Skip to Main Content
Skip to Navigation

Regional Advisory Messages

This page does not refresh automatically, you must manually refresh this page.
Information is updated as conditions change.

New York Regional Advisory Message

Coverage area: I-87 Thruway from the NY City Line to Exit 19 (Kingston), Garden State Parkway (GSP) Connector, I-95 New England Thruway and I-287 Cross Westchester Expressway

Message Updated: 7/28/2016 8:20 AM

This is the New York State Thruway Regional Advisory message for the New York area. Now for Travel Time Information, I-87 Southbound from Exit 14A - Garden State Parkway milepost 24 to mid-span on the Tappan Zee Bridge milepost 14, the current estimated travel time is 21 minutes. OK, it's traffic time Currently, there are no traffic reports With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown. TARRYTOWN

And now a rundown of the scheduled construction projects on the New York State Thruway, for the Lower Hudson Valley region, for the week ending Friday July 29, 2016.

Road work on I-87 between Tarrytown, Exit 9, and Nyack, Exit 11, will require north and southbound daytime single lane closures Monday through Friday from 9AM to 3PM.

Road work on I-87 between Palisades Interstate Parkway, Exit 13N/13S and Airmont, Exit 14B, will require north and southbound overnight single lane closures Monday through Friday from 7PM to 5AM.

Bridge work on I-87 between Sloatsburg, Exit 15A and Newburgh, Exit 17, will require north and southbound daytime single lane closures Monday through Friday from 5AM to 5PM.

Road work on I-287 between the New York State Thruway (I-87) and New York (I-95) South, Exit 12 will require westbound daytime single lane closures Monday through Friday from 10AM to 3PM. There will also be east and westbound overnight single and double lane closures Monday through Sunday from 7PM to 8AM.

Road work on I-95 between Bruckner Expressway and Playland Parkway, Exit 19, will require north and southbound daytime single lane closures Monday through Friday from 9AM to 2PM. There will also be north and southbound overnight single and double lane closures Monday through Friday from 7PM to 9AM.
A long term closure of the I-95 Exit 16 (New Rochelle/North Avenue/Cedar Street) southbound on-ramp will begin Tuesday, December 15, at 10AM, and continue for the duration of the winter season.
Ongoing bridge, and pavement repairs in the vicinity of the Exit 16 southbound on-ramp will force the closure of the ramp, due to the lack of an acceleration lane for entering traffic. All traffic seeking to enter I-95 southbound, will be detoured via Memorial Highway to the Memorial Highway southbound entrance ramp.
All work is weather dependent and subject to change.

New York Regional Advisory Message in Audio Format New York Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)