Skip to Main Content
Skip to Navigation

Regional Advisory Messages

This page does not refresh automatically, you must manually refresh this page.
Information is updated as conditions change.

New York Regional Advisory Message

Coverage area: I-87 Thruway from the NY City Line to Exit 19 (Kingston), Garden State Parkway (GSP) Connector, I-95 New England Thruway and I-287 Cross Westchester Expressway

Message Updated: 11/19/2018 12:21 AM

This is the New York State Thruway Regional Advisory message for the New York area. OK, it's traffic time On I-87 - NYS Thruway northbound between Exit 13 (I-87) - Palisades Interstate Parkway and Exit 14 (I-87) - Spring Valley (Rte 59) Road maintenance work is in progress, The left lane is closed, The center lane is closed for the next two hours With the ongoing construction of the Governor Mario M Cuomo Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown.

New York Regional Advisory Message in Audio Format New York Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Hudson Valley Regional Advisory Message

Coverage area: I-87 Thruway from Exit 16 (Harriman) to Exit 21A (I-90 East/Massachusetts Turnpike) and I-84

Message Updated: 11/18/2018 3:40 PM

This is the New York State Thruway Regional Advisory message for the Hudson Valley. OK, it's traffic time Currently, there are no traffic reports With the ongoing construction of the Governor Mario M Cuomo Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown.

Hudson Valley Regional Advisory Message in Audio Format Hudson Valley Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Albany Regional Advisory Message

Coverage area: I-87/I-90 Thruway from Exit 18 (New Paltz) to Exit 29A (Little Falls) and I-90 Berkshire Connector

Message Updated: 11/18/2018 9:29 PM

This is the New York State Thruway Regional Advisory message for Albany. OK, it's traffic time Currently, there are no traffic reports And now a rundown of scheduled construction projects on the New York State Thruway in the Albany Division for the week of November 18, 2018: Road Work between I-87 Exit 21A, Thruway Mainline, and Interchange B2, Taconic Parkway, will have east and westbound left and right lane closures Monday thru Wednesday, between 6 AM and 5 PM.

Roadwork between Interchange B2, Taconic Parkway, and the Massachusetts State Line, will have eastbound right lane closures Monday and Tuesday, between 6 AM and 5 PM. Road Work between Interchange 19, Kingston and Interchange 20, Saugerties, will have southbound right lane closures Monday and Tuesday between 7 AM and 1 PM.

Road Work between Interchange 20, Saugerties, and Interchange 21, Catskill, will have northbound right lane closures Monday and Tuesday between 7 AM and 1 PM.
Road Work between Interchange 21, Catskill and Interchange 21B, Coxsackie, will have southbound left and right lane closures Monday and Tuesday between 7 AM and 2 PM.

Road Work between Interchange 26, Rotterdam, and Interchange 27, Amsterdam, will have east and westbound right lane closures Monday thru Wednesday, between 7 AM and 3 PM.

Road Work between Interchange 27, Amsterdam and Interchange 28, Fultonville, will have east and westbound left lane closures Monday and Tuesday between 6AM and 5 PM.

Road Work between Interchange 28, Fultonville, and Interchange 29, Canajoharie, will have east and westbound right and left lane closures Monday thru Wednesday, between 6 AM and 2 PM.




Albany Regional Advisory Message in Audio Format Albany Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Utica Regional Advisory Message

Coverage area: I-90 Thruway from Exit 27 (Amsterdam) to Exit 39 (Syracuse/Fulton)

Message Updated: 11/18/2018 9:40 PM

This is the New York State Thruway Regional Advisory message for Utica. OK, it's traffic time Currently, there are no traffic reports

Utica Regional Advisory Message in Audio Format Utica Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Syracuse Regional Advisory Message

Coverage area: I-90 Thruway from Exit 29A (Little Falls) to Exit 45 (Rochester/Victor)

Message Updated: 11/18/2018 9:40 PM

This is the New York State Thruway Regional Advisory message for Syracuse. OK, it's traffic time Currently, there are no traffic reports

Syracuse Regional Advisory Message in Audio Format Syracuse Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Rochester Regional Advisory Message

Coverage area: I-90 Thruway from Exit 39 (Syracuse/Fulton) to Exit 53 (Buffalo/Downtown)

Message Updated: 11/19/2018 12:31 AM

This is the New York State Thruway Regional Advisory message for Rochester. OK, it's traffic time On I-90 - NYS Thruway eastbound, between NY 33 and Exit 48A (I-90) - Pembroke (Rte 77) Look out for an accident On I-90 - NYS Thruway westbound between Exit 52 (I-90) - Buffalo- Walden Ave and Exit 57 (I-90) - Hamburg (Rte 75) Road maintenance work is in progress, The right lane is closed for the next two hours . And now a road safety reminder from the New York State Thruway and the Rochester region�for the week starting Monday, November 19th�.

Motorists can expect to see Various Personnel along the entire length of the Thruway performing regular maintenance and construction work.

So�Please move over or slow down before entering these Thruway Work-Zones and remember to obey all posted Work-Zone speed limits.

For driver�s safety, as well as the safety of our construction and maintenance workers, most work-zone speed limits will be posted at 55MPH and strictly enforced by State Police.

And�Please remember to slow down and use caution when entering Thruway Toll Plazas.

Keep in mind that it is necessary for toll personnel to cross lanes from time to time.

As always, do not text and drive, remember to wear your seat-belts and have a safe and enjoyable trip.

Rochester Regional Advisory Message in Audio Format Rochester Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Buffalo Regional Advisory Message

Coverage area: I-90 Thruway from Exit 45 (Rochester/Victor) to the NY/Pennsylvania State Line and I-190 Niagara Thruway

Message Updated: 11/19/2018 12:31 AM

This is the New York State Thruway Regional Advisory message for Buffalo. OK, it's traffic time On I-90 - NYS Thruway eastbound, between NY 33 and Exit 48A (I-90) - Pembroke (Rte 77) Look out for an accident On I-90 - NYS Thruway westbound between Exit 52 (I-90) - Buffalo- Walden Ave and Exit 57 (I-90) - Hamburg (Rte 75) Road maintenance work is in progress, The right lane is closed for the next two hours . And now a rundown of the scheduled construction projects on the New York State Thruway in the Buffalo-Erie region�for the week starting Monday, November 19th�.

ON INTERSTATE 90

The lane configuration between Exit 54 (West Seneca- NY Route 400) and the Lackawanna Toll Barrier has returned its normal configuration both east and westbound. The speed limit for the section of the I-90 is 55mph.

A daytime alternating lane closure will be in place for sign inspection work east and westbound near Exit 54 (NY Route 400-West Seneca) Monday from 9am to 4pm and Tuesday from 9am to 1pm.

An overnight alternating lane closure will be in place for road work westbound near Exit 53 (Buffalo Downtown - Canada) Sunday Monday and Tuesday from 7pm to 6am.

An overnight RIGHT lane closure will be in place for road work southbound near Interchange 53 and Interstate 90. This lane closure will include the I-190 southbound ramp to I-90 westbound. The ramp will remain open at all times. That�s Monday and Tuesday from 8pm to 6am.

An overnight RIGHT lane closure will be in place for road work NORTHBOUND near the South Grand Island Bridge!! Monday and Tuesday from 8pm to 6am.
----------------------------------------------------------------------------------------------------------------------------
In addition to this work�.Motorists can expect to see Various Personnel along the entire length of the Thruway performing regular maintenance and construction work.

So�Please move over or slow down before entering these Thruway Work-Zones and remember to obey all posted Work-Zone speed limits.

For driver�s safety, as well as the safety of our construction and maintenance workers, most work-zone speed limits will be posted at 55MPH and strictly enforced by State Police. And�Please remember to slow down and use caution when entering Thruway Toll Plazas.

Keep in mind that it is necessary for toll personnel to cross lanes from time to time.

As always, do not text and drive, remember to wear your seat-belts.

Buffalo Regional Advisory Message in Audio Format Buffalo Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)