Canal Only Projects
81 projects found
Information as of 05/06/2013 8:45:48 AM
Planned Projects | Under Construction Projects | Completed Projects
Information as of 05/06/2013 8:45:48 AM
Planned Projects
- Lysander: Canal Section 5 Office & Shop - Roof Replacement, Onondaga County
- Estimated Letting Year: 2013
- Approved Construction Amount: $1,500,000.00
- View Project on Map
- Brewerton: North Dock Wall - Rehabilitation, Oswego County
- Estimated Letting Year: 2014
- Approved Construction Amount: $2,600,000.00
- View Project on Map
- May's Point: Movable Dam 18 - Rehabilitation, Seneca County
- Estimated Letting Year: 2014
- Approved Construction Amount: $5,000,000.00
- View Project on Map
- Rochester: East Guard Lock - Rehabilitation, Monroe County
- Estimated Letting Year: 2015
- Approved Construction Amount: $5,800,000.00
- View Project on Map
- Fairport: Spillway Wall - Rehabilitation, Monroe County
- Estimated Letting Year: 2013
- Approved Construction Amount: $3,000,000.00
- View Project on Map
- Whitehall: Constructon of a New Lock C-12 Utility Structure, Washington County
- Estimated Letting Year: 2013
- Approved Construction Amount: $750,000.00
- Waterford: Lock E-2 South Approach Wall - Rehabilitation, Saratoga County
- Estimated Letting Year: 2014
- Approved Construction Amount: $3,000,000.00
- View Project on Map
- Lockport: Wall - Rehabilitation, Niagara County
- Estimated Letting Year: 2014
- Approved Construction Amount: $3,000,000.00
- Scotia: Rehabilitation of Lock E-8 Breast Wall/Floor, Movable Dam 4 and Lock E-8 Southeast Approach Wall
- Estimated Letting Year: 2014
- Approved Construction Amount: $5,600,000.00
- View Project on Map
- Amsterdam: Movable Dam 7 at Lock E-11 - Rehabilitation, Montgomery County
- Estimated Letting Year: 2013
- Approved Construction Amount: $30,000,000.00
- View Project on Map
- Newark: Military Run Stream Culvert - Replacement, Wayne County
- Estimated Letting Year: 2015
- Approved Construction Amount: $400,000.00
- View Project on Map
- Monroe County: Erie Canal Lock 32 Bypass Culvert - Repairs, Monroe County (funded with 2005 Transportation Bond Act funds)
- Estimated Letting Year: 2014
- Approved Construction Amount: $500,000.00
- View Project on Map
- Tribes Hill: Dredge Erie Canal in the Area of Lock E-12, Montgomery Cty (Tropical Storms Irene and Lee Recovery Project - Partial FEMA Eligible)
- Estimated Letting Year: 2013
- Approved Construction Amount: $1,400,000.00
- View Project on Map
- Crescent: Dredge Erie Canal in the Area of Lock E-6, Saratoga Cty (Tropical Storms Irene & Lee Recovery Project - Partial FEMA Reimbursable)
- Estimated Letting Year: 2013
- Approved Construction Amount: $2,000,000.00
- View Project on Map
- Cranesville: Spillway and Sitework at Lock E-10, Montgomery County (Tropical Storms Irene and Lee Recovery Project - Partial FEMA Eligible)
- Estimated Letting Year: 2013
- Approved Construction Amount: $7,000,000.00
- View Project on Map
- Scotia & Rotterdam: Spillway & Sitework at Locks E-8 & E-9, Schenectady Cty (Tropical Storms Irene & Lee Recovery Project - Partial FEMA Eligible)
- Estimated Letting Year: 2013
- Approved Construction Amount: $12,000,000.00
- Tribes Hill: Approach Wall Repair/Replacement at Lock E-12, Montgomery Cty (Tropical Storms Irene & Lee Recovery Project - Partial FEMA Eligible)
- Estimated Letting Year: 2013
- Approved Construction Amount: $7,200,000.00
- View Project on Map
- Amsterdam: Guy Park Manor Repairs at Lock E-11, Montgomery County (Tropical Storms Irene and Lee Recovery Project - Partial FEMA Eligible)
- Estimated Letting Year: 2014
- Approved Construction Amount: $600,000.00
- Albany Division: Mule Rehabilitation at Movable Dams 4 - 11 at Lock E-8 - E-15, Schenectady & Montgomery Cty (Tropical Storm Recovery - Partial FEMA)
- Estimated Letting Year: 2013
- Approved Construction Amount: $7,600,000.00
- Tribes Hill & Fort Plain: Truss Repairs at Movable Dams 8 & 11 at Locks E-12 & E-15, Montgomery County
- Estimated Letting Year: 2013
- Approved Construction Amount: $5,000,000.00
- Syracuse: Inner Harbor Upland Disposal Site, Onondaga County
- Estimated Letting Year: 2015
- Approved Construction Amount: $800,000.00
- Gryziec Park to Stanwix: Canalway Trail, Oneida County (funded with 2005 Transportation Bond Act funds)
- Estimated Letting Year: 2013
- Approved Construction Amount: $1,925,000.00
- Amherst: Canalway Trail Repairs, Erie County
- Estimated Letting Year: 2014
- Approved Construction Amount: $400,000.00
- Fort Edward to Fort Ann: Canalway Trail, Washington County (funded with 2005 Transportation Bond Act funds)
- Estimated Letting Year: 2014
- Approved Construction Amount: $4,410,000.00
- Amherst to Lockport: Canalway Trail, Erie/Niagara Counties
- Estimated Letting Year: 2013
- Approved Construction Amount: $5,000,000.00
- Pittsford to Fairport: Canalway Trail - Rehabilitation, Monroe County (funded with 2005 Transportation Bond Act funds)
- Estimated Letting Year: 2013
- Approved Construction Amount: $2,320,000.00
Under Construction Projects
- Lysander: Section 5 Office and Shop - Roof and Insulation Repairs, Onondaga County
- Letting Date: 12/02/2009
- Estimated Completion Year: 2011
- Low Bid Amount: $1,788,143.00
- Contract Number: TAS 09-56C/D213910
- Contractor: Contracting Management, Inc.
- View Project on Map
- Crescent: Guard Gates 1 & 2 and Crocker's Reef: Guard Gate - Replace Cables and Rollers, Saratoga, Washington Counties
- Letting Date: 11/14/2012
- Estimated Completion Year: 2014
- Low Bid Amount: $4,885,308.45
- Contract Number: TAA 12-34C/D214162
- Contractor: D.A. Collins Construction Co., Inc.
- Palatine Bridge & Indian Castle: Lock E-14 & Rocky Rift Movable Dam - Railing Installation, Montgomery & Herkimer Counties
- Letting Date: 10/10/2012
- Estimated Completion Year: 2013
- Low Bid Amount: $759,499.00
- Contract Number: TAA 12-2C/D214100
- Contractor: Tioga Construction Co., Inc.
- Utica: Taintor Gate and Dam - Rehabilitation, Oneida County
- Letting Date: 11/28/2012
- Estimated Completion Year: 2016
- Low Bid Amount: $9,635,661.70
- Contract Number: TAS 12-35C/D214068
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Statewide: Canal On-Demand Repair and Vessel Recovery Contract
- Letting Date: 11/21/2012
- Estimated Completion Year: 2014
- Low Bid Amount: $1,674,560.00
- Contract Number: TA 12-22C/D214161
- Contractor: Tioga Construction Co., Inc.
- Yosts: Movable Dam 9 at Lock E-13 - Rehabilitation, Montgomery County
- Letting Date: 09/15/2010
- Estimated Completion Year: 2013
- Low Bid Amount: $15,514,331.25
- Contract Number: TAA 10-2C/D213874
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Canajoharie: Installation of Required Railroad Crossing Signal System on Access Road to Lock E-14, Montgomery County
- Letting Date: 02/06/2013
- Estimated Completion Year: 2013
- Low Bid Amount: $263,520.00
- Contract Number: TAA 12-38C/D214174
- Contractor: Rifenburg Construction, Inc.
- View Project on Map
- Amsterdam: Sitework at Lock E-11, Montgomery County (Tropical Storms Irene and Lee Recovery Project - Partial FEMA Eligible)
- Letting Date: 02/20/2013
- Estimated Completion Year: 2014
- Low Bid Amount: $1,935,847.50
- Contract Number: TAA 13-6C/D214192
- View Project on Map
- Upright & Lighting Repairs to MD 5, 6 & 7 at Locks E-9,10 & 11, Schenectady & Montgomery Co. (Tropical Storm Recovery Project - Partial FEMA Eligible)
- Letting Date: 06/27/2012
- Estimated Completion Year: 2015
- Low Bid Amount: $7,173,649.60
- Contract Number: TAA 12-11C/D214138
- Contractor: C.D. Perry LLC
- View Project on Map
- Upright & Lighting Repairs to MD 4, 8, 10 & 11, Schenectady & Montgomery Counties (Tropical Storm Recovery Project - Partial FEMA Eligible)
- Letting Date: 06/27/2012
- Estimated Completion Year: 2015
- Low Bid Amount: $7,413,203.66
- Contract Number: TAA 12-12C/D214139
- Contractor: C.D. Perry LLC
- Cranesville & Tribes Hill: Bearing Rehabilitation at Movable Dams 6 & 8 at Locks E-10 & E-12, Montgomery County
- Letting Date: 12/12/2012
- Estimated Completion Year: 2013
- Low Bid Amount: $362,500.00
- Contract Number: TAA 12-41C/D214197
- Contractor: Piasecki Steel Construction Corporation
- Lyons: Abbey Park to Route 14: Canalway Trail, Wayne County
- Letting Date: 08/29/2012
- Estimated Completion Year: 2013
- Low Bid Amount: $547,818.40
- Contract Number: TAS 12-23C/D214164
- Contractor: Keeler Construction Co., Inc.
- Little Falls: Railroad Ave to Route 167: Canalway Trail, Herkimer County
- Letting Date: 08/15/2012
- Estimated Completion Year: 2013
- Low Bid Amount: $861,646.00
- Contract Number: TAS 12-24C/D214165
- Contractor: ALX Hunter Excavation, Inc.
Completed Projects
- Waterford: Lock E-4 - Miter Gate Replacement, Saratoga County
- Letting Date: 05/10/2006
- Completion Date: 04/19/2007
- Construction Amount: $1,558,821.64
- Contract Number: TAA 06-24C/D213588
- Contractor: James H. Maloy, Inc.
- View Project on Map
- Phoenix: Lock O-1 Southwest Approach Wall - Rehabilitation, Oswego County
- Letting Date: 06/08/2011
- Completion Date: 05/18/2012
- Construction Amount: $.00
- Contract Number: TAS 11-13C/D214046
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Albany Division: Locks E-9, E-11, E-14, E-15 - Electrical Rehabilitation (2006 Flood), Schenectady & Montgomery Counties
- Letting Date: 12/20/2006
- Completion Date: 06/04/2007
- Construction Amount: $1,369,631.40
- Contract Number: TAA 06-60C/D213665
- Contractor: LaCorte Companies, Inc.
- Albany Division: Locks E-12, E-13 - Electrical Rehabilitation (2006 Flood), Montgomery County
- Letting Date: 01/31/2007
- Completion Date: 10/19/2007
- Construction Amount: $667,299.88
- Contract Number: TAA 07-7C/D213664
- Contractor: O'Connell Electric Company
- Albany Division: Locks E-9, E-13, E-14, E-15 - Site Rehabilitation & Buildings (2006 Flood), Schenectady & Montgomery Counties
- Letting Date: 06/27/2007
- Completion Date: 08/29/2008
- Construction Amount: $1,682,863.76
- Contract Number: TAA 07-9C/D213667
- Contractor: Harrison & Burrows Bridge Constructors, Inc.
- Albany Division: Locks E-8, E-9, E-11, E-12, E-13, E-14, E-15 - Steel & Concrete Repairs (2006 Flood), Schenectady & Montgomery Counties
- Letting Date: 04/25/2007
- Completion Date: 06/30/2008
- Construction Amount: $4,346,531.98
- Contract Number: TAA 07-8C/D213666
- Contractor: Harrison & Burrows Bridge Constructors, Inc.
- Statewide: Installation of Fall Protection Systems at 10 Dams - Schenectady, Montgomery, Herkimer and Seneca Counties
- Letting Date: 08/11/2010
- Completion Date: 08/31/2012
- Construction Amount: $1,957,647.47
- Contract Number: TAA 10-26C/D213970
- Contractor: Piasecki Steel Construction Corporation
- Lockport: Rock Slope - Remediation, Niagara County
- Letting Date: 10/07/2009
- Completion Date: 11/18/2010
- Construction Amount: $789,852.00
- Contract Number: TAB 09-40CR/D213887
- Contractor: Nichols Long & Moore Construction Corporation
- Statewide: Marine Vessel - When/Where Recovery Contract
- Letting Date: 06/16/2010
- Completion Date: 12/21/2012
- Construction Amount: $.00
- Contract Number: TA 10-32C/D213982
- Contractor: Tioga Construction Co., Inc.
- Waterford: OCC Stone Retaining Wall - Replacement, Saratoga County
- Letting Date: 07/07/2010
- Completion Date: 06/20/2011
- Construction Amount: $191,078.99
- Contract Number: TAA 10-14C/D213949
- Contractor: Bette & Cring, LLC
- Seneca Falls: Lock C&S-2 - Lower Miter Gate Replacement, Seneca County
- Letting Date: 12/01/2010
- Completion Date: 04/11/2012
- Construction Amount: $1,391,684.84
- Contract Number: TAS 10-50C/D214004
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Pittsford: Replace Lower Miter Gates at Lock E-32, Monroe County
- Letting Date: 06/15/2011
- Completion Date: 05/22/2012
- Construction Amount: $.00
- Contract Number: TAB 11-37C/D214087
- Contractor: BVR Construction Company, Inc.
- View Project on Map
- Crescent: Lock E-6 - Rehabilitation, Saratoga County
- Letting Date: 06/11/2008
- Completion Date: 04/15/2011
- Construction Amount: $.00
- Contract Number: TAA 08-35C/D213750
- Contractor: Kubricky Construction Corporation
- View Project on Map
- Clyde: Lock E-26 Taintor Gate and Dam - Rehabilitation, Wayne County
- Letting Date: 07/19/2006
- Completion Date: 06/10/2008
- Construction Amount: $7,598,749.28
- Contract Number: TAS 06-32C/D213513
- Contractor: Tioga Construction Co., Inc.
- Minetto: Lock O-5 - Rehabilitation and Lock O-8 Concrete Repairs, Oswego County
- Letting Date: 10/22/2008
- Completion Date: 08/31/2010
- Construction Amount: $10,217,170.15
- Contract Number: TAS 08-8C/D213758
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Cranesville: Lock E-10 - Emergency Repairs (2006 Flood), Montgomery County
- Letting Date: 04/15/2009
- Completion Date: 06/10/2010
- Construction Amount: $1,219,557.50
- Contract Number: TAA 09-7C/D213844
- Contractor: James H. Maloy, Inc.
- Oswego: Lock O-7/O-8 Walls - Repairs, Oswego County
- Letting Date: 03/15/2006
- Completion Date: 04/23/2007
- Construction Amount: $978,597.57
- Contract Number: TAS 06-9C/D213496
- Contractor: Tuscarora Construction Co., Inc.
- Pittsford: Cartersville Waste Weir - Rehabilitation, Monroe County
- Letting Date: 07/26/2006
- Completion Date: 01/09/2008
- Construction Amount: $925,296.84
- Contract Number: TAB 06-34C/D213615
- Contractor: C.P. Ward, Inc.
- View Project on Map
- St. Johnsville: Lock E-16 Approach Wall - Rehabilitation, Montgomery County
- Letting Date: 07/20/2005
- Completion Date: 06/22/2006
- Construction Amount: $201,660.15
- Contract Number: TAA 05-1C/D213418
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Rochester: West Guard Lock - Rehabilitation, Monroe County
- Letting Date: 06/30/2010
- Completion Date: 10/06/2011
- Construction Amount: $4,237,852.50
- Contract Number: TAB 10-11C/D213945
- Contractor: The Pike Company, Inc.
- View Project on Map
- Fort Miller: Lock C-6 - Miter Gate Replacement, Washington County
- Letting Date: 11/15/2006
- Completion Date: 05/20/2008
- Construction Amount: $1,793,733.40
- Contract Number: TAA 06-55C/D213643
- Contractor: C. D. Perry & Sons, Inc.
- View Project on Map
- Canajoharie: Movable Dam 10 at Lock E-14 - Rehabilitation, Montgomery County
- Letting Date: 03/21/2007
- Completion Date: 05/21/2010
- Construction Amount: $17,204,894.65
- Contract Number: TAA 07-20C/D213616
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Cayuga Lake: Range Tower - Replacement, Seneca County and Lyons: Lower Yard Sheeting - Replacement, Wayne County
- Letting Date: 11/02/2005
- Completion Date: 07/19/2007
- Construction Amount: $542,047.33
- Contract Number: TAS 05-19C/D213442
- Contractor: Economy Paving Co., Inc.
- View Project on Map
- Orleans County: Bank and Culvert Repair Work
- Letting Date: 08/10/2011
- Completion Date: 10/11/2012
- Construction Amount: $1,340,833.57
- Contract Number: TAB 11-22C/D213703
- Contractor: C.P. Ward Inc.
- Tribes Hill: Movable Dam 8 at Lock E-12 - Painting, Montgomery County
- Letting Date: 09/23/2009
- Completion Date: 08/31/2012
- Construction Amount: $4,228,856.45
- Contract Number: TAA 09-50C/D213748
- Contractor: Erie Painting and Maintenance
- View Project on Map
- Statewide: Dredging - Initiative Phase 4, Fabrication
- Letting Date: 11/07/2007
- Completion Date: 03/11/2009
- Construction Amount: $906,627.00
- Contract Number: TAS 07-58C/D213752
- Contractor: BVR Construdtion Co.
- Utica Harbor: Remediation - Phase 1, Oneida County
- Letting Date: 01/21/2009
- Completion Date: 09/23/2009
- Construction Amount: $1,922,567.05
- Contract Number: TAS 09-10C/D213458
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Utica Harbor: Remediation - Phase 2, Oneida County
- Letting Date: 03/15/2006
- Completion Date: 09/08/2006
- Construction Amount: $761,616.97
- Contract Number: TAS 06-1C/D213563
- Contractor: D.H. Smith Company, Inc.
- View Project on Map
- Fort Edward: Section 1 Office & Shop - Roof Replacement, Washington County
- Letting Date: 01/18/2006
- Completion Date: 06/02/2006
- Construction Amount: $78,434.00
- Contract Number: TAA 06-4C/D213540
- Contractor: T.P. Monahan, Inc.
- View Project on Map
- Rotterdam: Movable Dam 5 at Lock E-9 - Steel Repairs, Schenectady County and Amsterdam: Movable Dam 7 at Lock E-11- Steel & Scour Repairs (2006 Flood)
- Letting Date: 09/06/2006
- Completion Date: 05/29/2007
- Construction Amount: $1,005,216.88
- Contract Number: TAA 06-40C/D213617
- Contractor: C. D. Perry & Sons, Inc.
- Little Falls: Lock E-17 Lower Approach Wall and Tribes Hill: Lock E-12 NE & NW Approach Walls - Scour Repairs (2006 Flood)
- Letting Date: 11/01/2006
- Completion Date: 06/18/2007
- Construction Amount: $327,544.49
- Contract Number: TAS 06-52C/D213646
- Contractor: Slate Hill Constructors, Inc.
- Tribes Hill: Lock E-12 NW Approach Wall - Scour Repairs (2006 Flood), Phase 2, Montgomery County
- Letting Date: 01/07/2009
- Completion Date: 07/02/2009
- Construction Amount: $69,895.50
- Contract Number: TAA 09-1C/D213833
- Contractor: Tioga Construction Co., Inc.
- View Project on Map
- Waterford: Dry Dock - Electrical Repairs, Saratoga County
- Letting Date: 11/29/2006
- Completion Date: 09/18/2007
- Construction Amount: $291,040.85
- Contract Number: TAA 06-25C/D213589
- Contractor: Northwild Systems, Inc.
- View Project on Map
- Pendleton: Slope - Restoration & Associated Dredging, Niagara County
- Letting Date: 11/08/2006
- Completion Date: 08/10/2007
- Construction Amount: $1,746,695.10
- Contract Number: TAB 06-14CR/D213572
- Contractor: Pinto Construction Services, Inc.
- Herkimer County: Bank Repairs, Herkimer County
- Letting Date: 11/28/2007
- Completion Date: 06/06/2008
- Construction Amount: $545,253.16
- Contract Number: TAS 07-55C/D213742
- Contractor: Tioga Construction Co., Inc.
- Medina: Bank Failure Restoration, Orleans County
- Letting Date: 01/24/2007
- Completion Date: 05/04/2007
- Construction Amount: $327,992.64
- Contract Number: TAB 07-19C/D213689
- Contractor: Nichols Long & Moore Construction
- Waterford: Lock E-4 - Emergency Repairs and Lock E-5 - Emergency Repairs and Miter Gate Replacement, Saratoga County
- Letting Date: 11/30/2005
- Completion Date: 04/28/2006
- Construction Amount: $2,003,216.00
- Contract Number: TAA 05-43C/D213568
- Contractor: C. D. Perry & Sons, Inc.
- View Project on Map
- Scotia & Rotterdam: Lighting Repairs to MD 4 at Lock E-8 and Partial Upright and Lighting Repairs to MD 5 at Lock E-9, Schenectady Co. (Partial FEMA)
- Letting Date: 01/11/2012
- Completion Date: 06/08/2012
- Construction Amount: $.00
- Contract Number: TAA 11-55CR/D214136
- Contractor: Tioga Construction Co., Inc.
- Emergency Replacement of Grade Control Structures at Lock E-8 and Lock E-9 (Tropical Storm Recovery)
- Letting Date: 12/23/2011
- Completion Date: 05/25/2012
- Construction Amount: $1,598,425.36
- Contract Number: TAA 11-54C/D214135
- Contractor: The Delaney Group, Inc.
- View Project on Map
- Canastota to Erie Canal Village: Canalway Trail, Madison/Oneida Counties
- Letting Date: 08/05/2009
- Completion Date: 11/12/2010
- Construction Amount: $2,081,010.59
- Contract Number: TAS 09-38C/D213415
- Contractor: Dolomite Products, Inc./dba Ulster Paving Company
- Jordan to Port Byron: Canalway Trail, Cayuga/Onondaga Counties
- Letting Date: 01/25/2006
- Completion Date: 10/30/2007
- Construction Amount: $1,349,078.38
- Contract Number: TAS 05-39C/D213553
- Contractor: Vector Construction Corporation
- Schenectady: Canalway Trail, Schenectady County
- Letting Date: 08/12/2009
- Completion Date: 11/30/2010
- Construction Amount: $1,042,795.07
- Contract Number: TAA 09-30C/D213785
- Contractor: Carver Construction, Inc.