Skip to Main Content
Skip to Navigation

Regional Advisory Messages

This page does not refresh automatically, you must manually refresh this page.
Information is updated as conditions change.

New York Regional Advisory Message

Coverage area: I-87 Thruway from the NY City Line to Exit 19 (Kingston), Garden State Parkway (GSP) Connector, I-95 New England Thruway and I-287 Cross Westchester Expressway

Message Updated: 6/25/2017 2:55 PM

This is the New York State Thruway Regional Advisory message for the New York area. OK, it's traffic time On I-87 - NYS Thruway northbound between Yonkers Toll Barrier and Saw Mill River Parkway - Exit 7A - Road maintenance work is in progress, The left lane is closed On I-87 - NYS Thruway northbound between Saw Mill River Parkway - Exit 8 and 8A - and South Nyack - Exit 10 - Traffic is stop and go, Traffic is stopped, Expect delays On I-87 - NYS Thruway southbound at milepost 24.7, between Airmont Rd - Exit 14B - and Spring Valley Toll Barrier Look out for an accident On I-87 - NYS Thruway southbound between Spring Valley Toll Barrier and Palisades Interstate Parkway - Exit 13 - Traffic is stop and go, Traffic is stopped, Expect delays With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown. . And now a rundown of the scheduled construction projects on the New York State Thruway, for the Lower Hudson Valley region, for the week ending June 30, 2017.

Road work on I-87 between Saw Mill River Parkway � Taconic State Parkway, Exit 7A and New Jersey � Palisades Interstate Parkway � Bear Mountain State Park, Exit 13N/13S will require daytime north and southbound single lane closures Monday-Friday from 7AM to 3PM.

Bridge work on I-87 between Spring Valley � Nanuet �NY Route 59, Exit 14 and Airmont - Montebello � Airmont Road, Exit 14B will require daytime northbound single lane closures Monday-Friday from 10AM to 12PM.

Bridge work on I-87 between Newburgh � Scranton � I-84 - NY Routes 17K and 300, Exit 17 and New Paultz � Poughkeepsie � NY Route 299, Exit 18 will require daytime north and southbound single lane closures Monday-Friday from 6AM to 4PM.

Bridge work on I-287 between the New York State Thruway (I-87) and New York City - Taconic State Parkway � Sprain Brook Parkway, Exit 3 will require daytime westbound single lane closures Monday- Friday from 10AM to 2PM.

Road work on I-95 between New Rochelle � North Ave � Cedar Street, Exit 16 and the Connecticut State Line � Connecticut Turnpike (I-95) will require daytime north and southbound single lane closure Monday-Friday from 9AM to 2:30PM.

HARRIMAN/ NEWBURGH

And now a rundown of the scheduled construction projects on the New York State Thruway, for the Hudson Valley region, for the week ending June 30, 2017.

Road work on I-87 between Saw Mill River Parkway � Taconic State Parkway, Exit 7A and New Jersey � Palisades Interstate Parkway � Bear Mountain State Park, Exit 13N/13S will require daytime north and southbound single lane closures Monday-Friday from 7AM to 3PM

Bridge work on I-87 between Spring Valley � Nanuet �NY Route 59, Exit 14 and Airmont - Montebello � Airmont Road, Exit 14B will require daytime northbound single lane closures Monday-Friday from 10AM to 12PM.

Bridge work on I-87 between Newburgh � Scranton � I-84 - NY Routes A long term closure of the I-95 Exit 16 (New Rochelle/North Avenue/Cedar Street) southbound on-ramp will begin Tuesday, December 15, at 10AM, and continue for the duration of the winter season.
Ongoing bridge, and pavement repairs in the vicinity of the Exit 16 southbound on-ramp will force the closure of the ramp, due to the lack of an acceleration lane for entering traffic. All traffic seeking to enter I-95 southbound, will be detoured via Memorial Highway to the Memorial Highway southbound entrance ramp.
All work is weather dependent and subject to change.

New York Regional Advisory Message in Audio Format New York Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Hudson Valley Regional Advisory Message

Coverage area: I-87 Thruway from Exit 16 (Harriman) to Exit 21A (I-90 East/Massachusetts Turnpike) and I-84

Message Updated: 6/25/2017 12:11 PM

This is the New York State Thruway Regional Advisory message for the Hudson Valley. OK, it's traffic time Currently, there are no traffic reports With the ongoing construction of the Tappan Zee Bridge, motorists are advised to keep their eyes on the roadway, avoid distractions, and tailgating other vehicles. Views of the new bridge construction can be seen on the New New York Bridge project website and viewing platform in Tarrytown.

Hudson Valley Regional Advisory Message in Audio Format Hudson Valley Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Albany Regional Advisory Message

Coverage area: I-87/I-90 Thruway from Exit 18 (New Paltz) to Exit 29A (Little Falls) and I-90 Berkshire Connector

Message Updated: 6/25/2017 2:55 PM

This is the New York State Thruway Regional Advisory message for Albany. OK, it's traffic time On I-90 - Berkshire Connector eastbound at milepost 6.9, between I-90 at Exit B1 - and Taconic Parkway at Exit B2 - Look out for an accident On I-90 - Berkshire Connector westbound between I-90 at Exit B1 - and Start of Berkshire Connector at Exit 21A - Road maintenance work is in progress, The left lane is closed . On Interstate 90:

Overnight Road Work between Interchange 24, Albany and Interchange 25, Schenectady, will have eastbound left and right lane closures Monday thru Thursday, from 6PM to 6AM.

Road Work between Interchange 24, Albany and Interchange 25, Schenectady, will have east and westbound left lane closures Monday through Wednesday, from 9AM to 2PM.

Road Work between Interchange 25, Schenectady and Interchange 25A, I-88 will have a westbound right lane closure Wednesday, from 8AM to 2PM.

In addition to these projects, motorists can expect to see Thruway Personnel along the entire length of the Thruway performing routine maintenance. Please use caution when traveling through highway construction zones and remember to obey all posted work zone speed limits. For your safety, as well as the safety of our construction and maintenance workers, most of the work zone speed limits will be posted at 55MPH and will be strictly enforced by State Police. Please remember to use caution when entering Toll Plazas and be aware that it is necessary for toll personnel to cross lanes from time to time. As always, remember to wear your seatbelt and have a safe and enjoyable trip.
. And now a rundown of scheduled construction projects on the New York State Thruway in the Albany Division for the week of June 26, 2017:

On the Berkshire Connector:

Road Work between I-87 Exit 21A, Thruway Mainline and Interchange B1, Hudson/Rensselaer, will have a 24-hour, around-the-clock, westbound left lane closure on the Castleton-on-Hudson Bridge, Monday thru Sunday.

Road Work between Interchange B1, Hudson/Rensselaer and Interchange B2, Taconic Parkway, will have east & westbound right and left lane closures on Tuesday, from 7AM to 7PM.

Road Work between Interchange B2, Taconic Parkway and the Canaan Toll Barrier, will have an eastbound right lane closure on Wednesday & Thursday, from 7AM to 7PM.

Road Work between the Canaan Toll Barrier, and Interchange B3, Austerlitz/Route 22, will have east & westbound bound right and left lane closures on Monday and Tuesday, from 7AM to 2PM.

On Interstate 87:

Road Work between Interchange 18, New Paltz and Interchange 19, Kingston, will have northbound right lane closures on Tuesday, from 7AM to 2PM.

Overnight Road Work between Interchange 19, Kingston and Interchange 18, New Paltz, will have southbound right and left lane closures Monday thru Thursday, from 6PM to 8AM.

Road Work between Interchange 20, Saugerties and Interchange 21, Catskill, will have north & southbound left and right lane closures Tuesday through Thursday, from 7AM to 4PM.

Rock Blasting between Interchange 21, Catskill and Interchange 21B, Coxsackie, will require north and southbound traffic stoppages Monday through Thursday, from 11AM to 12Noon.

Road Work between Interchange 21B, Coxsackie and Interchange and Exit 21A, Berkshire Spur, will have north and southbound left and right lane closures Monday thru Thursday, from 8AM to 5PM.

Roadwork between Interchange 24, I-87 Northway and Interchange 23, Albany/I-787 will have a southbound right lane closure on Wednesday, from 9AM to 2PM.

Albany Regional Advisory Message in Audio Format Albany Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Utica Regional Advisory Message

Coverage area: I-90 Thruway from Exit 27 (Amsterdam) to Exit 39 (Syracuse/Fulton)

Message Updated: 6/25/2017 1:09 PM

This is the New York State Thruway Regional Advisory message for Utica. OK, it's traffic time Currently, there are no traffic reports

Utica Regional Advisory Message in Audio Format Utica Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Syracuse Regional Advisory Message

Coverage area: I-90 Thruway from Exit 29A (Little Falls) to Exit 45 (Rochester/Victor)

Message Updated: 6/25/2017 2:31 PM

This is the New York State Thruway Regional Advisory message for Syracuse. OK, it's traffic time On I-90 - NYS Thruway eastbound at milepost 342.7, between Canandaigua - Exit 44 - and Manchester - Exit 43 - Look out for an accident

Syracuse Regional Advisory Message in Audio Format Syracuse Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Rochester Regional Advisory Message

Coverage area: I-90 Thruway from Exit 39 (Syracuse/Fulton) to Exit 53 (Buffalo/Downtown)

Message Updated: 6/25/2017 2:45 PM

This is the New York State Thruway Regional Advisory message for Rochester. OK, it's traffic time On I-90 - NYS Thruway eastbound at milepost 342.7, between Canandaigua - Exit 44 - and Manchester - Exit 43 - Look out for an accident . And now a rundown of the scheduled construction projects on the New York State Thruway in the Rochester region�For the week starting Monday, June 26th�.

ON INTERSTATE 90
Overnight alternating lane closures will be in place for bridgework Westbound between and Exit 45 (Victor) and Exit 46 (Corning) Monday 8pm to 6am, Tuesday and Wednesday from 6pm to 4am, and Thursday from 7pm to 5am

Overnight lane closures will be in place for road paving work east and westbound between Exit 47 (Leroy) and Exit 48 (Batavia) Monday through Thursday from 6pm to 6am.

Daytime alternating lane closures will be in place for pavement repair work eastbound between and Exit 48 (Batavia) and Exit 47 (Leroy) Monday through Thursday from 5am to 2pm.

Overnight alternating lane closures will be in place for bridge repair work eastbound, between Exit 48 (Batavia) and Exit 47 (LeRoy), Monday and Tuesday from 6:30pm to 5am, Wednesday 7pm to 5am, and Thursday 8pm to 5am.

In addition to this work, motorists can expect to see Various Personnel along the entire length of the Thruway performing regular maintenance and construction work.

So�Please move over or slow down before entering these Thruway Work-Zones and remember to obey all posted Work-Zone speed limits.

For driver�s safety, as well as the safety of our construction and maintenance workers, most work-zone speed limits will be posted at 55MPH and strictly enforced by State Police.

And�Please remember to slow down and use caution when entering Thruway Toll Plazas.

Keep in mind that it is necessary for toll personnel to cross lanes from time to time.

As always, remember to wear your seatbelts and have a safe and enjoyable trip.
. And now a rundown of the scheduled construction projects on the New York State Thruway in the Buffalo-Erie region�For the week starting Monday, June 26th�

ON INTERSTATE 90
Overnight alternating lane closures will be in place for bridgework Westbound between and Exit 45 (Victor) and Exit 46 (Corning) Monday 8pm to 6am, Tuesday and Wednesday from 6pm to 4am, and Thursday from 7pm to 5am

Overnight lane closures will be in place for road paving work east and westbound between Exit 47 (Leroy) and Exit 48 (Batavia) Monday through Thursday from 6pm to 6am.

Daytime alternating lane closures will be in place for pavement repair work eastbound between Exit 48 (Batavia) and Exit 47 (Leroy) Monday through Thursday from 5am to 2pm.

Overnight alternating lane closures will be in place for bridge repair work eastbound, between Exit 48 (Batavia) and Exit 47 (LeRoy), Monday and Tuesday from 6:30pm to 5am, Wednesday 7pm to 5am, and Thursday 8pm to 5am.

An Overnight RIGHT lane closure will be in place for road paving work at Exit 48A (Pembroke) off-ramp, both east and westbound, Wednesday and Thursday from 7pm to 6am each night.

Overnight alternating lane closures will be in place for pavement repair work eastbound between Exit 49 (Depew) and Williamsville Toll Barrier Monday through Thursday from 7pm to 6am.

Overnight single lane closures are scheduled for roadwork east and westbound between the Cleveland Drive Overhead Bridge and Exit 51 (NYS Route 33 � Buffalo Airport) Monday Tuesday and Wednesday from 8pm to 11pm. At 11pm double lane closures will be set Monday, Tuesday and Wednesday from 11pm to 5am each night. Also, on Thursday the eastbound Exit 50A (Cleveland Drive) off-ramp will be closed for pavement repair work from 9pm to 6am

Overnight alternating lane closures will be in place for pavement repair work westbound between the Lackawanna Toll Barrier and Exit 56 (Blasdell) Sunday Monday and Tuesday from 8pm to 6am, Wednesday from 7pm to � 7am and Thursday from 8pm to 7am.

Rochester Regional Advisory Message in Audio Format Rochester Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top

Buffalo Regional Advisory Message

Coverage area: I-90 Thruway from Exit 45 (Rochester/Victor) to the NY/Pennsylvania State Line and I-190 Niagara Thruway

Message Updated: 6/25/2017 2:45 PM

This is the New York State Thruway Regional Advisory message for Buffalo. OK, it's traffic time On I-90 - NYS Thruway eastbound between Ripley Toll Barrier and Westfield - Exit 60 - Road maintenance work is in progress, The right lane is closed until tomorrow at about 12:00PM On I-90 - NYS Thruway westbound between Westfield - Exit 60 - and Ripley Toll Barrier Road maintenance work is in progress, The right lane is closed until June 30 . And now a rundown of the scheduled construction projects on the New York State Thruway in the Buffalo region�For the week starting Monday, June 26th�

ON INTERSTATE 190
The northbound North Grand Island Bridge will be closed for pavement repair work Monday, Tuesday and Wednesday 9pm to 6am, Thursday 10pm to 6am, and Friday from 11pm to 6am. All traffic will be crossed-over into a single lane onto the southbound North Grand Island Bridge. Overhead Lane Designation Signals will be use to direct traffic during these construction periods.

An Overnight single lane closures will be in place for Bridge Work southbound on the Exit 5 (Louisiana Street) off-ramp. Monday through Thursday from 7pm to 6am. The ramp will remain open at all times.

Also, A right Shoulder Closure will remain in place northbound at the Louisiana Street overhead Bridge until further notice.

In addition to this work, motorists can expect to see Various Personnel along the entire length of the Thruway performing regular maintenance and construction work.

So�Please move over or slow down before entering these Thruway Work-Zones and remember to obey all posted Work-Zone speed limits.

For driver�s safety, as well as the safety of our construction and maintenance workers, most work-zone speed limits will be posted at 55MPH and strictly enforced by State Police.

And�Please remember to slow down and use caution when entering Thruway Toll Plazas.

Keep in mind that it is necessary for toll personnel to cross lanes from time to time.

As always, remember to wear your seatbelts and have a safe and enjoyable trip. . And now a rundown of the scheduled construction projects on the New York State Thruway in the Buffalo-Erie region�For the week starting Monday, June 26th�

ON INTERSTATE 90
Overnight alternating lane closures will be in place for bridgework Westbound between and Exit 45 (Victor) and Exit 46 (Corning) Monday 8pm to 6am, Tuesday and Wednesday from 6pm to 4am, and Thursday from 7pm to 5am

Overnight lane closures will be in place for road paving work east and westbound between Exit 47 (Leroy) and Exit 48 (Batavia) Monday through Thursday from 6pm to 6am.

Daytime alternating lane closures will be in place for pavement repair work eastbound between Exit 48 (Batavia) and Exit 47 (Leroy) Monday through Thursday from 5am to 2pm.

Overnight alternating lane closures will be in place for bridge repair work eastbound, between Exit 48 (Batavia) and Exit 47 (LeRoy), Monday and Tuesday from 6:30pm to 5am, Wednesday 7pm to 5am, and Thursday 8pm to 5am.

An Overnight RIGHT lane closure will be in place for road paving work at Exit 48A (Pembroke) off-ramp, both east and westbound, Wednesday and Thursday from 7pm to 6am each night.

Overnight alternating lane closures will be in place for pavement repair work eastbound between Exit 49 (Depew) and Williamsville Toll Barrier Monday through Thursday from 7pm to 6am.

Overnight single lane closures are scheduled for roadwork east and westbound between the Cleveland Drive Overhead Bridge and Exit 51 (NYS Route 33 � Buffalo Airport) Monday Tuesday and Wednesday from 8pm to 11pm. At 11pm double lane closures will be set Monday, Tuesday and Wednesday from 11pm to 5am each night. Also, on Thursday the eastbound Exit 50A (Cleveland Drive) off-ramp will be closed for pavement repair work from 9pm to 6am

Overnight alternating lane closures will be in place for pavement repair work westbound between the Lackawanna Toll Barrier and Exit 56 (Blasdell) Sunday Monday and Tuesday from 8pm to 6am, Wednesday from 7pm to � 7am and Thursday from 8pm to 7am.

Buffalo Regional Advisory Message in Audio Format Buffalo Regional Message in Audio Format
(.wav file format, this link will open in a new window with your default audio player)

Back to Top



Information is updated as conditions change.

Current Thruway road conditions also available at: 1-800-THRUWAY (1-800-847-8929)