Skip to Main Content
Skip to Navigation

New York State Thruway Authority

Regional Advisory Messages (Text View)

New York Regional Advisory Message

Coverage area: I-87 Thruway from the NY City Line to Exit 19 (Kingston), Garden State Parkway (GSP) Connector, I-95 New England Thruway and I-287 Cross Westchester Expressway

Message Updated: 3/1/2015 2:56 AM

This is the New York State Thruway Regional Advisory message for the New York area. OK, it's traffic time Currently, there are no traffic reports And now a rundown of the scheduled construction projects on the New York State Thruway, for the Lower Hudson Valley region, for the week ending March 6th, 2015.

Road Work on I-87, between Elmsford, Exit 8A, and Nyack, Exit 11, will require north and southbound daytime lane closures, Monday to Friday from 9AM to 3PM. The Exit 10 southbound entrance ramp to the Thruway will be closed Friday night from 9PM to 5AM. A detour will be in place.

Bridge repairs on I-87, between NJ I-287, Exit 15 and Harriman, Exit 16 will require north, and southbound lane closures, Monday to Friday from 7AM to 3:30PM.

Bridge repairs on I-287 from Hartsdale, Exit 4 and White Plains, Exit 6 will require overnight double lane closures eastbound Monday through Friday from 9PM to 6AM.

Roadwork on I-95, between the Hutchison River Parkway, Exit 9 and Port Chester, Exit 22 will require overnight northbound, and southbound double lane closures, Monday to Friday from 9PM to 7AM. There will also be northbound daytime lane closures Saturday from 6AM to 2PM.
And now for some public service announcements ATTENTION... MTA BRIDGES AND TUNNELS ADVISE THAT DUE TO CONSTRUCTION ON THE MANHATTAN-BOUND HENRY HUDSON BRIDGE, ONE LANE WILL BE CLOSED BEGINNING TUESDAY, FEBRUARY 24TH FOR APPROXIMATELY ONE MONTH. THERE WILL BE TWO LANES AVAILABLE FOR MOTORISTS TO CROSS THE SPAN OF THE BRIDGE. MOTORISTS CAN EXPECT DELAYS DURING PEAK PERIODS AND SHOULD ALLOW FOR EXTRA TRAVEL TIME.

New York Regional Advisory Message in Audio Format New York Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Hudson Valley Regional Advisory Message

Coverage area: I-87 Thruway from Exit 16 (Harriman) to Exit 21A (I-90 East/Massachusetts Turnpike) and I-84

Message Updated: 3/1/2015 12:22 AM

This is the New York State Thruway Regional Advisory message for the Hudson Valley. OK, it's traffic time Currently, there are no traffic reports And now a rundown of the scheduled construction projects on the New York State Thruway, for the Hudson Valley region, for the week ending March 6th, 2015.

Road Work on I-87, between Elmsford, Exit 8A, and Nyack, Exit 11 will require north, and southbound daytime lane closures, Monday to Friday from 9AM to 3PM. The Exit 10, southbound entrance ramp to the Thruway will be closed Friday night from 9PM to 5AM. A detour will be in place.

Bridge repairs on I-87, between NJ I-287, Exit 15 and Harriman, Exit 16 will require north, and southbound lane closures, Monday to Friday from 7AM to 3:30PM.

Hudson Valley Regional Advisory Message in Audio Format Hudson Valley Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Albany Regional Advisory Message

Coverage area: I-87/I-90 Thruway from Exit 18 (New Paltz) to Exit 29A (Little Falls) and I-90 Berkshire Connector

Message Updated: 2/27/2015 10:01 PM

This is the New York State Thruway Regional Advisory message for Albany. OK, it's traffic time Currently, there are no traffic reports

Albany Regional Advisory Message in Audio Format Albany Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Utica Regional Advisory Message

Coverage area: I-90 Thruway from Exit 27 (Amsterdam) to Exit 39 (Syracuse/Fulton)

Message Updated: 2/28/2015 8:12 PM

This is the New York State Thruway Regional Advisory message for Utica. OK, it's traffic time Currently, there are no traffic reports

Utica Regional Advisory Message in Audio Format Utica Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Syracuse Regional Advisory Message

Coverage area: I-90 Thruway from Exit 29A (Little Falls) to Exit 45 (Rochester/Victor)

Message Updated: 2/28/2015 8:12 PM

This is the New York State Thruway Regional Advisory message for Syracuse. OK, it's traffic time Currently, there are no traffic reports

Syracuse Regional Advisory Message in Audio Format Syracuse Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Rochester Regional Advisory Message

Coverage area: I-90 Thruway from Exit 39 (Syracuse/Fulton) to Exit 53 (Buffalo/Downtown)

Message Updated: 2/28/2015 4:08 PM

This is the New York State Thruway Regional Advisory message for Rochester. OK, it's traffic time Currently, there are no traffic reports

Rochester Regional Advisory Message in Audio Format Rochester Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Buffalo Regional Advisory Message

Coverage area: I-90 Thruway from Exit 45 (Rochester/Victor) to the NY/Pennsylvania State Line and I-190 Niagara Thruway

Message Updated: 2/28/2015 8:12 PM

This is the New York State Thruway Regional Advisory message for Buffalo. OK, it's traffic time Currently, there are no traffic reports And now a rundown of the scheduled construction projects on the New York State Thruway in the Buffalo/Erie region´┐ŻFor this week ending March 6th:

On Interstate 90:

A left lane closure will be in place for bridge work, east and westbound between Exit 58 (Silver Creek) and Exit 59 (Dunkirk-Fredonia) starting Monday at 7AM until Wednesday 5PM, and again Thursday from 7AM to 5PM, and Friday from 7AM to2PM.

On Interstate 190:

A right lane closure will remain in place until further notice on Exit 9 (Porter Avenue) southbound. The ramp will remain open at all times.

Also, a right lane closure will remain in place until further notice northbound on Exit 9 (Peace Bridge-Porter Avenue) to the Peace Bridge Plaza Split Ramp.
Also, a new traffic pattern will be in place on Exit 9 ramp, from the Peace Bridge Plaza Split Ramp to Niagara Street. The ramp will remain open at all times.

A lane closure will remain in place for road work on the Busti Avenue On-Ramp to the I-190 southbound. The ramp will remain open at all times.
---------------------------------------------------------------------------------------------------------------------
In addition to these projects, motorists can expect to see Thruway Personnel along the entire length of the Thruway performing routine maintenance. Please use caution when traveling through highway construction zones and remember to obey all posted work zone speed limits.

For your safety, as well as the safety of our construction and maintenance workers, most work zone speed limits will be posted at 45MPH and strictly enforced by State Police.

Please remember to use caution when entering Toll Plazas. Be aware that it is necessary for toll personnel to cross lanes from time to time.

As always, remember to wear your seatbelts and have a safe and enjoyable trip.

Buffalo Regional Advisory Message in Audio Format Buffalo Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)

| Google Translate Disclaimer