Skip to Main Content
Skip to Navigation

New York State Thruway Authority

Regional Advisory Messages (Text View)

New York Regional Advisory Message

Coverage area: I-87 Thruway from the NY City Line to Exit 19 (Kingston), Garden State Parkway (GSP) Connector, I-95 New England Thruway and I-287 Cross Westchester Expressway

Message Updated: 8/3/2015 12:09 AM

This is the New York State Thruway Regional Advisory message for the New York area. OK, it's traffic time On I-95 - New England Thruway southbound between the end of I-95 - New England Thruway and Bruckner Expressway Road maintenance work is in progress, The left lane is closed, Look out for a slow moving maintenance vehicle until today at about 4:00AM And now a rundown of the scheduled construction projects on the New York State Thruway, for the Lower Hudson Valley region, for the week ending August 7, 2015.

Transmit work and culvert repairs on I-87 between Hall Place, Exit 1 and, Saw Mill River Parkway, Exit 7A will require north, and southbound daytime single lane closures Tuesday to Friday from 7AM to 3PM. There will also be north, and southbound overnight single, and double lane closures Tuesday to Friday from 7PM to 6AM.

Road work on I-87 between Ardsley, Exit 7 and New Jersey Garden State Parkway, Exit 14A will require north, and southbound daytime single lane closures Monday to Friday from 6AM to 3PM. There will also be north, and southbound overnight single, and double lane closures Monday to Friday from 5PM to 9AM.

Transmit and bridge work on I-87 between New Jersey I-287 South, Exit 15 and Harriman, Exit 16 will require north, and southbound overnight single and double lane closures Monday to Friday from 5PM to 7AM. There will also be overnight single lane closures on southbound Ramp B, I-287 to I-87 southbound, northbound Ramp C, northbound I-87 to New Jersey, and Northbound Ramp D, New Jersey to I-87 northbound Monday to Friday from 9PM to 6AM. Ramps B, C, and D will remain open at all times.

Road work on I-87, between Harriman, Exit 16 and New Paltz, Exit 18 will require north, and southbound overnight single lane closures Monday to Friday from 6PM to 7AM.

Road Work on I-95 between Pelham Parkway, Exit 8, and Cross westchester Expressway (I-287), Exit 21 will require southbound daytime single lane closures Tuesday to Wednesday from 9AM to 3PM. There will also be north, and southbound overnight single and double lane closures 7PM to 9AM

The Exit 18B northbound entrance ramp remains closed throughout the summer for bridge work. A detour is in place.

Bridge repairs on I-287 from knollwood Road, Exit 4, and Broadway, Exit 6 will require eastbound overnight single, and double lane closures Monday � Friday from 9PM to 6AM.

New York Regional Advisory Message in Audio Format New York Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Hudson Valley Regional Advisory Message

Coverage area: I-87 Thruway from Exit 16 (Harriman) to Exit 21A (I-90 East/Massachusetts Turnpike) and I-84

Message Updated: 8/2/2015 10:12 PM

This is the New York State Thruway Regional Advisory message for the Hudson Valley. OK, it's traffic time Currently, there are no traffic reports And now a rundown of the scheduled construction projects on the New York State Thruway, for the Hudson Valley region, for the week ending August 7, 2015.

Road work on I-87 between Ardsley, Exit 7, and New Jersey Garden State Parkway, Exit 14A will require north, and southbound daytime single lane closures Monday to Friday from 6AM to 3PM. There will also be north, and southbound overnight single and double lane closures Monday to Friday from 5PM to 9AM.

Transmit and bridge work on I-87 between New Jersey I-287 South, Exit 15, and Harriman, Exit 16 will require north, and southbound overnight single, and double lane closures Monday to Friday from 5PM to 7AM. There will also be overnight single lane closures on southbound Ramp B, I-287 southbound, northbound Ramp C, northbound I-87 to New Jersey, and Northbound Ramp D, New Jersey to I-87 northbound Monday � Friday from 9PM to 6AM. Ramps B, C, and D will remain open at all times.

Road work on I-87, between Harriman, Exit 16 and New Paltz, Exit 18 will require north, and southbound overnight single lane closures Monday to Friday from 6PM to 7AM.

Hudson Valley Regional Advisory Message in Audio Format Hudson Valley Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Albany Regional Advisory Message

Coverage area: I-87/I-90 Thruway from Exit 18 (New Paltz) to Exit 29A (Little Falls) and I-90 Berkshire Connector

Message Updated: 8/2/2015 10:12 PM

This is the New York State Thruway Regional Advisory message for Albany. OK, it's traffic time On I-90 - Berkshire Connector westbound between I-90 at Exit B1 - and Start of Berkshire Connector at Exit 21A - Road maintenance work is in progress, The right lane is closed until November 13

Albany Regional Advisory Message in Audio Format Albany Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Utica Regional Advisory Message

Coverage area: I-90 Thruway from Exit 27 (Amsterdam) to Exit 39 (Syracuse/Fulton)

Message Updated: 8/3/2015 12:01 AM

This is the New York State Thruway Regional Advisory message for Utica. OK, it's traffic time On I-90 - NYS Thruway westbound between Verona - Exit 33 - and I-481- East Syracuse - Exit 34A Road maintenance work is in progress, The right lane is closed until today at about 6:00AM

Utica Regional Advisory Message in Audio Format Utica Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Syracuse Regional Advisory Message

Coverage area: I-90 Thruway from Exit 29A (Little Falls) to Exit 45 (Rochester/Victor)

Message Updated: 8/3/2015 12:01 AM

This is the New York State Thruway Regional Advisory message for Syracuse. OK, it's traffic time On I-90 - NYS Thruway westbound between Verona - Exit 33 - and I-481- East Syracuse - Exit 34A Road maintenance work is in progress, The right lane is closed until today at about 6:00AM

Syracuse Regional Advisory Message in Audio Format Syracuse Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Rochester Regional Advisory Message

Coverage area: I-90 Thruway from Exit 39 (Syracuse/Fulton) to Exit 53 (Buffalo/Downtown)

Message Updated: 8/3/2015 12:02 AM

This is the New York State Thruway Regional Advisory message for Rochester. OK, it's traffic time On I-90 - NYS Thruway eastbound between Walden Ave - Exit 52 - and Buffalo - Exit 51 - Road maintenance work is in progress, The left lane is closed, The center lane is closed until today at about 5:00AM On I-90 - NYS Thruway eastbound between Walden Ave - Exit 52 - and Williamsville Toll Barrier Road maintenance work is in progress, The road is closed to traffic, A detour is in operation On I-90 - NYS Thruway westbound at Cleveland Dr - Exit 50A - Road maintenance work is in progress, The entrance ramp is closed until October 1 On I-90 - NYS Thruway westbound between West Seneca - Exit 54 - and Orchard Pk - Exit 55 - Road maintenance work is in progress, The left lane is closed until today at about 3:00AM

Rochester Regional Advisory Message in Audio Format Rochester Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Buffalo Regional Advisory Message

Coverage area: I-90 Thruway from Exit 45 (Rochester/Victor) to the NY/Pennsylvania State Line and I-190 Niagara Thruway

Message Updated: 8/3/2015 12:02 AM

This is the New York State Thruway Regional Advisory message for Buffalo. OK, it's traffic time On I-90 - NYS Thruway eastbound between Walden Ave - Exit 52 - and Buffalo - Exit 51 - Road maintenance work is in progress, The left lane is closed, The center lane is closed until today at about 5:00AM On I-90 - NYS Thruway eastbound between Walden Ave - Exit 52 - and Williamsville Toll Barrier Road maintenance work is in progress, The road is closed to traffic, A detour is in operation On I-90 - NYS Thruway westbound at Cleveland Dr - Exit 50A - Road maintenance work is in progress, The entrance ramp is closed until October 1 On I-90 - NYS Thruway westbound between West Seneca - Exit 54 - and Orchard Pk - Exit 55 - Road maintenance work is in progress, The left lane is closed until today at about 3:00AM

Buffalo Regional Advisory Message in Audio Format Buffalo Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)

| Google Translate Disclaimer