Albany Division 2005-2011 Projects

Planned Projects

No Projects at this time

Go to Top | Bottom

Under Construction Projects

  • Yosts: Movable Dam 9 at Lock E-13 - Rehabilitation, Montgomery County
    • Letting Date: 09/15/2010
    • Estimated Completion Year: 2014
    • Low Bid Amount: $15,514,331.25
    • Contract Number: TAA 10-2C/D213874
    • Contractor: Tioga Construction Co., Inc.
    • View Project on Map

Go to Top | Bottom

Completed Projects

  • MP 168.0: Pattersonville Service Area - Rehabilitation of Water and Wastewater Treatment Systems
    • Letting Date: 12/13/2006
    • Completion Date: 03/31/2008
    • Construction Amount: $849,469.07
    • Contract Number: TAA 06-57A/D213612
    • Contractor: Blue Heron Construction Co., LLC
  • MP 96.00 and MP 127.00: Ulster and New Baltimore Service Areas - Waste Water Treatment Plant Rehabilitation
    • Letting Date: 12/13/2006
    • Completion Date: 07/31/2008
    • Construction Amount: $1,071,235.85
    • Contract Number: TAA 06-58A/D213613
    • Contractor: Blue Heron Construction Co., LLC
  • Kingston, Catskill and Berkshire Maintenance Sections: Salt Shed Structural Rehabilitation and Roof Replacements
    • Letting Date: 04/04/2007
    • Completion Date: 10/03/2007
    • Construction Amount: $273,891.73
    • Contract Number: TAA 07-22A/D213673
    • Contractor: Gudabri, Inc.
  • MP 141.92: Central Sign Shop - Improve HVAC System
    • Letting Date: 09/14/2005
    • Completion Date: 07/14/2006
    • Construction Amount: $180,500.00
    • Contract Number: TAA 05-21A/D213509
    • Contractor: DiGesare Mechanical, Inc.
  • MP 141.92: Thruway Building at 337 Southern Boulevard - Repair Exterior Concrete Walls and Loading Dock Roof, and Replace Windows
    • Letting Date: 12/15/2010
    • Completion Date: 12/20/2011
    • Construction Amount: $581,162.67
    • Contract Number: TAA 10-53A/D214000
    • Contractor: Rosch Brothers, Inc.
  • New Baltimore Service Area: Roof Replacement - Pitched Roof Area Only
    • Letting Date: 02/21/2007
    • Completion Date: 08/09/2007
    • Construction Amount: $240,058.00
    • Contract Number: TAA 07-12A/D213649
    • Contractor: WB Roofing & Sheetmetal, Inc.
  • Malden and New Baltimore Service Areas Roof Replacements - Flat Roof Areas Only
    • Letting Date: 11/14/2007
    • Completion Date: 12/04/2008
    • Construction Amount: $422,890.43
    • Contract Number: TAA 07-17A/D213671
    • Contractor: Everfoam Instulation Systems, Inc.
  • MP 96.0, MP 153.0, MP 168.0 and MP 172.0: Ulster, Guilderland, Pattersonville and Mohawk Service Areas - Flat Roof Replacements
    • Letting Date: 03/04/2009
    • Completion Date: 01/29/2010
    • Construction Amount: $704,767.23
    • Contract Number: TAA 09-4A/D213836
    • Contractor: Henderson-Johnson Company, Inc.
  • MP 162.2, MP 173.6 and MP 187.0: Salt Sheds - Complete Repairs and Replace Roofs
    • Letting Date: 01/28/2009
    • Completion Date: 10/23/2009
    • Construction Amount: $306,592.39
    • Contract Number: TAA 08-48A/D213820
    • Contractor: BCI Construction, Inc.
    • View Project on Map
  • MP 96.0: Ulster Service Area - Pitched Roof Replacement
    • Letting Date: 02/04/2009
    • Completion Date: 03/08/2010
    • Construction Amount: $111,100.00
    • Contract Number: TAA 09-3A/D213818
    • Contractor: Louis Guglielmetti dba Catskill Park Construction
    • View Project on Map
  • MP BS15.1: Berkshire Maintenance Section - Replace Salt Shed
    • Letting Date: 04/15/2009
    • Completion Date: 10/29/2009
    • Construction Amount: $702,981.00
    • Contract Number: TABS 09-2A/D213835
    • Contractor: Park Lane Construction & Development Corporation
  • MP 141.92: Install New Air Conditioning Unit for Main Computer Room at the Administrative Headquarters Building
    • Letting Date: 12/13/2006
    • Completion Date: 07/05/2007
    • Construction Amount: $64,998.55
    • Contract Number: TAA 06-59A/D213656
    • Contractor: General Mechanical Systems, Inc.
  • MP 141.92: 337 Southern Boulevard Data Center - Install New Air Conditioning System Unit
    • Letting Date: 07/25/2007
    • Completion Date: 02/29/2008
    • Construction Amount: $202,230.23
    • Contract Number: TAA 07-50A/D213733
    • Contractor: Family Danz Heating & Air Conditioning, Inc.
  • MP 141.92: Rehabilitation of the Administrative Headquarters Building Freight Elevator
    • Letting Date: 09/30/2009
    • Completion Date: 04/29/2010
    • Construction Amount: $236,488.91
    • Contract Number: TAA 09-32AR/D213872
    • Contractor: Downey-Goodlein Elevator Corporation
  • MP 141.92 : Administrative Headquarters Building - Modernization of Fire Alarm System
    • Letting Date: 03/11/2009
    • Completion Date: 07/09/2009
    • Construction Amount: $30,892.53
    • Contract Number: TAA 09-16A/D213840
    • Contractor: Life Safety Engineered Systems, Inc.
  • MP 103.0: Malden Service Area Remediation
    • Letting Date: 07/01/2009
    • Completion Date: 05/14/2010
    • Construction Amount: $1,295,134.10
    • Contract Number: TAA 09-20/D213859
    • Contractor: Op-Tech Environmental Services, Inc.
    • View Project on Map
  • MP 141.92: Central Sign Shop (Building M2347) - Roof Replacement
    • Letting Date: 11/04/2009
    • Completion Date: 05/05/2010
    • Construction Amount: $104,761.32
    • Contract Number: TAA 09-54A/D213891
    • Contractor: Best Roofing of New Jersey, Inc.
  • MP BS1.08: Castelton Bridge over Hudson River - Rehabilitation
    • Letting Date: 11/29/2006
    • Completion Date: 11/21/2008
    • Construction Amount: $30,805,004.52
    • Contract Number: TABS 06-54B/D213648
    • Contractor: D.A. Collins Construction Co., Inc.
    • View Project on Map
  • MP BS6.58 & BS6.59: Post Road (Exit B1) Bridges over Berkshire Thruway - Replacements
    • Letting Date: 07/09/2008
    • Completion Date: 11/20/2009
    • Construction Amount: $6,383,837.22
    • Contract Number: TABS 08-36B/D213745
    • Contractor: Kubricky Construction Corporation
    • View Project on Map
  • MP BS24.09: Route 102 Bridge over Berkshire Thruway - Replacement
    • Letting Date: 10/31/2007
    • Completion Date: 11/26/2008
    • Construction Amount: $6,380,594.67
    • Contract Number: TABS 07-56B/D213238
    • Contractor: Bette & Cring, LLC
  • MP 182.17: Fultonville Interchange (Exit 28) Bridge over Thruway - Replacement
    • Letting Date: 04/29/2009
    • Completion Date: 12/03/2010
    • Construction Amount: $3,382,352.51
    • Contract Number: TAA 09-15B/D213795
    • Contractor: Bette & Cring LLC
    • View Project on Map
  • Albany Division: On-Demand Bridge Repair Contract 2005-2007
    • Letting Date: 08/24/2005
    • Completion Date: 08/24/2007
    • Construction Amount: $150,111.03
    • Contract Number: TAA 05-16B/D213453
    • Contractor: D.A. Collins Construction Co., Inc.
  • Albany Division: Install Protective Screening on 4 Bridges
    • Letting Date: 07/20/2005
    • Completion Date: 11/18/2005
    • Construction Amount: $105,185.00
    • Contract Number: TAA 05-11B/D213480
    • Contractor: New York State Fence, Inc.
  • Albany Division: On-Demand Bridge Repair Contract 2007-2009
    • Letting Date: 07/11/2007
    • Completion Date: 09/14/2009
    • Construction Amount: $25,000.00
    • Contract Number: TAA 07-30B/D213700
    • Contractor: D.A. Collins Construction Co., Inc.
  • Albany Division: On-Demand Repair Contract for Damaged and Flagged Bridges - 2009-2011
    • Letting Date: 08/05/2009
    • Completion Date: 11/18/2011
    • Construction Amount: $732,710.90
    • Contract Number: TAA 09-42B/D213896
    • Contractor: Harrison & Burrowes Bridge Constructors, Inc.
    • View Project on Map
  • Repair 11 Large Culverts on the Berkshire Spur in Albany Division
    • Letting Date: 12/01/2010
    • Completion Date: 03/26/2012
    • Construction Amount: $1,548,019.95
    • Contract Number: TABS 10-56/D214028
    • Contractor: Ketco, Inc.
  • MP 113.22: Thruway Bridge over Catskill Creek - Emergency Slope and Scour Repairs (Tropical Storm Recovery)
    • Letting Date: 11/09/2011
    • Completion Date: 05/11/2012
    • Construction Amount: $1,401,542.56
    • Contract Number: TAA 11-53B/D214126
    • Contractor: The Delaney Group dba Tetra Tech Construction
    • View Project on Map
  • Install Protective Screening on 9 Albany Division Bridges
    • Letting Date: 03/14/2007
    • Completion Date: 11/28/2007
    • Construction Amount: $248,834.52
    • Contract Number: TAA 07-15B/D213653
    • Contractor: Rommel Fence, LLC
  • Albany Division: On-Demand Repair Contract for Damaged and Flagged Bridges - 2012-2013
    • Letting Date: 09/28/2011
    • Completion Date: 11/01/2013
    • Construction Amount: $.00
    • Contract Number: TAA 11-48B/D214111
    • Contractor: D.A. Collins
    • View Project on Map
  • MP 125.45 to MP 194.10 and MP BS0.00: Painting of Six Albany Division Bridges
    • Letting Date: 02/11/2009
    • Completion Date: 12/18/2009
    • Construction Amount: $3,148,910.44
    • Contract Number: TAA 09-6BP/D213837
    • Contractor: Erie Painting and Maintenance, Inc.
  • MP BS1.08: Castleton Bridge Deck Rehabilitation
    • Letting Date: 04/29/2009
    • Completion Date: 11/13/2009
    • Construction Amount: $2,931,004.08
    • Contract Number: TABS 09-18B/D213853
    • Contractor: Harrison & Burrowes Bridge Constructors, Inc.
    • View Project on Map
  • MP 104.04 to MP 179.38 and MP BS7.77 to MP BS23.27: Albany Division Bridge Painting - 13 Bridges
    • Letting Date: 12/22/2010
    • Completion Date: 08/31/2012
    • Construction Amount: $8,516,605.25
    • Contract Number: TAA 10-59BP/D214022
    • Contractor: P.S. Bruckel, Inc.
  • MP BS0.19: Impact Damage Repairs to Route 144 Bridge
    • Letting Date: 05/12/2010
    • Completion Date: 08/23/2010
    • Construction Amount: $184,704.00
    • Contract Number: TABS 10-29B/D213974
    • Contractor: Tioga Construction Company, Inc.
    • View Project on Map
  • MP 177.47, MP 182.76, MP 811.35 and MP 103.16: Steel Repairs to 4 Albany Division Bridges
    • Letting Date: 12/15/2010
    • Completion Date: 09/22/2011
    • Construction Amount: $284,554.80
    • Contract Number: TAA 10-48B/D214005
    • Contractor: Tioga Construction Co., Inc.
  • Waterford: Lock E-4 - Miter Gate Replacement, Saratoga County
    • Letting Date: 05/10/2006
    • Completion Date: 04/19/2007
    • Construction Amount: $1,558,821.64
    • Contract Number: TAA 06-24C/D213588
    • Contractor: James H. Maloy, Inc.
    • View Project on Map
  • Albany Division: Locks E-9, E-11, E-14, E-15 - Electrical Rehabilitation (2006 Flood), Schenectady & Montgomery Counties
    • Letting Date: 12/20/2006
    • Completion Date: 06/04/2007
    • Construction Amount: $1,369,631.40
    • Contract Number: TAA 06-60C/D213665
    • Contractor: LaCorte Companies, Inc.
  • Albany Division: Locks E-12, E-13 - Electrical Rehabilitation (2006 Flood), Montgomery County
    • Letting Date: 01/31/2007
    • Completion Date: 10/19/2007
    • Construction Amount: $667,299.88
    • Contract Number: TAA 07-7C/D213664
    • Contractor: O'Connell Electric Company
  • Albany Division: Locks E-9, E-13, E-14, E-15 - Site Rehabilitation & Buildings (2006 Flood), Schenectady & Montgomery Counties
    • Letting Date: 06/27/2007
    • Completion Date: 08/29/2008
    • Construction Amount: $1,682,863.76
    • Contract Number: TAA 07-9C/D213667
    • Contractor: Harrison & Burrows Bridge Constructors, Inc.
  • Albany Division: Locks E-8, E-9, E-11, E-12, E-13, E-14, E-15 - Steel & Concrete Repairs (2006 Flood), Schenectady & Montgomery Counties
    • Letting Date: 04/25/2007
    • Completion Date: 06/30/2008
    • Construction Amount: $4,346,531.98
    • Contract Number: TAA 07-8C/D213666
    • Contractor: Harrison & Burrows Bridge Constructors, Inc.
  • Statewide: Installation of Fall Protection Systems at 10 Dams - Schenectady, Montgomery, Herkimer and Seneca Counties
    • Letting Date: 08/11/2010
    • Completion Date: 08/31/2012
    • Construction Amount: $1,957,647.47
    • Contract Number: TAA 10-26C/D213970
    • Contractor: Piasecki Steel Construction Corporation
  • Waterford: OCC Stone Retaining Wall - Replacement, Saratoga County
    • Letting Date: 07/07/2010
    • Completion Date: 06/20/2011
    • Construction Amount: $191,078.99
    • Contract Number: TAA 10-14C/D213949
    • Contractor: Bette & Cring, LLC
  • Crescent: Lock E-6 - Rehabilitation, Saratoga County
    • Letting Date: 06/11/2008
    • Completion Date: 04/15/2011
    • Construction Amount: $.00
    • Contract Number: TAA 08-35C/D213750
    • Contractor: Kubricky Construction Corporation
    • View Project on Map
  • Cranesville: Lock E-10 - Emergency Repairs (2006 Flood), Montgomery County
    • Letting Date: 04/15/2009
    • Completion Date: 06/10/2010
    • Construction Amount: $1,219,557.50
    • Contract Number: TAA 09-7C/D213844
    • Contractor: James H. Maloy, Inc.
  • St. Johnsville: Lock E-16 Approach Wall - Rehabilitation, Montgomery County
    • Letting Date: 07/20/2005
    • Completion Date: 06/22/2006
    • Construction Amount: $201,660.15
    • Contract Number: TAA 05-1C/D213418
    • Contractor: Tioga Construction Co., Inc.
    • View Project on Map
  • Fort Miller: Lock C-6 - Miter Gate Replacement, Washington County
    • Letting Date: 11/15/2006
    • Completion Date: 05/20/2008
    • Construction Amount: $1,793,733.40
    • Contract Number: TAA 06-55C/D213643
    • Contractor: C. D. Perry & Sons, Inc.
    • View Project on Map
  • Canajoharie: Movable Dam 10 at Lock E-14 - Rehabilitation, Montgomery County
    • Letting Date: 03/21/2007
    • Completion Date: 05/21/2010
    • Construction Amount: $17,204,894.65
    • Contract Number: TAA 07-20C/D213616
    • Contractor: Tioga Construction Co., Inc.
    • View Project on Map
  • Tribes Hill: Movable Dam 8 at Lock E-12 - Painting, Montgomery County
    • Letting Date: 09/23/2009
    • Completion Date: 08/31/2012
    • Construction Amount: $4,228,856.45
    • Contract Number: TAA 09-50C/D213748
    • Contractor: Erie Painting and Maintenance
    • View Project on Map
  • Fort Edward: Section 1 Office & Shop - Roof Replacement, Washington County
    • Letting Date: 01/18/2006
    • Completion Date: 06/02/2006
    • Construction Amount: $78,434.00
    • Contract Number: TAA 06-4C/D213540
    • Contractor: T.P. Monahan, Inc.
    • View Project on Map
  • Rotterdam: Movable Dam 5 at Lock E-9 - Steel Repairs, Schenectady County and Amsterdam: Movable Dam 7 at Lock E-11- Steel & Scour Repairs (2006 Flood)
    • Letting Date: 09/06/2006
    • Completion Date: 05/29/2007
    • Construction Amount: $1,005,216.88
    • Contract Number: TAA 06-40C/D213617
    • Contractor: C. D. Perry & Sons, Inc.
  • Tribes Hill: Lock E-12 NW Approach Wall - Scour Repairs (2006 Flood), Phase 2, Montgomery County
    • Letting Date: 01/07/2009
    • Completion Date: 07/02/2009
    • Construction Amount: $69,895.50
    • Contract Number: TAA 09-1C/D213833
    • Contractor: Tioga Construction Co., Inc.
    • View Project on Map
  • Waterford: Dry Dock - Electrical Repairs, Saratoga County
    • Letting Date: 11/29/2006
    • Completion Date: 09/18/2007
    • Construction Amount: $291,040.85
    • Contract Number: TAA 06-25C/D213589
    • Contractor: Northwild Systems, Inc.
    • View Project on Map
  • Waterford: Lock E-4 - Emergency Repairs and Lock E-5 - Emergency Repairs and Miter Gate Replacement, Saratoga County
    • Letting Date: 11/30/2005
    • Completion Date: 04/28/2006
    • Construction Amount: $2,003,216.00
    • Contract Number: TAA 05-43C/D213568
    • Contractor: C. D. Perry & Sons, Inc.
    • View Project on Map
  • Emergency Replacement of Grade Control Structures at Lock E-8 and Lock E-9 (Tropical Storm Recovery)
    • Letting Date: 12/23/2011
    • Completion Date: 05/25/2012
    • Construction Amount: $1,598,425.36
    • Contract Number: TAA 11-54C/D214135
    • Contractor: The Delaney Group, Inc.
    • View Project on Map
  • Albany Division: Pavement Striping - 2006
    • Letting Date: 01/11/2006
    • Completion Date: 07/28/2006
    • Construction Amount: $317,918.77
    • Contract Number: TAA 05-36/D213543
    • Contractor: Straight Line Industries, Inc.
  • Albany Division: Pavement Striping - 2007
    • Letting Date: 11/01/2006
    • Completion Date: 07/19/2007
    • Construction Amount: $461,285.73
    • Contract Number: TAA 06-47/D213636
    • Contractor: Straight Line Industries, Inc.
  • MP 145.41 to MP 161.0: Installation of Triple Drop Epoxy Pavement Markings in Albany Division
    • Letting Date: 04/13/2011
    • Completion Date: 09/26/2011
    • Construction Amount: $197,264.24
    • Contract Number: TAA 11-31/D214080
    • Contractor: Straight Line Industries, Inc.
    • View Project on Map
  • Emergency Slope Repairs - MP 83.0 to MP 83.1(SB) and MP 83.1 to MP 83.3 (NB) (Tropical Storm Recovery)
    • Letting Date: 10/12/2011
    • Completion Date: 12/09/2011
    • Construction Amount: $360,472.41
    • Contract Number: TAA 11-52/D214125
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • South of Catskill (MP 109.3) to South of Coxsackie (MP 121.2): Pavement Resurfacing and Safety Upgrades with Coxsackie Plaza (Exit 21B, MP 124.5) and Saugerties (Exit 20E, MP 101.25) Ramp Repairs
    • Letting Date: 09/07/2005
    • Completion Date: 11/10/2006
    • Construction Amount: $7,420,859.19
    • Contract Number: TAA 05-10/D213251
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • Berkshire Thruway, I-90 (MP BS5.70) to Canaan Toll Barrier (MP BS17.80): Pavement Resurfacing with Safety Upgrades
    • Letting Date: 10/18/2006
    • Completion Date: 09/21/2007
    • Construction Amount: $7,723,376.06
    • Contract Number: TABS 06-45/D213634
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • Rotterdam (Exit 26, MP 163.3) to East of Amsterdam (MP 170.0): Pavement Resurfacing (including Pattersonville Service Area Ramps) and Safety Upgrades
    • Letting Date: 08/31/2005
    • Completion Date: 08/09/2006
    • Construction Amount: $3,402,110.93
    • Contract Number: TAA 05-5/D213504
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • East of Amsterdam (MP 170.0) to East of Fultonville (MP 180.0): Pavement Resurfacing including Mohawk Service Area
    • Letting Date: 07/19/2006
    • Completion Date: 12/04/2006
    • Construction Amount: $4,426,483.84
    • Contract Number: TAA 06-41/D213630
    • Contractor: Lancaster Development, Inc.
    • View Project on Map
  • Newburgh (Exit 17, MP 60.10) to North of Kingston (MP 93.8): Pavement Resurfacing with Selective Full Depth Repairs
    • Letting Date: 02/22/2006
    • Completion Date: 11/22/2006
    • Construction Amount: $13,356,030.65
    • Contract Number: TAA 06-3/D213437
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • New Paltz (Exit 18, MP 76.5) to North of Kingston (MP 93.8): Safety Upgrades
    • Letting Date: 08/13/2008
    • Completion Date: 09/23/2009
    • Construction Amount: $2,952,936.03
    • Contract Number: TAA 08-13/D213747
    • Contractor: Callanan Industries, Inc
    • View Project on Map
  • North of New Paltz (MP 81.23) to North of Kingston (MP 97.2): Culvert Rehabilitation and Miscellaneous Drainage Improvements
    • Letting Date: 12/23/2009
    • Completion Date: 09/03/2010
    • Construction Amount: $1,793,675.58
    • Contract Number: TAA 09-57/D213922
    • Contractor: Argenio Brothers, Inc.
    • View Project on Map
  • MP 96.00: Ulster Service Area - Commercial Truck Parking Expansion
    • Letting Date: 09/05/2007
    • Completion Date: 07/15/2008
    • Construction Amount: $1,709,551.42
    • Contract Number: TAA 07-44/D213510
    • Contractor: Callanan Industries, Inc.
  • Guilderland and Pattersonville Service Areas: Commercial Truck Parking Resurfacing and Expansion, and Mohawk Service Area Truck Parking Resurfacing
    • Letting Date: 09/01/2010
    • Completion Date: 01/13/2012
    • Construction Amount: $4,298,332.35
    • Contract Number: TAA 10-28/D213972
    • Contractor: Callanan Industries, Inc.
  • MP 103.00: Malden Service Area - Commercial Truck Parking Expansion
    • Letting Date: 07/21/2010
    • Completion Date: 05/17/2011
    • Construction Amount: $1,595,343.58
    • Contract Number: TAA 10-27/D213971
    • Contractor: Rifenburg Construction, Inc.
  • MP 141.92: Thruway Headquarters and 337 Southern Boulevard Buildings - Resurface Driveways and Parking Lots
    • Letting Date: 05/26/2010
    • Completion Date: 10/21/2010
    • Construction Amount: $1,167,194.02
    • Contract Number: TAA 10-16/D213957
    • Contractor: Carver Construction, Inc.
    • View Project on Map
  • Albany Division: Pavement Striping - 2008
    • Letting Date: 11/07/2007
    • Completion Date: 07/02/2008
    • Construction Amount: $606,033.23
    • Contract Number: TAA 07-47/D213728
    • Contractor: Straight Line Industries, Inc.
  • Albany Division: Pavement Striping - 2009
    • Letting Date: 11/12/2008
    • Completion Date: 08/25/2009
    • Construction Amount: $730,129.85
    • Contract Number: TAA 08-46/D213813
    • Contractor: Straight Line Industries, Inc.
  • Albany Division: Pavement Striping - 2010
    • Letting Date: 10/21/2009
    • Completion Date: 07/22/2010
    • Construction Amount: $339,871.91
    • Contract Number: TAA 09-44/D213900
    • Contractor: Straight Line Industries, Inc.
  • Albany Division: On-Demand Pavement Repairs - 2006
    • Letting Date: 05/31/2006
    • Completion Date: 12/01/2006
    • Construction Amount: $1,927,845.42
    • Contract Number: TAA 06-8R/D213508
    • Contractor: Callanan Industries, Inc.
  • North of Coxsackie (MP 129.1): Rock Removal
    • Letting Date: 11/01/2006
    • Completion Date: 08/07/2007
    • Construction Amount: $1,477,938.11
    • Contract Number: TAA 06-44/D213592
    • Contractor: Rifenburg Construction, Inc.
    • View Project on Map
  • Berkshire Thruway, Canaan Toll Barrier (MP BS17.6) to Massachusetts State Line (MP BS24.3): Pavement Resurfacing and Safety Upgrades
    • Letting Date: 04/07/2010
    • Completion Date: 11/19/2010
    • Construction Amount: $4,827,204.72
    • Contract Number: TABS 10-13/D213948
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • Albany Division: Pavement Striping - 2011
    • Letting Date: 11/10/2010
    • Completion Date: 07/21/2011
    • Construction Amount: $399,314.71
    • Contract Number: TAA 10-43/D213996
    • Contractor: Straight Line Industries, Inc.
  • Albany Division: Installation of Median Guiderail
    • Letting Date: 08/09/2006
    • Completion Date: 12/15/2006
    • Construction Amount: $1,084,644.99
    • Contract Number: TAA 06-46/D213635
    • Contractor: Elderlee, Inc.
  • West of Canajoharie (MP 199.9) to Little Falls (Exit 29A, MP 209.50) and Two Locations on the Berkshire Thruway: Installation of Median Guiderail
    • Letting Date: 05/13/2009
    • Completion Date: 09/11/2009
    • Construction Amount: $571,329.46
    • Contract Number: TAA 09-23/D213862
    • Contractor: Elderlee, Inc.
  • Albany Division: Culvert Cleaning
    • Letting Date: 09/08/2010
    • Completion Date: 12/15/2010
    • Construction Amount: $66,462.25
    • Contract Number: TAA 10-38/D213989
    • Contractor: Precision Industrial Maintenance, Inc.
  • East of Amsterdam (MP 170.0) to East of Fultonville (MP 180.0): Safety Upgrades
    • Letting Date: 10/22/2008
    • Completion Date: 09/25/2009
    • Construction Amount: $1,934,853.03
    • Contract Number: TAA 08-20/D213755
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • Albany Division: Pavement Safety Striping - 2012
    • Letting Date: 11/23/2011
    • Completion Date: 08/15/2012
    • Construction Amount: $441,392.79
    • Contract Number: TAA 11-41/D214093
    • Contractor: Straight Line Industries, Inc.
  • I-787 (Exit 23, MP 141.2) to South of Northway (MP 146.0): Pavement Resurfacing and Paving of Interchanges 23, 24, 25, 25A and 26
    • Letting Date: 06/17/2009
    • Completion Date: 11/18/2009
    • Construction Amount: $4,475,041.44
    • Contract Number: TAA 09-24/D213863
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • West of Rotterdam (MP 164.9 to MP 165.1) Eastbound: Slope Stabilization
    • Letting Date: 06/17/2009
    • Completion Date: 10/16/2009
    • Construction Amount: $464,013.60
    • Contract Number: TAA 09-34/D213852
    • Contractor: KETCO, Inc.
    • View Project on Map
  • I-787 (Exit 23, MP 141.9) to Northway (Exit 24, MP 148.15): Pavement Reconstruction with Congestion Relief and Painting of 3 Bridges
    • Letting Date: 11/17/2010
    • Completion Date: 12/16/2013
    • Construction Amount: $.00
    • Contract Number: TAA 10-36/D213986
    • Contractor: Rifenburg Construction, Inc.
    • View Project on Map
  • East of Fultonville (MP 180.0) to West of Canajoharie (MP 197.9): Pavement Resurfacing
    • Letting Date: 04/21/2010
    • Completion Date: 12/17/2010
    • Construction Amount: $8,833,701.20
    • Contract Number: TAA 10-5/D213917
    • Contractor: Hanson Aggregates New York, LLC
    • View Project on Map
  • East of Fultonville (MP 180.0) to West of Canajoharie (MP 197.9): Safety Upgrades, Drainage Improvements and Misc. Work
    • Letting Date: 07/07/2010
    • Completion Date: 11/29/2011
    • Construction Amount: $2,415,660.50
    • Contract Number: TAA 10-33/D213983
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • Saugerties (Exit 20, MP 100.8) to South of Catskill (MP 109.3): Safety Upgrades
    • Letting Date: 01/21/2009
    • Completion Date: 11/06/2009
    • Construction Amount: $1,924,250.06
    • Contract Number: TAA 08-24/D213763
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • Saugerties (Exit 20, MP 100.8) to South of Catskill (MP 109.3): Pavement Resurfacing
    • Letting Date: 06/05/2008
    • Completion Date: 07/02/2008
    • Construction Amount: $1,461,376.94
    • Contract Number: NO TA/31509
    • Contractor: Midland Asphalt Materials, Inc.
    • View Project on Map
  • Schenectady (Exit 25, MP 146.0) to I-88 (Exit 25A, MP 163.3): Pavement Resurfacing and Safety Upgrades
    • Letting Date: 05/09/2007
    • Completion Date: 11/28/2007
    • Construction Amount: $9,065,613.44
    • Contract Number: TAA 07-13/D213672
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • North of New Paltz (MP 86.8) to North of Kingston (MP 93.8): Pavement Resurfacing and Safety Upgrades
    • Letting Date: 10/20/2010
    • Completion Date: 12/14/2011
    • Construction Amount: $4,023,104.22
    • Contract Number: TAA 10-47/D213975
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • Kingston (Exit 19, MP 93.8) to Saugerties (Exit 20, MP 100.8): Pavement Resurfacing and Safety Upgrades, with Drainage Improvements at MP 99.0
    • Letting Date: 04/21/2010
    • Completion Date: 11/24/2010
    • Construction Amount: $4,646,146.88
    • Contract Number: TAA 10-3/D213914
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • South of Coxsackie (MP 121.2) to I-787 (Exit 23, MP 141.3) and Northway (Exit 24, MP 148.1) to West of Schenectady (MP 154.4): Pavement Resurfacing
    • Letting Date: 07/21/2010
    • Completion Date: 04/27/2012
    • Construction Amount: $12,592,290.22
    • Contract Number: TAA 10-37/D213981
    • Contractor: Kubricky Construction Corp.
    • View Project on Map
  • South of Coxsackie (MP 121.2) to I-787 (Exit 23, MP 141.3) and Northway (Exit 24, MP 148.1) to West of Schenectady (MP 154.4): Safety Upgrades and Thruway over Coeymans Creek Bridge (MP 131.90) - Mill and Overlay Deck
    • Letting Date: 06/22/2011
    • Completion Date: 07/20/2012
    • Construction Amount: $.00
    • Contract Number: TAA 11-23/D214033
    • Contractor: Callanan Industries, Inc.
    • View Project on Map
  • Albany Division - Installation of ITS Equipment
    • Letting Date: 09/29/2010
    • Completion Date: 03/13/2012
    • Construction Amount: $2,381,335.68
    • Contract Number: TAA 10-35I/D213969
    • Contractor: Power & Construction Group, Inc.
  • Schenectady: Canalway Trail, Schenectady County
    • Letting Date: 08/12/2009
    • Completion Date: 11/30/2010
    • Construction Amount: $1,042,795.07
    • Contract Number: TAA 09-30C/D213785
    • Contractor: Carver Construction, Inc.