Skip to Main Content
Skip to Navigation

Regional Advisory Messages

This page does not refresh automatically, you must manually refresh this page.
Information is updated as conditions change.

New York Regional Advisory Message

Coverage area: I-87 Thruway from the NY City Line to Exit 19 (Kingston), Garden State Parkway (GSP) Connector, I-95 New England Thruway and I-287 Cross Westchester Expressway

Message Updated: 8/20/2018 2:22 AM

This is the New York State Thruway Regional Advisory message for the New York area. OK, it's traffic time On I-95 - New England Thruway northbound between New Rochelle Toll Barrier and the end of I-95 - New England Thruway Road maintenance work is in progress, The left lane is closed, Look out for a slow moving maintenance vehicle until today at about 7:00AM On I-87 - NYS Thruway northbound between New Paltz - Exit 18 - and Kingston - Exit 19 - Road maintenance work is in progress, The right lane is closed until today at about 6:00AM . And now a rundown of the scheduled construction projects on the New York State Thruway, for the Lower Hudson Valley region, for the week ending August 24, 2018.

Road work on I-87 between Exit 9 (White Plains Road /Route 119) and Exit 13 (Palisades Interstate Parkway) will require southbound single lane closures Tuesday to Wednesday from 10 PM � 5 PM; and northbound single and double lane closures Monday to Thursday from 8 pm � 5 am, and Friday from 10 pm � 5 am.

Road work on I-87 between Exit 13 (Palisades Interstate Parkway) � Exit 15 (New Jersey I-287) will require overnight southbound single and double lane closures Monday from 7 PM � 5 AM, Tuesday to Wednesday from 7 PM � 6 AM, Thursday from 8 PM to 6 AM, and Friday from 7 PM- 6 AM; as well as northbound single and double lane closures Monday from 7 pm- 5 am, Tuesday to Thursday from 8 PM � 6 AM, and Friday from 9 PM- 7 AM.

Road work on I-87 between Exit 15 (New Jersey I-287) � Exit 16 (Harriman) will require overnight northbound single and double lane closures Monday and Wednesday from 7 PM � 7 AM, Tuesday from 7 PM � 11 PM, and Friday from 10 PM � 7 AM; as well as southbound single and double lane closures on Monday from 8 PM � 6 AM, Tuesday from 6 PM � 10 PM, Wednesday from 6 PM � 6 AM, Thursday from 5 PM- 5AM, and Friday from 6 PM-7 AM. Road work on I-287 between Exit 5 (Hillside Ave/Tarrytown Road) and Exit 6 (N Broadway/Orchard Road) will require overnight westbound single and double lane closures Monday to Thursday from 8 PM � 6 AM, and Friday from 9 PM � 6 AM.

Road work on I-287 between Exit 9 (Hutchinson River Parkway) and Exit 11 (Boston Post Road) will require daytime eastbound rolling single lane closures Monday to Tuesday from 9:30 am � 2:30 pm; and westbound rolling single lane closures from 9:30 am � 2:30 pm.

Road work on I-95 between Exit 8 (Pelham Pkwy/Shore Road) and Exit 15 (Boston Post Road) will require northbound double lane closures Monday to Friday from 1 AM � 5 AM.
With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown.

New York Regional Advisory Message in Audio Format New York Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Hudson Valley Regional Advisory Message

Coverage area: I-87 Thruway from Exit 16 (Harriman) to Exit 21A (I-90 East/Massachusetts Turnpike) and I-84

Message Updated: 8/20/2018 12:03 AM

This is the New York State Thruway Regional Advisory message for the Hudson Valley. OK, it's traffic time On I-87 - NYS Thruway northbound between New Paltz - Exit 18 - and Kingston - Exit 19 - Road maintenance work is in progress, The right lane is closed until today at about 6:00AM . And now a rundown of the scheduled construction projects on the New York State Thruway, for the Hudson Valley region, for the week ending August 24, 2018. Road work on I-87 between Exit 9 (White Plains Road /Route 119) and Exit 13 (Palisades Interstate Parkway) will require southbound single lane closures Tuesday to Wednesday from 10 PM � 5 PM; and northbound single and double lane closures Monday to Thursday from 8 pm � 5 am, and Friday from 10 pm � 5 am.

Road work on I-87 between Exit 13 (Palisades Interstate Parkway) � Exit 15 (New Jersey I-287) will require overnight southbound single and double lane closures Monday from 7 PM � 5 AM, Tuesday to Wednesday from 7 PM � 6 AM, Thursday from 8 PM to 6 AM, and Friday from 7 PM- 6 AM; as well as northbound single and double lane closures Monday from 7 pm- 5 am, Tuesday to Thursday from 8 PM � 6 AM, and Friday from 9 PM- 7 AM.

Road work on I-87 between Exit 15 (New Jersey I-287) � Exit 16 (Harriman) will require overnight northbound single and double lane closures Monday and Wednesday from 7 PM � 7 AM, Tuesday from 7 PM � 11 PM, and Friday from 10 PM � 7 AM; as well as southbound single and double lane closures on Monday from 8 PM � 6 AM, Tuesday from 6 PM � 10 PM, Wednesday from 6 PM � 6 AM, Thursday from 5 PM- 5AM, and Friday from 6 PM-7 AM.

Road work on I-87 at the Exit 16 (Harriman) Toll Plaza will require daytime single lane closures on the southbound on-ramp Tuesday from 12 PM � 6 PM, Wednesday � Thursday from 10 AM � 6 PM, and Friday from 10 AM � 1 PM; overnight single lane closures on the southbound on-ramp Monday-Thursday from 5 PM-5AM, and Friday from 9 PM- 5AM; daytime and overnight single lane closures on the northbound off-ramp Monday � Wednesday 7 AM � 2 PM and 8 PM � 5 AM, Thursday from 11 PM � 5 AM, Friday from 9 Pm � 5 AM; as well as daytime shoulder closures at the Harriman Toll Plaza Monday � Thursday from 8 AM- 3 PM; and Friday from 8 am � 12 pm. Road work between Newburgh/Exit 17 and New Paltz/Exit 18 will require daytime southbound single. With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown.

Hudson Valley Regional Advisory Message in Audio Format Hudson Valley Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Albany Regional Advisory Message

Coverage area: I-87/I-90 Thruway from Exit 18 (New Paltz) to Exit 29A (Little Falls) and I-90 Berkshire Connector

Message Updated: 8/20/2018 12:03 AM

This is the New York State Thruway Regional Advisory message for Albany. OK, it's traffic time On I-87 - NYS Thruway northbound between New Paltz - Exit 18 - and Kingston - Exit 19 - Road maintenance work is in progress, The right lane is closed until today at about 6:00AM On I-90 - Berkshire Connector eastbound between Start of Berkshire Connector at Exit 21A - and I-90 at Exit B1 - Road maintenance work is in progress, The right lane is closed On I-90 - Berkshire Connector westbound between I-90 at Exit B1 - and Start of Berkshire Connector at Exit 21A - Bridge maintenance work is in progress, The right lane is closed And now a rundown of scheduled construction projects on the New York State Thruway in the Albany Division for the week of August 20, 2018: Rock Blasting between Interchange B1, Hudson/Rensselaer, and the Canaan Toll Barrier, will require east & westbound traffic stoppages Monday thru Friday, from 10AM to 2PM.

Road Work between Interchange B1, Hudson/Rensselaer, and Exit 21A, I-87/Thruway Mainline, will have 24-hour, around-the-clock, east and westbound right and left lane closures, Monday thru Sunday, and an eastbound left lane closure on Friday from 7am to 3pm.

Road Work between Interchange B1, Hudson/Rensselaer and Interchange B2, Taconic Parkway, will have east & westbound right and left lane closures Monday thru Thursday 5AM to 6PM and a 24-hour, around-the-clock lane closure Tuesday and Wednesday.

Road work between the Canaan Toll Barrier and Exit B3, Austerlitz will require east and westbound left and right lane closures Monday thru Friday from 7am to 5pm. Road work between Interchange 20, Saugerties and Interchange 21, Catskill, will have northbound right lane closures Tuesday and Wednesday, from 10PM to 6AM.

Road work between Interchange 22, Selkirk and Interchange 23, I-787 Albany will require southbound left and right lane closures Tuesday thru Thursday from 3AM to 2PM. Road Work between Interchange 26, Rotterdam and Interchange 27, Amsterdam, will have westbound right lane closures Monday thru Friday, from 7AM to 3PM.

Road Work between Interchange 27, Amsterdam and Interchange 28, Fultonville
will have a 24-hour, around-the-clock, eastbound right lane closure from 7AM Monday thru 10AM Sunday and a westbound right lane closure Wednesday from 5PM to 4AM. Road Work between Interchange 29, Canajoharie and Interchange 28, Fultonville, will have east and westbound right and left lane closures Monday thru Friday, from 5PM to 6AM, and Thursday from 7AM to 2PM

Road Work between Interchange 29, Canajoharie and Interchange 29A, Little Falls, will have an eastbound right lane closure on Friday.

Albany Regional Advisory Message in Audio Format Albany Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Utica Regional Advisory Message

Coverage area: I-90 Thruway from Exit 27 (Amsterdam) to Exit 39 (Syracuse/Fulton)

Message Updated: 8/20/2018 2:17 AM

This is the New York State Thruway Regional Advisory message for Utica. OK, it's traffic time Currently, there are no traffic reports

Utica Regional Advisory Message in Audio Format Utica Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Syracuse Regional Advisory Message

Coverage area: I-90 Thruway from Exit 29A (Little Falls) to Exit 45 (Rochester/Victor)

Message Updated: 8/20/2018 2:17 AM

This is the New York State Thruway Regional Advisory message for Syracuse. OK, it's traffic time On I-90 - NYS Thruway eastbound between I-390 - Rochester - Exit 46 - and Canandaigua - Exit 44 - Road maintenance work is in progress, The right lane is closed until today at about 6:00AM On I-90 - NYS Thruway westbound between Manchester - Exit 43 - and I-490 - Rochester - Exit 45 - Road maintenance work is in progress, The right lane is closed until today at about 6:30AM

Syracuse Regional Advisory Message in Audio Format Syracuse Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Rochester Regional Advisory Message

Coverage area: I-90 Thruway from Exit 39 (Syracuse/Fulton) to Exit 53 (Buffalo/Downtown)

Message Updated: 8/20/2018 2:12 AM

This is the New York State Thruway Regional Advisory message for Rochester. OK, it's traffic time On I-90 - NYS Thruway eastbound between Walden Ave - Exit 52 - and Williamsville Toll Barrier Road maintenance work is in progress, The right lane is closed, Look out for a slow moving maintenance vehicle until today at about 3:30AM On I-90 - NYS Thruway eastbound between I-390 - Rochester - Exit 46 - and Canandaigua - Exit 44 - Road maintenance work is in progress, The right lane is closed until today at about 6:00AM On I-90 - NYS Thruway westbound between Manchester - Exit 43 - and I-490 - Rochester - Exit 45 - Road maintenance work is in progress, The right lane is closed until today at about 6:30AM . And now a rundown of the scheduled construction projects on the New York State Thruway in the Rochester region�for the week starting Monday, August 20th�.

Motorists can expect to see Various Personnel along the entire length of the Thruway performing regular maintenance and construction work.

So�Please move over or slow down before entering these Thruway Work-Zones and remember to obey all posted Work-Zone speed limits.

For driver�s safety, as well as the safety of our construction and maintenance workers, most work-zone speed limits will be posted at 55MPH and strictly enforced by State Police.

And�Please remember to slow down and use caution when entering Thruway Toll Plazas.

Keep in mind that it is necessary for toll personnel to cross lanes from time to time. As always, remember to wear your seat-belts and have a safe and enjoyable trip.

Rochester Regional Advisory Message in Audio Format Rochester Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Buffalo Regional Advisory Message

Coverage area: I-90 Thruway from Exit 45 (Rochester/Victor) to the NY/Pennsylvania State Line and I-190 Niagara Thruway

Message Updated: 8/20/2018 2:12 AM

This is the New York State Thruway Regional Advisory message for Buffalo. OK, it's traffic time On I-190 - Niagara Thruway southbound between Smith St - Exit 4 - and Clinton St - Exit 2 - Road maintenance work is in progress, The left lane is closed until today at about 5:30AM On I-90 - NYS Thruway eastbound between Walden Ave - Exit 52 - and Williamsville Toll Barrier Road maintenance work is in progress, The right lane is closed, Look out for a slow moving maintenance vehicle until today at about 3:30AM On I-90 - NYS Thruway eastbound between I-390 - Rochester - Exit 46 - and Canandaigua - Exit 44 - Road maintenance work is in progress, The right lane is closed until today at about 6:00AM . And now a rundown of the scheduled construction projects on the New York State Thruway in the Buffalo-Erie region�for the week starting Monday, August 20th�.

ON INTERSTATE 90

A temporary change in lane configuration remains in place, until further notice, for roadwork WESTBOUND between Exit 54 (West Seneca- NY Route 400) and the Lackawanna Toll Barrier. Motorists are advised to slow-down and remain alert as the posted speed limit for this work-zone is 45 miles per hour.

A temporary change in lane configuration remains in place, until further notice, for roadwork EASTBOUND between the Lackawanna Toll Barrier, and Exit 54 (West Seneca � NY Route 400). Motorists are advised to slow-down and remain alert as the posted speed limit for this work-zone is 45 miles per hour.

Construction work continues at Interchange 57 (Hamburg) affecting traffic entering and exiting the Hamburg Toll Barrier, to and from NY Route 75!!! Motorists should remain alert and adjust speed to the changing traffic patterns at Exit 57 (Hamburg) and NY Route 75.

Daytime alternating lane closures will be in place for overhead bridge work east and westbound between Exit 60 (Westfield) and Exit 59 (Dunkirk-Fredonia) Monday through Thursday from 7am to 5pm each day.
-----------------------------------------------------------------------------------------------------------------------------
In addition to this work�.Motorists can expect to see Various Personnel along the entire length of the Thruway performing regular maintenance and construction work.

So�Please move over or slow down before entering these Thruway Work-Zones and remember to obey all posted Work-Zone speed limits.

For driver�s safety, as well as the safety of our construction and maintenance workers, most work-zone speed limits will be posted at 55MPH and strictly enforced by State Police.

And�Please remember to slow down and use caution when entering Thruway Toll Plazas.

Keep in mind that it is necessary for toll personnel to cross lanes from time to time.

Buffalo Regional Advisory Message in Audio Format Buffalo Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)