013 Buffalo Division: On-Demand Repair Contract - 2013-2014 $2,000,000.00 CPP 2012 B619.1 Buffalo 2013 MP 901.56 to MP 906.92: Replace Non-Functional Joints on 12 I-190 (Niagara Thruway) Bridges and Substructure and Bearing Repairs to 6 I-190 Bridges in Buffalo Division $5,200,000.00 42.869340 -78.836975 CPP 2012 B624.1 New York 2014 I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2014 $700,000.00 CPP 2012 B625.1 New York 2015 I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2015 $700,000.00 CPP 2012 B628.1 Albany 2015 Paint 8 Albany Division Bridges with Poor Paint Condition Ratings $3,000,000.00 CPP 2012 B633.1 Albany 2014 MP BS5.22 and MP BS5.23: Berkshire Thruway Bridges over County Road 19 - Rehabilitations $4,600,000.00 42.485981 -73.696521 CPP 2012 B648.1 Buffalo 2014 Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges $2,250,000.00 CPP 2012 B650.1 Buffalo 2014 Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2014 $350,000.00 43.026985 -78.978054 CPP 2012 B652.1 Buffalo 2015 Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2015 $800,000.00 43.026985 -78.978054 CPP 2012 B658.1 Syracuse 2014 MP 276.58: I-481/Collamer Interchange (Exit 34A) Bridge - Rehabilitation $2,000,000.00 43.094743 -76.043924 CPP 2012 B659.1 New York 2013 Repairs to Deteriorated/Damaged Steel Members on Eight New York Division Bridges and Replace Two Sign Structures $1,450,000.00 CPP 2012 B663.1 Thruway Wide 2014 Seismic Retrofits for Various Bridges Statewide $4,000,000.00 CPP 2012 B882.1 New York 2015 MP 46.42: Estrada Road Bridge over Thruway - Rehabilitation $2,200,000.00 41.325521 -74.112476 CPP 2012 B889.1 New York 2014 MP 53.10: Pleasant Hill Road Bridge over Thruway - Rehabilitation $2,200,000.00 41.411925 -74.074035 CPP 2012 B900.1 Buffalo 2013 4 Bridge Rehabilitations - MP 458.5 and MP 458.81 - Thruway Bridges over Silver Creek and MP 459.9 and MP 459.91 Thruway Bridges over Walnut Creek $12,900,000.00 42.517669 -79.153102 CPP 2012 B907.1 Buffalo 2014 MP N18.39: Bedell Road Bridge over I-190 (Niagara Thruway): Rehabilitation $2,500,000.00 43.036077 -78.984112 CPP 2012 B942.1 Buffalo 2013 MP 455.54 & MP 460.74 & MP 467.74: Silver Creek Interchange, Fredonia-Silver Creek Rd (Route 20) and Dunkirk-Fredonia Interchange - Bridge Rehabilitations $2,200,000.00 42.462186 -79.305030 CPP 2012 B946.1 New York NA MP 14.67: Tappan Zee Bridge - Repair Gusset Plates $2,000,000.00 41.070116 -73.893335 CPP 2012 B949.1 New York 2014 New York Division: On-Demand Repair Contract - 2014-2015 $2,000,000.00 CPP 2012 B949.2 Albany 2013 Albany Division: On-Demand Repair Contract - 2014-2015 $2,000,000.00 CPP 2012 B949.3 Syracuse 2014 Syracuse Division: On-Demand Repair Contract - 2014-2015 $2,000,000.00 CPP 2012 B957.1 Albany 2013 MP 111.13 & 113.22: Thruway Bridges over Kaaterskill Creek and Catskill Creek: Railing/Fascia Repairs $2,200,000.00 42.231472 -73.905441 CPP 2012 B958.1 Albany 2013 MP BS0.00: Exit 21A Ramp Bridge Over Thruway and MP BS0.10: Berkshire Thruway Bridge over CSX RR - Deck Rehabilitations, and Joint Replacements/Substructure Repairs to 17 Other Bridges $5,250,000.00 CPP 2012 B959.1 Albany 2014 MP BS11.34 and MP BS11.35: Berkshire Thruway Bridges (eastbound and westbound) over Kinderhook Creek: Rehabilitations $3,865,000.00 42.461726 -73.589453 CPP 2012 B961.1 Albany 2013 Repair/Rehabilitate 4 Large Culverts on the Mainline and Berkshire Spur in Albany Division $1,500,000.00 CPP 2012 B969.1 New York 2015 New York Division: On-Demand Bridge Repair Contract - 2016-2017 $2,000,000.00 CPP 2012 B970.1 New York 2015 New York Division Bridges: Substructure Repairs $3,000,000.00 CPP 2012 B973.1 Buffalo 2015 Buffalo Division: On-Demand Repair Contract - 2015-2016 $2,000,000.00 CPP 2012 B974.1 Albany 2014 MP BS1.08: Castleton Bridge Truss Spans - Painting and Repair of Deteriorated Steel Members $17,500,000.00 42.508508 -73.770431 CPP 2012 B975.1 Albany 2015 MP 81.72: Thruway Bridge over Wallkill River - Rehabilitation $12,000,000.00 41.815849 -74.055741 CPP 2012 B978.1 Buffalo 2015 MP 369.85: Union Street Bridge over Thruway - Replacement $4,500,000.00 43.0407 -77.799023 CPP 2012 B979.1 Albany 2015 Albany Division: On-Demand Repair Contract - 2016-2017 $2,000,000.00 CPP 2012 B980.1 Syracuse 2015 Syracuse Division: On-Demand Bridge Repair Contract - 2016-2017 $2,000,000.00 CPP 2012 B2231.1 New York 2015 MP 41.57: Arden Valley Road Bridge over Thruway - Rehabilitation $2,200,000.00 41.265831 -74.155597 CPP 2012 C7.2 Syracuse 2013 Lysander: Canal Section 5 Office & Shop - Roof Replacement, Onondaga County $1,500,000.00 43.211423 -76.288799 CPP 2012 C32.1 Syracuse 2014 Brewerton: North Dock Wall - Rehabilitation, Oswego County $2,600,000.00 43.240906 -76.139068 CPP 2012 C46.1 Syracuse 2014 May's Point: Movable Dam 18 - Rehabilitation, Seneca County $5,000,000.00 42.996894 -76.762309 CPP 2012 C47.1 Buffalo 2015 Rochester: East Guard Lock - Rehabilitation, Monroe County $5,800,000.00 43.116874 -77.633337 CPP 2012 C69.1 Buffalo 2013 Fairport: Spillway Wall - Rehabilitation, Monroe County $3,000,000.00 43.101153 -77.440433 CPP 2012 C71.1 Albany 2013 Whitehall: Construction of a New Lock C-12 Utility Structure, Washington County $750,000.00 CPP 2012 C76.1 Albany 2014 Waterford: Lock E-2 South Approach Wall - Rehabilitation, Saratoga County $3,000,000.00 42.788192 -73.680965 CPP 2012 C78.1 Buffalo 2014 Lockport: Wall - Rehabilitation, Niagara County $3,000,000.00 CPP 2012 C140.1 Albany 2014 Scotia: Rehabilitation of Lock E-8 Breast Wall/Floor, Movable Dam 4 and Lock E-8 Southeast Approach Wall $5,600,000.00 42.829348 -73.991392 CPP 2012 C172.1 Albany 2013 Amsterdam: Movable Dam 7 at Lock E-11 - Rehabilitation, Montgomery County $30,000,000.00 42.946016 -74.211062 CPP 2012 C176.1 Syracuse 2015 Newark: Military Run Stream Culvert - Replacement, Wayne County $400,000.00 43.052287 -77.070299 CPP 2012 C217.1 Buffalo 2014 Monroe County: Erie Canal Lock 32 Bypass Culvert - Repairs, Monroe County (funded with 2005 Transportation Bond Act funds) $500,000.00 43.090854 -77.545380 CPP 2012 C253.2 Albany 2013 Crescent: Dredge Erie Canal in the Area of Lock E-6, Saratoga Cty (Tropical Storms Irene & Lee Recovery Project - Partial FEMA Reimbursable) $2,000,000.00 42.802867 -73.701738 CPP 2012 C255.1 Albany 2013 Scotia & Rotterdam: Spillway & Sitework at Locks E-8 & E-9, Schenectady Cty (Tropical Storms Irene & Lee Recovery Project - Partial FEMA Eligible) $12,000,000.00 CPP 2012 C257.1 Albany 2013 Tribes Hill: Approach Wall Repair/Replacement at Lock E-12, Montgomery Cty (Tropical Storms Irene & Lee Recovery Project - Partial FEMA Eligible) $7,200,000.00 42.945590 -74.288589 CPP 2012 C259.1 Albany 2014 Amsterdam: Guy Park Manor Repairs at Lock E-11, Montgomery County (Tropical Storms Irene and Lee Recovery Project - Partial FEMA Eligible) $600,000.00 CPP 2012 C263.1 Albany 2013 Albany Division: Mule Rehabilitation at Movable Dams 4 - 11 at Lock E-8 - E-15, Schenectady & Montgomery Cty (Tropical Storm Recovery - Partial FEMA) $7,600,000.00 CPP 2012 C264.1 Albany 2013 Tribes Hill & Fort Plain: Truss Repairs at Movable Dams 8 & 11 at Locks E-12 & E-15, Montgomery County $5,000,000.00 CPP 2012 C266.1 Syracuse 2015 Syracuse: Inner Harbor Upland Disposal Site, Onondaga County $800,000.00 CPP 2012 H81.1 Albany 2015 Berkshire Thruway, West of Exit B-1 (MP BS5.7) to Canaan Toll Barrier (MP BS17.8): Pavement Resurfacing and Safety Upgrades $6,000,000.00 42.458893 -73.582686 CPP 2012 H340.1 Albany 2015 Northway (Exit 24, MP 148.1) to West of Schenectady (Exit 25, MP 154.4): Pavement Resurfacing $6,500,000.00 42.730494 -73.895618 CPP 2012 H508.3 Buffalo 2013 LeRoy (Exit 47, MP 378.2) to west of Batavia (MP 393.7): Pavement Resurfacing $20,000,000.00 43.014772 -78.109239 CPP 2012 H508.4 Buffalo 2013 LeRoy (Exit 47, MP 378.2) to west of Batavia (MP 393.7): Safety Upgrades $5,000,000.00 43.014772 -78.109239 CPP 2012 H811.1 Buffalo 2014 Angola Interchange (Exit 57A, MP 444.87): Ramp Pavement Rehabilitation and Angola Interchange Bridge Rehabilitation $1,500,000.00 42.658749 -78.961289 CPP 2012 H853.1 New York 2014 I-95 (New England Thruway), Pelham Parkway (MP NE0.0, Exit 8B) to Port Chester (MP NE14.1, Exit 22): Concrete Pavement Restoration, including New Rochelle Toll Plaza Pavement Repairs and Kings Highway, Cross County Connection and Cedar Street Bridges Rehabilitations $16,500,000.00 40.965515 -73.728698 CPP 2012 H908.1 Syracuse 2013 Verona (Exit 33, MP 252.2) to Canastota (Exit 34, MP 262.0): Pavement Resurfacing and Safety Upgrades $12,000,000.00 43.110405 -75.664905 CPP 2012 H908.2 Syracuse 2015 East of Rome (MP 240.0) to Verona (Exit 33, MP 252.2): Pavement Resurfacing and Safety Upgrades $15,600,000.00 43.130419 -75.454170 CPP 2012 H911.3 Syracuse 2013 Electronics Parkway (Exit 37, MP 284.0) to I-690 (Exit 39, MP 289.3), Including Interchange 38: Safety Upgrades $3,500,000.00 43.118117 -76.233375 CPP 2012 H916.1 New York 2014 New York Division: Pavement Safety Striping - 2015 $700,000.00 CPP 2012 H916.2 Albany 2014 Albany Division: Pavement Safety Striping - 2015 $800,000.00 CPP 2012 H916.3 Syracuse 2014 Syracuse Division: Pavement Safety Striping - 2015 $800,000.00 CPP 2012 H916.4 Buffalo 2014 Buffalo Division: Pavement Safety Striping - 2015 $850,000.00 CPP 2012 H998.2 Albany 2014 MP 187: Construct Rest Area with Amenities and Truck Parking west of Fultonville near Erie Canal Lock 13 $5,000,000.00 42.917401 -74.440504 CPP 2012 H999.1 New York 2015 I-95 Northbound (New England Thruway), Bartow Avenue (Exit 11, MP NE1.11): Ramp and Safety Upgrades (NYS/NYCDOT funded) $3,470,000.00 40.868368 -73.832596 CPP 2012 H1010.2 Buffalo 2013 Batavia (Exit 48, MP 393.70) to West of Pembroke (MP 404.70): Safety Upgrades, Installation of Median Guiderail (MP 395 to MP 405), and MP 402.90, Rehabilitation of the Thruway Bridge over Murder Creek $3,000,000.00 43.010168 -78.370573 CPP 2012 H1025.1 Syracuse 2013 MP 308: Construct Rest Area with Amenities west of Weedsport near the Old Erie Canal Port Byron Lock (Lock 52) $8,000,000.00 43.038979 -76.632283 CPP 2012 H1042.2 Buffalo 2014 Williamsville Toll Barrier (MP 419.69): Operation Improvements $14,000,000.00 42.952034 -78.752647 CPP 2012 H1082.1 New York 2013 New York Division Culverts: Remove Sediment, Restore Capacity and Inspect for Needed Repairs $250,000.00 CPP 2012 H1082.4 Buffalo 2013 Buffalo Division Culverts: Remove Sediment, Restore Capacity and Inspect for Needed Repairs $250,000.00 CPP 2012 H1085.1 New York 2013 I-287/Route 17S (Exit 15) to North of Suffern (Exit 15A): Pavement Resurfacing, Exits 15/15A Ramp Concrete Pavement Restoration and 2 Bridge Rehabilitations at MP 31.78 and MP 31.79 $14,920,000.00 41.164190 -74.184321 CPP 2012 H1089.4 Buffalo 2013 I-90, West of Pembroke (MP 404.7) to West of William Street (MP 425.9) and I-190, North of Church Street (MP N5.5) to Peace Bridge: Safety Upgrades $5,900,000.00 CPP 2012 H1103.1 New York 2014 MP 6.0: Ardsley Service Area - Pavement Rehabilitation $1,500,000.00 CPP 2012 H1108.1 New York 2014 New York Division Culvert Repairs $3,000,000.00 CPP 2012 H1109.1 Albany 2014 Schenectady (Exit 25, MP 154.4) to Rotterdam (Exit 26, MP 163.3): Pavement Resurfacing with Resurfacing of Exit 25A Tandem Lot $7,400,000.00 42.791475 -74.016275 CPP 2012 H1110.1 Syracuse 2013 Syracuse Division Culvert Repairs $4,000,000.00 CPP 2012 H1117.5 Buffalo 2013 Buffalo Division: Pavement Safety Striping, MP 452.34 to MP 455.06 - 2013 $50,000.00 42.577429 -79.074043 CPP 2012 H1118.1 Syracuse 2015 Waterloo (Exit 41, MP 320.70) to Geneva (Exit 42, MP 327.54): Pavement Resurfacing $3,500,000.00 42.958034 -76.924232 CPP 2012 H1119.1 New York 2013 New York Division: Pavement Safety Striping - 2014 $700,000.00 CPP 2012 H1119.2 Albany 2013 Albany Division: Pavement Safety Striping - 2014 $700,000.00 CPP 2012 H1119.3 Syracuse 2013 Syracuse Division: Pavement Safety Striping - 2014 $700,000.00 CPP 2012 H1119.4 Buffalo 2013 Buffalo Division: Pavement Safety Striping - 2014 $850,000.00 CPP 2012 H1120.1 Albany 2015 Rotterdam (Exit 26, MP 163.3) to East of Amsterdam (MP 170.0): Pavement Resurfacing including the Pattersonville Service Area $3,800,000.00 42.883759 -74.073405 CPP 2012 H1121.1 Albany 2015 South of Saugerties (MP 100.8) to North of Saugerties (MP 109.3): Pavement Resurfacing with Resurfacing of Malden Service Area $5,200,000.00 42.135285 -73.950768 CPP 2012 H1126.1 New York 2015 South of Nyack (MP 16.00) to North of Garden State Parkway Connector (MP 24.00): Pavement Resurfacing $10,400,000.00 41.101050 -73.974484 CPP 2012 H1128.1 New York 2013 North of Newburgh (MP 62.0 NB, MP 68.0 SB) to south of New Paltz (MP 74.5): Pavement Rehabilitation $36,000,000.00 41.669504 -74.079049 CPP 2012 H1130.1 New York 2015 New York Division: Pavement Safety Striping - 2016 $700,000.00 CPP 2012 H1130.2 Albany 2015 Albany Division: Pavement Safety Striping - 2016 $850,000.00 CPP 2012 H1130.3 Syracuse 2015 Syracuse Division: Pavement Safety Striping - 2016 $850,000.00 CPP 2012 H1130.4 Buffalo 2015 Buffalo Division: Pavement Safety Striping - 2016 $900,000.00 CPP 2012 H1131.1 New York 2015 Woodbury Toll Barrier (MP 46) to Newburgh (Exit17, MP 60.1): Pavement Resurfacing $10,400,000.00 41.411925 -74.074035 CPP 2012 H1140.1 Buffalo 2015 Buffalo Division Culvert Repairs $3,000,000.00 CPP 2012 H1142.1 Albany 2015 MP 817.80, Canaan Toll Barrier: Pavement Rehabilitation/Resurfacing $2,000,000.00 CPP 2012 H1143.1 Syracuse 2015 West of Utica (MP 233.5) to east of Westmoreland (MP 240.9): Pavement Resurfacing $4,300,000.00 43.136101 -75.282174 CPP 2012 H1150.1 Buffalo 2014 Tonawanda Toll Barrier (MP N14.90) to Niagara Toll Barrier (MP N20.22): Pavement Resurfacing with Resurfacing of Interchanges $6,800,000.00 43.025686 -78.977188 CPP 2012 I103.1 Buffalo 2015 MP 418.33 WB, MP N0.35 NB, MP N6.2 NB and MP N11.87 NB: Replacement of Four Outdated Dynamic Message Signs in Buffalo Division $2,000,000.00 CPP 2012 I104.1 New York 2014 Replacement of Three Outdated Dynamic Message Signs, Closed Circuit Cameras and other ITS Equipment in New York Division $4,000,000.00 CPP 2012 R9.1 Albany 2013 Amsterdam: Mohawk Valley Gateway Overlook - New Construction, Montgomery County (funded with 2005 Transportation Bond Act funds) $12,000,000.00 CPP 2012 R17.1 Buffalo 2013 Lockport: Rehabilitation of Historic Locks E-69 and E-70 at Flight of Five, Niagara County $1,852,675.00 CPP 2012 T6.1 Syracuse 2013 Gryziec Park to Stanwix: Canalway Trail, Oneida County (funded with 2005 Transportation Bond Act funds) $1,925,000.00 CPP 2012 T13.1 Buffalo 2014 Amherst: Canalway Trail Repairs, Erie County $400,000.00 CPP 2012 T20.1 Albany 2014 Fort Edward to Fort Ann: Canalway Trail, Washington County (funded with 2005 Transportation Bond Act funds) $4,410,000.00 CPP 2012 T30.1 Buffalo 2013 Amherst to Lockport: Canalway Trail, Erie/Niagara Counties $5,000,000.00 CPP 2012 T57.1 Buffalo 2013 Pittsford to Fairport: Canalway Trail - Rehabilitation, Monroe County (funded with 2005 Transportation Bond Act funds) $2,320,000.00 CPP 2012 ActiveCapProject: ID DIVISION LETTINGDATE ESTIMATEDCOMPLETIONDATE DESCRIPTION CONTRACTNO CONTRACTOR LOWBIDAMOUNT LATITUDE LONGITUDE YEAR_TYPE_CODE PROGRAM_YEAR A349.1 Buffalo 01/16/2013 2014 Construction of Wind Turbines at 5 Locations to Provide Energy to Buffalo Division Facilities TAB 12-37A/D214167 Kandey Co., Inc. $7,875,000.00 CPP 2012 A855.1 Syracuse 03/13/2013 2013 MP 210: Replacement of Deteriorated Flat Roof at the Indian Castle Service Area TAS 13-1A/D214154 Henderson-Johnson Co., Inc. $387,740.00 43.015495 -74.802992 CPP 2012 A855.2 Syracuse 10/24/2012 2013 MP 210: Replacement of Deteriorated Pitched Roof at the Indian Castle Service Area TAS 12-7A/D214127 Mid-State Industries, Ltd. $357,811.00 43.015495 -74.802992 CPP 2012 B117.1 Albany 02/27/2013 2014 MP 173.59: Amsterdam Interchange (Exit 27) Bridge over Thruway - Replacement TAA 13-21B/D214025 $7,127,781.00 42.922991 -74.196672 CPP 2012 B513.1 Buffalo 02/06/2013 2013 MP 415.92: Thruway Bridges over Harris Hill Road and Transit Road (Rte. 78) (MP 416.94) - Rehabilitations TAB 13-13B/D214091 Oakgrove Construction, Inc. $1,835,159.00 42.948901 -78.687965 CPP 2012 B615.1 New York 11/14/2012 2013 I-95 (New England Thruway): Bridge Maintenance Cleaning for Steel Preservation - 2013 TANE 12-40B/D214193 Dandrow's Painting, Inc. $592,800.00 CPP 2012 B659.2 New York 02/20/2013 2013 Replacement of Two New York Division Sign Structures TANY 13-30B/D214221 Mohegan Associates, Inc $1,589,203.20 CPP 2012 B925.2 New York 02/22/2012 2013 New York Division: On-Demand Repair Contract for Damaged and Flagged Bridges - 2012-2013 TANY 12-5B/D214123 E. Daskal Corporation $562,000.00 CPP 2012 B940.1 Syracuse 02/22/2012 2013 Syracuse Division: On-Demand Repair Contract for Damaged and Flagged Bridges - 2012-2013 TAS 12-6B/D214124 D.A. Collins Construction Co. $367,380.00 CPP 2012 B944.1 Buffalo 03/28/2012 2013 MP N14.99: South Grand Island Bridge Southbound - Deck Rehabilitation, Miscellaneous Bridge Repairs and 2013 North Grand Island Bridge Washing TAN 12-16B/D214067 Union Concrete & Construction Corporation $13,764,051.50 43.000894 -78.940905 CPP 2012 C41.1 Albany 11/14/2012 2014 Crescent: Guard Gates 1 & 2 and Crocker's Reef: Guard Gate - Replace Cables and Rollers, Saratoga, Washington Counties TAA 12-34C/D214162 D.A. Collins Construction Co., Inc. $4,885,308.45 CPP 2012 C50.1 Albany 10/10/2012 2013 Palatine Bridge & Indian Castle: Lock E-14 & Rocky Rift Movable Dam - Railing Installation, Montgomery & Herkimer Counties TAA 12-2C/D214100 Tioga Construction Co., Inc. $759,499.00 CPP 2012 C57.1 Syracuse 11/28/2012 2016 Utica: Taintor Gate and Dam - Rehabilitation, Oneida County TAS 12-35C/D214068 Tioga Construction Co., Inc. $9,635,661.70 43.106230 -75.208059 CPP 2012 C68.1 Thruway Wide 11/21/2012 2014 Statewide: Canal On-Demand Repair and Vessel Recovery Contract TA 12-22C/D214161 Tioga Construction Co., Inc. $1,674,560.00 CPP 2012 C253.1 Albany 03/13/2013 2013 Tribes Hill: Dredge Erie Canal in the Area of Lock E-12, Montgomery Cty (Tropical Storms Irene and Lee Recovery Project - Partial FEMA Eligible) TAA 13-3C/D214166 Tioga Construction Co., Inc. $982,200.00 42.945590 -74.288589 CPP 2012 C254.1 Albany 04/03/2013 2014 Cranesville: Spillway and Sitework at Lock E-10, Montgomery County (Tropical Storms Irene and Lee Recovery Project - Partial FEMA Eligible) TAA 13-11C/D214202 James H. Maloy, Inc. $5,198,000.00 42.917097 -74.140784 CPP 2012 C256.1 Albany 02/20/2013 2014 Amsterdam: Sitework at Lock E-11, Montgomery County (Tropical Storms Irene and Lee Recovery Project - Partial FEMA Eligible) TAA 13-6C/D214192 $1,935,847.50 42.946629 -74.210104 CPP 2012 C261.1 Albany 06/27/2012 2015 Upright & Lighting Repairs to MD 5, 6 & 7 at Locks E-9,10 & 11, Schenectady & Montgomery Co. (Tropical Storm Recovery Project - Partial FEMA Eligible) TAA 12-11C/D214138 C.D. Perry LLC $7,173,649.60 42.917912 -74.140488 CPP 2012 C262.1 Albany 06/27/2012 2015 Upright & Lighting Repairs to MD 4, 8, 10 & 11, Schenectady & Montgomery Counties (Tropical Storm Recovery Project - Partial FEMA Eligible) TAA 12-12C/D214139 C.D. Perry LLC $7,413,203.66 CPP 2012 C263.2 Albany 12/12/2012 2013 Cranesville & Tribes Hill: Bearing Rehabilitation at Movable Dams 6 & 8 at Locks E-10 & E-12, Montgomery County TAA 12-41C/D214197 Piasecki Steel Construction Corporation $362,500.00 CPP 2012 H539.1 Buffalo 04/10/2013 2013 South of I-190 (MP 425.8) to West Seneca/East Aurora (Exit 54, MP 427.7): Concrete Pavement Restoration TAB 13-16/D214107 Union Concrete and Construction $6,904,696.60 42.900724 -78.767029 CPP 2012 H1082.3 Syracuse 10/17/2012 2013 Syracuse Division Culverts: Remove Sediment, Restore Capacity and Inspect for Needed Repairs TAS 11-29R/D214064 Custom Crews, Inc. $318,846.00 CPP 2012 H1087.1 Syracuse 12/12/2012 2013 West of Canajoharie (Exit 29, MP 197.9) to Little Falls (Exit 29A, MP 210.3): Pavement Resurfacing TAS 12-3/D214110 Kubricky Construction Corp. $10,086,659.67 42.990425 -74.697704 CPP 2012 H1087.2 Syracuse 05/23/2012 2012 MP 202.45 to MP 202.65 WB: Slope Stabilization and Miscellaneous Work TAS 12-20/D214151 Ketco, Inc. $662,130.00 42.988260 -74.668765 CPP 2012 H1117.1 New York 12/12/2012 2013 New York Division: Pavement Safety Striping - 2013 TANY 12-28/D214170 Safety Marketing, Inc. $529,011.60 CPP 2012 H1117.2 Albany 12/12/2012 2013 Albany Division: Pavement Safety Striping - 2013 TAA 12-29/D214171 Straight Line Industries, Inc. $223,587.00 CPP 2012 H1117.3 Syracuse 01/16/2013 2013 Syracuse Division: Pavement Safety Striping - 2013 TAS 12-30/D214172 Accent Stripe, Inc. $796,896.10 CPP 2012 H1117.4 Buffalo 01/16/2013 2013 Buffalo Division: Pavement Safety Striping - 2013 TAB 12-31/D214173 Accent Stripe, Inc. $861,326.44 CPP 2012 H1148.1 Buffalo 03/06/2013 2014 Dunkirk (Exit 59, MP 467.0) to Westfield (Exit 60, MP 485.5) and Exit 59: Pavement Resurfacing TAB 13-32/D214131 Oakgrove Construction Co., Inc. $16,388,664.00 42.406891 -79.442889 CPP 2012 T34.2 Syracuse 08/29/2012 2013 Lyons: Abbey Park to Route 14: Canalway Trail, Wayne County TAS 12-23C/D214164 Keeler Construction Co., Inc. $547,818.40 CPP 2012 T35.2 Syracuse 08/15/2012 2013 Little Falls: Railroad Ave to Route 167: Canalway Trail, Herkimer County TAS 12-24C/D214165 ALX Hunter Excavation, Inc. $861,646.00 CPP 2012