Skip to Main Content
NYS Thruway Authority Home

New York State Thruway Authority

For more information call:
Media Relations and Communications
(518) 471-5300

Immediate Release: September 16, 2011

Thruway Authority to Continue with Tappan Zee Bridge Deck Replacement Project

Deck replacement work on the Tappan Zee Bridge will continue during the week of September 19, 2011, the New York State Thruway Authority announced.

The work will be done in sequential order, is weather-dependent, and is subject to change. Updates will be issued to announce any change in schedule.

Monday, September 19 through Wednesday, September 21

No work scheduled.

Thursday, September 22

Work will begin at 8 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 11 p.m. until 6 a.m. from milepost 13.2 to milepost 17.9 on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 9 p.m. and an additional left northbound lane at 12 midnight until 6 a.m. from milepost 13.2 to milepost 16.2 also on the Tappan Zee Bridge. At least one lane southbound and one lane northbound will be opened to traffic from 8 p.m. to 6 a.m.

During Thursday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 8 p.m. to 6 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Interchange 11.

Friday, September 23

Work will begin at 9 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 12 midnight until 8 a.m. from milepost 13.2 to milepost 17.9 on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 9 p.m. and an additional left northbound lane at 12 midnight until 8 a.m. from milepost 13.2 to milepost 16.2 on the Tappan Zee Bridge. At least one lane southbound and one lane northbound will be opened to traffic from 9 p.m. to 8 a.m.

During Friday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 9 p.m. to 8 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Interchange 11.

Saturday, September 24 and Sunday, September 25

No work scheduled.
The lane closures on Thursday and Friday nights are required in order for the contractor to be able to start to replace the deck in the middle three lanes on the Tappan Zee Bridge from milepost 13.2 to milepost 17.9.

For the safety of the public and construction workers, motorists are urged to proceed with caution and obey posted work-zone speed limits.

Traffic updates will be broadcast to motorists via Variable Message Signs along the highway and by Highway Advisory Radio 530 AM in the Tappan Zee Bridge corridor, as well as 1610 AM in the Newburgh area.

The second phase of the deck replacement project is slated for completion in the Winter of 2012.

-30-

Google Translate Disclaimer