Skip to Main Content
NYS Thruway Authority Home

New York State Thruway Authority

For more information call:
Media Relations and Communications
(518) 471-5300

For immediate release: November 16, 2012
Contact: Office of Public Affairs (518) 436-2983

Thruway Authority to Continue with Tappan Zee Bridge Deck Replacement Project November 17 through November 25

Deck replacement work on the Tappan Zee Bridge will continue November 17 through November 25, the New York State Thruway Authority announced today.

The work is weather-dependent, and is subject to change. Updates will be issued to announce any change in schedule.

Traffic updates will be broadcast to motorists via Variable Message Signs along the highway and by Highway Advisory Radio 530 AM in the Tappan Zee Bridge corridor, as well as 1610 AM in the Newburgh area. To see real-time webcam views of the bridge and approaches, go to http://www.thruway.ny.gov/travelers/map/index.html?layer=cameras.

To receive TRANSalert emails with information on Thruway traffic incidents and other timely information that may affect travel on the Tappan Zee Bridge, go to http://www.thruway.ny.gov/tas/index.shtml .

To see an interactive map including Google traffic conditions for the Thruway and other roadways in New York State and beyond, go to http://www.thruway.ny.gov/travelers/map/index.html?layer=traffic.

Saturday, November 17 and Sunday, November 18
Work will begin at 11 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 12 midnight until 8 a.m. on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 11 p.m. and an additional left northbound lane at 12 midnight until 8 a.m., also on the Tappan Zee Bridge. At least one lane southbound will be opened to traffic from 11 p.m. to 9 a.m. and one lane northbound will be opened to traffic from 11 p.m. to 9 a.m.

All lanes will be opened to traffic in both directions by 9 a.m. on Sunday.

During Saturday night operations, due to the southbound lane closures, the southbound entrance at Exit 10 South Nyack will be closed from 11 p.m. to 8 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Exit  11.

During Saturday night operations, due to the northbound lane closures, the entrance ramp from Broadway southbound in Tarrytown will also be closed from 11 p.m. until 8 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Sunday, November 18
No work scheduled.

Monday, November 19 and Tuesday, November 20
Work will begin at 8 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 11 p.m. until 6 a.m. on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 8 p.m. and an additional left northbound lane at 11 p.m. until 6 a.m., also on the Tappan Zee Bridge. At least one lane southbound will be opened to traffic from 8 p.m. to 6 a.m. and one lane northbound will be opened to traffic from 8 p.m. to 6 a.m.

During Monday and Tuesday night operations, due to the southbound lane closures, the southbound entrance at Exit 10 will be closed from 8 p.m. to 6 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Exit  11.

During Monday and Tuesday night operations, due to the northbound lane closures, the entrance ramp from Broadway southbound in Tarrytown will also be closed from 8 p.m. until 6 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Wednesday, November 21
No lane closures scheduled.

Contractor will be working under the bridge away from travelling public.

Thursday, November 22
No work scheduled.

Friday, November 23 and Saturday, November 24
No lane closures scheduled.

Contractor will be working under the bridge away from travelling public.

Saturday, November 24 and Sunday, November 25
No work scheduled.

The lane closures on Monday and Tuesday nights are required in order for the contractor to continue with the replacement of the deck in the middle three lanes on the Tappan Zee Bridge.  

During the nighttime operations, several 20 minute traffic stoppages will take place in both the northbound and southbound directions.
For the safety of the public and construction workers, motorists are urged to proceed with caution and obey posted work-zone speed limits.
The second phase of the deck replacement project is slated for completion in the Winter of 2012.

-30-

Google Translate Disclaimer