Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 12/10/2018
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
53 & 54  Road Work  West: Right lane,
NOTE: Right Lane Closure Includes Exit 54 NY Route 400) Ramp Lane. Ramp Will Remain Open At All Times.Shawn OBrien 716-891-3539. Monday 12/10/18 8:45am - 12NOON.

 
Minimal  None 
54 & 55  Road Work  West: Right lane,
NOTE: Contact, Scott Robertson (O) 716-891-3566 (C) 716-432-3593. Wednesday 12/12/18 9:00am - 1:00pm. Thursday 12/13/18 9:00am - 1:00pm.

 
Minimal  None 
56 & 55  Overhead Sign Work  East: Left lane,
Wednesday 12/12/18 9:30am - 10:30am.

 
Minimal  None 
58 & 60  Road Work  West: Right lane,
NOTE: Lane Will Remain Closed. Tuesday 12/11/18 8am -through- 2pm Wednesday 12/12/18.

 
Minimal  None 


Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 12/10/2018
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
53 & 54  Road Work  West: Right lane,
NOTE: Right Lane Closure Includes Exit 54 NY Route 400) Ramp Lane. Ramp Will Remain Open At All Times.Shawn OBrien 716-891-3539. Monday 12/10/18 8:45am - 12NOON.

 
Minimal  None 
54 & 55  Road Work  West: Right lane,
NOTE: Contact, Scott Robertson (O) 716-891-3566 (C) 716-432-3593. Wednesday 12/12/18 9:00am - 1:00pm. Thursday 12/13/18 9:00am - 1:00pm.

 
Minimal  None 


Back to Top

Rochester Region


For The Week Starting Monday 12/10/2018
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
44 & 42  Bridge Construction  West: Alternating right lane with the left lane,
7AM-5PM MON, 7PM-7AM TUE-THU

East: Alternating right lane with the left lane,
7AM-5PM MON, 7PM-7AM TUE-THU

 
None  None 
43 & 45  Road Work  West: Alternating right lane with the left lane,
7PM-7AM MON-THU, 9PM-9AM FRI

 
Minimal  None 
44 & 46  Road Work  West: Alternating right lane with the left lane,
8PM-6AM MON-WED, 9PM-6AM THU, 10PM-8AM FRI

 
Minimal  None 
45 & 43  Road Work  East: Alternating right lane with the left lane,
7PM-7AM MON-THU, 8PM-8AM FRI

 
Minimal  None 
45 & 46  Road Work  West: Ramp,
10AM-2PM TUE-THU (OFF RAMP)

 
Minimal  None 
46 & 44  Road Work  East: Alternating right lane with the left lane,
8PM-7AM MON-TUE, 8PM-6AM WED, 9PM-6AM THU, 9PM-8AM FRI

 
Minimal  None 


Back to Top

Syracuse Region


For The Week Starting Monday 12/10/2018
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
34A & 33  Other  West: Left lane,
7AM-3PM MON-THU

East: Alternating right lane with the left lane,
7AM-3PM MON-THU

 
Minimal  None 
34A & 34  Other  East: Right lane,
7AM-noon TUE/WED/THU

West: Alternating right lane with the left lane,
9AM-2PM TUE-THU

East: Alternating right lane with the left lane,
7AM-2PM TUE-THU

 
Minimal  None 
35 & 36  Other  West: Alternating right lane with the left lane,
6PM-5:30AM MON-FRI

 
Minimal  None 
36 & 34A  Other  East: Alternating right lane with the left lane,
6PM-5:30AM MON-FRI

 
Minimal  None 
39 & 38  Other  East: Right lane,
9AM-3PM THU

 
None  None 
41 & 40  Road Work  East: Left lane,
9AM-9PM WED/THU

East: Left lane,
9PM-9AM SUN/MON

East: Left lane,
9AM-9PM TUE/WED

East: Left lane,
9PM-9AM MON/TUE

 
Minimal  None 
42 & 41  Bridge Construction  West: Alternating right lane with the left lane,
7AM-2PM MON/WED/THU/FRI, 7AM-4:30PM TUE

East: Alternating right lane with the left lane,
7AM-2PM MON/WED/THU/FRI, 7AM-4:30PM TUE

 
Minimal  None 
44 & 42  Bridge Construction  West: Alternating right lane with the left lane,
7AM-5PM MON, 7PM-7AM TUE-THU

East: Alternating right lane with the left lane,
7AM-5PM MON, 7PM-7AM TUE-THU

 
None  None 


Back to Top

Utica Region


For The Week Starting Monday 12/10/2018
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Road Work  East: Right lane,
Friday, 7:00AM - 2:00PM

East: Right lane,
Thursday, 7:00AM - 2:00PM

 
Minor  Weather Permitting 
28 & 27  Road Work  East: Left lane,
Tuesday, 7:00AM - 5:00PM

 
Minimal  Weather Permitting 
29 & 27  Road Work  East: Right lane,
Monday, 7:00AM - 5:00PM

 
Minimal  Weather Permitting 
28 & 29  Road Work  West: Right lane,
Thursday, 7:00AM - 5:00PM

 
Minimal  Weather Permitting 
29 & 27  Road Work  East: Left lane,
Wednesday, 7:00AM - 5:00PM

 
Minimal  Weather Permitting 
28 & 29  Road Work  West: Right lane,
Friday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
29 & 28  Paving  East: Right lane,
Thursday, 7:00AM - 2:00PM

 
Minor  Weather Permitting 
29 & 28  Road Work  East: Left lane,
Tuesday, 7:00AM - 5:00PM

East: Left lane,
Monday, 7:00AM - 5:00PM

 
Minimal  Weather Permitting 
32 & 31  Other  West: Alternating right lane with the left lane,
7AM-4PM MON-FRI

West: Alternating right lane with the left lane,
7AM-3PM TUE-WED

East: Alternating right lane with the left lane,
7AM-4PM MON-FRI

 
Minimal  None 
34A & 33  Other  West: Left lane,
7AM-3PM MON-THU

East: Alternating right lane with the left lane,
7AM-3PM MON-THU

 
Minimal  None 


Back to Top

Albany Region


For The Week Starting Monday 12/10/2018
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Road Work  Direction: Interchange B1 WB Accel and Decel ramps right shoulders closed.: Right shoulder,
Monday (12/10), 12:00MIDNIGHT to Friday (12/14), 12:00MIDNIGHT; *24 Hour Closures*

 
None  Lane closures will be limited to 3 miles in length (max) at each location. 
21A & B1  Road Work  East: Right lane,
Monday, 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
B1 & 21A  Road Work  West: Right lane,
Friday, 7:00AM - 2:00PM

West: Right lane,
Thursday, 7:00AM - 4:00PM

West: Right lane,
Wednesday, 7:00AM - 4:00PM

West: Right lane,
Tuesday, 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
B2 & 21A  Road Work  West: Left lane,
Friday, 7:00AM - 4:00PM

 
None  Lane closures will be limited to 3 miles in length (max) at each location. 
B2 & B1  Road Work  East: Left lane,
Monday, 7:00AM - 4:00PM

West: Left lane,
Thursday, 7:00AM - 4:00PM

 
None  Lane closures will be limited to 3 miles in length (max) at each location. 
B3 & B1  Road Work  East: Left lane,
Tuesday, 7:00AM - 4:00PM

West: Right lane,
Monday & Tuesday, 7:00AM - 4:00PM; Thursday & Friday, 7:00AM - 4:00PM

West: Left lane,
Wednesday, 7:00AM - 4:00PM

 
None  Lane closures will be limited to 3 miles in length (max) at each location. 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Overhead Sign Work  Direction: Interchange 25 Traffic shifted for overhead sign Inspections: Other,
Thursday, 9:00AM - 2:00PM

Direction: Interchange 25A Traffic shifted for overhead sign inspections: Other,
Monday, 9:00AM - 2:00PM

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
22 & 21B  Bridge Inspection  South: Right lane,
Thursday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
22 & 23  Bridge Inspection  North: Right lane,
Tuesday, 9:00AM - 3:00PM

 
Moderate  Weather Permitting 
24 & 22  Bridge Inspection  South: Right lane,
Wednesday, 9:00AM - 3:00PM

 
Moderate  Weather Permitting 
24 & 23  Bridge Inspection  North: Alternating right lane with the left lane,
Monday, 7:00AM - 12:00NOON

South: Alternating right lane with the left lane,
Monday, 12:00NOON - 4:00PM

 
Minimal  None 


Back to Top

Mid-Hudson Region


For The Week Starting Monday 12/10/2018
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18 & 17  Bridge Construction  South: Right lane,
Mon 6am-10am Tue-Thur 6am-2pm Fri 6am-11am

 
Minimal  None 
18 & 19  Bridge Work  North: Right lane,
Tuesday (12/11), 5:00AM to Thursday (12/13), 5:00PM

 
Minimal  None 
20 & 18  Bridge Work  South: Right lane,
Thursday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 19  Bridge Work  South: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
20 & 19  Overhead Sign Work  South: Right lane,
Monday & Tuesday, 8:00AM - 12:00NOON

 
Minimal  Weather Permitting 
20 & 19  Bridge Work  South: Right lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 


Back to Top

New York Region


For The Week Starting Monday 12/10/2018
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
2 & 1  Other  West: Left shoulder,
I-287 Interchange 1 Ramp from RT119&Saw Mill to I287 WB/87SB shoulder closure Mon-Thur 7am-3:30pm Fri 7am-2pm Ramp from Rt119 to 287 EB alt R/L lane closures Mon-Thur 9am-3:30pm Fri 9am-2pm Ramp from 287WB to 87SB shoulder closures Mon-Thur 7am-3:30pm Fri 7am-2pm mainline right shoulder closure Mon-Thru 10am-3pm Fri 10am-2pm

 
None  None 
2 & 3  Bridge Construction  East: Right lane,
Mon 10:30PM-12AM

East: Left lane,
Mon 12:30 AM-2AM

 
None  None 
2 & 4  Other  East: Right shoulder,
Mon-Fri 10am-3pm

 
None  None 
4 & 2  Bridge Construction  West: Right lane,
Mon 9PM-10:30 PM

 
None  None 
5 & 3  Other  West: Right shoulder,
Mon-Fri 10am-3pm

West: Ramp,
Interchange 4 WB on-ramp & EB off-ramp shoulder closure Mon-Fri 7am-3:30pm

 
None  None 
6 & 5  Other  West: Ramp,
Interchange 5 WB on-ramp should closure Mon-Thur 7am-3:30pm Fri 7am-2pm

 
None  None 
8 & 9  Bridge Construction  East: Right shoulder,
Tue 10am-2pm

East: Alternating right shoulder or left shoulder,
Wed 10am-2pm

 
None  None 
9A & 10  Bridge Construction  East: Left lane,
Mon 2:30 AM-4AM

 
None  None 
11 & 9  Bridge Construction  West: Right lane,
Thur 10am-1pm

 
None  None 
10  Highway Construction  East: Alternating right lane with the left lane,
Mon-Thur 10PM-6AM Fri 11pm-7am

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Bridge Construction  Direction: WB direction of the Harriman Toll Plaza: Shoulder,
Mon-Tue 10am-3pm Wed-Fri 8am-3pm

 
None  None 
1 & 6  Other  North: Right shoulder,
Mon-Thur 7pm-6am Fri 7pm-10am

 
Minimal  None 
6 & 7  Bridge Construction  North: Left lane,
Tues.-Fri. 7AM-7PM

 
Moderate  None 
7 & 6A  Bridge Construction  South: Left and center lanes,
Wed 7pm-6am

South: Left lane,
Tues.-Fri. 7AM-7PM

South: Right and center lanes,
Mon. 7PM-6AM

South: Right lane,
Mon. 6PM-6AM

 
Moderate  None 
6A & 7A  Bridge Inspection  North: Right lane,
Sat 9AM-10AM

North: Left lane,
Sat 10:30AM-11:30AM

 
None  None 
7A & 7  Bridge Inspection  South: Left lane,
Sat 12PM-1PM

South: Right lane,
Sat 1:30PM-2:20PM

 
None  None 
8 & 10  Bridge Construction  North: Right lane,
Mon-Wed 7pm-8pm Thur 8pm-9pm Fri 8pm-10pm

North: Right 2 lanes,
Mon-Wed 8pm-7am Thur 9pm-7am Fri 10pm-8am

 
Minimal  None 
8 & 9  Other  North: Ramp,
I-87 NB Exit 9 Off-ramp shoulder Mon-Thur 7am-3:30pm Fri 7am-2pm

North: Ramp,
I-87 Exit 9 NB on-ramp shoulder closure Mon-Thur 7am-3:30pm Fri 7am-2pm

 
None  None 
11 & 13  Bridge Construction  North: Right lane,
Tue 4:30AM-5:30AM

 
Minimal  None 
11 & 13  Bridge Construction  North: Left and center lanes,
Tuesday 1:30 AM-3:30 AM

North: Right lane,
Tuesday 4:30 AM-5:30 AM

 
None  None 
11 & 13  Bridge Construction  North: Left and center lanes,
Tue 1:30AM-3:30AM

 
Minimal  None 
12 & 13  Other  North: Right shoulder,
Mon-Thur 10am-3pm Fri 10am-2pm

North: Ramp,
Interchange 12 NB on-ramp shoulder closure Mon-Thur 7am-3pm Fri 7am-2pm

 
None  None 
13 & 14B  Bridge Construction  North: Right lane,
Sunday into Monday 9PM-1AM

North: Left and center lanes,
Monday 1AM-5AM

 
None  None 
13 & 14A  Bridge Construction  North: Left and center lanes,
Tue-Wed 1AM-5AM

North: Right lane,
Tue-Wed 9PM-1AM

 
Minimal  None 
13 & 14A  Other  North: Right shoulder,
Mon-Thur 10am-3pm Fri 10am-2pm

 
None  None 
14 & 13  Other  North: Ramp,
Interchange 14 NB off-ramp shoulder closure Mon-Thur 7am-3pm Fri 7am-2pm

North: Ramp,
Interchange 14 NB on-ramp shoulder closure Mon-Thur 7am-3pm Fri 7am-2pm

South: Ramp,
Interchange 14 SB on-ramp RT lane closure Mon-Thur 7am-3pm Fri 7am-2pm

 
None  None 
14 & 13  Bridge Construction  South: Left and center lanes,
Fri 2AM-4AM

South: Right lane,
Fri 5AM-6AM

 
Minimal  None 
14A & 13  Other  South: Right shoulder,
Mon-Fri 10am-3pm

 
None  None 
14 & 14B  Bridge Construction  North: Left and center lanes,
Wed-Thur 1AM-5AM

North: Right lane,
Wed-Thur 9PM-1AM

 
Minimal  None 
14A & 14  Other  South: Ramp,
Interchange 14A SB on-ramp Alt RT/LT lane closure Mon-Thur 9am-3pm Fri 9am-2pm

 
None  None 
14B & 14  Other  South: Right shoulder,
Mon-Thur 10am-3:30pm Fri 10am-2pm

 
None  None 
14B & 14A  Bridge Construction  South: Right lane,
Thur 9PM-10PM

South: Left and center lanes,
Thur-Fri 11PM-1AM

 
Minimal  None 
14B & 15  Bridge Construction  North: Right lane,
Wednesday 9PM-11PM

North: Left and center lanes,
Thursday 12AM-2AM

 
None  None 
15A & 14B  Other  South: Alternating right lane with the left lane,
Mon-Wed 7PM-9PM Thurs-Fri 7PM-10PM Sat 7AM-10AM Sat 8PM-10PM

South: Left and center lanes,
LL/RL/CL Mon 9PM-5AM Tues-Wed 9PM-6AM Thur-Fri 10PM-6AM Sat 10PM-7AM

 
Minor  None 
16 & 15  Bridge Construction  South: Left and center lanes,
Friday 3AM-5AM

South: Right lane,
Thursday into Friday 9PM-1AM

 
None  None 
16 & 15A  Bridge Construction  North: Ramp,
Exit 16 NB off-ramp one lane closure Mon-Tue 10am-3pm Wed 7am-3pm Thur 7am-2pm Mon-Fri 8pm-7am

South: Ramp,
Exit 16 SB on-ramp: one lane closures Mon-Wed 10am-6pm Thur 10am-4pm Fri 10am-1pm Mon-Fri 6pm-5am

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
16 & 15  Bridge Construction  South: Right lane,
Mon-Wed 10am-2pm

 
None  None 
15 & 18A  Other  North: Right and center lanes,
Tue-Wed 11PM-5AM

 
Minor  None 
15 & 17  Other  North: Left and center lanes,
Thur 11pm-5am Fri 12am-5am

North: Right lane,
Mon 7pm-5am

 
Minor  None 
16 & 17  Other  North: Ramp,
Interchange 17 off-ramp shoulder closure Mon-Tue 9am-3pm

 
Minor  None 
18B & 17  Other  South: Right and center lanes,
Mon 11pm-5am

South: Right lane,
Mon 8pm-5am

 
Minor  None 
19 & 22  Bridge Construction
Long Range: Through 2021 
North: Alternating right lane with the left lane,
Fri 9PM-8AM

 
Severe  None 
21 & 22  Bridge Construction
Long Range: Through 2021 
North: Alternating the 2 right lanes with the left lanes,
Mon-Thur 10pm-6am Fri 11pm-6am

 
Severe  None 
22 & 19  Bridge Construction
Long Range: Through 2021 
South: Alternating right lane with the left lane,
Mon-Thur 8PM-7AM Fri 9PM-8AM

 
Severe  None 
22 & 21  Bridge Construction
Long Range: Through 2021 
North: Alternating the 2 right lanes with the left lanes,
Mon-Tue 1am-4am Wed-Thur 1am-3am Fri 1am-5am

North: Alternating right lane with the left lane,
Mon-Tue 9pm-6am Wed-Thur 10pm-6am Fri 11pm-7am

South: Alternating the 2 right lanes with the left lanes,
Mon-Thur 11pm-5am Fri 11pm-7am

South: Alternating the 2 right lanes with the left lanes,
Mon-Tue 11pm-5am Wed-Thur 12am-5am Fri 12am-6am

South: Alternating right lane with the left lane,
Mon-Tue 8pm-6am Wed-Thur 9pm-6am Fri 10pm-8am

 
Severe  None 