Skip to Main Content
NYS Thruway Authority Home

New York State Thruway Authority

For more information call:
Media Relations and Communications
(518) 471-5300

For Immediate Release: October 29, 2010

Thruway Authority to Continue with Tappan Zee Bridge Deck Replacement Project

The New York State Thruway Authority announced that deck replacement work on the Tappan Zee Bridge will continue during the week of October 30, 2010.

The work will be done in sequential order, is weather-dependent, and is subject to change. Updates will be issued announcing any change in schedule.

Lane closures will be announced as necessary during the following days:

Saturday, October 30, Daytime

Work will begin at 7 a.m. resulting in the closure of one right southbound lane until 4 p.m. from milepost 13.8 to milepost 17.9 on the Tappan Zee Bridge.  At least three lanes southbound and three lanes northbound will be opened to traffic from 7 a.m. to 4 p.m.

Saturday, October 30, Nighttime

Work will begin at 8 p.m. resulting in the closure of two right northbound lanes until 8 a.m. from milepost 12.9 to the west abutment on the Tappan Zee Bridge. At least three lanes southbound and two lanes northbound will be opened to traffic from 8 p.m. to 8 a.m.

During Saturday night operations, due to the northbound lane closures, the entrance ramp from Broadway (southbound) in Tarrytown will also be closed from 8 p.m. until 8 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Sunday, October 31
No work scheduled.

Monday, November 1 through Wednesday, November 3 Work will begin at 8 p.m. resulting in the closure of two right southbound lanes until 6 a.m. from milepost 13.8 to milepost 17.9 on the Tappan Zee Bridge. At least two lanes southbound and three lanes northbound will be opened to traffic from 8 p.m. to 6 a.m.

During Monday through Wednesday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 8 p.m. to 6 a.m. and southbound traffic will be detoured on a posted detour route through Nyack to the entrance at Route 59 near Interchange 11.

Thursday, November 4
Work will begin at 9 p.m. resulting in the closure of two right southbound lanes until 6 a.m. from milepost 13.8 to milepost 17.9 on the Tappan Zee Bridge. At least two lanes southbound and three lanes northbound will be opened to traffic from 9 p.m. to 6 a.m.

During Thursday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 9 p.m. until 6 a.m. and southbound traffic will be detoured on a posted detour route through Nyack to the entrance at Route 59 near Interchange 11.

Friday, November 5
Work will begin at 9 p.m. resulting in the closure of two right southbound lanes until 7 a.m. from milepost 13.8 to milepost 17.9 on the Tappan Zee Bridge. At least two lanes southbound and three lanes northbound will be opened to traffic from 9 p.m. to 7 a.m.

During Friday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 9 p.m. until 7 a.m. and southbound traffic will be detoured on a posted detour route through Nyack to the entrance at Route 59 near Interchange 11.

Saturday, November 6
Work will begin at 7 p.m. resulting in the closure of one right southbound lane and an additional right southbound lane at 11 p.m. until 7 a.m. from milepost 13.8 to milepost 17.9 on the Tappan Zee Bridge. At least two lanes southbound and three lanes northbound will be opened to traffic from 7 p.m. to 7 a.m.

During Saturday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 7 p.m. until 7 a.m. and southbound traffic will be detoured on a posted detour route through Nyack to the entrance at Route 59 near Interchange 11.

Sunday, November 7
No work scheduled.

These lane closures are required for the contractor to work on the installation of safety railing on the steel barriers and in the east deck truss spans; perform surveying work, and install fiber optic conduits and their supports from milepost 13.8 to the west abutment. 

For the safety of the public and construction workers, motorists are urged to proceed with caution and obey posted work-zone speed limits.
Traffic updates will be broadcast to motorists via Variable Message Signs along the highway and by Highway Advisory Radio 530 AM in the Tappan Zee Bridge corridor, as well as 1610 AM in the Newburgh area.

The second phase of the deck replacement project is slated for completion in the Winter of 2012.

-30-

Google Translate Disclaimer