Skip to Main Content
Skip to Navigation

Design Build Projects


Active Design Build Projects

SYRACUSE DIVISION

Potential Design Build Projects

BUFFALO DIVISION
BUFFALO Division
Milepost Bin Name MAINLINE, OVERHEAD, AWAY MAIN SPAN STRUCTURE TYPE LENGTH (ft) # SPANS WORK TYPE
420.34 5511960 NB Ramp to I-290 OH Stringer/Multi-Beam or Girder 332 4 Replacement
420.36 5511990 SB Ramp over Wehrle INT (A) Stringer/Multi-Beam or Girder 152 3 Replacement
434.85 5515489 South Park Avenue OH Stringer/Multi-Beam or Girder 362 5 Replacement
435.60 5512470 Sowles Road OH Stringer/Multi-Beam or Girder 296 5 Replacement
900.37 5511720 Rossler Avenue OH Stringer/Multi-Beam or Girder 199 4 Replacement
901.06 5512180 Weiss Street OH Stringer/Multi-Beam or Girder 199 4 Replacement
915.46 5045800 Beaver Island Parkway OH Stringer/Multi-Beam or Girder 280 4 Replacement
917.27 5512720 Whitehaven Road OH Stringer/Multi-Beam or Girder 224 4 Replacement

Anticipated Bid Bond requirement - $100.0M
Anticipated  LOI - Fall of 2017


Back to top