Skip to Main Content
Skip to Navigation

Regional Advisory Messages

This page does not refresh automatically, you must manually refresh this page.
Information is updated as conditions change.

New York Regional Advisory Message

Coverage area: I-87 Thruway from the NY City Line to Exit 19 (Kingston), Garden State Parkway (GSP) Connector, I-95 New England Thruway and I-287 Cross Westchester Expressway

Message Updated: 2/25/2018 4:02 PM

This is the New York State Thruway Regional Advisory message for the New York area. Now for Travel Time Information, I-87 Northbound from Exit 14A - Garden State Parkway Milepost 24 to Sloatsburg Travel Plaza milepost 33.2, the current estimated travel time is 11 minutes. OK, it's traffic time On I-87 - NYS Thruway northbound at milepost 31.5, between Suffern - Exit 15A - and Woodbury Toll Barrier Look out for debris on the roadway With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown. . And now a rundown of the scheduled construction projects on the New York State Thruway, for the Lower Hudson Valley region, for the week ending March 4, 2018.

Road work on I-87 between Exit 7A and New Jersey � Palisades Interstate Parkway � Bear Mountain State Park, Exit 13N/13S, and Exit 14B will require daytime northbound single lane closures from 7 AM � 3 PM Monday to Thursday, southbound single lane closures from 10 AM � 3 PM on Friday; and overnight northbound highway speed E-Z pass closures at the Spring Valley Toll Barriers from 10 pm to 5 am Monday to Wednesday.

Ditch work on Garden State Parkway Connector will require daytime southbound single lane closures Monday to Wednesday from 10 AM � 3 PM, and Thursday from 10 AM � 2 PM.

Road survey on Route 17 right before the Harriman Toll Plaza will require westbound single lane and shoulder closures from 7 am to 2 pm Monday to Friday, and eastbound single lane and shoulder closures from 10 am to 3 pm Monday to Friday.

Road work on I-87 between Newburgh Exit 17 and New Paltz � Poughkeepsie � NY Route 299, Exit 18 will require daytime northbound shoulder closures from 6 am to 4 pm on Monday and Thursday, from 6 AM to 1 PM on Friday; and southbound shoulder closures from 6 am to 4 pm on Tuesday and Wednesday.
. Road work on I-95 between New Rochelle � North Ave � Cedar Street, Exit 16 and the Connecticut State Line � Connecticut Turnpike (I-95) will require night time southbound double lane closures Tuesday to Thursday from 11 PM to 5:30 AM, and Friday from 11:59 PM to 6 AM.
A long term closure of the I-95 Exit 16 (New Rochelle/North Avenue/Cedar Street) southbound on-ramp will begin Tuesday, December 15, at 10AM, and continue for the duration of the winter season.
Ongoing bridge, and pavement repairs in the vicinity of the Exit 16 southbound on-ramp will force the closure of the ramp, due to the lack of an acceleration lane for entering traffic. All traffic seeking to enter I-95 southbound, will be detoured via Memorial Highway to the Memorial Highway southbound entrance ramp.
All work is weather dependent and subject to change.

New York Regional Advisory Message in Audio Format New York Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Hudson Valley Regional Advisory Message

Coverage area: I-87 Thruway from Exit 16 (Harriman) to Exit 21A (I-90 East/Massachusetts Turnpike) and I-84

Message Updated: 2/25/2018 3:39 PM

This is the New York State Thruway Regional Advisory message for the Hudson Valley. OK, it's traffic time On I-87 - NYS Thruway northbound at milepost 123.5, between Catskill - Exit 21 - and Coxsackie - Exit 21B - Look out for an accident With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown. . And now a rundown of the scheduled construction projects on the New York State Thruway, for the Hudson Valley region, for the week ending March 4, 2018.

Road work on I-87 between Exit 7A and New Jersey � Palisades Interstate Parkway � Bear Mountain State Park, Exit 13N/13S, and Exit 14B will require daytime northbound single lane closures from 7 AM � 3 PM Monday to Thursday, southbound single lane closures from 10 AM � 3 PM on Friday; and overnight northbound highway speed E-Z pass closures at the Spring Valley Toll Barriers from 10 pm to 5 am Monday to Wednesday.

Ditch work on Garden State Parkway Connector will require daytime southbound single lane closures Monday to Wednesday from 10 AM � 3 PM, and Thursday from 10 AM � 2 PM.

Road survey on Route 17 right before the Harriman Toll Plaza will require westbound single lane and shoulder closures from 7 am to 2 pm Monday to Friday, and eastbound single lane and shoulder closures from 10 am to 3 pm Monday to Friday.
. Road work on I-87 between Newburgh Exit 17 and New Paltz � Poughkeepsie � NY Route 299, Exit 18 will require daytime northbound shoulder closures from 6 am to 4 pm on Monday and Thursday, from 6 AM to 1 PM on Friday; and southbound shoulder closures from 6 am to 4 pm on Tuesday and Wednesday.

Hudson Valley Regional Advisory Message in Audio Format Hudson Valley Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Albany Regional Advisory Message

Coverage area: I-87/I-90 Thruway from Exit 18 (New Paltz) to Exit 29A (Little Falls) and I-90 Berkshire Connector

Message Updated: 2/25/2018 3:39 PM

This is the New York State Thruway Regional Advisory message for Albany. OK, it's traffic time On I-87 - NYS Thruway northbound at milepost 123.5, between Catskill - Exit 21 - and Coxsackie - Exit 21B - Look out for an accident . And now a rundown of scheduled construction projects on the New York State Thruway in the Albany Division for the week of February 26, 2018:

On the Berkshire Connector: Road Work between I-87 Interchange B2, Taconic Parkway and Exit B3, Austerlitz/Route 22, will have westbound right lane closures, Monday thru Friday, from 6AM to 5PM.

On Interstate 87: Road Work between Interchange 18, New Paltz and Interchange 19, Kingston, will have northbound right and left lane closures on Monday and Tuesday, from 7AM to 1PM.
. In addition to these projects, motorists can expect to see Thruway Personnel along the entire length of the Thruway performing routine maintenance. Please use caution when traveling through highway construction zones and remember to obey all posted work zone speed limits. For your safety, as well as the safety of our construction and maintenance workers, most of the work zone speed limits will be posted at 55MPH and will be strictly enforced by State Police. Please remember to use caution when entering Toll Plazas and be aware that it is necessary for toll personnel to cross lanes from time to time. As always, remember to wear your seat-belt and have a safe and enjoyable trip.

Albany Regional Advisory Message in Audio Format Albany Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Utica Regional Advisory Message

Coverage area: I-90 Thruway from Exit 27 (Amsterdam) to Exit 39 (Syracuse/Fulton)

Message Updated: 2/24/2018 12:14 PM

This is the New York State Thruway Regional Advisory message for Utica. OK, it's traffic time Currently, there are no traffic reports

Utica Regional Advisory Message in Audio Format Utica Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Syracuse Regional Advisory Message

Coverage area: I-90 Thruway from Exit 29A (Little Falls) to Exit 45 (Rochester/Victor)

Message Updated: 2/24/2018 12:14 PM

This is the New York State Thruway Regional Advisory message for Syracuse. OK, it's traffic time Currently, there are no traffic reports

Syracuse Regional Advisory Message in Audio Format Syracuse Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Rochester Regional Advisory Message

Coverage area: I-90 Thruway from Exit 39 (Syracuse/Fulton) to Exit 53 (Buffalo/Downtown)

Message Updated: 2/25/2018 1:11 PM

This is the New York State Thruway Regional Advisory message for Rochester. OK, it's traffic time Currently, there are no traffic reports

Rochester Regional Advisory Message in Audio Format Rochester Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Buffalo Regional Advisory Message

Coverage area: I-90 Thruway from Exit 45 (Rochester/Victor) to the NY/Pennsylvania State Line and I-190 Niagara Thruway

Message Updated: 2/25/2018 3:39 PM

This is the New York State Thruway Regional Advisory message for Buffalo. OK, it's traffic time Currently, there are no traffic reports And now a rundown of the scheduled construction projects on the New York State Thruway in the Buffalo-Erie region�For the week starting Monday, February 26th�.

ON INTERSTATE 90

A daytime right lane closure will be in place for road repair work westbound between Exit 59 (Dunkirk-Fredonia) and Exit 60 (Westfield) Monday and Tuesday from 7am to 3pm.

ON INTERSTATE 190:
A northbound right shoulder closure will be in place for road work near Exit 17 (River Road � NY Route 266) and the Northbound South Grand Island Bridge Toll Barrier. Daytime shoulder work is scheduled, Monday through Friday from 7am to 3pm.

A southbound right shoulder closure will be in place for road work notice just beyond the southbound North Grand Island Toll Barrier and before Exit 20B (Long Road). Daytime shoulder work is scheduled, Monday through Friday from 7am to 3pm.

Buffalo Regional Advisory Message in Audio Format Buffalo Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)