Buffalo Division Projects
131 projects found
Information as of 06/03/2013 8:23:20 AM
Planned Projects | Under Construction Projects | Completed Projects
Information as of 06/03/2013 8:23:20 AM
Planned Projects
- MP 420.33, MP 420.34 and MP 420.36: I-90/I-290 Interchange (Exit 50) Bridges - Rehabilitations
- Estimated Letting Year: 2015
- Approved Construction Amount: $3,300,000.00
- View Project on Map
- MP 921.12: North Grand Island Bridge Southbound - Deck Replacement
- Estimated Letting Year: 2013
- Approved Construction Amount: $70,000,000.00
- View Project on Map
- MP 380.57: West Bergen Road Bridge over Thruway - Replacement
- Estimated Letting Year: 2014
- Approved Construction Amount: $5,200,000.00
- View Project on Map
- MP 454.31: Four Mile Level Road (Route 438) Bridge over Thruway - Replacement
- Estimated Letting Year: 2015
- Approved Construction Amount: $4,500,000.00
- View Project on Map
- MP 453.46: Mile Strip Road Bridge over Thruway - Rehabilitation
- Estimated Letting Year: 2015
- Approved Construction Amount: $2,500,000.00
- View Project on Map
- West Seneca (Exit 54, MP 427.9) to Lackawanna Barrier (MP 430.6): Pavement Resurfacing and Replacement of Thruway Bridge over NYCRR/Penn RR (MP 430.05) and Rehabilitate Four Other Bridges
- Estimated Letting Year: 2015
- Approved Construction Amount: $20,000,000.00
- View Project on Map
- MP 407.27: South Newstead Road Bridge over Thruway - Replacement
- Estimated Letting Year: 2014
- Approved Construction Amount: $5,500,000.00
- View Project on Map
- MP 420.70: Cleveland Drive Bridge over Thruway - Replacement
- Estimated Letting Year: 2014
- Approved Construction Amount: $10,000,000.00
- View Project on Map
- MP 427.95: Route 400 Ramp Bridge over Harlem Road - Replacement (NYSDOT Project)
- Estimated Letting Year: 2015
- Approved Construction Amount: $500,000.00
- View Project on Map
- Buffalo Division: On-Demand Repair Contract - 2013-2014
- Estimated Letting Year: 2013
- Approved Construction Amount: $2,000,000.00
- MP 901.56 to MP 906.92: Replace Non-Functional Joints on 12 I-190 (Niagara Thruway) Bridges and Substructure and Bearing Repairs to 6 I-190 Bridges in Buffalo Division
- Estimated Letting Year: 2013
- Approved Construction Amount: $5,200,000.00
- View Project on Map
- Repair/Replace Joints and Substructure and Fascia Repairs on Various Buffalo Division Bridges
- Estimated Letting Year: 2014
- Approved Construction Amount: $2,250,000.00
- Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2014
- Estimated Letting Year: 2014
- Approved Construction Amount: $350,000.00
- View Project on Map
- Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2015
- Estimated Letting Year: 2015
- Approved Construction Amount: $800,000.00
- View Project on Map
- 4 Bridge Rehabilitations - MP 458.5 and MP 458.81 - Thruway Bridges over Silver Creek and MP 459.9 and MP 459.91 Thruway Bridges over Walnut Creek
- Estimated Letting Year: 2013
- Approved Construction Amount: $12,900,000.00
- View Project on Map
- MP N18.39: Bedell Road Bridge over I-190 (Niagara Thruway): Rehabilitation
- Estimated Letting Year: 2014
- Approved Construction Amount: $2,500,000.00
- View Project on Map
- MP 455.54 & MP 460.74 & MP 467.74: Silver Creek Interchange, Fredonia-Silver Creek Rd (Route 20) and Dunkirk-Fredonia Interchange - Bridge Rehabilitations
- Estimated Letting Year: 2013
- Approved Construction Amount: $2,200,000.00
- View Project on Map
- Buffalo Division: On-Demand Repair Contract - 2015-2016
- Estimated Letting Year: 2015
- Approved Construction Amount: $2,000,000.00
- MP 369.85: Union Street Bridge over Thruway - Replacement
- Estimated Letting Year: 2015
- Approved Construction Amount: $4,500,000.00
- View Project on Map
- Rochester: East Guard Lock - Rehabilitation, Monroe County
- Estimated Letting Year: 2015
- Approved Construction Amount: $5,800,000.00
- View Project on Map
- Fairport: Spillway Wall - Rehabilitation, Monroe County
- Estimated Letting Year: 2013
- Approved Construction Amount: $3,000,000.00
- View Project on Map
- Lockport: Wall - Rehabilitation, Niagara County
- Estimated Letting Year: 2014
- Approved Construction Amount: $3,000,000.00
- Monroe County: Erie Canal Lock 32 Bypass Culvert - Repairs, Monroe County (funded with 2005 Transportation Bond Act funds)
- Estimated Letting Year: 2014
- Approved Construction Amount: $500,000.00
- View Project on Map
- LeRoy (Exit 47, MP 378.2) to west of Batavia (MP 393.7): Pavement Resurfacing
- Estimated Letting Year: 2013
- Approved Construction Amount: $20,000,000.00
- View Project on Map
- LeRoy (Exit 47, MP 378.2) to west of Batavia (MP 393.7): Safety Upgrades
- Estimated Letting Year: 2013
- Approved Construction Amount: $5,000,000.00
- View Project on Map
- Angola Interchange (Exit 57A, MP 444.87): Ramp Pavement Rehabilitation and Angola Interchange Bridge Rehabilitation
- Estimated Letting Year: 2014
- Approved Construction Amount: $1,500,000.00
- View Project on Map
- Buffalo Division: Pavement Safety Striping - 2015
- Estimated Letting Year: 2014
- Approved Construction Amount: $850,000.00
- Batavia (Exit 48, MP 393.70) to West of Pembroke (MP 404.70): Safety Upgrades, Installation of Median Guiderail (MP 395 to MP 405), and MP 402.90, Rehabilitation of the Thruway Bridge over Murder Creek
- Estimated Letting Year: 2013
- Approved Construction Amount: $3,000,000.00
- View Project on Map
- Williamsville Toll Barrier (MP 419.69): Operation Improvements
- Estimated Letting Year: 2014
- Approved Construction Amount: $14,000,000.00
- View Project on Map
- Buffalo Division Culverts: Remove Sediment, Restore Capacity and Inspect for Needed Repairs
- Estimated Letting Year: 2013
- Approved Construction Amount: $250,000.00
- I-90, West of Pembroke (MP 404.7) to West of William Street (MP 425.9) and I-190, North of Church Street (MP N5.5) to Peace Bridge: Safety Upgrades
- Estimated Letting Year: 2013
- Approved Construction Amount: $5,900,000.00
- Buffalo Division: Pavement Safety Striping, MP 452.34 to MP 455.06 - 2013
- Estimated Letting Year: 2013
- Approved Construction Amount: $50,000.00
- View Project on Map
- Buffalo Division: Pavement Safety Striping - 2014
- Estimated Letting Year: 2013
- Approved Construction Amount: $850,000.00
- Buffalo Division: Pavement Safety Striping - 2016
- Estimated Letting Year: 2015
- Approved Construction Amount: $900,000.00
- Buffalo Division Culvert Repairs
- Estimated Letting Year: 2015
- Approved Construction Amount: $3,000,000.00
- Tonawanda Toll Barrier (MP N14.90) to Niagara Toll Barrier (MP N20.22): Pavement Resurfacing with Resurfacing of Interchanges
- Estimated Letting Year: 2014
- Approved Construction Amount: $6,800,000.00
- View Project on Map
- MP 418.33 WB, MP N0.35 NB, MP N6.2 NB and MP N11.87 NB: Replacement of Four Outdated Dynamic Message Signs in Buffalo Division
- Estimated Letting Year: 2015
- Approved Construction Amount: $2,000,000.00
- Lockport: Rehabilitation of Historic Locks E-69 and E-70 at Flight of Five, Niagara County
- Estimated Letting Year: 2013
- Approved Construction Amount: $1,852,675.00
- Amherst: Canalway Trail Repairs, Erie County
- Estimated Letting Year: 2014
- Approved Construction Amount: $400,000.00
- Amherst to Lockport: Canalway Trail, Erie/Niagara Counties
- Estimated Letting Year: 2013
- Approved Construction Amount: $5,000,000.00
- Pittsford to Fairport: Canalway Trail - Rehabilitation, Monroe County (funded with 2005 Transportation Bond Act funds)
- Estimated Letting Year: 2013
- Approved Construction Amount: $2,320,000.00
Under Construction Projects
- Construction of Wind Turbines at 5 Locations to Provide Energy to Buffalo Division Facilities
- Letting Date: 01/16/2013
- Estimated Completion Year: 2014
- Low Bid Amount: $7,875,000.00
- Contract Number: TAB 12-37A/D214167
- Contractor: Kandey Co., Inc.
- MP 415.92: Thruway Bridges over Harris Hill Road and Transit Road (Rte. 78) (MP 416.94) - Rehabilitations
- Letting Date: 02/06/2013
- Estimated Completion Year: 2013
- Low Bid Amount: $1,835,159.00
- Contract Number: TAB 13-13B/D214091
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- Buffalo Division: On-Demand Repair Contract for Damaged and Flagged Thruway and Canal Structures - 2012-2013
- Letting Date: 11/23/2011
- Estimated Completion Year: 2013
- Low Bid Amount: $570,233.00
- Contract Number: TAB 11-49B/D214118
- Contractor: C.P. Ward, Inc.
- MP N14.99: South Grand Island Bridge Southbound - Deck Rehabilitation, Miscellaneous Bridge Repairs and 2013 North Grand Island Bridge Washing
- Letting Date: 03/28/2012
- Estimated Completion Year: 2013
- Low Bid Amount: $13,764,051.50
- Contract Number: TAN 12-16B/D214067
- Contractor: Union Concrete & Construction Corporation
- View Project on Map
- South of I-190 (MP 425.8) to West Seneca/East Aurora (Exit 54, MP 427.7): Concrete Pavement Restoration
- Letting Date: 04/10/2013
- Estimated Completion Year: 2013
- Low Bid Amount: $6,904,696.60
- Contract Number: TAB 13-16/D214107
- Contractor: Union Concrete and Construction
- View Project on Map
- Buffalo Division: Pavement Safety Striping - 2013
- Letting Date: 01/16/2013
- Estimated Completion Year: 2013
- Low Bid Amount: $861,326.44
- Contract Number: TAB 12-31/D214173
- Contractor: Accent Stripe, Inc.
- Dunkirk (Exit 59, MP 467.0) to Westfield (Exit 60, MP 485.5) and Exit 59: Pavement Resurfacing
- Letting Date: 03/06/2013
- Estimated Completion Year: 2014
- Low Bid Amount: $16,388,664.00
- Contract Number: TAB 13-32/D214131
- Contractor: Oakgrove Construction Co., Inc.
- View Project on Map
Completed Projects
- MP 423.19: Walden Avenue Maintenance Building - Install New Overhead Doors
- Letting Date: 10/26/2005
- Completion Date: 10/19/2006
- Construction Amount: $170,561.80
- Contract Number: TAB 05-29A/D213335
- Contractor: Miller Enterprises, Inc.
- MP 423.19: Walden Avenue Maintenance Building - Replace Heating System
- Letting Date: 01/25/2006
- Completion Date: 08/31/2006
- Construction Amount: $342,279.70
- Contract Number: TAB 05-25AR/D213336
- Contractor: Hoot Mechanical and Electrical Inc.
- MP 421.5: Buffalo State Police Zone Headquarters - Construct New Building Adjacent to Existing Building
- Letting Date: 12/16/2009
- Completion Date: 07/16/2012
- Construction Amount: $.00
- Contract Number: TAB 09-55A/D213754
- Contractor: Pepe Construction Co., Inc.
- MP 430.51: Lackawanna Barrier Toll Utility Building - Sewer Connection Project
- Letting Date: 10/26/2005
- Completion Date: 05/12/2006
- Construction Amount: $78,637.56
- Contract Number: TAB 05-22A/D213534
- Contractor: Milherst Construction, Inc.
- View Project on Map
- MP 365.7 and MP 447.1: Scottsville and Angola Service Areas - Emergency Generator Replacements and Upgrades
- Letting Date: 03/24/2010
- Completion Date: 12/31/2010
- Construction Amount: $703,775.99
- Contract Number: TAB 10-4A/D213830
- Contractor: Power & Construction Group, Inc.
- MP 447: Angola Service Area Restaurant - Replace Flat Roof
- Letting Date: 06/23/2010
- Completion Date: 10/29/2010
- Construction Amount: $269,740.00
- Contract Number: TAB 10-25A/D213950
- Contractor: Henderson-Johnson Co., Inc.
- View Project on Map
- MP N14.35: South Grand Island Bridge (Northbound) Deck Replacement, and Substructure and Bearing Rehabilitation to the Northbound and Southbound Bridges
- Letting Date: 07/23/2008
- Completion Date: 02/18/2011
- Construction Amount: $45,999,898.25
- Contract Number: TAN 08-30B/D213701
- Contractor: American Bridge Company
- View Project on Map
- North and South Grand Island Bridges - Bridge Washing 2007
- Letting Date: 10/18/2006
- Completion Date: 06/15/2007
- Construction Amount: $435,000.00
- Contract Number: TAN 06-53B/D213626
- Contractor: JRT Concrete, Inc.
- View Project on Map
- MP 362.12 to MP 434.85: Install Protective Screening on 10 Bridges in Buffalo Division
- Letting Date: 07/27/2005
- Completion Date: 01/20/2006
- Construction Amount: $281,297.47
- Contract Number: TAB 05-12B/D213392
- Contractor: Rommel Fence, LLC
- MP 401.72: Pembroke/Route 77 (Exit 48A) Thruway Bridge over Ramps - Rehabilitation
- Letting Date: 12/21/2005
- Completion Date: 11/17/2006
- Construction Amount: $2,356,675.70
- Contract Number: TAB 05-42B/D213554
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- MP 430.84: Thruway Bridge over Abbott Road - Rehabilitation
- Letting Date: 11/22/2006
- Completion Date: 12/03/2007
- Construction Amount: $2,951,075.76
- Contract Number: TAB 06-39B/D213629
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- MP N20.35 (Northbound) and MP N21.12 (Southbound): North Grand Island Bridges - Washing 2010
- Letting Date: 11/04/2009
- Completion Date: 06/05/2010
- Construction Amount: $310,200.00
- Contract Number: TAN 09-60B/D213919
- Contractor: Dandrow's Painting, Inc.
- View Project on Map
- North and South Grand Island Bridges: Bridge Washing - 2006
- Letting Date: 11/23/2005
- Completion Date: 06/06/2006
- Construction Amount: $388,000.00
- Contract Number: TAN 05-32B/D213400
- Contractor: JRT Concrete, Inc.
- View Project on Map
- MP 384.61 and MP 384.62: Thruway Bridges over Black Creek - Bridge and Deck Rehabilitations
- Letting Date: 02/25/2009
- Completion Date: 11/20/2009
- Construction Amount: $1,938,419.77
- Contract Number: TAB 09-11B/D213799
- Contractor: Crane-Hogan Structural Systems, Inc.
- View Project on Map
- MP N20.35: North Grand Island Bridge Northbound - Repair/Replace Sidewalk
- Letting Date: 04/12/2006
- Completion Date: 03/28/2007
- Construction Amount: $1,450,516.21
- Contract Number: TAN 06-11B/D213403
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- MP N14.99: South Grand Island Bridge Southbound - Repair/Replace Sidewalk
- Letting Date: 04/18/2007
- Completion Date: 10/16/2007
- Construction Amount: $1,316,794.60
- Contract Number: TAN 07-11B/D213642
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- I-90 (Thruway Mainline) and I-190 (Niagara Section) Culverts: Repairs
- Letting Date: 12/20/2006
- Completion Date: 12/06/2007
- Construction Amount: $1,614,727.87
- Contract Number: TAB 06-62B/D213641
- Contractor: Kandey Company, Inc.
- Paint 11 Buffalo Division Bridges in Genesee, Erie and Chautauqua Counties
- Letting Date: 11/09/2005
- Completion Date: 11/20/2006
- Construction Amount: $2,765,920.01
- Contract Number: TAB 05-34BP/D213435
- Contractor: Atlas Painting & Sheeting Corporation
- Buffalo Division: On-Demand Bridge Repair Contract 2006-2007
- Letting Date: 03/01/2006
- Completion Date: 10/18/2007
- Construction Amount: $919,594.26
- Contract Number: TAB 06-15B/D213561
- Contractor: C. P. Ward, Inc.
- MP N20.35 and MP N21.12: North Grand Island Bridges - Washing 2008
- Letting Date: 10/03/2007
- Completion Date: 06/07/2008
- Construction Amount: $342,000.00
- Contract Number: TAN 07-53B/D213699
- Contractor: JRT Concrete, Inc.
- View Project on Map
- MP 388.73 to MP 477.55: Install Protective Screening on 20 Bridges
- Letting Date: 12/17/2008
- Completion Date: 10/29/2009
- Construction Amount: $509,447.96
- Contract Number: TAB 08-37B/D213741
- Contractor: Rommel Fence, LLC
- Buffalo Division: On-Demand Bridge Repair Contract 2007-2009
- Letting Date: 06/27/2007
- Completion Date: 09/17/2009
- Construction Amount: $542,583.21
- Contract Number: TAB 07-42B/D213720
- Contractor: C.P.Ward, Inc.
- MP N20.35 and N21.12: North Grand Island Bridge Washing - 2009
- Letting Date: 12/17/2008
- Completion Date: 06/05/2009
- Construction Amount: $335,000.00
- Contract Number: TAN 08-52B/D213784
- Contractor: JRT Concrete, Inc.
- View Project on Map
- MP N1.88: I-190 Thruway Bridge over Bailey Avenue and Norfolk Southern Railroad - Pier/Bearing Repair
- Letting Date: 04/26/2006
- Completion Date: 01/10/2007
- Construction Amount: $242,067.33
- Contract Number: TAN 06-23B/D213574
- Contractor: Nichols, Long and Moore Construction
- View Project on Map
- MP 366.27 and MP 366.28: Thruway Bridges over the Genesee River - Deck Replacements; MP 367.38: Thruway Bridge over B&O RR - Substructure Repairs; MP 367.49: Thruway Bridge over Reed Road - Rehabilitation; MP 366.42: Thruway Bridge over Scottsville Road - Deck Rehabilitation; MP 366.28 to MP 366.42, Pavement Rehabilitation; and MP 366.0 to MP 367.6, Pavement Resurfacing
- Letting Date: 12/23/2009
- Completion Date: 12/08/2011
- Construction Amount: $.00
- Contract Number: TAB 09-53B/D213879
- Contractor: Sealand Constructors Corporation
- View Project on Map
- Buffalo Division: On-Demand Repair Contract for Damaged and Flagged Bridges - 2010-2011
- Letting Date: 11/04/2009
- Completion Date: 09/16/2011
- Construction Amount: $2,115,218.73
- Contract Number: TAB 09-58B/D213924
- Contractor: C.P. Ward, Inc.
- View Project on Map
- MP 352.36 to MP 434.03: Paint 11 Buffalo Division Bridges
- Letting Date: 01/14/2009
- Completion Date: 07/12/2010
- Construction Amount: $6,556,808.12
- Contract Number: TAB 08-49BP/D213792
- Contractor: Atlas Painting & Sheeting Corporation
- Rehabilitation/Repair of 3 Bridges at MP 352.59, Thruway Bridge over Abandoned NYCRR; MP 363.95, Thruway Bridge over Livonia, Avon & Lakeville RR; and MP 364.74, East River Road Bridge over Thruway; and Culvert Replacement at MP 363.12, West of I-390 (Exit 46)
- Letting Date: 03/31/2010
- Completion Date: 10/31/2011
- Construction Amount: $5,565,010.58
- Contract Number: TAB 10-10B/D213933
- Contractor: Slate Hill Constructors, Inc.
- Buffalo Division: Steel Repairs of 4 Bridges
- Letting Date: 06/03/2009
- Completion Date: 11/02/2009
- Construction Amount: $648,878.21
- Contract Number: TAB 09-13B/D213780
- Contractor: Hohl Industrial Services, Inc.
- MP N14.35 Northbound and N14.99 Southbound: South Grand Island Bridges - Bridge Washing 2011
- Letting Date: 02/09/2011
- Completion Date: 06/09/2011
- Construction Amount: $265,000.00
- Contract Number: TAN 11-2B/D214002
- Contractor: JRT Concrete, Inc.
- View Project on Map
- MP N14.99, MP N20.35 and MP N21.12: Grand Island Bridges - Gusset Plate and Steel Repairs
- Letting Date: 08/25/2010
- Completion Date: 06/25/2012
- Construction Amount: $5,848,702.34
- Contract Number: TAN 10-40B/D213992
- Contractor: Piasecki Steel Construction Group
- View Project on Map
- Buffalo Division Bridge Painting - 6 Bridges
- Letting Date: 11/24/2010
- Completion Date: 06/29/2012
- Construction Amount: $2,667,100.00
- Contract Number: TAB 10-55BP/D214013
- Contractor: Erie Painting and Maintenance, Inc.
- MP 413.65 - MP 494.93 and MP 911.55 - MP 915.77: Buffalo Division - Installation of Protective Screening on 27 Bridges
- Letting Date: 12/02/2009
- Completion Date: 07/02/2010
- Construction Amount: $647,064.17
- Contract Number: TAB 09-59B/D213928
- Contractor: Rommel Fence, LLC.
- Lockport: Rock Slope - Remediation, Niagara County
- Letting Date: 10/07/2009
- Completion Date: 11/18/2010
- Construction Amount: $789,852.00
- Contract Number: TAB 09-40CR/D213887
- Contractor: Nichols Long & Moore Construction Corporation
- Pittsford: Replace Lower Miter Gates at Lock E-32, Monroe County
- Letting Date: 06/15/2011
- Completion Date: 05/22/2012
- Construction Amount: $.00
- Contract Number: TAB 11-37C/D214087
- Contractor: BVR Construction Company, Inc.
- View Project on Map
- Pittsford: Cartersville Waste Weir - Rehabilitation, Monroe County
- Letting Date: 07/26/2006
- Completion Date: 01/09/2008
- Construction Amount: $925,296.84
- Contract Number: TAB 06-34C/D213615
- Contractor: C.P. Ward, Inc.
- View Project on Map
- Rochester: West Guard Lock - Rehabilitation, Monroe County
- Letting Date: 06/30/2010
- Completion Date: 10/06/2011
- Construction Amount: $4,237,852.50
- Contract Number: TAB 10-11C/D213945
- Contractor: The Pike Company, Inc.
- View Project on Map
- Orleans County: Bank and Culvert Repair Work
- Letting Date: 08/10/2011
- Completion Date: 10/11/2012
- Construction Amount: $1,340,833.57
- Contract Number: TAB 11-22C/D213703
- Contractor: C.P. Ward Inc.
- Pendleton: Slope - Restoration & Associated Dredging, Niagara County
- Letting Date: 11/08/2006
- Completion Date: 08/10/2007
- Construction Amount: $1,746,695.10
- Contract Number: TAB 06-14CR/D213572
- Contractor: Pinto Construction Services, Inc.
- Medina: Bank Failure Restoration, Orleans County
- Letting Date: 01/24/2007
- Completion Date: 05/04/2007
- Construction Amount: $327,992.64
- Contract Number: TAB 07-19C/D213689
- Contractor: Nichols Long & Moore Construction
- Victor (Exit 45, MP 350.99) and Henrietta (Exit 46, MP 362.44): Plaza and Ramp Resurfacing
- Letting Date: 05/27/2009
- Completion Date: 11/23/2009
- Construction Amount: $2,901,952.22
- Contract Number: TAB 09-31/D213871
- Contractor: Sealand Contractors Corporation
- View Project on Map
- East of Henrietta (MP 359.6) to LeRoy (Exit 47, MP 378.2): Pavement Resurfacing and Safety Upgrades
- Letting Date: 06/03/2009
- Completion Date: 11/05/2010
- Construction Amount: $12,062,470.78
- Contract Number: TAB 09-17/D213856
- Contractor: Keeler Construction Co. Inc.
- View Project on Map
- I-190 (MP N0.0) to Ontario Street (Exit N14, MP N10.0): Portland Cement Concrete Joint Repair/Resealing & Grinding at Various Locations
- Letting Date: 04/01/2009
- Completion Date: 12/24/2010
- Construction Amount: $9,737,389.99
- Contract Number: TAN 09-19/D213660
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- West of Pembroke (MP 404.7) to Depew (Exit 49, MP 416.9): Pavement Resurfacing
- Letting Date: 07/20/2011
- Completion Date: 08/29/2012
- Construction Amount: $9,019,444.36
- Contract Number: TAB 11-8/D214034
- Contractor: Union Concrete & Construction Corporation
- View Project on Map
- Buffalo Division: Pavement Striping - 2006
- Letting Date: 12/14/2005
- Completion Date: 07/31/2006
- Construction Amount: $669,874.28
- Contract Number: TAB 05-35/D213545
- Contractor: Accent Stripe, Inc.
- Buffalo Division: Pavement Striping - 2007
- Letting Date: 11/29/2006
- Completion Date: 06/27/2007
- Construction Amount: $612,446.89
- Contract Number: TAB 06-49/D213638
- Contractor: Accent Stripe, Inc.
- MP 350.6 to 362.0 and MP 416.0 to 419.4: Installation of Triple Drop Epoxy Pavement Markings in Buffalo Division
- Letting Date: 04/20/2011
- Completion Date: 08/28/2011
- Construction Amount: $395,401.40
- Contract Number: TAB 11-33/D214082
- Contractor: Accent Stripe, Inc.
- MP 432.45: Blasdell (Exit 56) Interchange Rehabilitation with E-ZPass Improvements and Replacement of the Ramp Bridge over Thruway
- Letting Date: 06/07/2006
- Completion Date: 09/24/2007
- Construction Amount: $8,260,198.33
- Contract Number: TAB 06-29/D213590
- Contractor: UCC Constructors, Inc.
- View Project on Map
- I-190 Thruway (MP N5.62 - MP N6.6): Drainage Improvements near Porter Ave/Peace Bridge and MP N8.0: Black Rock Toll Barrier Plaza Resurfacing
- Letting Date: 07/12/2006
- Completion Date: 09/27/2007
- Construction Amount: $1,791,077.38
- Contract Number: TAN 06-20/D213552
- Contractor: Strock Contracting, Inc.
- View Project on Map
- LeRoy (Exit 47, MP 378.56): Ramps Pavement Rehabilitation and a Higher Speed E-ZPass Lane
- Letting Date: 01/09/2008
- Completion Date: 10/14/2008
- Construction Amount: $1,806,168.59
- Contract Number: TAB 07-60/D213751
- Contractor: Villager Construction, Inc.
- Hamburg (Exit 57, MP 436.22): Ramp and Toll Plaza Pavement Rehabilitation
- Letting Date: 01/06/2010
- Completion Date: 07/15/2010
- Construction Amount: $737,859.03
- Contract Number: TAB 10-6/D213929
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- Hamburg (Exit 57, MP 438.5) to East of Silver Creek (MP 451.5): Pavement Rehabilitation, 4 Bridge Rehabilitations and Painting of 4 Bridges
- Letting Date: 04/28/2010
- Completion Date: 12/14/2012
- Construction Amount: $.00
- Contract Number: TAB 10-8/D213939
- Contractor: Union Concrete and Construction Corporation
- View Project on Map
- West of Westfield (MP 485.6) to Pennsylvania State Line (MP 496.0): Westbound Pavement Resurfacing with Safety Upgrades
- Letting Date: 11/02/2005
- Completion Date: 12/21/2006
- Construction Amount: $4,716,715.56
- Contract Number: TAB 05-23/D213529
- Contractor: UCC Constructors, Inc.
- View Project on Map
- East of Westfield (MP 483.0) to Pennsylvania State Line (MP 496.0) Eastbound: Pavement Rehabilitation of the Mainline, Westfield (Exit 60) and Shortman Road (Exit 61) Interchange Ramps and Rehabilitation of the Westfield Interchange Bridge
- Letting Date: 07/14/2010
- Completion Date: 11/11/2011
- Construction Amount: $17,419,167.40
- Contract Number: TAB 10-15/D213951
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- Lackawanna Toll Barrier (MP 430.6) to West of Hamburg (MP 438.5): Pavement Resurfacing and Safety Upgrades
- Letting Date: 11/30/2005
- Completion Date: 11/22/2006
- Construction Amount: $5,981,897.74
- Contract Number: TAB 05-27/D213477
- Contractor: UCC Constructors, Inc.
- View Project on Map
- West of Hamburg (MP 438.0) to West of Angola (MP 451.0) and Silver Creek (Exit 58, MP 455.2) to Dunkirk (Exit 59, MP 467.0): Pavement Resurfacing
- Letting Date: 06/28/2006
- Completion Date: 11/16/2007
- Construction Amount: $16,682,263.88
- Contract Number: TAB 06-19/D213571
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- West of Batavia (MP 393.7) to West of Pembroke (MP 404.7): Pavement Resurfacing
- Letting Date: 12/23/2009
- Completion Date: 11/19/2010
- Construction Amount: $8,687,172.43
- Contract Number: TAB 09-28/D213868
- Contractor: Keeler Construction Co., Inc.
- View Project on Map
- Williams Street (Exit 52A, MP 424.92): Ramp Widening
- Letting Date: 05/31/2006
- Completion Date: 12/18/2006
- Construction Amount: $1,134,617.26
- Contract Number: TAB 06-33/D213603
- Contractor: Nichols Long & Moore Construction Corporation
- View Project on Map
- Ripley Toll Barrier (MP 494.50): Construct 2 Additional E-ZPass Lanes
- Letting Date: 05/31/2006
- Completion Date: 12/08/2006
- Construction Amount: $2,189,762.82
- Contract Number: TAB 06-28/D213591
- Contractor: Nichols Long & Moore Construction Corporation
- View Project on Map
- Grand Island Bridge (Exit 18A, MP N15.0 ) to Niagara Toll Barrier (MP N20.1): Pavement Resurfacing
- Letting Date: 09/02/2008
- Completion Date: 10/30/2008
- Construction Amount: $2,230,606.20
- Contract Number: NO TA/PC63883
- Contractor: Midland Asphalt Materials, Inc.
- View Project on Map
- Grand Island Bridge (Exit 18A, MP N14.99 ) to Robert Moses Parkway (Exit 21, MP N21.2): Safety and Drainage Upgrades
- Letting Date: 12/23/2009
- Completion Date: 11/05/2010
- Construction Amount: $1,394,235.00
- Contract Number: TAN 09-62/D213913
- Contractor: Keleman-Bauer Construction Co., Inc. dba Ed Bauer Construction
- View Project on Map
- Lackawanna Toll Barrier (MP 430.51) Pavement Rehabilitation and MP 430.51, NYCRR/Penn RR Bridge - Joint Repairs
- Letting Date: 06/15/2011
- Completion Date: 12/09/2011
- Construction Amount: $2,236,529.55
- Contract Number: TAB 11-9/D213962
- Contractor: Union Concrete & Construction Corporation
- View Project on Map
- MP 412.00: Clarence Service Area - Commercial Truck Parking Expansion
- Letting Date: 03/28/2007
- Completion Date: 11/30/2007
- Construction Amount: $1,331,081.28
- Contract Number: TAB 07-2/D213511
- Contractor: UCC Constructors, Inc.
- Buffalo Division: Pavement Striping - 2008
- Letting Date: 11/28/2007
- Completion Date: 11/07/2008
- Construction Amount: $720,515.54
- Contract Number: TAB 07-49/D213730
- Contractor: Accent Stripe, Inc.
- Buffalo Division: Pavement Striping - 2009
- Letting Date: 12/03/2008
- Completion Date: 09/03/2009
- Construction Amount: $625,625.00
- Contract Number: TAB 08-51/D213831
- Contractor: Accent Stripe, Inc.
- Buffalo Division: Pavement Striping - 2010
- Letting Date: 10/28/2009
- Completion Date: 07/20/2010
- Construction Amount: $787,927.71
- Contract Number: TAB 09-46/D213902
- Contractor: Accent Stripe, Inc.
- Construct Noise Wall Barriers near Lackawanna Toll Barrier (MP 430.51 - MP 431.22) and South Ogden St. (Exit N1, MP N0.71 - MP N0.85)
- Letting Date: 08/25/2010
- Completion Date: 11/18/2011
- Construction Amount: $2,968,480.91
- Contract Number: TAB 10-41/D213993
- Contractor: Keeler Construction Co., Inc.
- View Project on Map
- Buffalo Division: On-Demand Pavement Repairs - 2005
- Letting Date: 07/06/2005
- Completion Date: 06/08/2006
- Construction Amount: $2,543,962.80
- Contract Number: TAB 05-6/D213476
- Contractor: UCC Constructors, Inc.
- View Project on Map
- Buffalo Division: On Demand Pavement Repairs - 2006
- Letting Date: 03/15/2006
- Completion Date: 08/16/2006
- Construction Amount: $2,302,099.17
- Contract Number: TAB 06-10/D213557
- Contractor: Oakgrove Construction, Inc.
- Buffalo Division: On-Demand Pavement Repairs - 2007
- Letting Date: 02/21/2007
- Completion Date: 06/13/2007
- Construction Amount: $2,368,593.22
- Contract Number: TAB 07-5/D213661
- Contractor: Keeler Construction Co., Inc.
- Buffalo Division: Highway Resurfacing at Various Locations
- Letting Date: 06/04/2008
- Completion Date: 11/21/2008
- Construction Amount: $4,847,229.38
- Contract Number: TAB 08-10/D213759
- Contractor: Oakgrove Construction, Inc.
- Buffalo Division: Pavement Striping - 2011
- Letting Date: 12/01/2010
- Completion Date: 07/21/2011
- Construction Amount: $748,817.10
- Contract Number: TAB 10-45/D213998
- Contractor: Accent Stripe, Inc.
- I-190 (Niagara Section), Ontario Street (Exit 14, MP N10.0) to River Road/Route 266 (Exit 17, MP N14.11): Concrete Pavement Repairs, Painting of Two Bridges (MP N11.55 and MP N13.54) and Substructure Repairs to the MP N11.55 Bridge
- Letting Date: 06/29/2011
- Completion Date: 09/26/2012
- Construction Amount: $5,591,429.29
- Contract Number: TAN 11-17/D214052
- Contractor: Oakgrove Construction
- View Project on Map
- Removal of the Buffalo City Line (MP N0.53 NB) and Black Rock (MP N8.00 SB) Toll Barriers
- Letting Date: 04/25/2007
- Completion Date: 09/28/2007
- Construction Amount: $795,345.33
- Contract Number: TAN 07-27/D213690
- Contractor: Oakgrove Construction, Inc.
- Williamsville Toll Barrier (MP 419.4) to West of William Street (MP 425.9) and I-190 (Niagara Section), North of Church Street (MP N5.5) to Peace Bridge (Exit 9, MP N6.6): Pavement Resurfacing and Installation of Median and Ramp Gates
- Letting Date: 06/08/2011
- Completion Date: 12/03/2012
- Construction Amount: $.00
- Contract Number: TAB 11-39/D214090
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- Williamsville (MP 419.7) and Lackawanna (MP 430.5) Toll Barriers: Installation of Treadles and Complete Toll Plaza Modifications
- Letting Date: 08/06/2008
- Completion Date: 11/14/2008
- Construction Amount: $156,332.15
- Contract Number: TAB 08-34/D213793
- Contractor: Nichols Long & Moore Construction Corporation
- East of Westfield (MP 483.0) to Penn. State Line (MP 496.0) Eastbound: Pavement Resurfacing, Driving Lane Only (Excluding the Ripley Toll Plaza)
- Letting Date: 07/02/2008
- Completion Date: 10/06/2008
- Construction Amount: $1,128,885.01
- Contract Number: TAB 08-39/D213796
- Contractor: UCC Contractors, Inc.
- View Project on Map
- West Seneca (Exit 54, MP 427.7) to Lackawanna Barrier (MP 430.4): Pavement Resurfacing
- Letting Date: 07/29/2009
- Completion Date: 06/30/2010
- Construction Amount: $1,988,780.36
- Contract Number: TAB 09-26/D213866
- Contractor: UCC Contructors, Inc.
- View Project on Map
- Buffalo Division: Pavement Safety Striping - 2012
- Letting Date: 11/30/2011
- Completion Date: 08/31/2012
- Construction Amount: $.00
- Contract Number: TAB 11-43/D214095
- Contractor: Accent Stripe, Inc.
- Depew (Exit 49, MP 416.9) to Williamsville Toll Barrier (MP 419.6): Pavement Resurfacing and MP 407.0 to MP 415.5 - Installation of Median Guiderail
- Letting Date: 05/27/2009
- Completion Date: 11/10/2009
- Construction Amount: $3,528,975.09
- Contract Number: TAB 09-8/D213846
- Contractor: Oakgrove Construction, Inc.
- View Project on Map
- Buffalo Division ITS Phase 3: Installation of Fiber Opic Cable, TRANSMIT, Closed Circuit TV Cameras and Dynamic Message Signs
- Letting Date: 03/08/2006
- Completion Date: 03/11/2009
- Construction Amount: $7,704,953.59
- Contract Number: TAB 06-22I/D213505
- Contractor: Power Line Constructors, Inc
- Installation of Fiber Optic Line along I-190 and 2 Dynamic Message Signs, 16 TRANSMIT and 15 Closed Circut TV Cameras along I-90 and I-190
- Letting Date: 11/12/2008
- Completion Date: 07/27/2011
- Construction Amount: $.00
- Contract Number: TAB 08-29I/D213789
- Contractor: Concrete Applied Technologies Corporation
- Lockport: Lock E-34 & E-35 - Install Vehicular Barrier Railing, Niagara County
- Letting Date: 07/27/2005
- Completion Date: 09/07/2006
- Construction Amount: $561,677.18
- Contract Number: TAB 05-3C/D213436
- Contractor: Oakgrove Construction, Inc.