Skip to Main Content
Skip to Navigation

Regional Advisory Messages

This page does not refresh automatically, you must manually refresh this page.
Information is updated as conditions change.

Rochester Regional Advisory Message

Coverage area: I-90 Thruway from Exit 39 (Syracuse/Fulton) to Exit 53 (Buffalo/Downtown)

Message Updated: 6/26/2017 8:11 PM

This is the New York State Thruway Regional Advisory message for Rochester. OK, it's traffic time On I-90 - NYS Thruway eastbound between Batavia - Exit 48 - and I-490 - Rochester - Exit 47 - Road maintenance work is in progress, The left lane is closed starting tomorrow at 7:00AM On I-90 - NYS Thruway eastbound between Batavia - Exit 48 - and I-490 - Rochester - Exit 47 - Road maintenance work is in progress, The right lane is closed until tomorrow at about 6:00AM On I-90 - NYS Thruway westbound between Manchester - Exit 43 - and I-490 - Rochester - Exit 45 - Road maintenance work is in progress, The right lane is closed until tomorrow at about 4:00AM On I-90 - NYS Thruway westbound at Pembroke - Exit 48A - Road maintenance work is in progress, The right lane of the exit ramp is closed until tomorrow at about 6:00AM . And now a rundown of the scheduled construction projects on the New York State Thruway in the Rochester region�For the week starting Monday, June 26th�.

ON INTERSTATE 90
Overnight alternating lane closures will be in place for bridgework Westbound between and Exit 45 (Victor) and Exit 46 (Corning) Monday 8pm to 6am, Tuesday and Wednesday from 6pm to 4am, and Thursday from 7pm to 5am

Overnight lane closures will be in place for road paving work east and westbound between Exit 47 (Leroy) and Exit 48 (Batavia) Monday through Thursday from 6pm to 6am.

Daytime alternating lane closures will be in place for pavement repair work eastbound between and Exit 48 (Batavia) and Exit 47 (Leroy) Monday through Thursday from 5am to 2pm.

Overnight alternating lane closures will be in place for bridge repair work eastbound, between Exit 48 (Batavia) and Exit 47 (LeRoy), Monday and Tuesday from 6:30pm to 5am, Wednesday 7pm to 5am, and Thursday 8pm to 5am.

In addition to this work, motorists can expect to see Various Personnel along the entire length of the Thruway performing regular maintenance and construction work.

So�Please move over or slow down before entering these Thruway Work-Zones and remember to obey all posted Work-Zone speed limits.

For driver�s safety, as well as the safety of our construction and maintenance workers, most work-zone speed limits will be posted at 55MPH and strictly enforced by State Police.

And�Please remember to slow down and use caution when entering Thruway Toll Plazas.

Keep in mind that it is necessary for toll personnel to cross lanes from time to time.

As always, remember to wear your seatbelts and have a safe and enjoyable trip.
. And now a rundown of the scheduled construction projects on the New York State Thruway in the Buffalo-Erie region�For the week starting Monday, June 26th�

ON INTERSTATE 90
Overnight alternating lane closures will be in place for bridgework Westbound between and Exit 45 (Victor) and Exit 46 (Corning) Monday 8pm to 6am, Tuesday and Wednesday from 6pm to 4am, and Thursday from 7pm to 5am

Overnight lane closures will be in place for road paving work east and westbound between Exit 47 (Leroy) and Exit 48 (Batavia) Monday through Thursday from 6pm to 6am.

Daytime alternating lane closures will be in place for pavement repair work eastbound between Exit 48 (Batavia) and Exit 47 (Leroy) Monday through Thursday from 5am to 2pm.

Overnight alternating lane closures will be in place for bridge repair work eastbound, between Exit 48 (Batavia) and Exit 47 (LeRoy), Monday and Tuesday from 6:30pm to 5am, Wednesday 7pm to 5am, and Thursday 8pm to 5am.

An Overnight RIGHT lane closure will be in place for road paving work at Exit 48A (Pembroke) off-ramp, both east and westbound, Wednesday and Thursday from 7pm to 6am each night.

Overnight alternating lane closures will be in place for pavement repair work eastbound between Exit 49 (Depew) and Williamsville Toll Barrier Monday through Thursday from 7pm to 6am.

Overnight single lane closures are scheduled for roadwork east and westbound between the Cleveland Drive Overhead Bridge and Exit 51 (NYS Route 33 � Buffalo Airport) Monday Tuesday and Wednesday from 8pm to 11pm. At 11pm double lane closures will be set Monday, Tuesday and Wednesday from 11pm to 5am each night. Also, on Thursday the eastbound Exit 50A (Cleveland Drive) off-ramp will be closed for pavement repair work from 9pm to 6am

Overnight alternating lane closures will be in place for pavement repair work westbound between the Lackawanna Toll Barrier and Exit 56 (Blasdell) Sunday Monday and Tuesday from 8pm to 6am, Wednesday from 7pm to � 7am and Thursday from 8pm to 7am.

Rochester Regional Advisory Message in Audio Format Rochester Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)