Skip to Main Content
NYS Thruway Authority Home

New York State Thruway Authority

For more information call:
Media Relations and Communications
(518) 471-5300

Immediate Release: June 3, 2011

Thruway Authority to Continue with Tappan Zee Bridge Deck Replacement Project

Deck replacement work on the Tappan Zee Bridge will continue during the week of June 6, 2011, the New York State Thruway Authority announced today.

The work will be done in sequential order, is weather-dependent, and is subject to change. Updates will be issued to announce any change in schedule.

Monday, June 6 through Wednesday, June 8

Work will begin at 8 p.m. resulting in the closure of two right southbound lanes and an additional right southbound lane at 11 p.m. until 6 a.m. from milepost 13.2 to milepost 17.9 on the Tappan Zee Bridge. At least one lane southbound and three lanes northbound will be opened to traffic from 8 p.m. to 6 a.m.

During Monday through Wednesday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 8 p.m. to 6 a.m. and southbound traffic will be detoured on a posted detour route through Nyack to the entrance at Route 59 near Interchange 11.

Thursday, June 9

Work will begin at 8 p.m. resulting in the closure of one left northbound lane, an additional left northbound lane at 10 p.m. and another left lane northbound at 12 midnight until 6 a.m. from milepost 13.2 to milepost 17.9 on the Tappan Zee Bridge. At least one lane northbound and three lanes southbound will be opened to traffic from 8 p.m. to 6 a.m.

During Thursday night operations, due to the northbound lane closures, the entrance ramp from Broadway (southbound) in Tarrytown will also be closed from 8 p.m. until 6 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Friday, June 10

Work will begin at 9 p.m. resulting in the closure of one left northbound lane, an additional left northbound lane at 10 p.m. and another left lane northbound at 12 midnight until 6 a.m. from milepost 13.2 to milepost 17.9 on the Tappan Zee Bridge. At least one lane northbound and three lanes southbound will be opened to traffic from 9 p.m. to 6 a.m.

During Friday night operations, due to the northbound lane closures, the entrance ramp from Broadway (southbound) in Tarrytown will also be closed from 9 p.m. until 6 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Saturday, June 11 and Sunday, June 12

No work scheduled.

The lane closures on Monday through Friday nights are required in order for the contractor to be able to perform deck repairs and surveying on the Tappan Zee Bridge from milepost 13.2 to milepost 17.9.

For the safety of the public and construction workers, motorists are urged to proceed with caution and obey posted work-zone speed limits.

Traffic updates will be broadcast to motorists via Variable Message Signs along the highway and by Highway Advisory Radio 530 AM in the Tappan Zee Bridge corridor, as well as 1610 AM in the Newburgh area.

The second phase of the deck replacement project is slated for completion in the Winter of 2012.

-30-

Google Translate Disclaimer