Skip to Main Content
Skip to Navigation

Regional Advisory Messages

This page does not refresh automatically, you must manually refresh this page.
Information is updated as conditions change.

New York Regional Advisory Message

Coverage area: I-87 Thruway from the NY City Line to Exit 19 (Kingston), Garden State Parkway (GSP) Connector, I-95 New England Thruway and I-287 Cross Westchester Expressway

Message Updated: 5/24/2016 9:43 AM

This is the New York State Thruway Regional Advisory message for the New York area. Now, for the urgent reports On I-87 - NYS Thruway southbound between Garden State Parkway - Exit 14A - and Tappan Zee Bridge Toll Barrier Traffic is stop and go, Traffic is slow Now for Travel Time Information, I-87 Southbound from Exit 14A - Garden State Parkway milepost 24 to mid-span on the Tappan Zee Bridge milepost 14, the current estimated travel time is 27 minutes. OK, it's traffic time On I-87 - NYS Thruway southbound between Garden State Parkway - Exit 14A - and Tappan Zee Bridge Toll Barrier Traffic is stop and go, Traffic is slow With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown. And now a rundown of the scheduled construction projects on the New York State Thruway, for the Lower Hudson Valley region, for the week ending May 27, 2016.

Road work on I-87 between Stew Leonard Drive, Exit 6A and Saw Mill River Parkway, Exit 7A will require southbound daytime single lane closures on Monday from 9AM to 4PM.

Road work on I-87 between the Cross Westchester Expressway, Exit 8, and West Nyack, Exit 12 will require north, and southbound, daytime single lane closures Monday to Wednesday from 9AM to 3PM.

Road work on I-87 between the Palisades Interstate Parkway, Exit 13N/13S and Suffern Exit 15A, will require north, and southbound, daytime single lane closures on Wednesday from 9AM to 2PM. There will also be north, and southbound overnight single lane closures Monday to Wednesday from 7PM to 5AM. Northbound Ramp C, northbound I-87 to New Jersey southbound will be closed Monday to Wednesday from 9PM to 5AM and southbound Ramp E, southbound I-87 to I-287/ NJ 17 will have single lane closures Monday to Wednesday from 10PM to 5AM. Ramp E will remain open at all times.

Bridge work on I-87 between Suffern, Exit 15A, and Harriman, Exit 16 will require southbound daytime single lane closures Tuesday thru Thursday from 9AM to 5PM.

Road work on I-95 between Bruckner Expressway (I-95) and Rye, Exit 19 will require north, and southbound, daytime single, and double lane closures Monday to Wednesday from 10AM to 2PM. There will also be north, and southbound overnight single, and double lane closures Monday to Wednesday from 7PM to 7AM.

A long term closure of the I-95 Exit 16 (New Rochelle/North Avenue/Cedar Street) southbound on-ramp will begin Tuesday, December 15, at 10AM, and continue for the duration of the winter season.
Ongoing bridge, and pavement repairs in the vicinity of the Exit 16 southbound on-ramp will force the closure of the ramp, due to the lack of an acceleration lane for entering traffic. All traffic seeking to enter I-95 southbound, will be detoured via Memorial Highway to the Memorial Highway southbound entrance ramp.
All work is weather dependent and subject to change.

New York Regional Advisory Message in Audio Format New York Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Hudson Valley Regional Advisory Message

Coverage area: I-87 Thruway from Exit 16 (Harriman) to Exit 21A (I-90 East/Massachusetts Turnpike) and I-84

Message Updated: 5/24/2016 9:02 AM

This is the New York State Thruway Regional Advisory message for the Hudson Valley. OK, it's traffic time Currently, there are no traffic reports With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown. And now a rundown of the scheduled construction projects on the New York State Thruway, for the Hudson Valley region, for the week ending May 27, 2016.

Road work on I-87 between the Cross Westchester Expressway, Exit 8 and West Nyack, Exit 12 will require north, and, southbound daytime single lane closures Monday to Wednesday from 9AM to 3PM.

Road work on I-87 between the Palisades Interstate Parkway, Exit 13N/13S and Suffern, Exit 15A will require north, and southbound daytime single lane closures on Wednesday from 9AM to 2PM. There will also be north, and southbound, overnight single lane closures Monday to Wednesday from 7PM to 5AM. Northbound Ramp C, northbound I-87 to New Jersey southbound will be closed Monday to Wednesday from 9PM to 5AM and southbound Ramp E, southbound I-87 to I-287/ NJ 17 will have single lane closures Monday � Wednesday from 10PM to 5AM. Ramp E will remain open at all times.

Bridge work on I-87 between Suffern, Exit 15A and Harriman, Exit 16 will require southbound daytime single lane closures Tuesday to Thursday from 9AM to 5PM.

Hudson Valley Regional Advisory Message in Audio Format Hudson Valley Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Albany Regional Advisory Message

Coverage area: I-87/I-90 Thruway from Exit 18 (New Paltz) to Exit 29A (Little Falls) and I-90 Berkshire Connector

Message Updated: 5/24/2016 9:02 AM

This is the New York State Thruway Regional Advisory message for Albany. OK, it's traffic time On I-90 - NYS Thruway eastbound between Little Falls - Exit 29A - and Canajoharie - Exit 29 - Road maintenance work is in progress, The right lane is closed until today at about 2:30PM On I-90 - NYS Thruway eastbound between Fultonville - Exit 28 - and Amsterdam - Exit 27 - Road maintenance work is in progress, The right lane is closed until today at about 1:00PM On I-90 - Berkshire Connector eastbound between Start of Berkshire Connector at Exit 21A - and I-90 at Exit B1 - Bridge maintenance work is in progress, The left lane is closed until November 18 On I-90 - Berkshire Connector westbound between I-90 at Exit B1 - and Start of Berkshire Connector at Exit 21A - Road maintenance work is in progress, The right lane is closed until November 18 And now a rundown of scheduled construction projects on the New York State Thruway in the Albany Division for the week ending May 27, 2016:

On the Berkshire Connector:

Bridge Painting between I-87 Exit 21A, Thruway Mainline and Interchange B1, Hudson, will have 24 hour, around-the-clock east, and westbound, left lane closures on the Castleton-on-Hudson Bridge, Monday thru Sunday.

On Interstate 87:

Road Work between Interchange 18, New Paltz and interchange 19, Kingston, will have northbound right lane closures Tuesday thru Thursday, from 7AM to 2PM.

Overnight Road Work between Interchange 18, New Paltz and Interchange 19, Kingston, will have northbound right lane closures Monday thru Wednesday, from 6PM to 6AM.

Bridge Work at Interchange 19, Kingston, will have north, and southbound left, and right lane closures Monday thru Thursday, from 6AM to 4PM.

Road Work between Interchange 19, Kingston and Interchange 20, Saugerties, will have northbound right lane closures Tuesday thru Thursday, 7AM to 2PM.

Overnight Road Work between Interchange 20, Saugerties and Interchange 21, Catskill, will have northbound right lane closures Monday thru Wednesday, from 6PM to 6AM.

Road Work between Interchange 21A, Berkshire Spur and Interchange 21B, Coxsackie, will have a north, and southbound left, and right lane closures on Tuesday, from 7AM to 2PM.

Road Work between Interchange 21B, Coxsackie and Interchange 22, Selkirk, will have northbound right lane closures on Tuesday & Wednesday, from 9AM to 1PM.

On Interstate 90:

Road Work between Interchange 25, Schenectady and Interchange 25A, Duanesburg, will have a westbound left closure on Wednesday, from 8AM to 12Noon.

Road Work between Interchange 27, Amsterdam and Interchange 29, Canajoharie, will have east, and westbound right lane closures Monday thru Thursday, from 7AM to 2PM.

Albany Regional Advisory Message in Audio Format Albany Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Utica Regional Advisory Message

Coverage area: I-90 Thruway from Exit 27 (Amsterdam) to Exit 39 (Syracuse/Fulton)

Message Updated: 5/24/2016 9:16 AM

This is the New York State Thruway Regional Advisory message for Utica. OK, it's traffic time On I-90 - NYS Thruway eastbound between Liverpool - Exit 38 - and Syracuse - Exit 35 - Road maintenance work is in progress, The right lane is closed until today at about 3:15PM On I-90 - NYS Thruway eastbound between Canastota - Exit 34 - and Verona - Exit 33 - Road maintenance work is in progress, The right lane is closed until today at about 11:15AM On I-90 - NYS Thruway eastbound between Little Falls - Exit 29A - and Canajoharie - Exit 29 - Road maintenance work is in progress, The right lane is closed until today at about 2:30PM On I-90 - NYS Thruway eastbound between Fultonville - Exit 28 - and Amsterdam - Exit 27 - Road maintenance work is in progress, The right lane is closed until today at about 1:00PM On I-90 - NYS Thruway westbound between I-690 - State Fair - Exit 39 - and Weedsport - Exit 40 - Road maintenance work is in progress, The right lane is closed until today at about 10:15AM

Utica Regional Advisory Message in Audio Format Utica Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Syracuse Regional Advisory Message

Coverage area: I-90 Thruway from Exit 29A (Little Falls) to Exit 45 (Rochester/Victor)

Message Updated: 5/24/2016 9:16 AM

This is the New York State Thruway Regional Advisory message for Syracuse. OK, it's traffic time On I-90 - NYS Thruway eastbound between Geneva - Exit 42 - and Weedsport - Exit 40 - Road maintenance work is in progress, The left lane is closed until today at about 10:30AM On I-90 - NYS Thruway eastbound between Liverpool - Exit 38 - and Syracuse - Exit 35 - Road maintenance work is in progress, The right lane is closed until today at about 3:15PM On I-90 - NYS Thruway eastbound between Canastota - Exit 34 - and Verona - Exit 33 - Road maintenance work is in progress, The right lane is closed until today at about 11:15AM On I-90 - NYS Thruway westbound between I-690 - State Fair - Exit 39 - and Weedsport - Exit 40 - Road maintenance work is in progress, The right lane is closed until today at about 10:15AM

Syracuse Regional Advisory Message in Audio Format Syracuse Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Rochester Regional Advisory Message

Coverage area: I-90 Thruway from Exit 39 (Syracuse/Fulton) to Exit 53 (Buffalo/Downtown)

Message Updated: 5/24/2016 9:18 AM

This is the New York State Thruway Regional Advisory message for Rochester. OK, it's traffic time On I-90 - NYS Thruway eastbound between Cleveland Dr - Exit 50A - and Williamsville Toll Barrier Road maintenance work is in progress, The left lane is closed until today at about 2:30PM On I-90 - NYS Thruway eastbound between I-390 - Rochester - Exit 46 - and I-490 - Rochester - Exit 45 - Road maintenance work is in progress, The right lane is closed until today at about 3:00PM On I-90 - NYS Thruway eastbound between Geneva - Exit 42 - and Weedsport - Exit 40 - Road maintenance work is in progress, The left lane is closed until today at about 10:30AM On I-90 - NYS Thruway westbound between I-690 - State Fair - Exit 39 - and Weedsport - Exit 40 - Road maintenance work is in progress, The right lane is closed until today at about 10:15AM

Rochester Regional Advisory Message in Audio Format Rochester Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Buffalo Regional Advisory Message

Coverage area: I-90 Thruway from Exit 45 (Rochester/Victor) to the NY/Pennsylvania State Line and I-190 Niagara Thruway

Message Updated: 5/24/2016 9:18 AM

This is the New York State Thruway Regional Advisory message for Buffalo. OK, it's traffic time On I-90 - NYS Thruway eastbound between Eden - Exit 57A - and Hamburg - Exit 57 - Road maintenance work is in progress, The right lane is closed until today at about 11:00AM On I-90 - NYS Thruway eastbound between Cleveland Dr - Exit 50A - and Williamsville Toll Barrier Road maintenance work is in progress, The left lane is closed until today at about 2:30PM On I-90 - NYS Thruway eastbound between I-390 - Rochester - Exit 46 - and I-490 - Rochester - Exit 45 - Road maintenance work is in progress, The right lane is closed until today at about 3:00PM On I-90 - NYS Thruway westbound between Eden - Exit 57A - and Dunkirk - Exit 59 - Road maintenance work is in progress, The right lane is closed until today at about 8:00PM On I-90 - NYS Thruway westbound between Dunkirk - Exit 59 - and Westfield - Exit 60 - Road maintenance work is in progress, The right lane is closed until today at about 2:15PM On I-90 - NYS Thruway westbound between Westfield - Exit 60 - and Ripley Toll Barrier Road maintenance work is in progress, The left lane is closed until Thursday, at about 12:00PM On I-90 - NYS Thruway westbound between Westfield - Exit 60 - and Ripley Toll Barrier Road maintenance work is in progress, The right lane is closed until today at about 6:00PM

Buffalo Regional Advisory Message in Audio Format Buffalo Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)