Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 08/12/2019
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
49 & 54  Road Work  West: Left lane,
NOTE: Movable Maintenance For Center Mall Cleaning Work. Thursday 8/15/19 11pm -through- 5am Friday 8/16/19.

 
Minimal  None 
56 & 55  Road Work  East: Right lane,
NOTE: Pavement Repair Work. Tuesday 8/13/19 11pm -through- 5am Wednesday 8/14/19. Wednesday 8/14/19 11pm -through- 5am Thursday 8/15/19.

 
Minimal  None 
57 & 56  Road Work  East: Right lane,
NOTE: Pavement Repair Work At Exit 56 (Blasdell) Toll Lane 4E. Monday 8/12/19 11pm -through- 5am Tuesday 8/13/19.

 
Minimal  None 
58 & 57A  Bridge Inspection  West: Alternating right lane with the left lane,
NOTE: Bridge Inspection Work Will Include Bridge and Ramp Over N.Y. Routes 5 And 20. Tuesday 8/9/19 11:30am - 2:30pm.

East: Alternating right lane with the left lane,
NOTE: Bridge Inspection Work Will Include Bridge and Ramp Over N.Y. Routes 5 And 20. Tuesday 8/9/19 7:30am - 10:30am.

 
Minimal  None 
60 & 59  Bridge Painting  West: Left lane,
NOTE: Lane Closure Will Remain In Place; Monday 8/12/19 7am -through- 12NOON Friday 8/16/19.

East: Right lane,
NOTE: Lane Closure Will Remain In Place; Wednesday 8/14/19 12NOON -through- 12NOON Friday 8/1619.

East: Left lane,
NOTE: Lane Closure Will Remain In Place; Monday 8/12/19 7am -through- 12NOON Wednesday 8/14/19.

 
Minimal  None 
61 & 60  Bridge Inspection  West: Alternating right lane with the left lane,
Monday 8/12/19 7:30am - 1:00pm.

East: Alternating right lane with the left lane,
Tuesday 8/9/19 7:30am - 1:00pm.

 
Minimal  None 
61 & 59  Road Work  East: Right lane,
Monday 8/12/19 7:00am - 2:00pm Tuesday 8/13/19 7:00am - 2:00pm. Wednesday 8/14/19 7:00am - 2:00pm. Thursday 8/15/19 7:00am - 2:00pm. Friday 8/16/19 7:00am - 2:00pm.

 
Minimal  None 


For The Week Starting Monday 08/19/2019
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
53 & 54  Road Work  West: Left 2 lanes,
Sunday 8/18/19 11pm -through- 5am Monday 8/19/19.

 
Minimal  None 
56 & 55  Road Work  East: Right lane,
Monday 8/19/19 3:00am - 6:00am. Tuesday 8/20/19 3:00am - 6:00am. Wednesday 8/21/19 3:00am - 6:00am. Thursday 8/22/19 3:00am - 6:00am. Friday 8/23/19 3:00am - 6:00am.

 
Minimal  None 
57 & 56  Road Work  East: Right lane,
Tuesday 8/20/19 11pm -through- 5am Wednesday 8/21/19. Wednesday 8/21/19 11pm -through- 5am Thursday 8/22/19.

East: Right lane,
Monday 8/19/19 11pm -through- 5am Tuesday 8/20/19.

 
Minimal  None 
60 & 59  Bridge Painting  West: Left lane,
NOTE: Lane Closure Will Remain In Place; Monday 8/19/19 7am -through- 12NOON Friday 8/23/19.

East: Right lane,
NOTE: Lane Closure Will Remain In Place; Monday 8/19/19 7am -through- 12NOON Friday 8/23/19.

 
Minimal  None 
61 & 60  Bridge Inspection  West: Alternating right lane with the left lane,
NOTE: Bridge Inspection On Shortman Road Over I-90. Thursday 8/22/19 7:30am - 10:00am. Friday 8/23/19 7:30am - 10:00am.

East: Alternating right lane with the left lane,
NOTE: Bridge Inspection On Shortman Road Over I-90. Thursday 8/22/19 12NOON - 3:00pm. Friday 8/23/19 12NOON - 3:00pm.

 
Minimal  None 

Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 08/12/2019
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
49 & 53  Road Work  West: Left lane,
NOTE: Weed Whacking And ROW Clean Up Between Mall. Sunday 8/11/19 11pm -through- 5am Monday 8/12/19.

 
Minimal  None 
49 & 54  Road Work  West: Left lane,
NOTE: Movable Maintenance For Center Mall Cleaning Work. Thursday 8/15/19 11pm -through- 5am Friday 8/16/19.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
9 & 15  Road Work  North: Left lane,
Monday 8/12/19 10pm -through- 6am Tuesday 8/13/19. Tuesday 8/13/19 10pm -through- 6am Wednesday 8/14/19. Wednesday 8/14/19 10pm -through- 6am Thursday 8/15/19. Thursday 8/15/19 10pm -through- 6am Friday 8/16/19.

 
Minimal  None 


For The Week Starting Monday 08/19/2019
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
53 & 54  Road Work  West: Left 2 lanes,
Sunday 8/18/19 11pm -through- 5am Monday 8/19/19.

 
Minimal  None 
56 & 55  Road Work  East: Right lane,
Monday 8/19/19 3:00am - 6:00am. Tuesday 8/20/19 3:00am - 6:00am. Wednesday 8/21/19 3:00am - 6:00am. Thursday 8/22/19 3:00am - 6:00am. Friday 8/23/19 3:00am - 6:00am.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
3 & 9  Road Work  North: Right lane,
Wednesday 8/21/19 10pm -through- 6am Thursday 8/22/19.

 
Minimal  None 
3 & 6  Road Work  North: Right lane,
Tuesday 8/20/19 10pm -through- 6am Wednesday 8/21/19.

 
Minimal  None 
3 & 5  Road Work  North: Ramp,
NOTE: Smith Street On Ramp To I-190 Northbound Will Be Closed. Tuesday 8/20/19 10pm -through- 6am Wednesday 8/21/19.

 
Minimal  None 
5 & 11  Road Work  North: Left lane,
Monday 8/19/19 7pm -through- 6am Tuesday 8/20/19. Tuesday 8/20/19 7pm -through- 6am Wednesday 8/21/19. Wednesday 8/21/19 7pm -through- 6am Thursday 8/22/19. Thursday 8/22/19 7pm -through- 6am Friday 8/23/19.

 
Minimal  None 
7 & 5  Road Work  South: Ramp,
NOTE: Oak And Washington Street On Ramps To I-190 Southbound Will Be Closed. Tuesday 8/20/19 10pm -through- 6am Wednesday 8/21/19.

 
Minimal  None 
7 & 2  Road Work  South: Left lane,
Monday 8/19/19 7:00pm - 11:00pm. ***Back Up Days*** Tuesday 8/20/19 7:00pm - 11:00pm. Wednesday 8/21/19 7:00pm - 11:00pm.

South: Right 2 lanes,
Monday 8/19/19 11pm -through- 6am Tuesday 8/20/19. ***Back Up Days*** Tuesday 8/20/19 11pm -through- 6am Wednesday 8/21/19. Wednesday 8/21/19 11pm -through- 6am Thursday 8/22/19.

 
Minimal  None 
7 & 3  Road Work  South: Right lane,
Tuesday 8/20/19 10pm -through- 6am Wednesday 8/21/19.

 
Minimal  None 
8 & 12  Road Work  North: Right shoulder,
Sunday 8/18/19 10pm -through- 6am Monday 8/19/19.

 
Minimal  None 
9 & 3  Road Work  South: Left lane,
Wednesday 8/21/19 10pm -through- 6am Thursday 8/22/19.

 
Minimal  None 
11 & 15  Road Work  North: Right lane,
Sunday 8/18/19 10pm -through- 6am Monday 8/19/19.

 
Minimal  None 
12 & 8  Road Work  South: Right shoulder,
Sunday 8/18/19 10pm -through- 6am Monday 8/19/19.

 
Minimal  None 
12 & 14  Road Work  North: Left lane,
NOTE: Exit 13 (Austin Street) Will Be Closed. Tuesday 8/20/19 10pm -through- 6am Wednesday 8/21/19. Wednesday 8/21/19 10pm -through- 6am Thursday 8/22/19.

 
Minimal  None 
15 & 11  Road Work  South: Right lane,
Sunday 8/18/19 10pm -through- 6am Monday 8/19/19.

 
Minimal  None 

Back to Top

Rochester Region


For The Week Starting Monday 08/12/2019
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
44 & 42  Road Work  West: Alternating right lane with the left lane,
MON-THU 7PM-7AM, FRI 9PM-9AM

East: Alternating right lane with the left lane,
MON-THU 7PM-7AM, FRI 9PM-9AM

 
Minimal  None 
48A & 49  Road Work  East: Right lane,
Note: Binder Paving. Pier Protection Work. Tuesday 8/13/19 7pm -through- 7am Wednesday 8/14/19.

East: Left lane,
Note: Binder Paving. Pier Protection Work. Wednesday 8/14/19 7pm -through- 7am Thursday 8/15/19. Thursday 8/15/19 7pm -through- 7am Friday 8/16/19.

East: Left lane,
Note: Binder Paving. Pier Protection Work. Monday 8/12/19 7pm -through- 7am Tuesday 8/13/19.

West: Right lane,
NOTE: Guiderail Repair Work. Monday 8/12/19 7pm -through- 7am Tuesday 8/13/19. Tuesday 8/13/19 7pm -through- 7am Wednesday 8/14/19

West: Right lane,
NOTE: Guiderail Repair Work. Wednesday 8/14/19 7pm -through- 7am Thursday 8/15/19. Thursday 8/15/19 7pm -through- 7am Friday 8/16/19

 
Minimal  None 
49 & 53  Road Work  West: Left lane,
NOTE: Weed Whacking And ROW Clean Up Between Mall. Sunday 8/11/19 11pm -through- 5am Monday 8/12/19.

 
Minimal  None 
49 & 54  Road Work  West: Left lane,
NOTE: Movable Maintenance For Center Mall Cleaning Work. Thursday 8/15/19 11pm -through- 5am Friday 8/16/19.

 
Minimal  None 


For The Week Starting Monday 08/19/2019
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
44 & 42  Road Work  West: Alternating right lane with the left lane,
MON-THU 7PM-7AM

East: Alternating right lane with the left lane,
MON-THU 7PM-7AM

 
Minimal  None 
49 & 48A  Road Work  East: Right lane,
NOTE: Guiderail Work. Wednesday 8/21/19 7pm -through- 7am Thursday 8/22/19. Thursday 8/22/19 7pm -through- 7am Friday 8/23/19.

East: Right lane,
NOTE: Guiderail Work. Monday 8/19/19 7pm -through- 7am Tuesday 8/20/19. Tuesday 8/20/19 7pm -through- 7am Wednesday 8/21/19.

West: Right lane,
NOTE: Guiderail Repair Work. Monday 8/12/19 7pm -through- 7am Tuesday 8/13/19. Tuesday 8/13/19 7pm -through- 7am Wednesday 8/14/19

East: Left lane,
Note: Paving Work. Wednesday 8/21/19 7pm -through- 7am Thursday 8/22/19.

East: Right lane,
Note: Paving Work. Thursday 8/22/19 7pm -through- 7am Friday 8/23/19.

West: Right lane,
NOTE: Guiderail Repair Work. Wednesday 8/14/19 7pm -through- 7am Thursday 8/15/19. Thursday 8/15/19 7pm -through- 7am Friday 8/16/19

East: Left lane,
Note: Paving Work. Monday 8/19/19 7pm -through- 7am Tuesday 8/20/19.

East: Right lane,
Note: Paving Work. Tuesday 8/20/19 7pm -through- 7am Wednesday 8/21/19.

 
Minimal  None 

Back to Top

Syracuse Region


For The Week Starting Monday 08/12/2019
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Shoulder Work  Other  Direction: Exit 41 WB On/Off Ramp/Shoulder: Ramp,
MON-FRI 7AM-3PM

Direction: Exit 38 WB On/Off Ramp/Shoulder: Ramp,
MON-FRI 7AM-3PM

Direction: Exit 40 WB On/Off Ramp/Shoulder: Ramp,
MON-FRI 7AM-3PM

 
None  None 
Ramp Work  Shoulder Work  Direction: Accel Ramp/Rt Shoulder EB: Acceleration lane,
MON-TUE 7AM-5PM

 
None  None 
36 & 38  Bridge Work  West: Other,
MON 7AM-5:30PM NO CLOSURES - LANES SHIFT

 
None  None 
38 & 37  Bridge Work  East: Other,
MON 7AM-5:30PM NO CLOSURE - LANES SHIFT

 
None  None 
38 & 37  Road Work  East: Right lane,
MON 6:30AM-6:30PM

 
Minimal  None 
40 & 41  Bridge Construction  West: Alternating right lane with the left lane,
MON-THU 7PM-7AM, FRI 9PM-9AM

 
Minimal  None 
40 & 41  Ramp Work  West: Alternating right lane with the left lane,
MON-FRI 7AM-5PM

 
None  None 
41 & 40  Bridge Construction  East: Alternating right lane with the left lane,
MON-THU 7PM-7AM, FRI 9PM-9AM

 
Minimal  None 
41 & 40  Ramp Work  East: Alternating right lane with the left lane,
MON-FRI 7AM-5PM

 
None  None 
44 & 42  Road Work  West: Alternating right lane with the left lane,
MON-THU 7PM-7AM, FRI 9PM-9AM

East: Alternating right lane with the left lane,
MON-THU 7PM-7AM, FRI 9PM-9AM

 
Minimal  None 


For The Week Starting Monday 08/19/2019
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Shoulder Work  Other  Direction: Exit 41 WB On/Off Ramp/Shoulder: Ramp,
MON-FRI 7AM-3PM

Direction: Exit 38 WB On/Off Ramp/Shoulder: Ramp,
MON-FRI 7AM-3PM

Direction: Exit 40 WB On/Off Ramp/Shoulder: Ramp,
MON-FRI 7AM-3PM

 
None  None 
36 & 38  Bridge Work  West: Other,
MON 7AM-5:30PM NO CLOSURES - LANES SHIFT

 
None  None 
38 & 37  Bridge Work  East: Other,
MON 7AM-5:30PM NO CLOSURE - LANES SHIFT

 
None  None 
39 & 40  Ramp Work  West: Left lane,
WED 7PM-7AM, THU 8PM-7AM, FRI 8PM-8AM

 
None  None 
40 & 41  Ramp Work  West: Alternating right lane with the left lane,
MON&WED 7PM-7AM, TUE 8PM-6AM, THU 7PM-8AM

 
None  None 
40 & 41  Bridge Construction  West: Alternating right lane with the left lane,
MON-TUE 7PM-7AM

 
Minimal  None 
41 & 40  Ramp Work  East: Alternating right lane with the left lane,
MON&WED 7PM-7AM, TUE 8PM-6AM, THU 7PM-8AM

 
None  None 
41 & 40  Bridge Construction  East: Alternating right lane with the left lane,
MON-THU 7PM-7AM, FRI 9PM-9AM

 
Minimal  None 
44 & 42  Road Work  West: Alternating right lane with the left lane,
MON-THU 7PM-7AM

East: Alternating right lane with the left lane,
MON-THU 7PM-7AM

 
Minimal  None 

Back to Top

Utica Region


For The Week Starting Monday 08/12/2019
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 26  Road Work  West: Right lane,
Thursday, 6:00PM - 7:00AM; ** Night Work **

East: Right lane,
Friday, 6:00PM - 7:00AM **Night Work**

East: Right lane,
Monday, 6:00PM - 7:00AM; ** Night Work **

 
Minimal  Night Work; No individual closure will exceed 2 miles in length 
29 & 28  Road Work  West: Right shoulder,
Monday - Monday, 7:00AM - 7:00AM; 24 hour permanent right shoulder closure until further notice

West: Left shoulder,
Monday - Monday, 7:00AM - 7:00AM; 24 hour permanent left shoulder closure until further notice

East: Right shoulder,
Monday - Monday, 7:00AM - 7:00AM; 24 hour permanent right shoulder closure until further notice

East: Left shoulder,
Monday - Monday, 7:00AM - 7:00AM; 24 hour permanent left shoulder closure until further notice

 
Minimal  Eastbound lanes permanently shifted to westbound side of roadway until Nov. of 2019 
29 & 28  Guide Rail Installation  East: Right lane,
Monday - Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather permitting 
29A & 29  Bridge Work  East: Left lane,
Tuesday, 11:00AM - 2:00PM

East: Right lane,
Tuesday, 7:00AM - 10:00AM

 
Minimal  None 
29A & 29  Bridge Work  East: Left lane,
Thursday, 7:00AM - 2:00PM

East: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
29A & 29  Road Work  East: Right lane,
TUE 8AM-2PM

East: Right lane,
WED 8AM-2PM

 
Minimal  None 
30 & 29  Road Work  East: Alternating right lane with the left lane,
TUE 8AM-2PM

 
Minimal  None 
29A & 30  Shoulder Work  West: Alternating right lane with the left lane,
WED 7AM-5PM,THU 7AM-3PM,FRI 7AM-11AM

 
None  None 
31 & 30  Shoulder Work  East: Right lane,
MON 7AM-5PM

 
None  None 
31 & 30  Road Work  East: Right lane,
THU 8AM-2PM

West: Alternating right lane with the left lane,
WED 8AM-2PM

East: Alternating right lane with the left lane,
WED 8AM-2PM

 
Minimal  None 
32 & 31  Road Work  East: Right lane,
MON-THU 7:30AM-2PM

 
Minimal  None 
31 & 33  Road Work  West: Right lane,
TUE-THU 7:30AM-2PM

 
Minimal  None 


For The Week Starting Monday 08/19/2019
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
26 & 28  Road Work  West: Right lane,
Monday, 6:00PM - 7:00AM

West: Right lane,
Tuesday, 6:00PM - 7:00AM

 
Minimal  Night Work; No individual closure will exceed 2 miles in length 
29 & 28  Guide Rail Installation  East: Right lane,
Wednesday - Friday, 6:00AM - 2:00PM

 
Minor  Weather Permitting 
29 & 28  Road Work  West: Right shoulder,
Monday - Monday, 7:00AM - 7:00AM; 24 hour permanent right shoulder closure until further notice

West: Left shoulder,
Monday - Monday, 7:00AM - 7:00AM; 24 hour permanent left shoulder closure until further notice

East: Left shoulder,
Monday - Monday, 7:00AM - 7:00AM; 24 hour permanent left shoulder closure until further notice

East: Right shoulder,
Monday - Monday, 7:00AM - 7:00AM; 24 hour permanent right shoulder closure until further notice

East: Alternating right lane with the left lane,
Monday - Thursday, 7:00AM -5:00PM

 
Minimal  Eastbound lanes permanently shifted to westbound side of roadway until Nov. of 2019 
29A & 29  Road Work  East: Right lane,
WED 8AM-2PM

 
Minimal  None 
29 & 30  Road Work  West: Right lane,
TUE 8AM-2PM

West: Left lane,
WED 8AM-2PM

 
Minimal  None 
29A & 29  Road Work  East: Right lane,
TUE 8AM-2PM

 
Minimal  None 
29A & 30  Shoulder Work  West: Right shoulder,
MON&TUE 7AM-5PM

 
Minor  None 
31 & 30  Road Work  West: Alternating right lane with the left lane,
THU 8AM-2PM

East: Alternating right lane with the left lane,
THU 8AM-2PM

 
Minimal  None 
30 & 32  Shoulder Work  West: Left lane,
MON&TUE 7AM-2PM

 
Minor  None 
32 & 31  Road Work  East: Right lane,
MON-WED 7:30AM-2PM

 
Minimal  None 
31 & 33  Road Work  West: Right lane,
MON-WED 7:30AM-2PM

 
Minimal  None 

Back to Top

Albany Region


For The Week Starting Monday 08/12/2019
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Bridge Work  East: Left lane,
Monday (8/12) 6:00AM, to Sunday (8/18) 6:00AM; 24 Hour Closure

West: Left lane,
Monday (8/12) 6:00AM, to Sunday (8/18) 6:00AM; 24 Hour Closure

 
Minimal  None 
21A & B2  Guide Rail Installation  East: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
B2 & B1  Guide Rail Installation  West: Right lane,
Tuesday,7:00AM - 2:00PM

West: Alternating right lane with the left lane,
Thursday,7:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Toll Plaza Work  Guide Rail Installation  Direction: Interchange 25 Right shoulder Closed in Toll Plaza: Right shoulder,
Tuesday, 9:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
23 & 21A  Road Work  North: Left lane,
Thursday, 8:00PM - 7:00AM **Night Work **

South: Left lane,
Wednesday, 7:00PM - 7:00AM **Night Work **

 
Minimal  Night Work 
23 & 22  Road Work  North: Left lane,
Friday, 11:00PM - 8:00AM **Night Work **

North: Right lane,
Monday, 7:00PM - 7:00AM **Night Work **

South: Left lane,
Tuesday, 7:00PM - 7:00AM **Night Work **

 
Minimal  Night Work 
23 & 22  Guide Rail Installation  North: Right shoulder,
Wednesday, 7:00AM - 2:00AM

South: Right shoulder,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
23 & 22  Road Work  South: Right lane,
Monday, 8:00PM - 7:00AM **Night Work **

 
Minimal  Night Work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25A & 26  Bridge Inspection  West: Left lane,
Tuesday, 9:00AM - 2:00PM

 
Minimal  Weather Permitting 
27 & 26  Road Work  West: Right lane,
Wednesday, 6:00PM - 7:00AM; ** Night Work **

East: Right lane,
Tuesday, 6:00PM - 7:00AM; ** Night Work **

 
Minimal  Night Work; No individual closure will exceed 2 miles in length 
28 & 26  Road Work  West: Right lane,
Thursday, 6:00PM - 7:00AM; ** Night Work **

East: Right lane,
Friday, 6:00PM - 7:00AM **Night Work**

East: Right lane,
Monday, 6:00PM - 7:00AM; ** Night Work **

 
Minimal  Night Work; No individual closure will exceed 2 miles in length 


For The Week Starting Monday 08/19/2019
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21A & B1  Bridge Work  East: Right lane,
Monday (8/19) 6:00AM, to Sunday (8/25) 6:00AM; 24 Hour Closure

 
Minimal  None 
B1 & 21A  Guide Rail Installation  West: Left lane,
Tuesday, 7:00AM - 2:00PM

 
Minimal  None 
21A & B2  Overhead Sign Work  East: Alternating right lane with the left lane,
Thursday, 7:00AM - 2:00PM

 
Minimal  None 
B2 & B1  Guide Rail Installation  West: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  None 
B2 & B1  Overhead Sign Work  West: Alternating right lane with the left lane,
Tuesday, 8:00AM - 2:00PM

 
Minimal  None 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Road Work  Direction: Interchange 27: Ramp,
Wednesday & Thursday, 6:00PM - 7:00AM; EB/WB ACCEL & DECEL ramp paving; Traffic shifted with flaggers.

 
Minimal  Night Work; No individual closure will exceed 2 miles in length 
Service Area Work  Road Work  Direction: Mohawk Service Area: Other,
Thursday & Friday, 4:00PM - 7:00AM; Paving of Car Parking Lot and around Gas Pumps; McDonalds Drive Thru closed Thursday night

 
Minimal  Night Work; No individual closure will exceed 2 miles in length 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21B & 21  Road Work  South: Right lane,
Monday - Friday, 5:00AM - 9:00AM

 
None  Night Work 
23 & 21A  Road Work  North: Right lane,
Friday, 11:00PM - 8:00AM

South: Right lane,
Thursday, 8:00PM - 7:00AM

 
None  Night Work 
23 & 22  Road Work  North: Left lane,
Monday, 6:00PM - 7:00AM

South: Right lane,
Wednesday, 7:00PM - 7:00AM

 
None  Night Work 
22 & 23  Guide Rail Installation  North: Right shoulder,
Tuesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
23 & 22  Road Work  South: Right lane,
Tuesday, 7:00PM - 7:00AM

 
None  Night Work 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
27 & 26  Guide Rail Installation  East: Right lane,
Monday - Wednesday, 6:00AM - 2:00PM

 
Minor  Weather Permitting 
26 & 28  Road Work  West: Right lane,
Monday, 6:00PM - 7:00AM

West: Right lane,
Tuesday, 6:00PM - 7:00AM

 
Minimal  Night Work; No individual closure will exceed 2 miles in length 

Back to Top

Mid-Hudson Region


For The Week Starting Monday 08/12/2019
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
15A & 16  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Wed 8PM-7AM Thurs 11PM-5AM Fri 9PM-5AM

 
None  None 
16 & 17  Bridge Construction  North: Alternating right lane with the left lane,
Mon 6AM-10AM Tues 6AM-11AM Wed 6AM-10AM Thurs 6AM-9AM

 
Minimal  None 
16 & 18  Bridge Construction  North: Alternating right shoulder or left shoulder,
Mon-Thurs 7AM-3PM Fri 7AM-1PM

 
Minimal  None 
17 & 16  Bridge Construction  North: Alternating right lane with the left lane,
Mon 6PM-11AM Tues 7PM-10AM Wed 7PM-9AM Thurs 8PM-7AM Fri 10PM-7AM

South: Alternating right lane with the left lane,
Mon 7PM-7AM Tues-Wed 6PM-7AM Thurs 8PM-7AM Fri 8PM-9AM

South: Alternating right lane with the left lane,
Tues 9AM-3PM Wed 9AM-2PM Thurs 9AM-12PM

 
Minimal  None 
18 & 16  Bridge Construction  South: Alternating right shoulder or left shoulder,
Mon-Thurs 7AM-3PM Fri 7AM-1PM

 
Minimal  None 
19 & 18  Bridge Inspection  North: Alternating right lane with the left lane,
Monday, 10:00PM - 6:00AM **Night Work**

South: Alternating right lane with the left lane,
Tuesday, 10:00PM - 6:00AM **Night Work**

 
Minimal  Weather Permitting 


For The Week Starting Monday 08/19/2019
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
15A & 16  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Wed 8PM-7AM Thurs 11PM-5AM Fri 9PM-5AM

 
None  None 
16 & 17  Bridge Construction  North: Alternating right lane with the left lane,
Mon 6AM-10AM Tues 6AM-11AM Wed 6AM-10AM Thurs 6AM-9AM

 
Minimal  None 
16 & 18  Bridge Construction  North: Alternating right shoulder or left shoulder,
Mon-Thurs 7AM-3PM Fri 7AM-1PM

 
Minimal  None 
17 & 16  Bridge Construction  North: Alternating right lane with the left lane,
Mon 6PM-11AM Tues 7PM-10AM Wed 7PM-9AM Thurs 8PM-7AM Fri 10PM-7AM

South: Alternating right lane with the left lane,
Tues 9AM-3PM Wed 9AM-2PM Thurs 9AM-12PM

South: Alternating right lane with the left lane,
Mon 7PM-7AM Tues-Wed 6PM-7AM Thurs 8PM-7AM Fri 8PM-9AM

 
Minimal  None 
18 & 16  Bridge Construction  South: Alternating right shoulder or left shoulder,
Mon-Thurs 7AM-3PM Fri 7AM-1PM

 
Minimal  None 

Back to Top

New York Region


For The Week Starting Monday 08/12/2019
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
10  Highway Construction  East: Left lane,
Mon-Thurs 7PM-6AM Fri 8PM-7AM

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
6A & 5  Bridge Inspection  North: Right lane,
Mon 10PM-1:30AM Tues 10PM-5AM

South: Right lane,
Mon 1:30AM-5AM Tues 10PM-5AM

 
Minimal  None 
6A & 7  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Fri 10PM-6AM

 
None  None 
10 & 8  Bridge Construction  North: Left and center lanes,
Mon 9PM-7AM Thurs 10PM-12AM LL,ML,MR 12AM-4AM RR,MR 4AM-7AM Fri 10PM-12AM LL,ML,MR 12AM-4AM RR,MR 4AM-8AM

South: Left and center lanes,
Tues/Wed 8PM-11PM LL,ML, MR 11PM-2AM RR,MR 2AM-5AM

 
Minimal  None 
15A & 16  Bridge Inspection  North: Right lane,
Thurs 9AM-11:30AM

North: Left lane,
Thurs 11:30AM-2PM

 
Minimal  None 
16 & 15A  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Wed 8PM-7AM Thurs 11PM-5AM Fri 9PM-5AM

South: Alternating right lane with the left lane,
Mon-Fri 5PM-5AM

South: Right lane,
Tues 12PM-6PM Wed 10AM-6PM Thurs-Fri 10AM-12PM

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
11 & 13  Bridge Construction  North: Acceleration lane,
Wed 8AM-2PM

 
None  None 
13 & 12  Bridge Construction  South: Right lane,
Thurs 9AM-2PM Acceleration Lane

 
None  None 
14 & 12  Bridge Construction  South: Right lane,
Sun 11PM-5AM

 
None  None 
13 & 15  Bridge Construction  North: Left lane,
Mon 11PM-5AM

 
None  None 
16 & 15  Bridge Construction  North: Left lane,
Tues 10AM-11AM

North: Alternating right lane with the left lane,
Mon 3:30AM-4:30AM

North: Right lane,
Mon 2AM-3AM

South: Left lane,
Tues 12PM-1PM

 
None  None 
17 & 15  Toll Plaza Work  South: Left and center lanes,
Fri/Sat 12AM-6AM

 
Minimal  None 
17 & 15  Bridge Construction  South: Right lane,
Sun 11PM-11:30PM

South: Alternating right lane with the left lane,
Mon 12AM-1AM

 
None  None 
19 & 22  Bridge Construction
Long Range: Through 2021 
North: Left lane,
Mon-Thurs 10PM-6AM Fri 11PM-6AM

 
Severe  None 
21 & 22  Bridge Construction
Long Range: Through 2021 
North: Left lane,
Mon-Fri 8PM-5:30AM Mon-Thurs 10AM-2PM (Blasting Stops)

 
Severe  None 
22 & 19  Bridge Construction
Long Range: Through 2021 
South: Left lane,
Mon-Tues 8PM-6AM Wed-Thurs 9PM-6AM Fri 10PM-8AM

South: Left and center lanes,
Mon 8PM-6AM Tues-Fri 11PM-5AM

South: Left 2 lanes,
Mon-Tues 11PM-5AM Wed-Thurs 12AM-5AM Fri 12AM-6AM

 
Severe  None 
22 & 21  Bridge Construction
Long Range: Through 2021 
South: Left lane,
Mon-Tues 8PM-5:30AM Mon-Tues 10AM-2PM

 
Severe  None 


For The Week Starting Monday 08/19/2019
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
8 & 6  Bridge Construction  East: Left lane,
Wed 10PM-5AM

East: Right lane,
Tues 10PM-1:30AM

West: Right lane,
Tues 1:30AM-5AM

 
None  None 
10  Highway Construction  East: Left lane,
Mon-Thurs 7PM-6AM Fri 8PM-7AM

 
Minor  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
6A & 5  Bridge Inspection  North: Right lane,
Mon 10PM-1:30AM Tues 10PM-5AM

South: Right lane,
Mon 1:30AM-5AM Tues 10PM-5AM

 
Minimal  None 
6A & 7  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Fri 10PM-6AM

 
None  None 
8 & 10  Bridge Construction  North: Left lane,
Mon 6AM-2PM

 
Minimal  None 
10 & 9  Bridge Construction  South: Left lane,
Tues 10AM-5PM

 
Minimal  None 
14 & 14B  Bridge Deck Rehabilitation  North: Right and center lanes,
Mon-Wed 10PM-6AM Thurs-Fri 11PM-6AM

North: Right lane,
Mon-Wed 9PM-6AM Thurs-Fri 10PM-6AM

 
Minimal  None 
15A & 16  Bridge Inspection  North: Right lane,
Thurs 9AM-11:30AM

North: Left lane,
Thurs 11:30AM-2PM

 
Minimal  None 
16 & 15A  Bridge Construction  North: Alternating right lane with the left lane,
Mon-Wed 8PM-7AM Thurs 11PM-5AM Fri 9PM-5AM

South: Right lane,
Tues 12PM-6PM Wed 10AM-6PM Thurs-Fri 10AM-12PM

South: Alternating right lane with the left lane,
Mon-Fri 5PM-5AM

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
11 & 13  Bridge Construction  North: Acceleration lane,
Wed 8AM-2PM

 
None  None 
14 & 12  Bridge Construction  North: Left and center lanes,
Wed 12AM-5AM

South: Right lane,
Thurs 9AM-3PM

 
None  None 
17 & 15  Toll Plaza Work  South: Left and center lanes,
Fri/Sat 12AM-6AM

 
Minimal  None 
16 & 18A  Bridge Construction  North: Right lane,
Mon 9AM-10:30AM

North: Left lane,
Mon 11:30AM-1PM

 
None  None 
18A & 17  Bridge Construction  South: Right lane,
Tues 10AM-11:30AM

South: Left lane,
Tues 12PM-1:30PM

 
None  None 
18B & 8B  Bridge Construction  South: Left lane,
Tues 9AM-12PM

 
None  None 
19 & 22  Bridge Construction
Long Range: Through 2021 
North: Left lane,
Mon-Thurs 10PM-6AM Fri 11PM-6AM

 
Severe  None 
21 & 22  Bridge Construction
Long Range: Through 2021 
North: Left lane,
Mon-Fri 8PM-5:30AM Mon-Thurs 10AM-2PM (Blasting Stops)

 
Severe  None 
22 & 19  Bridge Construction
Long Range: Through 2021 
South: Left lane,
Mon-Tues 8PM-6AM Wed-Thurs 9PM-6AM Fri 10PM-8AM

 
Severe  None 
22 & 21  Bridge Construction
Long Range: Through 2021 
South: Left lane,
Mon-Tues 8PM-5:30AM Mon-Tues 10AM-2PM

 
Severe  None 
22 & 19  Bridge Construction
Long Range: Through 2021 
South: Left 2 lanes,
Mon-Tues 11PM-5AM Wed-Thurs 12AM-5AM Fri 12AM-6AM

South: Left and center lanes,
Mon 8PM-6AM Tues-Fri 11PM-5AM

 
Severe  None 

Back to Top